SITE:- DSG PAPER

PROJECT:- DISPERSER

PROCEDURE:
1. Lubricating pump is started by operator from field. Also, dilution
pump is started by operator from field.
2. As soon as the running feedback comes of both lubricating pump and
dilution pump and if there is no alarm of loading/unloading an enable
bit is generated to start the main motor.
3. Main motor is started by the operator from field.
4. As the running feedback of main motor is obtained an enable bit is
generated to start the screw feeder.
5. As the running feedback of screw feeder is obtained an enable bit is
generated to start the heating screw.
6. As the running feedback of heating screw is obtained an enable bit is
generated to start the plug screw.
7. As the running feedback of plug screw is obtained an enable bit is
generated to start the screw press.
8. As the running feedback of screw press is obtained an enable bit is
generated to start the de-watering1, de-watering2 and de-watering3 .
9. As the running feedback of any of the de-watering pump is obtained
an enable bit is generated to start the pulp pump.
10. When the pulp pump is running and at any moment during the cycle
feedback of any pump is not obtained then the pumps after the
specific pump(whose feedback is not coming) will trip.
11.If any pump remains tripped for 4sec it will remain tripped and
restored only when reset button is set from the panelview.