Faheem Ullah

Personnel Profiles:-
HOUSE NO# 03 STREET NO# 10,
SECTOR 03 H.B.C.H.S NEVAL COLONY,
HUB RIVER ROAD, KARACHI.
Cell: +92-3482815420
Mail: faheemullah1@outlook.com

OBJECTIVES
My objective is to work as a team member in a reputable Organization which will enhance my
Engineering, Management and decision making skills. I believe in my ability to deliver successful results.

PROFESSIONAL SUMMARY
3 years of experience as a Draftsman / NDT Inspector in reputed Oil & Gas Designing & Inspection
Consultancy firm with key experience in development of P&IDs, Piping Layout, Piping Isometrics & As-
built data collection at site and performing NDT Techniques like MFL,VBT, UTG, Hydro testing.

APPLUS VELOSI INTEGRITY AND SAFETY PAKISTAN Nov 2016 to –


Present
JOB SPECIFICATION
Development of:
1. As-Built Piping
2. Piping layout with Section Details
3. P&IDs and PFDs
4. Piping Isometrics
Nondestructive Testing (NDT):
1. MFL
2. UTG
3. DPT
4. VBT
5. Hydro testing

PROJECTS COMPLETED
Major projects involvement has been the following:
International Projects
 TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT (TANAP) (November
2016 to August 2017)
Applus Velosi had a contract to carry out Risk Based Inspection (RBI) for the 1800 km
Intercontinental Natural gas pipeline. For that purpose, they needed to draw the native PDF files to
CAD files. As a draftsman I was responsible for following:
Drawing CAD drawings from the Native PDF files, following a strict schedule.
Preparation of Mechanical Assessment sheets.
Preparation of data entre in excel sheets.
Projects in PAKISTAN
 Reliance Commodities (pvt) Limited Karachi (September 2017 to September 2017)

Resume of Faheem Ullah Page 1


Here I was responsible for Sketching & development of as‐ built Drawings of the existing Molasses
Tanks as AutoCAD Draftsman and Performing Vacuum box Testing of Oil Storage Tanks Bottom as
NDT Inspector.
 Pak-Arab Refinery Ltd (PARCO) Multan (September 2017 to October 2017)
Here I was responsible for Sketching & development of as‐built Inspection Drawings of Oil Storage
Tanks, as AUTOCAD Draftsman.

 Glaxo Smith Kline Ltd (GSK) Karachi (November 2017to December 2017)
Here I was responsible for Sketching & development of as‐built Drawings of complete GSK plant at
West Wharf, as following:
i. Data Collection at Site.
ii. Prepared as-built Drawing.
iii. Development of piping Drawing

 Automobile Corporation of Pakistan (pvt) LTD (AUTOCOM) Karachi (February 2018


to February 2018)
I was responsible for Performing:
i. UTG (Ultrasonic Testing)
ii. Hydro Testing
Prepared PSO Oil Tanker Plates Thickness monitoring with complete UT reports and tanker
compartment hydro test for leakage with Hydro test reports.

 English Biscuit Manufacturers of Pakistan (pvt) LTD (EBM) Karachi (February 2018
to February 2018)
i. Visit at site.
ii. (UTG) Ultrasonic Thickness Gauging on Vessels.

 Huffaz Seamless Pipeline Manufacturing (pvt) LTD Nooriyabad (February 2018 to


April 2018)
iii. Third Party Inspector from SSGCS.
iv. Wetness of 3LPE Coating Pipe Line Inspection.

 Pakistan Petroleum Limited SUI GAS FIELD (PPL) Baluchistan (May 2018 to July
2018)
i. Visit at site.
ii. DATA Collection at Site.
iii. Prepared ISO sketch of Wellhead Pipe Line.
iv. Prepared ISO sketch for Dead legs.
v. Development of ISO sketch on AUTOCAD.

