KISSICH Sven
KREINHOEFNER MARTIN Henri
A 2016-06-15 Ulrich FIN First issue
MODIFICATIONS /
REV. DATE AUTHOR CHECKED BY STATUS APPROVED BY
OBSERVATIONS
Olkiluoto 3 NPP Document was reviewed and is in accordance with the OL3 Plant Contract
The document has been electronically signed
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
SIEMENS
CONSORTIUM : WORK PACKAGE
AREVA NP NI-4-2790
SIEMENS AG OL3 KKS
Project Code FIN005
-
TITLE:
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All
rights, including rights created by patent grant or registration of a utility model or design, are reserved.
Goods labeled with "AL not equal to N" are subject to European or German export authorization when being exported out of the EU. Goods labeled with "ECCN not
equal to N" are subject to US reexport authorization. Even without a label, or with label "AL:N" or "ECCN:N", authorization may be required due to the final
whereabouts and purpose for which the goods are to be used.
The original version of this document is stored in electronic form in the AREVA NP-EDM system. The current status of this document can be viewed only in the EDM
system.
2006.04 ANP 2268
Document type
Technical report
Class Number of pages 191
RESTRICTED Number of appendices 1
Document Title
Short Title
Contract :
Project FIN005
PEPS-G/2015/en/1050
File code -
No EOTP:
REVISIONS
IND STATUS
PARAGRAPH SCOPE OF THE REVISION
REV DATE
SUMMARY
simulation is required in order to allow the testing of the functions mainly in phase A and B,
or to simulate plant situations which cannot be reached without unnecessary loads for the
equipment or damaging it.
KEY WORDS
Commissioning, I&C, Function test, signal simulation, CWS 69, I&C Functions Level Test
Plan
ABBREVIATIONS
SG Steam Generator
SICS Safety Information and Control System
SIMIT I/O simulation test bench from SIEMENS
AL: N
TABLE OF CONTENTS
0. REFERENCES 10
1. INTRODUCTION 12
1.1. Objective 12
1.2. Test scope during commissioning 12
1.3. Applicability 13
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
5. SIGNAL SIMULATION 44
5.1. Field instrumentation Simulation 44
5.2. Automation System Simulation 48
5.3. Deactivation of actuators 49
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 7 / 50
LIST OF APPENDICES
LIST OF TABLES
LIST OF FIGURES
Figure 17: Test coverage for Function with several triggering paramters 35
0. REFERENCES
1. INTRODUCTION
1.1. Objective
According to YVL guide [1], [2] the final testing shall demonstrate that the I&C system or
equipment fulfill the functional and performance requirements specified for it. The testing can
be partially based on simulation. The final testing shall, however, be performed in the final
operational environment.
The purpose of this document is to provide:
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
– define for each function test if signal simulation is required, and how it can be done.
According to I&C Architecture Master Test Plan [1], tests and verifications shall be performed
with the process SCP (e.g. mechanical, HVAC or electrical systems).
During process system commissioning the designed functionality of each unique process
system is validated and tested. During the testing of the process function the designed sub-
functionalities as e.g. mechanical component design or I&C design is activated and in this
frame tested in an overall manner. Therefore the control via the different I&C functions is
tested integrally for the single function. This activation allows the demonstration of the
correctness of I&C application function requirements by observing the result of the I&C
control on the process.
Testing the I&C Functions from sensors to actuators can be performed as a full chain test or
in an overlapping way.
I&C Functions involved in normal operation DBC1 and abnormal operation DBC2 events of
the plant shall be tested in the scope of Commissioning Program written by using the OL3
Operating Manual. The correct operational behavior of the I&C Functions and the fulfillment
of their intended use can be demonstrated when controlling process systems involved in the
normal operation of the plant. The plant level tests which are based on the operational
manual will be credited to determine the suitability of the I&C Functions, they are performed
according to the PCP which will contain the item-pass criteria based on plant requirements.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 13 / 50
I&C Functions designed to cope with DBC2 to DBC4, DEC-A and DEC-B events shall be
tested as far as possible tested from sensor to actuator at Commissioning Phases A to B.
If triggering parameter setpoint(s) cannot be reached with the plant process especially
without damaging equipment or endangering equipment lifetime, the triggering signal shall be
simulated. Actuation of field equipment shall only be performed if a damage of the equipment
can be excluded. In addition I&C Functions controlling this same process function i.e. the
same set of actuators or system functionality do not need to activate these actuators several
times in order not to endanger equipment lifetime.
During Commissioning the behavior of each function needs to be checked against functional,
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
1.3. Applicability
I&C Functions defined in the Allocation of I&C Functions [AD-02.01b] [6] shall be tested
during Commissioning. I&C Functions involved in the control of several process systems or
involving regulations is attributed to either one process SCP or to pseudo SCP.
This document is a guideline aiming at creating and gathering evidences which will ensure
that all functions are tested. The SCP allocated in Appendix A as a baseline should define
the tests done to verify the related I&C function.
The SCP of the main process system triggered by the I&C function coordinates the test
condition with the support process systems.
– Chapter 2 provides the strategies for testing of the different I&C functions;
– Chapter 3 defines the strategy for I&C function test coverage and documentation;
AL: N
During commissioning all process systems including related I&C need to be tested in order to
demonstrate a correct operation of the plant in normal, abnormal and accident conditions. In
order to demonstrate this, all process systems including related I&C need to be tested in as a
first step at system level according to the process SCP or pseudo SCP. As a second step,
the correct operation of all systems together at plant level needs to be tested in the different
phase commissioning programs.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
be reached and the field response would lead to damages of the equipment. For this type of
function adequate overlapping tests needs to be applied to test the whole function. Chapter 4
describes different application test types.
AL: N
– If simulation is required for the function testing the modified parts need to be restored
to normal conditions. That means for example instrumentation channels or actuation
channels have to be restored to normal configuration following the nuclear testing
manual or modifications of parameters, setpoint, etc. need to be tracked and put to
normal configuration after the test. A check of the complete restoration of all changes
required for simulation need to be done latest before fuel loading (see [17], [18]).
The leading principle is to get all I&C functions fully qualified during commissioning phases A
and B including actuation of all actuators involved (through test) with exception of all
functions involving nuclear flux, control rod position, nuclear and generator power and
associated parameters.
For those functions or sub-functions, a pre-qualification in full simulation mode shall be
performed prior to phase C in order to get all functions and sub-functions declared operable
for fuel loading, the once through test with actuator activation and feedback being postponed
in phase C or D.
ECCN: N
– Step 1) All I&C functions are assigned to at least one process or pseudo SCP with the
Preliminary I&C Function SCP assignment as provided in Appendix A as a baseline.
In the first step, the I&C functions defined in the different process system descriptions
(e.g. 3 0PE) are assigned to the process SCP which tests the I&C function related to
the process functions (e.g. SCP PE).
– Step 2) All I&C functions assigned to the SCP shall be listed and assigned to the final
SCP which takes care of the complete check of the I&C function. If the preliminary
assignment is modified and the assignment is shifted to another SCP, the function will
be kept in the table of the preliminary assigned SCP with the link to the final SCP and
will also be listed in the final SCP.
– Inside the SCP each I&C function shall be assigned to an Activity Code and the
related Commissioning Instruction(s) which defines the test in detail. The SCP states
with which activity codes of the SCP which I&C is tested. If the preliminary assignment
is not followed, the link to the SCP where the function is tested is given. A commonly
formatted table is extracted for each function detailing the tests defined. (see chapter
3.3.3)
– Step 3) A completeness check is performed whether all I&C functions are assigned or
ECCN: N
Allocation of I&C Functions table (refer to [6]) and will be updated regularly, in parallel
of SCP issuance.
– Step 4) The final verification that all functions are covered via test programs is
documented on I&C architecture level in the I&C Functions Level Test Plan by V&V
[4].
– Step 5) The test coverage analysis on I&C architecture level is recorded in the I&C
Functions Level Test Report by V&V [4].
At the end the SCP leads the test coverage of the complete I&C function to which the I&C
function is originally assigned to. There can be several commissioning steps /instructions
involved in the test but only one SCP.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 17 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
ECCN: N
AL: N
3.2. Definition of tests related to I&C functions in relation to the CIs and
SCPs
The I&C Functions shall be tested in the frame of the process SCP; they are assigned to like
defined in section 3.1.
All logics which are not covered by Test Bay Tests shall be tested during the commissioning
of the process system.
The author of the SCP is responsible to define tests covering the full functionality of I&C
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
functions.
As an input what has to be tested during commissioning the author can use:
– The description of the functions in the System Description related to the SCP;
– The Functional Diagrams (e.g. DD4);
– The documentation of allocation of I&C Functions to Logics (DD4 Bubbling);
– The documentation of Test Bay testing (test reports).
I&C tests are carried out in the frame of the corresponding process tests. If it appears that an
I&C function is not fully tested during process tests (as it is e.g. too complex), a dedicated
test procedure called CI-69 have to be created in order to fill the gap.
All functions are covered by one SCP. Together with the test description in the
commissioning documentation (SCP / CI) a full coverage of tests is ensured.
3.3.1. Overview
The following diagram provides an overview of the process aiming at collecting evidences of
I&C function test coverage.
AL: N
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 19 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
ECCN: N
AL: N
for clarity reasons, there shall be one main page and references to the following pages as
attachment.
For the test coverage analysis and documentation on I&C function level, the Functional
Diagrams of the Commissioning master documentation in reference configuration RC 2.1DP
is used. The highlighting is performed for all I&C systems for:
– TXP based System in the DD4 Functional Diagram Documentation per Functional
group complex (FGC), and for
– TXS based Systems in the level 3 Functional Diagrams per I&C System:
– PS NFLE DC 1018
– RCSL NGLP/2005/en/1008
– HBS NFLE DC 1070
– SA I&C NFLE DC 1164
– EDGSIC NLP-G/2006/en/1115 – Appendix A
Note: Any other I&C function embedded on another I&C platform (e.g. Self Standing
ECCN: N
step is to detect as early as possible the potential gaps, which will require extension
of an existing CI or creation of a dedicated test procedure (so called CI-69).
Preferably this highlighting step is organized as a sequence:
i. Firstly, I&C commissioning team pre-highlights scope covered by
SCI52/53, using thin colored lines
ii. Secondly, process commissioning engineer pre-highlights the scope
covered by the remaining part of SCP, using thin colored lines (pre-
highlighting)
iii. Thirdly, V&V team fill the gaps thanks to Test Bay activities, using thick
colored lines
2. Second one is performed while executing each relevant commissioning test, by
overlining the existing thin lines with thick ones.
If a part of a function is tested several times in various tests, it must only be highlighted once.
Nevertheless, it might be needed to highlight some parts twice in order to show the “Once
through Test”.
If a logic block is highlighted, it means signal path through that block has been checked
during test execution.
In the same way, if a parameter appearing on the Functional Diagrams is highlighted, it
means that this parameter has been directly checked during test execution (i.e. the range of
a sensor during SCI53 execution).
Links (between several diagrams or within a diagram) are highlighted as follow:
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
· In case it has been checked during tests execution that the signal path is reaching the
“transmitter” part of the link, only the “transmitter” block is highlighted
· In case the signal path has also been checked after the “receiver” part of the link,
then both “transmitter” and “receiver” block are highlighted
Regarding field components, if there is connection to a transmitter or switchgear, the
respective block module will be highlighted only if the test is done with the field up to
switchgear or component.
Following color code will be used:
· Green : SCI52 and SCI53
· Yellow : Once Through Test
· Blue : CI69
· Orange : other commissioning steps
· Pink : V&V
Figure 4 shows an example of a highlighted DD4 Functional Diagram.
ECCN: N
AL: N
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 22 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
ECCN: N
AL: N
3.3.2.2. Stamp
3.3.2.2.1. Usual case
Figure 5 shows an example of a stamp used for the documentation of the test execution in
the Functional Diagrams. This stamp is used for each test that can be used to cover some
logics on a functional diagram, except for SCI52 and SCI53.
Note: If a test does not cover any additional logic compared to what is already highlighted,
there is no need to make a dedicated stamp for it.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 23 / 50
– Test Ref: the test reference (e.g. Test Bay Test Protocol or Commissioning Step)
– Color in which the tested logic is highlighted.
– Name: Test executer name or the one who takes the responsibility that the test is
done e.g. by checking
• the existing Result Record Sheet (RRS) or
• the test report of Test Bay or
• the highlighted superseded Functional Diagrams of former tests
(without modification to the tested logic).
– Signature: Signature of the test executer, or the one who takes the responsibility that
the test is done, to validate that the test was performed
Note: For pre-highlighting, those stamps have to be filled without Date, Name, and Signature,
those will be filled only during final highlighting.
