Professional Documents
Culture Documents
Peer Graded Assignment by Krishna Rauniyar PDF
Peer Graded Assignment by Krishna Rauniyar PDF
PEER-GRADED ASSIGNMENT:
OIL AND GAS COMPANY PROFILE,
DUKE UNIVERSITY (COURSERA)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
COMPANY:
HINDUSTAN OIL EXPLORATION COMPANY LTD. (HOEC),
INDIA
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Oil & Gas Industry Operations and Markets
1
I. COMPANY PROFILE:
Currently, HOEC is identifying and securing tangibles for drilling of the two well
program, and identifying suitable partners to execute the drilling campaign. A
jack-up rig has been identified and acquired, and will be converted into a
MOPU. Contracts for conversion of top-sides, geo-tech and pipeline route
surveys are in advanced stages of close-out. The project is on track for delivery
of “First Oil” by June 2020. (Source: Company Website)
2
II. COMPANY PERFORMANCE:
Comparison with Other Indian companies:
(Source: Moneycontrol.com)
From the above parameters, it can be noted that company is fairly performing
when compared with other Indian major companies and also below table
represents company’s revenue in the last 5 years.
Revenue
(INR Millions)
3,000.00 2,705.39 2,794.65
2,651.41
2,459.02
2,500.00
2,000.00
1,500.00
1,000.00 790.99
487.13 487.18 595.29
500.00 254.92
0.00
12/31/2019 09/30/2019 06/30/2019 03/31/2019 03/31/2018 03/31/2017 03/31/2016 03/31/2015 03/31/2014
3
Drilling of first well completed safely and successfully; Conversion of Jack-
up rig to MOPU for B80 on-track for sail out in March 2020; Floating Storage
& Offloading (FSO) tanker sourced for deployment in B-80
Dirok production curtailed due to local agitations & partial shutdown of
major consumers like BVFCL
Limited gas offtake at PY-1 due to prolonged major consumer shutdown -
MOU executed with a private consumer on fall back basis with premium
pricing
Production Sharing Contracts (PSC) for PY-3, PY-1, Asjol extended upto
2030
Cambay Basin; Palej R2 PSC execution further delayed; HOEC is the highest
bidder for four marginal onshore blocks of GSPC; Farm-in discussions with
JV partner (holding First Right of Refusal) initiated
Kherem forest clearance approved; Petroleum Mining Lease (PML) awaited
Kharsang PML executed by Government of Arunachal Pradesh
HOEC submitted bid for Digboi Field under Production Enhancement
Contract (PEC) tender floated by Oil India
4
Bibliography:
2. MoneyControl.com :
https://www.moneycontrol.com/stocks/marketinfo/netprofit/bse/oil-
exploration-and-production.html
3. https://www.moneycontrol.com/india/stockpricequote/oil-
drillingexploration/hindustanoilexplorationcompany/HOE01
4. https://www.moneycontrol.com/india/stockpricequote/oil-drilling-and-
exploration/hindustanoilexplorationcompany/charts/technical-chart-
analysis/HOE01
5. https://in.reuters.com/finance/stocks/company-profile/HOEX.BO
6. https://simplywall.st/stocks/in/energy/bse-500186/hindustan-oil-
exploration-shares#health
5