 AL-Raheem (pvt) LTD Kamari Terminal Karachi (July 2018 to July 2018)
i. Visit at Site.
ii. (VBT)Vacuum Box Testing of Oil Storage Tank Bottom.

 Pakistan Petroleum Limited SUI GAS FIELD (PPL) Baluchistan (July 2018 to August
2018)
i. Visit at site.
ii. DATA Collection at Site.
iii. Prepared of ISO sketch of Wellhead Pipe Line.
iv. Development of ISO sketch on AUTOCAD.

 Pakistan Petroleum Limited SUI GAS FIELD (PPL) Baluchistan (August 2018 to
September 2018)
i. Visit at site.
ii. DATA Collection at Site.
iii. Prepared ISO sketch of Southern Header Northern Header.
iv. Prepared ISO sketch of DHP Dead Legs.
v. Development of ISO sketch on AUTOCAD.

Resume of Faheem Ullah Page 2


 AL-HAMD (pvt) LTD Kamari Terminal Karachi (September 2018 to October 2018)
i. Visit at Site.
ii. (VBT)Vacuum Box Testing of Storage Tank Bottom.

 Bashir Pipe Industries (pvt.) LTD Lahore (January 2019 to February 2019)
i. Visit at Site.
ii. Wetness of Manufacture Pipe Inspection.

 Pakistan Petroleum Limited SUI GAS FIELD (PPL) Baluchistan (February 2019 to
March 2019)
i. Visit at site.
ii. DATA Collection at Site.
iii. Prepared ISO sketch of Medium Risk Piping at Purification Plant.
iv. Development of ISO sketch on AUTOCAD.

 Pakistan State Oil (PSO) Kamari Terminal C Karachi (April 2019 to May 2019)
i. Visit at site
ii. (VBT) Vacuum Box Testing of Storage Tank Bottom.
iii. (MFL) Magnetic Flux Leakage Testing of Storage Tank Bottom.

 Pakistan Refinery LTD (PRL) Korangi Karachi (July 2019 to August 2019)
i. Visit at site
ii. (VBT) Vacuum Box Testing of Storage Tank Bottom.
iii. (MFL) Magnetic Flux Leakage Testing of Storage Tank Bottom.

 ENAR Petroleum Refining Facility (EPRF) Korangi Karachi (September 2019 to


September 2019)
i. Visit at site
ii. (VBT) Vacuum Box Testing of Storage Tank Bottom.
iii. (MFL) Magnetic Flux Leakage Testing of Storage Tank Bottom.

 Pak-Arab Refinery Ltd (PARCO) Korangi Terminal Karachi (September 2019 to


October 2019)
Here I was responsible for sketching and Inspection Drawings of Storage Tanks Bottom, as a
AUTOCAD Draftsman.

 Pak-Arab Pipe Line Company Ltd (PAPCO) Bubak Terminal Sindh (October 2019 to
December 2019)
i. Visit at site.
ii. (VBT) Vacuum Box Testing of Storage Tank Bottom.
iii. (MFL) Magnetic Flux Leakage Testing of Storage Tank Bottom.

QUALIFICATIONS

 Academic & Professional Qualification:-


Diploma Associate Engineer in Mechanical from Piston College Karachi. (2016)
Advance Mechanical Drafting from Shipyard Institute of Technology Karachi. (2015)
SSCE in Science La-Vance public School Naval Colony Karachi. (2013)

SKILLS
 COMPUTER LITERACY
AutoCAD 2D&3D
CadWorx Plant Professional
Microsoft Office.
Resume of Faheem Ullah Page 3
Internet for Correspondence Purpose.

 INSPICTION
Magnetic Flux Leakage (MFL)
Ultrasonic Thickness Gauging Testing (UTG)
Dye Penetrant Testing
Vacuum Box Testing (VBT)
Hydro testing

PERSONAL INFORMATION

Father’s Name: Hameed Ullah


Date of Birth: 08 Dec 1996
CNIC: 33104-7227791-1