3.3.2.2.2. SCI52/53 case
In case of SCI52 and SCI53, to avoid overloading the Functional Diagrams, a small stamp
ECCN: N
will be used, closed to the related highlighted part, with the date and the signature.
AL: N
“Status” of the sheet will be mentioned, in the top right corner, using the two following steps:
· PREL: From the sheet initialization, and during execution of related tests
· FIN: Once all tests mentioned in the sheets are successfully executed and the sheet
is ready to be signed.
Each “I&C function coverage review sheet” is filled by the process commissioning engineer in
charge of the SCP to which the I&C function is allocated, and then, if needed, by the V&V
team for Test Bay activities, and by I&C commissioning team for CI69. Each sheet will be in
the end signed when all commissioning steps listed in the sheet are successfully executed.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
For each SCP or pseudo SCP, relevant coverage review sheets are collected and gathered
in a dedicated appendix of the System Commissioning Report. In case a commissioning step
required for the coverage of an I&C function is planned to be executed in the frame of Phase
B, C or D, related System Commissioning Report will have to be updated after TOTO
milestone to include the finalized coverage review sheets.
those folders for their own highlighting scope directly in the MCR, or in TSC (Technical
Service Center).
3.3.5.1. I&C commissioning
I&C commissioning teams are in charge of the following activities:
· Building, updating and managing I&C systems master documentation, including
Functional Diagrams to be highlighted
· Creation and management of the I&C functions coverage database.
· Pre-highlighting and highlighting of Functional Diagrams scope covered by SCI52,
SCI53 and CI69
· Elaboration and execution of CI69
3.3.5.2. Process commissioning
Process commissioning teams are in charge of the following activities:
· Elaboration of System Commissioning Program and related System Commissioning
Report
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 26 / 50
· Filling the I&C coverage review sheets for the part related to commissioning, including
check of data previously imported in the database by I&C commissioning (ex: list of
Functional Diagrams related to each function)
· Pre-highlighting and highlighting of Functional Diagrams scope related to the SCP
(expect scope already covered by SCI52, SCI53 and CI69)
· Review of CI69
Each process commissioning engineer is responsible of the I&C function coverage database
filling for the function related to its SCP.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
3.3.5.3. V&V
V&V team is in charge of the following activities
· Highlighting of Functional Diagrams according to activities performed on Test Bay
· Filling the I&C coverage review sheets for the part related to V&V.
ECCN: N
AL: N
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 27 / 50
Depending on the test purpose and test environment conditions a function needs be tested
as a whole chain or needs to be tested in overlapping manner.
As far as reasonable, the I&C functions test shall be performed with the process system
tests. These allows monitoring the correct behavior of the process function as whole and also
reduces the number of retest for the different aspects (process, I&C, plant, etc. aspect).
Depending on the test purpose and boundary conditions, signal simulation is required to
reach the required test conditions for each I&C function. The following sections describe
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
typical tests which are used for the I&C function tests.
TABLE 1: TEST TYPES
Test Type Description
TT1 Instrumentation Channel Test (according to SCI 53)
TT2 Actuation Channel Test (according to SCI 52)
Function test with process system actuation and
TT3
triggering signal simulation
Function test with signal triggering by the process and
TT4
without process system actuation
Function test in open or closed loop control with process
TT5
system
TT6 Function test without field equipment
· HMI interface and general operation of the system (alarm appearing, actuator/sensor
operation).
These tests ensure that the implementation and correct operation of the main functionalities
related to the logics modules are correct on a full coverage basis (for software).
Further details are in the I&C system Master Test Reports, [3] and [7] - [11].
Different tools like SIMIT, ERBUS, etc. are used to simulate and monitor input and output
channel of the I&C functions processed in the final system environment (I&C cabinets).
Tools like SIVAT are used for application software testing.
Further details see I&C system Master Test Reports, [3] and [7] - [11].
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
The purpose of the instrumentation channel test is to assure that binary and analog
measuring circuits are ready for use when the associated process systems are put into
operation.
AL: N
Each sensor signal shall be monitored in each connected I&C automation system. The
correct triggering of the setpoints and the correct assignment of the output signal of the
threshold module to all connected voting modules (2oo4, OR…) shall be checked against the
I&C function specification. Indications of analog and binary values shall be checked on SICS
and PICS.
It shall be ensured that with the instrumentation channel check no unwanted actuator actions
occurs (e.g. by interlocks or disconnection from the field at PACS level and/or switchgear
level).
Further details are specified in SCI 53 NI [15].
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 29 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
For I&C validation it is sufficient to operate the actuator itself only one time, for all other
actuator channel test the signal can be disconnected at switchgear level.
Standard Commissioning Instruction SCI 52 NI [14] provides the detail for the actuation
AL: N
channel test.
Note: Actuator controls from each connected automation system are tested with dedicated
test instructions defined by each I&C system SCP.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 30 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
4.3.1. Function Test with Process System Actuation and Triggering Signal
Simulation (TT3)
The purpose of this function test is to ensure the commissioning of startup/shutdown or
operation of the process system(s) as a functional unit. The triggering parameter setpoints
are simulated.
ECCN: N
The I&C function shall be tested in the frame of the related process function test. This test
type is applied for I&C function for which the triggering parameter setpoint cannot be reached
with the plant process (e.g. without damaging equipment or endangering equipment lifetime).
AL: N
For I&C validation, it is sufficient to operate the actuator itself only one time. For all other I&C
functions with the same actuator processing in other I&C systems, the signal to the field
equipment can be disconnected at switchgear level.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 31 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
4.3.2. Function Test with Signal Triggering by the Process and without Process
System Actuation (TT4)
The purpose of this function test is to ensure the commissioning of startup/shutdown or
operation of the process system(s) without field response. This test type is applied for
function for which an actuation of the field equipment leads to a damage, an unwanted
system configuration or endanger equipment lifetime.
The I&C function shall be tested in the frame of the related process function test.
ECCN: N
It shall be ensured that the I&C function test does not lead to an unwanted actuator action
(e.g. by interlocks or disconnection from the field at PACS level and/or switchgear level).
AL: N
4.3.3. Function Test in Open or Closed Loop Control with Process System (TT5)
The purpose of this function test is to ensure the commissioning of startup/shutdown or
operation of the process system(s) in an open or closed loop control configuration.
This type of test is performed with the process system in an open or closed loop control
configuration. The process parameter setpoints can be reached and related actuation can be
performed without endangering or damaging plant equipment.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
This type of function test is only foreseen for functions which cannot be reasonable tested
with 4.3.1 or 4.3.2 and for function which requiring a pre-testing for safety reasons before
4.3.1, 4.3.2 or 4.3.3 test.
AL: N
This test type is applied for I&C Function for which the triggering parameter setpoint cannot
be reached with the plant process (e.g. without damaging equipment or endangering
equipment lifetime) and for function for which an actuation of the field equipment leads to a
damage or endanger equipment lifetime.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 33 / 50
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
selected. It needs to be ensured that with the simulation of the Interlock or Permissive no
other functions resulting from the I&C function under test are activated and an unwanted
actuation occurs. The interlock or permissive function itself needs to be tested at least once
as a complete chain.
AL: N
Similar approach can be performed for I&C function actuated signals like ATWS signal or SIS
signal in order to perform a proper testing of the related I&C function.
Simulation methods are further described in chapter 5.
the 2 out of 4 voting are tested with the instrumentation channel test TT1. The different
combinations of the 4 channels do not need to be tested during the commissioning test on
site again because the voting logic test is already performed in the Test Bay.
Figure 15 shows a function test with a voter in the logic (example ESFAS function processed
in PS). For the functional chain test, two channels need to be triggered in order to get an
actuation and the field response. The two other channels are tested with test type TT1. With
this approach all input and output channels are tested. Figure 16 shows the logic of the
example of Figure 15 with signal voters in the 4 divisions. The outputs of the 4 voters are
triggered with the input of 2 instrumentation channels. With the instrumentation channel
checks all other inputs are tested down to the voter module.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
ECCN: N
TT1. With this approach all input and output channels are tested. Figure 18 shows the logic
of the example of Figure 17 with an OR-gate combining several triggering parameters. The
outputs of the OR-gate are triggered with the input of at least one instrumentation channel.
With the instrumentation channel checks all other inputs are tested down to the voter
module.
ECCN: N
AL: N
with the interaction of the I&C functions with the process system(s) during the process
system test. Direct indications of process parameters on PICS and SICS are tested with
instrumentation channel test (TT1). The individual control of actuators from PICS and SICS
are tested with the actuation channel test (TT2).
AL: N
Process functions including the related I&C functions which are in standby during normal
plant or system operation requires to be tested in dedicated steps with either bringing the
plant or process system in the required condition or by simulation the process conditions.
In the first step of the flow diagram in Figure 19, it needs to be decided whether the function
can be fully tested with the plant process including all subfunctions or if signal simulation is
required to test the function. As described in section 4.3 different test types can be applied.
As far as possible the I&C functions shall be tested within the final process environment. If
this is not possible, it shall be checked if the function can be tested in a simulated system or
plant condition. This can be done by simulating interlocks or permissives. If the triggering
plant parameters cannot be reached with the plant process, the instrumentation channels
can be simulated. In some cases the function can only be tested without field response in
order not to damage the equipment or stress the equipment unnecessarily. In exceptional
cases, the I&C function can only be tested with simulation and monitoring of the output signal
because the plant conditions cannot be reached and the field response would lead to
damages of the plant equipment. For this type of function adequate overlapping tests needs
to be applied to test the whole function.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 37 / 50
Correct indication of the reactor trip actuation shall be checked on SICS and PICS.
AL: N
actuator shall be tested at least once. All other ESFAS function processed in the same I&C
system can be tested without actuation of the actuator in order not to endanger equipment
lifetime unnecessarily. The initiation channels shall be tested as described in section 4.5.
ESFAS backup functions in HBS and SAS (DEC-A functions) shall be tested at least once
down to the switchgear level. As the process response is tested with the PS function, it is not
necessary to repeat the test for the backup functions. For example the backup SIS function
in SAS can only be tested to the PAC/SWGR level w/o real actuation of the actuators. MHSI
and LHSI water injection in the primary circuit is done one time with the PS I&C function.
LCO functions shall be tested within the process SCP related to the main sensors triggering
the LCO alarm function.
LCO functions monitoring process parameters controlled by a closed loop control shall be
tested when possible and reasonable with the closed loop control test.
OAF function shall be tested with the closed loop control test. Otherwise dedicated tests
need to be defined.
AL: N
SICS (see TT2) of the corresponding process SCP. No dedicated tests are required for this
type of I&C functions.
I&C system. Table 2 summarize the allocation of the different I&C functions according to the
flow chart in FAR.
TABLE 2: ALLOCATION OF I&C FUNCTIONS TO I&C SYSTEMS
AL: N
I&C Functional
Main function types
System SC
SC2 FA.0002
PS SC3 FA.0009, FA.0012, FA.DEV
SC4 FA.DEV
SC2 FA.0001
EDGSIC
SC3 FA.DEV
SICS SC3 FA.0004, FA.0017, FA.DEV
HBS SC3 FA.0006, FA.0008, FA.0009
SC3 FA.0005, FA.DEV
RCSL
SC4 FA.DEV
SC3 FA.0007, FA.0013, FA.0014
SA I&C
SC4 FA.DEV
SC3 FA.0009, FA.0010, FA.0011, FA.0015, FA.0016, FA.0022, FA.DEV
SAS SC4 FA.0022, FA.DEV
EYT FA.0022, FA.DEV
PAS1 SC4 FA.0019, FA.DEV
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 40 / 50
I&C Functional
Main function types
System SC
EYT FA.0019
SC4 FA.0021
PAS2
EYT FA.0021
SC4 FA.0020
TGI
EYT FA.0020
SC2 FA.DEV
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
SC3 FA.0003
SSS
SC4 FA.0018
EYT FA.0018
Table 3 to Table 7 provides for each I&C platforms (TXS, TXP, SICS (hardwired) and SSS)
general information how the related I&C functions need to be tested.
– All here above I&C systems were tested on Test Bay in order to validate the implementation
of I&C functions in the application software.
ECCN: N
– All here above I&C systems were fully tested in Test Bay from input modules to output
modules (island mode).
AL: N
– Interfaces between field and between I&C systems were not tested in Test Bay.
General – All voting modules input combinations were tested in Test Bay.
– RCSL: All calculation / algorithms sub-modules were fully tested in Platform Simulator or
Test Bay from inputs to outputs
As per SCI53 all triggering sub functions outputs are checked down to the voting modules in all 4
divisions or to the concentration OR gate depending on the configuration.
