Professional Documents
Culture Documents
Critical =
Increasing =
Stable =
Decreasing =
Leadtime/ Leadtime
Supplier Product Group
Weeks Tendency
Memory-Module 4-8
Flash Card 4-8
Displays 4-6
Flash Card 6 - 12
SSD 10 - 12
Memory-Module
2–8
Flash Card
Boards 12 - 14
Power Supplies 12 - 14
Boards 8 - 10
Passive LCD 18 - 20
TFT 18 - 20
OLED 20 - 22
TFT 14 - 16
Passive LCD 18 - 23
TFT 18 - 20
Passive LCD 16 - 18
TFT 16 - 18
Passive LCD 16 - 20
TFT 16 - 18
OLED 14 – 18
Wireless 9
Wireless 12 - 15
Wireless 12
Wireless 16 - 18
Wireless 16
Wireless 9
Wireless 12 - 16
Wireless 12
Wireless 10
Wireless 10
Wireless 9 - 12
Wireless 12-16
Wireless 12-16
Wireless 20 - 130
Lora Module 22
RFID 20
868MHz & 2.4 GHz
16
Transceiver
20
Bluetooth low energy chips
Short range 16
NFC 16
Wireless 16 - 18
Wireless 12 - 18
Wireless 14
Wireless 38
Wireless
12 - 26
Wireless 10
Cellular 12 – 14
GNSS 16-18
Short Range 12 - 14
Wireless 12 - 18
Wireless 16-18
Please note:
This sheet shows the standard leadtime of our Embedded Wireless manufacturers in accordance with their current
notifications. The existing RUTRONIK stock is not taken into account.
Due to the present situation with the Corona virus, deviations and short-dated changes are to be expected in many cases.
Delivery delays and/or bottlenecks need to be considered in any planning.
Compliance with confirmed delivery dates is always subject to the condition that RUTRONIK is supplied by its own
suppliers correctly and on time. For more information, please contact your local sales office. Allocation tags and leadtime
information are a Rutronik outlook.