All RT and ESFAS to be tested ONCE from the All functions to be tested with the here above
input (triggering device) of the triggering sub- restrictions:
function to outputs of the ESFAS (actuators). All
other sub-functions triggering the ESFAS to be Calculations and Algorithms modules need not
tested from input (sensor or conditioning module) to be retested on site in term of correctness of
to input of the ESFAS (Voting module, OR gate) the results.
Scope in order not to jeopardize any actuator lifetime by Only capability of functions to react on operator
of test numerous unnecessary actuations. requests and/or parameter measure / setpoint
All HBS & SA I&C functions to be tested ONCE deviation and right actuator motion way to be
from the input (triggering device) of the sub- checked.
function to outputs of the HBS or SA I&C See also section 4.7.3, 4.7.4 and 4.7.9.
function. In case of multiple initiators, only ONE
test from sensor to actuators, the other ones up
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 41 / 50
– HBS and EDGSIC cabinets were fully tested on Test Bay in order to validate the
implementation of I&C functions.
– With the HBS and EDGSIC tester the I&C functions processed in the I&C system are tested
General on site with the SCP JQ HBS and SCP XYA EDG. The tester devices are also used for the
periodic test of the I&C systems.
As per SCI53 all triggering sub functions outputs are checked down to the voting modules in all
4 divisions or to the concentration OR gate depending on the configuration.
All functions to be tested from the input (sensor or conditioning module) of the triggering sub-function
to outputs of the functions. Actuators switchgears being racked out or in test position in order to get
the output modules fed back (simulation of checkback signals in SWGR).
Scope
of test Per function, at least ONCE from the input (sensor or conditioning module) of the triggering sub-
ECCN: N
do it? The ONCE THROUGH test is ideally performed during a process test. The additional tests to qualify
all other triggering sub-functions are mostly done in full simulation.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 42 / 50
SAS (SC3 / FA.0016, FA.0022, FA.DEV) PAS1 (SC4, EYT /, FA.0019, FA.DEV)
SAS H-Alarms H1, H2, H3,H7 (SC3 / FA.0009, PAS1 (SC4, EYT /, FA.0021)
FA.0010, FA.0011, FA.0015) TGI (SC4, EYT /, FA.020)
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
– System Integration tests are performed to verify the correct installation and operability of the
SAS and PAS systems. System tests are executed to validate the technological features on
both SAS and PAS with differences of scope and coverage. The objective of the Application
SW tests is to check the proper communication between Automation System (AS) and
OM690, to verify that the design guidelines have been applied as defined and that their
proper functionality within the installed I&C environment is ensured. The Application
Software tests cover all I&C functions of the Automation System
General – SAS: I&C functions tests are performed to validate all SC3 I&C functions. During these SAS
Functional Tests on Test Bay, the functional requirements established by the process
engineers are validated in order to confirm that the requirements are implemented without
errors into the system. (further details see [7])
As per SCI53 all triggering sub functions outputs are checked down to the voting modules (in all 4
divisions) or to the concentration OR gate depending on the configuration.
As per SCI52 all TXP output channels are tested from the drive macros down FUM or PAC, SWGR
to the field equipment.
All functions to be tested from the input (sensor
or conditioning module) of the triggering sub-
function to outputs of the functions. Actuators
switchgears being racked out or in test position All functions to be tested 100% on site.
in order to get the output modules fed back
All functions to be tested from the input (sensor
Scope (simulation of checkback signals in SWGR).
ECCN: N
General – Hardwired interfaces between SCPSSA/SICS and SICS/PACS are not tested in Test Bay.
All indications can be re-checked after startup/stop or operation test of the related process systems.
Scope All individual manual control on SICS shall be tested with TT2 (SCI 52).
of test All individual manual control can be used for system startup/stop or operation tests of the related
process systems instead of PICS controls.
See also section 4.7.7 and 4.7.8.
– SSS functions were tested during the factory acceptance tests and site acceptance tests
General
– Interfaces between I&C systems were not tested.
Scope SSS functions shall be tested with the process system startup/stop or operation test.
ECCN: N
of test
Ideally during process test for at least the ONCE THROUGH test.
How to
AL: N
do it? From 100% during process test with additional simulated inputs when required to 100% by inputs
simulation.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 44 / 50
5. SIGNAL SIMULATION
For the commissioning of the I&C functions signals need to be simulated in order to allow
testing of the process system independent from other functions or plant state or if the
triggering conditions cannot be reached without endangering of damaging plant equipment.
How signal can be simulated in principle is described in the following sections. More details
can be found in [19].
signal conditioning (SCPSSA or TXS signal conditioning cabinets RCSL) and TXS
card SSC1. The simulation will be enabled by an external release signal (hardwired to
SSC1).
– Simulation by a physical calibrator for level (dP), pressure (P) and flow (dP)
measurements. The physical calibrator is mounted on request at the valve manifold
connected to the sensor.
– Simulation by a binary simulator (jumper / bridge) at the sensor which is connected to
the I&C cables by a plug.
– Simulation by using a binary simulator (jumper / bridge) or TDI1 interface if binary
sensor is connected to TXS signal conditioning (SCPSSA or TXS signal conditioning
cabinets RCSL) and TXS card SBC1.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
5.1.6. Neutron Flux Measurement (SRD, IRD, PRD and SPND) sensors
The neutron flux sensors simulation can be performed in the SCPSSA of the neutron flux
measurements by means of the built-in simulation modules for neutron flux measurements.
However, in order to simulate a flux level a dedicated coding device describing (12 digits) all
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 47 / 50
necessary parameters must be designed and fit at the interface of the TXS signal
conditioning cabinet to get the right simulation done. The simulated flux level is validated by
means of a key switch located in the TXS conditioning cabinet.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
Following features in TXS for PS, SA I&C and RCSL are available:
– Release to perform a parameter modification must be available
– Parameter modification can be done parameter by parameter
– Modifications of parameters are also possible by a script where many parameters are
modified temporary by a batch. However, the script must be prepared. Therefore,
information regarding parameters to be modified should be available. The script can
be prepared and tested prio to testing by means of the TXS real-time simulator
RTSIM, which is located on the test server in the I&C commissioning department.
– Parameters change can be performed and restored easily
ECCN: N
AL: N
5.3.1. Switchgear
If needed the electrical switchgears for medium and low voltage can be switched into test
mode. By this feature following control is still available:
– Commands by I&C systems
– Feedbacks to I&C systems
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE 50 / 50
5.3.2. PACS
It is possible to block all commands to the electrical switchgear without suppression of
command signals of connected I&C systems. It is done by a coding plug used for TXS
module AV42.
Important information: This blocking of outgoing commands is not applicable for PAC-B
modules. There safety related commands have higher priority than the coding plug.
CPUs into test mode. The precondition is the permission to put the system into test mode
(“Permission Test / Diagnosis) is available. Following aspects need to be considered:
– Each SVE2 can be set into test mode individually
– One complete division can be set into test mode
– Complete system can be set into test mode
– All emitting signals by a SVE2 set into test mode are indicated as invalid by a SVE2
which is still in operation mode
– By setting the complete system into test mode the output cards can be set individual
into operation or out of operation
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A1 / A141
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
With the preliminary I&C functions assignment each I&C function listed in FAR [6] is
assigned to one process or pseudo SCP. If an I&C functions involves more than one process
system the function is listed in several lines with the related process system and SCP
assignment.
Subfunctions of for example automatic functions (e.g. RFFR00493) or group commands
(RFFR00006) shall be tested as far as reasonable with the main subfunctions and their
related SCP. For this then the subfunctions are assigned to the process SCP of the main
subfunctions.
According to [20] functions which are not specific to any given mechanical, electrical or I&C
system, are put together in so-called "pseudo-systems", for which a specific test program is
defined and described in a SCP. In the Preliminary I&C Functions Assignment all I&C
functions for which a pseudo system SCP exist are pre-assigned to this specific SCP.
Following pseudo SCPs have an assignment of I&C functions:
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JNA; JND;
RFFR00000 SIS switch-off MHSI (train by train) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00001 SIS switch-off LHSI (train by train) SC4 SAS SCP JN
AL: N
JNG, JNK
JNA; JND;
RFFR00002 SIS switch-off MHSI (train by train) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00003 SIS switch-off LHSI (train by train) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00004 SIS switch-off MHSI (train by train) SC3 SICS SCP JN
JNG, JNK
JNA; JND;
RFFR00005 SIS switch-off LHSI (train by train) SC3 SICS SCP JN
JNG, JNK
JNA; JND;
RFFR00006 SIS actuation MHSI (train by train) SC4 SAS SCP JN
JNG, JNK
RFFR00006 SIS actuation MHSI (train by train) KAA, KAB SC4 SAS SCP JN
1
The functions Restart after loss of power: Undervoltage monitoring are assigned first to the related process
SCP because some of these functions contain also a process related function. Functions which have no process
related function can be directly re-assigned to SCP UVP.
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A3 / A141
JNA; JND;
RFFR00011 SIS MHSI actuation (train by train) SC3 SICS SCP JN
JNG, JNK
RFFR00013 CCWS actuation from SICS KAA, KAB SC3 SICS SCP KAA/KAB
RFFR00014 ESWS actuation from SICS PEB/PEH SC3 SICS SCP PE
LHSI switch-over from cold leg injection to JNA; JND;
RFFR00015 SC4 SAS SCP JN
hot leg injection (train by train) JNG, JNK
LHSI switch-over from cold leg injection to JNA; JND;
RFFR00016 SC4 SAS SCP JN
hot leg injection (train by train) JNG, JNK
LHSI switch-over from cold leg injection to JNA; JND;
RFFR00017 SC3 SICS SCP JN
hot leg injection (train by train) JNG, JNK
Connection of LHSI in RHR mode train by JNA; JND;
RFFR00018 SC4 SAS SCP JN
train JNG, JNK
Connection of LHSI in RHR mode train by
RFFR00018 KAA, KAB SC4 SAS SCP JN
train
Connection of LHSI in RHR mode train by
RFFR00018 QKA-QKC SC4 SAS SCP JN
train
Connection of LHSI in RHR mode train by JNA; JND;
RFFR00019 SC4 SAS SCP JN
train JNG, JNK
Connection of LHSI in RHR mode train by JNA; JND;
RFFR00020 SC3 SICS SCP JN
train JNG, JNK
Isolation of LHSI in RHR mode train by JNA; JND;
RFFR00021 SC4 SAS SCP JN
ECCN: N
JAA
JAC
PSV opening / closing (PSV by PSV) JEA
RFFR00047 SC4 SAS SCP JA-JE
monitoring JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00048 PSV opening / closing (PSV by PSV) SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
BFJ
RFFR00049 PZR heaters switch off SC4 RCSL SCP JA-JE
BFK
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A5 / A141
JEF, JEG
FAK
RFFR00051 Manual Containment isolation stage 1 SC3 PS SCP CIT
FAL
RFFR00051 Manual Containment isolation stage 1 GHC SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 JDH SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 JMM SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 JMQ SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 KAA, KAB SC3 PS SCP CIT
KBA, KBD,
RFFR00051 Manual Containment isolation stage 1 SC3 PS SCP CIT
JEW
RFFR00051 Manual Containment isolation stage 1 KLA SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 KPL SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 KTA-KTE SC3 PS SCP CIT
KUA, KUB,
RFFR00051 Manual Containment isolation stage 1 SC3 PS SCP CIT
KUF
LCA90
RFFR00051 Manual Containment isolation stage 1 SC3 PS SCP CIT
LCQ
RFFR00051 Manual Containment isolation stage 1 QJA-QJE SC3 PS SCP CIT
RFFR00051 Manual Containment isolation stage 1 QN SC3 PS SCP CIT
ECCN: N
SCB
RFFR00051 Manual Containment isolation stage 1 QFB SC3 PS SCP CIT
SCA
RFFR00051 Manual Containment isolation stage 1 SGB SC3 PS SCP CIT
AL: N
RFFR00067 Manual Containment isolation stage 1 QFB SC4 PAS 1 SCP SCB1 NI
SCA
RFFR00068 Manual Containment isolation stage 1 SGB SC4 PAS 1 SCP SG
KBA, KBD, SCP KBA-KBD-
AL: N
RFFR00109 Containment isolation valve reopening QUC SC3 SICS SCP QUC NI
RFFR00110 Containment isolation valve reopening SGB SC3 SICS SCP SG
Manual MSRT opening / closing (train by
RFFR00111 LBA SC4 SAS SCP LBA NI
train)
Manual MSRT opening / closing (train by
RFFR00112 LBA SC3 SICS SCP LBA NI
train)
Manual actuation of automatic cooldown
RFFR00113 LBA SC3 SAS SCP CLT
via MSRT (train by train)
Manual MSRCV setpoint increase (train
RFFR00114 LBA SC3 SAS SCP CLT
by train)
RFFR00116 Manual MSIV closure (train by train) LBA SC4 SAS SCP LBA NI
RFFR00117 Manual MSIV closure (train by train) LBA SC4 SAS SCP LBA NI
RFFR00118 Manual MSIV closure (train by train) LBA SC3 SICS SCP LBA NI
Manual MSIV bypass opening / closing
RFFR00119 LBA SC4 SAS SCP LBA NI
(train by train)
Manual MSIV bypass opening / closing
RFFR00120 LBA SC3 SICS SCP LBA NI
(train by train)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A8 / A141
EDG
ECCN: N
SAD
RFFR00136 Manual diesel startup in case of LOOP SC3 Safety SCP LOOP
SAL
I&C
EDG
XJA10-40 SCP XJA-XKA
RFFR00136 Manual diesel startup in case of LOOP SC3 Safety
AL: N
XKA10-40 10-20-30-40
I&C
XJA50/80,
RFFR00137 Manual diesel startup in case of LOOP SC3 SICS SCP LOOP
XKA50/80
EDG
RFFR00138 Manual diesel startup in case of LOOP SC3 safety SCP LOOP
I&C
BM, BN, BL,
RFFR00139 Manual diesel startup in case of LOOP SC3 SICS SCP LOOP
BR
RFFR00140 Manual diesel startup in case of LOOP BD SC3 SICS SCP LOOP
RFFR00141 Manual diesel startup in case of LOOP SC3 SICS SCP LOOP
RFFR00142 EDG DLS consumer trip PEB/PEH SC3 SICS SCP PE
KBA, KBD, SCP KBA-KBD-
RFFR00143 EDG DLS consumer trip SC3 SICS
JEW JEW
EDG DLS consumer trip
RFFR00144 QN SC3 SICS SCP QN
SBO DLS consumer trip
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A9 / A141
JEF, JEG
JAA
JAC
AL: N
JEA
RFFR00167 SG level (WR) SC3 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00168 SG level (WR) SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00169 SSSS position SC3 SAS SCP JA-JE
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A10 / A141
JAA
JAC
JEA
RFFR00171 HLEG temperature (WR) SC3 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
JEA
RFFR00172 HLEG temperature (WR) SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00173 CLEG temperature (WR) SC4 SAS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00174 CLEG temperature (WR) SC3 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00175 HLEG loop level SC4 SAS SCP JA-JE
JEB
ECCN: N
JEC
JEF, JEG
JAA
AL: N
JAC
JEA
RFFR00176 HLEG loop level SC3 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00177 HLEG loop level SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00178 PZR level (NR) SC4 SAS SCP JA-JE
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A11 / A141
JAA
JAC
JEA
RFFR00180 PZR level (NR) SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
SCP JKS
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JNG, JNK
JNA; JND;
RFFR00195 HLEG pressure (WR) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00196 HLEG pressure (WR) SC3 SICS SCP JN
AL: N
JNG, JNK
JNA; JND;
RFFR00197 SAB sump level SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00198 SAB sump level SC3 PS SCP JN
JNG, JNK
JNA; JND;
RFFR00199 LHSI/RHR flow SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00200 LHSI/RHR flow SC3 SICS SCP JN
JNG, JNK
JNA; JND;
RFFR00201 LHSI HLEG injection flow SC3 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00202 MHSI flow SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00203 MHSI flow SC3 SICS SCP JN
JNG, JNK
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A12 / A141
BTD, BRU,
RFFR00241 12h UPS voltage BTP, BUE- SC4 SAS SCP BATT
BUH; BR; BTW
BTD, BRU,
RFFR00242 12h UPS current BTP, BUE- SC3 SA I&C SCP BATT
BUH; BR; BTW
JAA
JAC
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JEA
RFFR00243 PDS valve opening monitoring SC4 SAS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00244 PDS valve opening SC3 SICS SCP JA-JE
JEB
JEC
JEF, JEG
SCP JKS
RFFR00245 core outlet temperature (WR) JKS SC4 PS
SPND/COT
SCP JKS
RFFR00246 Core outlet temperature (WR) JKS SC3 SA I&C
SPND/COT
SCP JKS
RFFR00247 core outlet temperature (WR) JKS SC3 SICS
SPND/COT
RFFR00250 Venturi scrubber level JMA30 SC4 SAS SCP JMA30
RFFR00251 Venturi scrubber level JMA30 SC3 SA I&C SCP JMA30
RFFR00252 RPV lower head outside wall temperature JMB SC4 SAS SCP JMB
RFFR00253 RPV lower head outside wall temperature JMB SC3 SA I&C SCP JMB
RFFR00254 Central cooling channel temperature JMB SC4 SAS SCP JMB
ECCN: N
RFFR00255 Central cooling channel temperature JMB SC3 SA I&C SCP JMB
RFFR00256 venting chimney temperature JMB SC4 SAS SCP JMB
RFFR00257 venting chimney temperature JMB SC3 SA I&C SCP JMB
AL: N
RFFR00283 Hydrogen mixing damper opening JMT SC4 SAS SCP JMT
RFFR00284 Hydrogen mixing damper opening JMT SC3 SA I&C SCP JMT
RFFR00285 hydrogen concentration JMU SC4 SAS SCP JMU
RFFR00286 hydrogen concentration JMU SC3 SA I&C SCP JMU
RFFR00287 moisture concentration JMU SC4 SAS SCP JMU
RFFR00288 moisture concentration JMU SC3 SA I&C SCP JMU
RFFR00290 BB *JMU ON/OFF JMU SC3 SA I&C SCP JMU
JNA; JND;
RFFR00291 HLEG pressure SA (WR) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00292 HLEG pressure SA (WR) SC3 SA I&C SCP JN
JNG, JNK
JNA; JND;
RFFR00293 HLEG pressure SA (NR) SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00294 HLEG pressure SA (NR) SC3 SA I&C SCP JN
JNG, JNK
JNA; JND;
RFFR00295 DP CHRS sump strainer SC4 SAS SCP JN
JNG, JNK
JNA; JND;
RFFR00296 DP CHRS sump strainer SC3 SA I&C SCP JN
JNG, JNK
RFFR00297 Dedicated CCWS pump flow rate KAA50/80 SC4 SAS SCP KAA50/80
ECCN: N
RFFR00298 Dedicated CCWS pump flow rate KAA50/80 SC3 SA I&C SCP KAA50/80
RFFR00299 Dedicated CCWS JMQ HX flow rate KAA50/80 SC4 SAS SCP KAA50/80
RFFR00300 Dedicated CCWS JMQ HX flow rate KAA50/80 SC3 SA I&C SCP KAA50/80
AL: N
RFFR00322 CHRS room ventilation closing KLC SC3 SICS SCP KLC
RFFR00323 volume flow rate stack KLE SC4 SAS SCP KLE
RFFR00324 volume flow rate stack KLE SC3 SA I&C SCP KLE
RFFR00325 SAB ventilation volume flow rate KLC SC4 SAS SCP KLC
RFFR00326 SAB ventilation volume flow rate KLC SC3 SA I&C SCP KLC
RFFR00327 annulus ventilation dose rate JYK, KLK SC4 SAS SCP JYK - KLK
RFFR00328 annulus ventilation dose rate JYK, KLK SC3 SA I&C SCP JYK - KLK
RFFR00329 SAB ventilation dose rate JYK, KLK SC4 SAS SCP JYK - KLK
RFFR00330 SAB ventilation dose rate JYK, KLK SC3 SA I&C SCP JYK - KLK
RFFR00331 dose rate stack JYK, KLK SC4 SAS SCP JYK - KLK
RFFR00332 dose rate stack JYK, KLK SC3 SA I&C SCP JYK - KLK
RFFR00335 CHRS sample. Line pressure KUL SC4 SAS SCP KUL
RFFR00336 CHRS sample. Line pressure KUL SC3 SA I&C SCP KUL
RFFR00338 IRWST atmosphere sampling (BB *KUL) KUL SC3 SA I&C SCP KUL
RFFR00339 MSIV position LBA SC4 SAS SCP LBA NI
RFFR00340 MSIV position LBA SC3 SA I&C SCP LBA NI
RFFR00341 MSRIV position LBA SC4 SAS SCP LBA NI
RFFR00342 MSRIV position LBA SC3 SA I&C SCP LBA NI
RFFR00343 Dedicated ESWS flow rate PEB/PEH SC4 SAS SCP PE
ECCN: N
FAK
RFFR00347 Outer Containment Isolation stage 1 & 2 SC3 SA I&C SCP CIT
FAL
RFFR00347 Outer Containment Isolation stage 1 & 2 GHC SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 JDH SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 JMM SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 JMQ SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 KAA, KAB SC3 SA I&C SCP CIT
KBA, KBD,
RFFR00347 Outer Containment Isolation stage 1 & 2 SC3 SA I&C SCP CIT
JEW
RFFR00347 Outer Containment Isolation stage 1 & 2 KLA SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 KPL SC3 SA I&C SCP CIT
RFFR00347 Outer Containment Isolation stage 1 & 2 KTA-KTE SC3 SA I&C SCP CIT
KUA, KUB,
RFFR00347 Outer Containment Isolation stage 1 & 2 SC3 SA I&C SCP CIT
KUF
RFFR00347 Outer Containment Isolation stage 1 & 2 KUL SC3 SA I&C SCP CIT
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A16 / A141
RFFR00350 Manual Outer Containment isolation LAR, LAS SC3 SICS SCP LAR-LAS
RFFR00351 Manual Outer Containment isolation LBA SC3 SICS SCP LBA NI
Automatic Reactor Trip (RT) on Low SG
RFFR00352 BU SC3 HBS SCP JA-JE
level
JAA
JAC
Automatic Reactor Trip (RT) on Low SG JEA
RFFR00352 SC3 HBS SCP JA-JE
level JEB
JEC
JEF, JEG
Automatic Reactor Trip (RT) on Low SG
RFFR00352 JDA SC3 HBS SCP JA-JE
level
MFW-FL isolation triggered by hardwired
RFFR00353 LAB SC3 HBS SCP LAB NI
Reactor Trip
Turbine Trip triggered by hardwired
RFFR00354 SC3 HBS SCP CLT
Reactor Trip (on reactor trip check back)
Automatic Reactor Trip (RT) on High SG
RFFR00355 BU SC3 HBS SCP JA-JE
level
JAA
JAC
Automatic Reactor Trip (RT) on High SG JEA
RFFR00355 SC3 HBS SCP JA-JE
level JEB
ECCN: N
JEC
JEF, JEG
Automatic Reactor Trip (RT) on High SG
RFFR00355 JDA SC3 HBS SCP JA-JE
level
AL: N
JAA
JAC
Automatic CVCS HP & LP letdown JEA
RFFR00365 SC3 HBS SCP JA-JE
isolation on low PZR pressure JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A18 / A141
JAA
JAC
RCP trip on low DP over RCP and low JEA
RFFR00367 SC3 HBS SCP JA-JE
PZR pressure JEB
JEC
JEF, JEG
RFFR00368 RCP trip on high bearing temperature BB SC3 HBS SCP JA-JE
JAA
JAC
JEA
RFFR00368 RCP trip on high bearing temperature SC3 HBS SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00369 Containment ventilation system isolation KLA SC3 HBS SCP CIT
Closure of CVCS HP letdown line on high
KBA, KBD, SCP KBA-KBD-
RFFR00370 temperature downstream the non- SC3 HBS
JEW JEW
regenerative heat exchanger
JAA
JAC
Closure of RCP seal N°1 leak-off line on
JEA
RFFR00371 Loss of RCP thermal barrier and seal SC3 HBS SCP JA-JE
ECCN: N
JEB
injection
JEC
JEF, JEG
Closure of RCP seal N°1 leak-off line on
KBA, KBD,
AL: N
RFFR00371 Loss of RCP thermal barrier and seal SC3 HBS SCP JA-JE
JEW
injection
JAA
JAC
Closure of gaseous waste processing
JEA
RFFR00372 system containment isolation valves on SC3 HBS SCP JA-JE
JEB
high PZR relief tank pressure
JEC
JEF, JEG
feedwater
Automatic drop of all rods on loss of main
RFFR00387 LAB SC3 RCSL SCP LAB NI
feedwater
JAA
AL: N
JAC
JEA
RFFR00388 Permissive P12 SC3 SAS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
Permissive P20 for activation of automatic
JEA
RFFR00389 SIS actuation on diversified RCS loop SC3 SAS SCP JA-JE
JEB
level < min1
JEC
JEF, JEG
Automatic RHR pump trip on low CCWS
JNA; JND;
RFFR00390 flowrate or high CCWS temperature (on SC3 SAS SCP JN
JNG, JNK
LHSI trains 1&4)
Automatic RHR pump trip on low CCWS
RFFR00390 flowrate or high CCWS temperature (on KAA, KAB SC3 SAS SCP JN
LHSI trains 1&4)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A21 / A141
units)
SCP JKS
RFFR00394 Dome temperature measurement JKS EYT PAS 1
RPVL/RPVDT
RFFR00395 Entry in Emergency Operation (H1) SC3 PS SCP LOOP
Entry in symptom based EOP (H2).
Reactor power greater than 0.1% and
RFFR00396 JKT SC3 SAS SCP JKT
time after reactor trip is greater than 60
min
Entry in symptom based EOP (H2). : RCS JNA; JND;
RFFR00397 SC3 SAS SCP JN
pressure > 180 barg JNG, JNK
JAA
JAC
Entry in symptom based EOP (H2). : RPV JEA
RFFR00398 SC3 SAS SCP JA-JE
brittle fracture JEB
JEC
JEF, JEG
Entry in symptom based EOP (H2). : RPV JNA; JND;
RFFR00398 SC3 SAS SCP JA-JE
brittle fracture JNG, JNK
JAA
JAC
Entry in symptom based EOP (H2). : Loss JEA
RFFR00399 SC3 SAS SCP LBA NI
ECCN: N
RFFR00406 Superheating at RPV outlet > 40°C (H4) JKS SC3 PS SCP JA-JE
JAA
Entry into emergency operation after JAC
excessive core heatup when core outlet JEA
RFFR00407 SC3 SA I&C SCP JA-JE
temperature > 550°C or HLEG JEB
temperature > 390°C (H5) JEC
JEF, JEG
Entry into emergency operation after
excessive core heatup when core outlet
RFFR00407 JKS SC3 SA I&C SCP JA-JE
temperature > 550°C or HLEG
temperature > 390°C (H5)
SCP JKS
RFFR00408 Temperature core outlet > 650°C (H6) JKS SC3 SA I&C
SPND/COT
Entry in Fuel Pool EOP (H7): Logic for fuel FAK
RFFR00409 SC3 SAS SCP FAK/FAL
pool temperature FAL
Entry in Fuel Pool EOP (H7): Logic for fuel FAK
RFFR00410 SC3 SAS SCP FAK/FAL
pool level FAL
Safeguard building controlled area
RFFR00411 KLC SC3 SICS SCP KLC
ventilation
Non controlled mechanical area of
RFFR00412 SAC SC3 SICS SCP SAC
Safeguard building ventilation
ECCN: N
JEF, JEG
JNA; JND;
RFFR00453 Pressurizer Level Control SC3 RCSL SCP CLT
JNG, JNK
AL: N
KBA, KBD,
RFFR00453 Pressurizer Level Control SC3 RCSL SCP CLT
JEW
BFJ
RFFR00454 MIN3 level function: PZR level SC3 RCSL SCP JA-JE
BFK
JAA
JAC
JEA
RFFR00454 MIN3 level function: PZR level SC3 RCSL SCP JA-JE
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A25 / A141
JEF, JEG
KBA, KBD,
RFFR00456 MIN2 level function: PZR level SC3 RCSL SCP JA-JE
JEW
JAA
JAC
JEA
RFFR00457 SC3 RCPB isolation SC3 RCSL SCP CIT
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00457 SC3 RCPB isolation SC3 RCSL SCP JN
JNG, JNK
KBA, KBD,
RFFR00457 SC3 RCPB isolation SC3 RCSL SCP JN
JEW
JAA
JAC
JEA
RFFR00459 ΔMAX function: Pressurizer level SC3 RCSL SCP CLT
JEB
JEC
JEF, JEG
KBA, KBD,
RFFR00459 ΔMAX function: Pressurizer level SC3 RCSL SCP CLT
JEW
ECCN: N
JAC
JEA
RFFR00461 Pressurizer level LCO SC4 RCSL SCP CLT
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00462 High SG level operator aid function SC3 RCSL SCP CLT
JEB
JEC
JEF, JEG
RFFR00462 High SG level operator aid function LAB SC3 RCSL SCP CLT
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A26 / A141
BFJ
RFFR00468 RCS pressure control function SC3 RCSL SCP CLT
BFK
JAA
JAC
AL: N
JEA
RFFR00468 RCS pressure control function SC3 RCSL SCP CLT
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00468 RCS pressure control function SC3 RCSL SCP CLT
JNG, JNK
KBA, KBD,
RFFR00468 RCS pressure control function SC3 RCSL SCP CLT
JEW
JAA
JAC
JEA
RFFR00469 RCS pressure LCO SC4 RCSL SCP CLT
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A27 / A141
JNA; JND;
RFFR00469 RCS pressure LCO SC4 RCSL SCP CLT
JNG, JNK
BFJ
RFFR00470 RCS Pressure Control SC3 RCSL SCP JA-JE
BFK
JAA
JAC
JEA
RFFR00470 RCS Pressure Control SC3 RCSL SCP JA-JE
JEB
JEC
JEF, JEG
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JNA; JND;
RFFR00470 RCS Pressure Control SC3 RCSL SCP JA-JE
JNG, JNK
BFJ
RFFR00471 OAF Max2 / Max2 sliding / RHRS SC3 RCSL SCP CLT
BFK
JAA
JAC
JEA
RFFR00471 OAF Max2 / Max2 sliding / RHRS SC3 RCSL SCP CLT
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00471 OAF Max2 / Max2 sliding / RHRS SC3 RCSL SCP CLT
JNG, JNK
KBA, KBD,
RFFR00471 OAF Max2 / Max2 sliding / RHRS SC3 RCSL SCP CLT
JEW
BFJ
RFFR00472 OAF RCP function SC3 RCSL SCP CLT
BFK
JAA
JAC
JEA
RFFR00472 OAF RCP function SC3 RCSL SCP CLT
JEB
JEC
ECCN: N
JEF, JEG
JNA; JND;
RFFR00472 OAF RCP function SC3 RCSL SCP CLT
JNG, JNK
KBA, KBD,
AL: N
LAJ
Limitation of reactor power with respect to
RFFR00476 BU SC3 RCSL SCP LAB NI
feedwater flowrate - Start-up phase
Limitation of reactor power with respect to
RFFR00476 JDA SC3 RCSL SCP LAB NI
feedwater flowrate - Start-up phase
Limitation of reactor power with respect to
RFFR00476 LAB SC3 RCSL SCP LAB NI
feedwater flowrate - Start-up phase
Limitation of reactor power with respect to
RFFR00477 feedwater flowrate - Loss of one Main BU SC3 RCSL SCP CLT
Feedwater Pump
Limitation of reactor power with respect to
RFFR00477 feedwater flowrate - Loss of one Main JDA SC3 RCSL SCP CLT
Feedwater Pump
Limitation of reactor power with respect to
RFFR00477 feedwater flowrate - Loss of one Main LAB SC3 RCSL SCP CLT
Feedwater Pump
Limitation of reactor power with respect to
RFFR00478 BU SC4 RCSL SCP CLT
generator power
JAA
JAC
Limitation of reactor power with respect to JEA
RFFR00479 SC3 RCSL SCP JA-JE
heat removal JEB
JEC
JEF, JEG
Limitation of reactor power with respect to
RFFR00479 JDA SC3 RCSL SCP JA-JE
heat removal
Limitation function: Closure of turbine inlet
RFFR00480 valves on MIN MSH pressure (setpoint SC4 RCSL SCP LBA NI
only)
RFFR00481 Reactor trip on PZR pressure < MIN2p BU SC2 PS SCP JA-JE
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A29 / A141
JEF, JEG
RFFR00482 Reactor trip on PZR pressure > MAX2p JDA SC2 PS SCP JA-JE
RFFR00483 Reactor trip on PZR level > MAX1p BU SC2 PS SCP JA-JE
JAA
JAC
JEA
RFFR00483 Reactor trip on PZR level > MAX1p SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00483 Reactor trip on PZR level > MAX1p JDA SC2 PS SCP JA-JE
Reactor trip on hot leg pressure (WR) <
RFFR00484 BU SC2 PS SCP JN
MIN1p
Reactor trip on hot leg pressure (WR) <
RFFR00484 JDA SC2 PS SCP JN
MIN1p
Reactor trip on hot leg pressure (WR) < JNA; JND;
RFFR00484 SC2 PS SCP JN
MIN1p JNG, JNK
Reactor trip on SG pressure drop >
RFFR00485 BU SC2 PS SCP LBA NI
MAX1p
Reactor trip on SG pressure drop >
RFFR00485 JDA SC2 PS SCP LBA NI
MAX1p
Reactor trip on SG pressure drop >
RFFR00485 LBA SC2 PS SCP LBA NI
ECCN: N
MAX1p
RFFR00486 Reactor trip on SG pressure < MIN1p BU SC2 PS SCP LBA NI
RFFR00486 Reactor trip on SG pressure < MIN1p JDA SC2 PS SCP LBA NI
RFFR00486 Reactor trip on SG pressure < MIN1p LBA SC2 PS SCP LBA NI
AL: N
RFFR00493 SIS actuation on PZR pressure < MIN3p PEB/PEH SC2 PS SCP JN
RFFR00493 SIS actuation on PZR pressure < MIN3p QKA-QKC SC2 PS SCP JN
RFFR00493 SIS actuation on PZR pressure < MIN3p SAC SC2 PS SCP JN
RFFR00493 SIS actuation on PZR pressure < MIN3p SAQ SC2 PS SCP JN
AL: N
JNA; JND;
RFFR00495 SIS actuation on RCS loop level < MIN1p SC2 PS SCP JN
JNG, JNK
RFFR00495 SIS actuation on RCS loop level < MIN1p KAA, KAB SC2 PS SCP JN
KBA, KBD,
RFFR00495 SIS actuation on RCS loop level < MIN1p SC2 PS SCP JN
JEW
RFFR00495 SIS actuation on RCS loop level < MIN1p KLC SC2 PS SCP JN
RFFR00495 SIS actuation on RCS loop level < MIN1p PEB/PEH SC2 PS SCP JN
RFFR00495 SIS actuation on RCS loop level < MIN1p QKA-QKC SC2 PS SCP JN
RFFR00495 SIS actuation on RCS loop level < MIN1p SAC SC2 PS SCP JN
RFFR00495 SIS actuation on RCS loop level < MIN1p SAQ SC2 PS SCP JN
RCP trip on ΔP over RCP < MIN1p and
RFFR00496 BB SC2 PS SCP JA-JE
SIS signal
JAA
JAC
RCP trip on ΔP over RCP < MIN1p and JEA
RFFR00496 SC2 PS SCP JA-JE
SIS signal JEB
JEC
JEF, JEG
LHSI/RHR train isolation on SAB sump
JNA; JND;
RFFR00497 level > MAX1p or SABpressure rise > SC2 PS SCP JN
JNG, JNK
MAX1p
ECCN: N
RFFR00498 Minimum CCWS temperature control KAA, KAB SC2 PS SCP KAA/KAB
JAA
JAC
JEA
AL: N
LAB*
Partial cooldown actuation on SG level LAC
RFFR00502 SC2 PS SCP LBA NI
(NR) > MAX2p LAH
LAJ
Partial cooldown actuation on SG level
RFFR00502 LBA SC2 PS SCP LBA NI
(NR) > MAX2p
Partial cooldown actuation on SGTR and
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
RFFR00570 containment pressure > MAX1p or SIS SGB SC2 PS SCP CIT
signal
Containment isolation stage 2 on
RFFR00571 BB SC2 PS SCP CIT
containment pressure > MAX2p
Containment isolation stage 2 on FAK
RFFR00571 SC2 PS SCP CIT
containment pressure > MAX2p FAL
Containment isolation stage 2 on
RFFR00571 GHC SC2 PS SCP CIT
containment pressure > MAX2p
JAA
JAC
Containment isolation stage 2 on JEA
RFFR00571 SC2 PS SCP CIT
containment pressure > MAX2p JEB
JEC
JEF, JEG
Containment isolation stage 2 on
RFFR00571 JDH SC2 PS SCP CIT
containment pressure > MAX2p
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A35 / A141
JAA
JAC
JEA
RFFR00586 Permissives P 13 SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
JEA
RFFR00587 Permissives P 14 SC2 PS SCP JN
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00587 Permissives P 14 SC2 PS SCP JN
JNG, JNK
JAA
JAC
JEA
RFFR00588 Permissives P 15 SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
RFFR00589 Permissives P 16 SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00589 Permissives P 16 SC2 PS SCP JA-JE
JNG, JNK
ECCN: N
JAA
JAC
JEA
RFFR00590 Permissives P 17 SC2 PS SCP JA-JE
AL: N
JEB
JEC
JEF, JEG
RFFR00591 Permissives P 19 SC2 PS SCP LBA NI
SCP JKS
RFFR00592 High linear power density channel BU SC2 PS
SPND/COT
SCP JKS
RFFR00592 High linear power density channel JDA SC2 PS
SPND/COT
SCP JKS
RFFR00592 High linear power density channel JKS SC2 PS
SPND/COT
RFFR00593 Low DNBR channel BU SC2 PS SCP JA-JE
JAA
JAC
JEA
RFFR00593 Low DNBR channel SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A38 / A141
JEF, JEG
RFFR00595 High core power level (HCPL) channel JDA SC2 PS SCP JA-JE
JNA; JND;
RFFR00595 High core power level (HCPL) channel SC2 PS SCP JA-JE
JNG, JNK
RFFR00596 Low and low-low loop flow rate channels BU SC2 PS SCP JA-JE
JAA
JAC
JEA
RFFR00596 Low and low-low loop flow rate channels SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00596 Low and low-low loop flow rate channels JDA SC2 PS SCP JA-JE
RFFR00597 Low RCP speed (four RCPs) channel BU SC2 PS SCP JA-JE
JAA
JAC
JEA
RFFR00597 Low RCP speed (four RCPs) channel SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00597 Low RCP speed (four RCPs) channel JDA SC2 PS SCP JA-JE
ECCN: N
RFFR00598 High neutron flux (source range) channel BU SC2 PS SCP JDH
RFFR00598 High neutron flux (source range) channel JDA SC2 PS SCP JDH
RFFR00598 High neutron flux (source range) channel JDH SC2 PS SCP JDH
AL: N
RFFR00598 High neutron flux (source range) channel JKT SC2 PS SCP JDH
JNA; JND;
RFFR00598 High neutron flux (source range) channel SC2 PS SCP JDH
JNG, JNK
High neutron flux (intermediate range)
RFFR00599 BU SC2 PS SCP JKT
channel
High neutron flux (intermediate range)
RFFR00599 JDA SC2 PS SCP JKT
channel
High neutron flux (intermediate range)
RFFR00599 JKT SC2 PS SCP JKT
channel
RFFR00600 Low doubling time (intermediate range) BU SC2 PS SCP JKT
RFFR00600 Low doubling time (intermediate range) JDA SC2 PS SCP JKT
RFFR00600 Low doubling time (intermediate range) JKT SC2 PS SCP JKT
Anti-dilution in shutdown conditions with SCP KBA-KBD-
RFFR00601 CPF SC2 PS
RCP not in operation channel JEW
Anti-dilution in shutdown conditions with JNA; JND; SCP KBA-KBD-
RFFR00601 SC2 PS
RCP not in operation channel JNG, JNK JEW
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A39 / A141
JEW
KBA, KBD, SCP KBA-KBD-
RFFR00603 Anti-dilution in power conditions channel SC2 PS
JEW JEW
RFFR00604 Permissive P2 JKT SC2 PS SCP JKT
RFFR00605 Permissive P3 JKT SC2 PS SCP JKT
RFFR00606 Permissive P5 JKT SC2 PS SCP JKT
JAA
JAC
JEA
RFFR00607 Permissive P6 SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00607 Permissive P6 SC2 PS SCP JA-JE
JNG, JNK
JAA
JAC
JEA
RFFR00608 Permissive P7 SC2 PS SCP JA-JE
JEB
JEC
JEF, JEG
ECCN: N
RFFR00613 Limitation function: Rod drop JDA SC3 RCSL SCP JDA/BU NI
RFFR00613 Limitation function: Rod drop JKT SC3 RCSL SCP JDA/BU NI
RFFR00617 LCO function: Linear Power Density (LPD) BU SC3 RCSL SCP KBC
RFFR00617 LCO function: Linear Power Density (LPD) JDA SC3 RCSL SCP KBC
RFFR00617 LCO function: Linear Power Density (LPD) KBC SC3 RCSL SCP KBC
JEF, JEG
RFFR00618 LCO function: DNBR JDA SC3 RCSL SCP JA-JE
RFFR00618 LCO function: DNBR SC3 RCSL SCP JA-JE
RFFR00619 LCO function: Reactor Thermal Power BU SC3 RCSL SCP JA-JE
AL: N
JAA
JAC
JEA
RFFR00619 LCO function: Reactor Thermal Power SC3 RCSL SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00619 LCO function: Reactor Thermal Power JDA SC3 RCSL SCP JA-JE
RFFR00619 LCO function: Reactor Thermal Power KBC SC3 RCSL SCP JA-JE
SCP JKS
RFFR00620 LCO function: Axial power shape JKS SC4 RCSL
SPND/COT
RFFR00622 LCO function: Azimuthal power imbalance JKT SC4 RCSL SCP JKT
RFFR00623 LCO function: RCCA misalignment JDA SC4 RCSL SCP JDA/BU NI
RFFR00623 LCO function: RCCA misalignment JDA1 SC4 RCSL SCP JDA/BU NI
Automatic isolation of CVCS
KBA, KBD,
RFFR00624 demineralized water and start up of the SC3 RCSL SCP KBC
JEW
boric acid pumps on ATWS signal
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A41 / A141
XKA10-40 XKA10-20-30-40
I&C
Diesel actuation on 10kV busbar voltage <
RFFR00634 BD SC2 PS SCP LOOP
MIN1p or 10kV busbar frequency < MIN1p
AL: N
LCA
LCB
RFFR00645 Condensator monitoring SC4 PAS 2 PAS 2 Siemens
LCR
LCW
AL: N
PAB
PAC
RFFR00646 Circulation water pump monitoring PAH SC4 PAS 2 PAS 2 Siemens
PUE
PUR
RFFR00647 MCR air conditioning Building ISOL KLC SC4 SAS SCP SAB
RFFR00647 MCR air conditioning Building ISOL SAB SC4 SAS SCP SAB
RFFR00647 MCR air conditioning Building ISOL SAC SC4 SAS SCP SAB
SAD
RFFR00648 Diesel Building ventilation operation SC3 SICS SCP SAD-SAL
SAL
SAD
RFFR00649 Diesel Building ventilation operation SC3 SICS SCP SAD-SAL
SAL
RFFR00650 Averaged Coolant Temperature Control JDA SC3 RCSL SCP CLT
RFFR00650 Averaged Coolant Temperature Control JKT SC3 RCSL SCP CLT
RFFR00651 RCS Temperature Control - ACT LCO SC4 RCSL SCP CLT
JAA
JAC
JEA
RFFR00652 RCS temperature surveillance SC3 RCSL SCP JA-JE
JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
JEA
RFFR00653 RHR Control SC3 RCSL SCP JN
JEB
JEC
JEF, JEG
JNA; JND;
RFFR00653 RHR Control SC3 RCSL SCP JN
JNG, JNK
JNA; JND;
RFFR00654 RHR Control SC3 RCSL SCP JN
JNG, JNK
RFFR00654 RHR Control KAA, KAB SC3 RCSL SCP JN
JAA
JAC
JEA
RFFR00655 RCS Loop Level Control SC3 RCSL SCP CLT
JEB
JEC
JEF, JEG
KBA, KBD,
RFFR00655 RCS Loop Level Control SC3 RCSL SCP CLT
JEW
JAA
JAC
RCS loop level limitation I&C function: JEA
RFFR00656 SC3 RCSL SCP CIT
ECCN: N
JEF, JEG
Pressurize PZR at constant PZR water
KBA, KBD,
RFFR00665 temperature - Automatic end of the SC3 RCSL SCP CLT
JEW
manual phase
AL: N
JAA
JAC
JEA
RFFR00667 Alarm depressurization SC3 RCSL SCP JA-JE
JEB
JEC
JEF, JEG
RFFR00668 EFWS flow upstream SG LAR, LAS SC3 SAS SCP LAR-LAS
RFFR00670 Manual MFW/SSS isolation (SG per SG) LAB SC4 SAS SCP LAB NI
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A45 / A141
isolation)
Manual RT (including TT, MFW-FL
RFFR00674 JDA SC3 PS SCP LAB NI
isolation)
Manual RT (including TT, MFW-FL
RFFR00674 LAB SC3 PS SCP LAB NI
isolation)
EDG DLS consumer trip
RFFR00675 QKA-QKC SC3 SICS SCP LOOP
SBO DLS consumer trip
FAK
RFFR00677 Fuel pool cooling system operation SC3 SICS SCP FAK/FAL
FAL
Pressure difference over the
RFFR00678 CCWS/ESWS Heat exchanger control KAA, KAB SC3 SICS SCP KAA/KAB
valve
Position of control valve downstream the
RFFR00679 CCWS/ESWS heat exchanger and of KAA, KAB SC3 SICS SCP KAA/KAB
control valve on its bypass
RHR heat exchanger control valve and JNA; JND;
RFFR00680 SC3 SICS SCP JN
bypass control valve position JNG, JNK
RFFR00681 EFWS SG level control valve position LAR, LAS SC3 SICS SCP LAR-LAS
RFFR00682 EFWS overflow limitation valve position LAR, LAS SC3 SICS SCP LAR-LAS
RFFR00683 MSRCV position LBA SC3 SICS SCP LBA NI
RFFR00684 Loss of digital automation systems (H0) SC3 HBS SCP I&C ARCH
ECCN: N
RFFR00688 standard shutdown states - Maximum KBC SC3 RCSL SCP KBC
Boration Part
Source Part
BTD, BRU,
RFFR00735 12h UPS voltage BTP, BUE- SC3 SA I&C SCP BATT
BUH; BR; BTW
BTD, BRU,
ECCN: N
RFFR00736 12h UPS current BTP, BUE- SC4 SAS SCP BATT
BUH; BR; BTW
LAA
AL: N
RFFR00737 Feedwater water tank pressure LBS SC4 PAS 2 PAS 2 Siemens
LBS50
Manual Outer Containment isolation for CI
RFFR00738 valves not actuated by stage 1&2 KAA, KAB SC3 SICS SCP KAA/KAB
(Thermal Barrier)
Manual Outer Containment isolation for CI
RFFR00739 valves not actuated by stage 1&2 KAA, KAB SC4 SAS SCP KAA/KAB
(Thermal Barrier)
Manual Inner Containment isolation for CI
RFFR00740 valves not actuated by stage 1&2 KAA, KAB SC4 SAS SCP KAA/KAB
(Thermal Barrier)
Manual Inner Containment isolation for CI
RFFR00741 valves not actuated by stage 1&2 KAA, KAB SC3 SICS SCP KAA/KAB
(Thermal Barrier)
RFFR00742 Automatic escape alarm in UJA CYC SC4 SAS SCP CYC
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A48 / A141
RFFR00748 Automatic evacuation alarm in 31UJH CYC SC4 SAS SCP CYC
RFFR00748 Automatic evacuation alarm in 31UJH KLC SC4 SAS SCP CYC
RFFR00748 Automatic evacuation alarm in 31UJH KLE SC4 SAS SCP CYC
AL: N
RFFR00748 Automatic evacuation alarm in 31UJH QJA-QJE SC4 SAS SCP CYC
RFFR00749 Automatic evacuation alarm in 34UJH CYC SC4 SAS SCP CYC
RFFR00749 Automatic evacuation alarm in 34UJH KLC SC4 SAS SCP CYC
RFFR00749 Automatic evacuation alarm in 34UJH KLE SC4 SAS SCP CYC
RFFR00749 Automatic evacuation alarm in 34UJH QJA-QJE SC4 SAS SCP CYC
RFFR00750 Dose rate RB Refueling machine trolley JYK, KLK SC4 SAS SCP JYK - KLK
XJA10-40 SCP XJA-
RFFR00751 Excitation Control SC2 SSS
XKA10-40 XKA10-20-30-40
XJA10-40 SCP XJA-
RFFR00752 Speed Control SC2 SSS
XKA10-40 XKA10-20-30-40
XJA50/80, SCP XJA-XKA
RFFR00753 SBO Busbar Active Power SC3 SICS
XKA50/80 50/80
XJA10-40 SCP XJA-
RFFR00754 Emergency Busbar Active Power SC3 SICS
XKA10-40 XKA10-20-30-40
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A49 / A141
RFFR00761 Manual Containment isolation stage 1 KTA-KTE SC4 PAS 1 SCP KT10/11
RFFR00762 Manual Containment isolation stage 1 KTA-KTE SC4 SAS SCP KT10/11
RFFR00763 Test of SA I&C functions in SAS SC4 SAS SCP I&C ARCH
RFFR00764 EBS actuation (train by train) JDH SC4 SAS SCP JDH
JNA; JND;
RFFR00765 EBS actuation (train by train) SC4 SAS SCP JN
JNG, JNK
RFFR00766 EBS actuation (train by train) JDH SC3 SICS SCP JDH
JNA; JND;
RFFR00767 EBS actuation (train by train) SC3 SICS SCP JN
JNG, JNK
KBA, KBD, SCP KBA-KBD-
RFFR00768 RCPB isolation SC4 SAS
JEW JEW
JNA; JND;
RFFR00769 RCPB isolation SC4 SAS SCP JN
JNG, JNK
RFFR00770 EBS isolation (train by train) JDH SC4 SAS SCP JDH
JNA; JND;
RFFR00771 EBS isolation (train by train) SC4 SAS SCP JN
JNG, JNK
RFFR00772 EBS isolation (train by train) JDH SC3 SICS SCP JDH
JNA; JND;
RFFR00773 EBS isolation (train by train) SC3 SICS SCP JN
JNG, JNK
RFFR00774 Secondary heat balance measurement LAB SC4 SSS SCP CPB
ECCN: N
RFFR00774 Secondary heat balance measurement LBA SC4 SSS SCP CPB
RFFR00775 EFWS SG level control valve position LAR, LAS SC4 SAS SCP LAR-LAS
RFFR00776 EFWS overflow limitation valve position LAR, LAS SC4 SAS SCP LAR-LAS
AL: N
RFFR00777 MS activity alarm JYK, KLK SC3 HBS SCP JYK - KLK
RFFR00777 MS activity alarm LBA SC3 HBS SCP JYK - KLK
Process Radioactivity Monitoring:
RFFR00778 Component Cooling Water System JYK, KLK SC4 SAS SCP JYK - KLK
(System KAB) monitoring
Process Radioactivity Monitoring:
RFFR00778 Component Cooling Water System KAA, KAB SC4 SAS SCP JYK - KLK
(System KAB) monitoring
Area Radiation and Airborne Radioactivity
RFFR00779 Monitoring: Airborne Radioactivity JYK, KLK SC3 SAS SCP JYK - KLK
Monitoring
Area Radiation and Airborne Radioactivity
RFFR00780 Monitoring: Local Dose Rate Monitoring: JYK, KLK SC3 SAS SCP JYK - KLK
dose rate fuel pool
Effluent Radioactivity Monitoring:
RFFR00781 Gaseous Effluent Monitoring: Stack JYK, KLK SC3 SAS SCP JYK - KLK
activity monitoring
RFFR00782 Failure of Iodine sampler stack Monitoring JYK, KLK SC4 SAS SCP JYK - KLK
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A50 / A141
RFFR00793 MCR air conditioning Building ISOL SAB SC4 SAS SCP SAB
RFFR00794 Actuation of Safety Chilled Water System QKA-QKC SC3 SICS SCP QK
XJA50/80, SCP XJA-XKA
RFFR00795 Start SBO diesel SC3 SSS
XKA50/80 50/80
SAD
RFFR00796 Start SBO diesel SC3 SAS SCP SAD-SAL
SAL
XJA50/80, SCP XJA-XKA
RFFR00797 SBO diesel monitoring SC3 SSS
XKA50/80 50/80
EDG
XJA10-40 SCP XJA-
RFFR00798 EDG Safety Speed Control Actuation SC2 Safety
XKA10-40 XKA10-20-30-40
I&C
RFFR00799
3 Automatic evacuation alarm in UKE CYC SC4 SAS SCP CYC
*
RFFR00799
Automatic evacuation alarm in UKE KLD SC4 SAS SCP CYC
*3
RFFR00799
Automatic evacuation alarm in UKE QJA-QJE SC4 SAS SCP CYC
*3
RFFR00800
3 Monitoring of BB *JMU JMU SC4 SAS SCP JMU
*
RFFR00801 monitoring of IRWST atmosphere
3 KUL SC4 SAS SCP KUL
ECCN: N
QHE
xFSD00008 Boiler water’s conductivity control EYT SSS SSS Siemens
QHG
QHX
QHA
QHE
xFSD00009 Bottom blowdown EYT SSS SSS Siemens
QHG
QHX
QHA
QHE
xFSD00010 Deaerating the boiler EYT SSS SSS Siemens
QHG
QHX
QHA
QHE
xFSD00011 Cooling the protective cage EYT SSS SSS Siemens
QHG
QHX
QHA
QHE
xFSD00012 Heating of boiler during standby operation EYT SSS SSS Siemens
QHG
QHX
QHA
ECCN: N
QHE
xFSD00013 Pressure control of feedwater tank EYT SSS SSS Siemens
QHG
QHX
QHA
AL: N
QHE
xFSD00014 Level control of feedwater tank EYT SSS SSS Siemens
QHG
QHX
QHA
Overflow valve (30QHE03 AA404)
QHE
xFSD00015 opening on High water level (level switch EYT SSS SSS Siemens
QHG
30QHA03 CL001)
QHX
QHA
Keeping the feedwater tank “warm” and QHE
xFSD00016 EYT SSS SSS Siemens
pressurized during standby operation QHG
QHX
QHA
QHE
xFSD00017 Deaeration the feedwater tank EYT SSS SSS Siemens
QHG
QHX
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A52 / A141
xFSD00047 Monitoring of the generator stator MKA SC4 TGI TGI (Siemens)
Provide a status condition of any liquid
that has entered the generator frame or
xFSD00048 MKA SC4 TGI TGI (Siemens)
lead box: liquid level sensors to detect any
leaks and provide an Alarm
Turbine trip by opening of the Fire
Protection Valve 30 MKG19AA025 or low
xFSD00050 generator pressure from 2/3 signals of MKG SC4 TGI TGI (Siemens)
30MKG18CP001, 30MKG18CP002,
30MKG18CP003
xFSD00051 Control of the gas cooling system MKG SC4 TGI TGI (Siemens)
Protection of the gas cooling system
xFSD00052 MKG SC4 TGI TGI (Siemens)
valves
Monitoring of the exhaust gas system:
xFSD00053 Initiation of 30MKQ81AN001 fan upon MKQ EYT TGI TGI (Siemens)
low low pressure of 30MKQ82CP001
Monitoring of the exhaust gas system:
xFSD00054 Initiation of 30MKQ82AN001 fan upon MKQ EYT TGI TGI (Siemens)
low low pressure of 30MKQ81CP001
Provide a purge gas for the changing of
xFSD00055 MKG SC4 TGI TGI (Siemens)
generator gas.
Monitoring of the gas changing system:
xFSD00056 Monitor the argon supply pressure MKG SC4 TGI TGI (Siemens)
ECCN: N
30MKG82CP001
LAA
Supplying of steam from the moisture
xFSD00057 LBS EYT PAS 2 PAS 2 Siemens
separator to feedwater tank
LBS50
AL: N
LAA
Monitoring of the extraction steam piping
xFSD00058 LBS EYT PAS 2 PAS 2 Siemens
system
LBS50
Stop protection condensate extraction
pumps30LCB11/12/13AP001 on
LAA
Feedwater storage tank Level 30LAA10
xFSD00060 LBS SC4 PAS 2 PAS 2 Siemens
CL001/002/003 >= HIGH 4 (incl. Alarm on
LBS50
Feedwater storage tank Level 30LAA10
CL001/002/003 >= HIGH 4)
Stop protection condensate extraction
pumps30LCB11/12/13AP001 on LCA
Feedwater storage tank Level 30LAA10 LCB
xFSD00060 SC4 PAS 2 PAS 2 Siemens
CL001/002/003 >= HIGH 4 (incl. Alarm on LCR
Feedwater storage tank Level 30LAA10 LCW
CL001/002/003 >= HIGH 4)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A54 / A141
HIGH 2
Close protection aux. Steam CV
30LBG50AA101 on Feedwater storage LBG
xFSD00069 SC4 PAS 2 PAS 2 Siemens
tank Level 30LAA10 CL001/002/003 >= LCN
HIGH 2
Open emergency drain valve to
LAA
condenser 30LAA10AA405 on Feedwater
xFSD00070 LBS SC4 PAS 2 PAS 2 Siemens
storage tank Level 30LAA10
LBS50
CL001/002/003 >= HIGH 2
Close emergency drain valve to
LAA
condenser 30LAA10AA405 on Feedwater
xFSD00071 LBS SC4 PAS 2 PAS 2 Siemens
storage tank Level 30LAA10
LBS50
CL001/002/003 =< HIGH 1
Level control with 30LCA30AA101,
LAA
30LCA30AA102, 30LCA30AA111during
xFSD00072 LBS SC4 PAS 2 PAS 2 Siemens
Feedwater storage tank Level 30LAA10
LBS50
CL001/002/003 is within limits
Level control with 30LCA30AA101, LCA
30LCA30AA102, 30LCA30AA111during LCB
xFSD00072 SC4 PAS 2 PAS 2 Siemens
Feedwater storage tank Level 30LAA10 LCR
CL001/002/003 is within limits LCW
Enable start of feedwater pumps
LAA
30LAC11/12/13/14AP001 on Feedwater
xFSD00073 LBS SC4 PAS 2 PAS 2 Siemens
ECCN: N
xFSD00081 supplying demineralised water from the LBS SC4 PAS 2 PAS 2 Siemens
demineralised water storage tanks (3 LBS50
0GHC01/02 BB001)
Warming up feedwater tank maintaining
AL: N
LAA
pressure at 2 bar (a) by the auxiliary
xFSD00082 LBS SC4 PAS 2 PAS 2 Siemens
steam control valve (3 0LBG50 AA101) by
LBS50
a temperature gradient of 1 K/min
Warming up feedwater tank maintaining
pressure at 2 bar (a) by the auxiliary LBG
xFSD00082 SC4 PAS 2 PAS 2 Siemens
steam control valve (3 0LBG50 AA101) by LCN
a temperature gradient of 1 K/min
Limiting the opening of the auxiliary steam
LAA
control valve in case of the auxiliary steam
xFSD00083 LBS SC4 PAS 2 PAS 2 Siemens
header pressure (3 0LBG10 CP901)
LBS50
drops below 5 bar(a)
Limiting the opening of the auxiliary steam
control valve in case of the auxiliary steam LBG
xFSD00083 SC4 PAS 2 PAS 2 Siemens
header pressure (3 0LBG10 CP901) LCN
drops below 5 bar(a)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A57 / A141
30LAC11/12/13/14 AP001;
30LAJ10AP001 on HP Heater A6 Level LAD
xFSD00092 30LAD61/62CL001/002/003 (CL901)>= LBQ SC4 PAS 2 PAS 2 Siemens
HIGH 4 (inclu Alarm on HP Heater A6 LCH
Level 30LAD61/62CL001/002/003
AL: N
(CL901)>= HIGH 4)
Heater bypass operation on HP Heater A6
Level 30LAD61/62CL001/002/003 LAB*
(CL901)>= HIGH 3 (inlu. Alarm on HP LAC
xFSD00094 SC4 PAS 2 PAS 2 Siemens
Heater A6 Level LAH
30LAD61/62CL001/002/003 (CL901)>= LAJ
HIGH 3)
Heater bypass operation on HP Heater A6
Level 30LAD61/62CL001/002/003
LAD
(CL901)>= HIGH 3 (inlu. Alarm on HP
xFSD00094 LBQ SC4 PAS 2 PAS 2 Siemens
Heater A6 Level
LCH
30LAD61/62CL001/002/003 (CL901)>=
HIGH 3)
Close protective MSR stage 1 normal
drains control valve 30LCS11/12 AA101
LAD
on HP Heater A6 Level
xFSD00096 LBQ EYT PAS 2 PAS 2 Siemens
30LAD61/62CL001/002/003 (CL901)>=
LCH
HIGH 2 (incl. Alarm on HP Heater A6
Level 30LAD61/62CL001/002/003
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A58 / A141
Level 30LAD61/62CL001/002/003
LCH
(CL901)>= HIGH 2
Start-up drains level control 30LCH61/62
LAD
AA111 on HP Heater A6 Level
xFSD00098 LBQ EYT PAS 2 PAS 2 Siemens
30LAD61/62CL001/002/003 (CL901)>=
LCH
HIGH 1
Normal drains level control with
LAD
30LCH61/62 AA101on HP Heater A6
xFSD00099 LBQ EYT PAS 2 PAS 2 Siemens
Level 30LAD61/62CL001/002/003
LCH
(CL901) within limits
Close protective normal drains valve on
HP Heater A6 Level
30LAD61/62CL001/002/003 (CL901)
=<LOW 2 (incl. Warning on HP Heater A6 LAD
xFSD00102 Level 30LAD61/62CL001/002/003 LBQ EYT PAS 2 PAS 2 Siemens
(CL901) =<LOW 1 and Alarm on HP LCH
Heater A6 Level
30LAD61/62CL001/002/003 (CL901)
=<LOW 2)
Close protective start-up drains valve on
LAD
HP Heater A6 Level
xFSD00103 LBQ EYT PAS 2 PAS 2 Siemens
30LAD61/62CL001/002/003 (CL901)
LCH
=<LOW 2
Stop protective Feedwater pumps
ECCN: N
30LAC11/12/13/14 AP001,
LAB*
30LAJ10AP001on HP Heater A7 Level
LAC
xFSD00105 30LAD71/72 CL001/002/003 (CL901) >= SC4 PAS 2 PAS 2 Siemens
LAH
HIGH 4 (incl. Alarm on HP Heater A7
LAJ
Level 30LAD71/72 CL001/002/003
AL: N
LCH
(CL901) within limits
Close protective normal drains valve
30LCH71/72 AA101 on HP Heater A7
Level 30LAD71/72 CL001/002/003
(CL901) =< LOW 2 (incl. Warning on HP LAD
xFSD00116 Heater A7 Level 30LAD71/72 LBQ EYT PAS 2 PAS 2 Siemens
CL001/002/003 (CL901) =< LOW 1 and LCH
Alarm on HP Heater A7 Level
30LAD71/72 CL001/002/003 (CL901) =<
LOW 2 )
Close protective start-up drains valve
LAD
30LCH71/72 AA111 on HP Heater A7
xFSD00117 LBQ EYT PAS 2 PAS 2 Siemens
Level 30LAD71/72 CL001/002/003
LCH
(CL901) =< LOW 2
LAD
Indication in main control room of HP
xFSD00118 LBQ EYT PAS 2 PAS 2 Siemens
heater A6 drains flow
LCH
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A60 / A141
xFSD00123 extraction steam temperature upstream LBQ EYT PAS 2 PAS 2 Siemens
heater A7 LCH
LAB*
Feedwater pump minimum flow control LAC
xFSD00128 SC4 PAS 2 PAS 2 Siemens
(30 LAB11/12/13/14 DF121) LAH
LAJ
LAB*
Start-up/shutdown feedwater pump LAC
xFSD00129 SC4 PAS 2 PAS 2 Siemens
pressure control (3 0LAH10 DP901) LAH
LAJ
Automatic switch off of the second and LAB*
third feedwater pump during reactor trip or LAC
xFSD00130 SC4 PAS 2 SCP CLT
turbine trip, when signal 30LAC00EZ001 LAH
XV51 is not present LAJ
Automatic switch on of the second
LAB*
feedwater pump via signal
LAC
xFSD00131 30JSC00DF251AY XR20, switch off of the SC4 PAS 2 SCP CLT
LAH
second running pump when the signal is
LAJ
not present
Automatic switch on of the third feedwater LAB*
pump via signal 30JSC00DF251BY XR30, LAC
xFSD00132 SC4 PAS 2 SCP CLT
ECCN: N
LAC
xFSD00147 Monitoring of the feedwater system SC4 PAS 2 PAS 2 Siemens
LAH
LAJ
LBG
xFSD00148 Monitoring of the auxiliary steam system EYT PAS 2 PAS 2 Siemens
LCN
Monitoring of collection and discharge of
xFSD00151 LCS EYT PAS 2 PAS 2 Siemens
drains
Close protective heating steam valve on
reheater Stage 1 Condensate Tank Level
LBB
30LCS11/12 CL001/002/003 (CL901) >=
xFSD00153 LBC EYT PAS 2 PAS 2 Siemens
HIGH 2 (inlu. Alarm on reheater Stage 1
LBJ
Condensate Tank Level 30LCS11/12
CL001/002/003 (CL901) >= HIGH 2)
Close protective heating steam valve on
reheater Stage 1 Condensate Tank Level
xFSD00153 30LCS11/12 CL001/002/003 (CL901) >= LCS EYT PAS 2 PAS 2 Siemens
HIGH 2 (inlu. Alarm on reheater Stage 1
Condensate Tank Level 30LCS11/12
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A62 / A141
xFSD00182 Control of traveling band screens PAA SC4 SSS SSS Siemens
Supply of the turbine valves with SCB
xFSD00183 compressed air: Indication of the system QFB EYT PAS 2 PAS 2 Siemens
pressure SCA
AL: N
SCB
xFSD00184 Monitoring of the compressor units QFB EYT SSS SCP SB NI
SCA
SCB
Supply of the plant with compressed air:
xFSD00185 QFB EYT SSS SCP SB NI
Black Box I&C
SCA
Isolation of non-protected system part SCB
xFSD00186 inside containment and pressure QFB EYT PAS 1 SCP SCB1 NI
monitoring SCA
Control of Nitrogen (N2) Gas Distribution
xFSD00188 QJA-QJE EYT SSS SCP QJ NI
System
Control of Nitrogen (N2) Gas supply to the
xFSD00189 reactor pressure vessel head 30JAA and QJA-QJE EYT PAS 1 SCP QJ NI
the primary coolant pumps 30JEB.
Control of Oxygen (O2) Gas Distribution
xFSD00190 QJA-QJE EYT SSS SCP QJ NI
System
xFSD00193 Control of Hydrogen (H2) Gas Distribution QJA-QJE EYT SSS SCP QJ NI
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A64 / A141
detected
Automatic protective action: Protective
close of the corresponding ESWS
xFSD00199 GM SC3 SAS SCP GM NI
isolation valve (30PEB10/20/30/40
AA005) if flooding is detected
Automatic protective action: Protective
close of the corresponding ESWS
xFSD00199 PEB/PEH SC3 SAS SCP GM NI
isolation valve (30PEB10/20/30/40
AA005) if flooding is detected
Automatic protective action: Shut down of
the Anti Icing Pumps (30PAC41/42/43
AP001) if flooding is detected (incl. Alarm
xFSD00201 in case water level >0.1m in the room GM SC3 SAS SCP GM NI
(30GMQ11/13/21/23/31/32/41/42
CL003/004 and 30GMQ35/45/46
CL001/002))
Automatic protective action: Shut down of
the Anti Icing Pumps (30PAC41/42/43 PAB
AP001) if flooding is detected (incl. Alarm PAC
xFSD00201 in case water level >0.1m in the room PAH SC3 SAS SCP GM NI
(30GMQ11/13/21/23/31/32/41/42 PUE
CL003/004 and 30GMQ35/45/46 PUR
CL001/002))
EYT manual sump draining I&C function
ECCN: N
over temperature
Protection of heating water system from
xFSD00225 SBA EYT SSS SSS Siemens
overpressure
Control of chilled water supply
xFSD00227 QNM EYT SSS SSS Siemens
temperature of chilled water machines
Chilled water machine and relevant chilled
water re circulation pump switched ON on
xFSD00228 QNM EYT SSS SSS Siemens
water flow measurement 30QNM04CF001
high
Chilled water machine and relevant chilled
water re circulation pump switched OFF
xFSD00229 QNM EYT SSS SSS Siemens
on water flow measurement
30QNM04CF001 low
Freeze protection chilled water machines
30QNM01/02/03 through the Protection
xFSD00230 OFF command of the chilled water QNM EYT SSS SSS Siemens
machines in case of LOW temperature in
evaporator inside the chilled water
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A66 / A141
xFSD00239 OPENED in stages on room temperature SAM1 EYT SSS SSS Siemens
sensors value 30SAM19CT001/2/3 high
Exhaust air roof fans 30SAM19AN001-12
Switched ON in stages on room
xFSD00240 SAM1 EYT SSS SSS Siemens
AL: N
xFSD00265 switchgear rooms (also for boiler room, if SAH EYT SSS SSS Siemens
auxiliary boiler is not in operation) with
30SAH11AA001/2 and 30SAH12AA004
Control of supply air temperature to
switchgear rooms (also for boiler room, if
xFSD00266 auxiliary boiler is not in operation) with SAH EYT SSS SSS Siemens
valves 30SAH11AA001/2 and
30SAH12AA004
Switch ON Re circulation air heater
xFSD00267 30SBH02/03AH001 on room temperature SAH EYT SSS SSS Siemens
in boiler room 30SAH11CT002 low1
Switch OFF Re circulation air heater
xFSD00268 30SBH02/03AH001 on room temperature SAH EYT SSS SSS Siemens
in boiler room 30SAH11CT002 high
OPEN air intake openings on room
xFSD00269 temperature in boiler room SAH EYT SSS SSS Siemens
30SAH11CT008 high
Switch ON Exhaust air fans in stages on
xFSD00270 room temperature in boiler room SAH EYT SSS SSS Siemens
30SAH11CT008 high
Close air intake openings on room
xFSD00271 SAH EYT SSS SSS Siemens
temperature in boiler room low
ECCN: N
xFSD00287 Circulating Water Building: Fault, Alarm SAQ50 EYT SSS SSS Siemens
indication
Position control of multi leaf dampers
xFSD00288 30SAJ10/11AA001/2, 30SAJ20AA001 (in SAJ EYT SSS SSS Siemens
outside air, return air and exhaust air)
Switch ON supply air heater
30SAJ10/11AH001 on room temperature
xFSD00289 SAJ EYT SSS SSS Siemens
(30SAJ10CT002) in anti-icing pump room
low.
Switch OFF supply air heater
30SAJ10/11AH001 on room temperature
xFSD00290 SAJ EYT SSS SSS Siemens
(30SAJ10CT002) in anti-icing pump room
high.
Protection OFF command of electrical air
heaters 30SAJ10/11 AH001 in case of
xFSD00291 SAJ EYT SSS SSS Siemens
high supply air temperature behind
electrical air heater 30SAJ10/11 CT001
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A70 / A141
and Transformers
Indication of BB measurements and
xFSD00317 BB SC4 PAS 1 SCP BB-BD
system status
Indication of BD, BMT, BBA-BBD, XKA,
xFSD00318 TVA-TVD measurements and system BD SC3 SAS SCP BB-BD
status
xFSD00319 Monitoring of the LV Distribution System BF, BH, BJ SC4 PAS 2 PAS 2 Siemens
Control of switchgear for power supply of
TI LV loads 690V (safety class acc. to the
xFSD00320 BF, BH, BJ SC4 PAS 2 PAS 2 Siemens
class for the operation of the connected
loads)
Control of Distribution boards for power
supply of smaller TI LV loads 400V (safety
xFSD00321 BF, BH, BJ SC4 PAS 2 PAS 2 Siemens
class acc. to the class for the operation of
the connected loads)
Control of transformers for power supply
of TI switchgear BFA-BFD (safety class
xFSD00322 BF, BH, BJ SC4 PAS 2 PAS 2 Siemens
acc. to the class for the operation of the
connected loads)
Control of transformers for power supply
of switchgear BHA-BHF (safety class acc.
xFSD00323 BF, BH, BJ SC4 PAS 2 PAS 2 Siemens
to the class for the operation of the
connected loads)
ECCN: N
BTD, BRU,
Indication of BT, BR, BU measurements
xFSD00337 BTP, BUE- SC3 SAS SCP BATT
and system status
BUH; BR, BTW
BTD, BRU,
Indication of BN, BT, BR measurements
xFSD00338 BTP, BUE- SC3 SAS SCP BATT
and system status
BUH; BR; BTW
JAA
JAC
Control of change over between the two
JEA
xFSD00341 infeeds (30BBT-30BCT) in the TI 10kV SC4 SSS SCP PST
JEB
switchgear 30BBA-BBD
JEC
ECCN: N
JEF, JEG
PAB
Intermediate positions of check valves PAC
xFSD00357 30PAB11/12/13/14AA001 on the PAH SC4 PAS 2 PAS 2 Siemens
discharge site of Circulating water pump PUE
PUR
PAB
PAC
Monitoring of the circulating/recirculation
xFSD00358 PAH EYT PAS 2 PAS 2 Siemens
water pump
PUE
PUR
PAB
PAC
Monitoring of the circulating/recirculation
ECCN: N
PAB
AL: N
PAC
Pumping of the circulating water trough
xFSD00360 PAH SC4 PAS 2 PAS 2 Siemens
the condense back to the sea
PUE
PUR
PAB
PAC
Monitoring of the evacuation system for
xFSD00361 PAH EYT PAS 2 PAS 2 Siemens
cooling water
PUE
PUR
PAB
PAC
Control of cleaning of the condenser tubes
xFSD00362 PAH EYT PAS 2 PAS 2 Siemens
by rubber balls
PUE
PUR
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A74 / A141
PAB
PAC
Control of Evacuating of the circulating
xFSD00364 PAH EYT PAS 2 PAS 2 Siemens
water system
PUE
PUR
PAB
Control of recirculation of heated cooling
PAC
water to the cooling water inlet culvert via
xFSD00365 PAH SC4 PAS 2 PAS 2 Siemens
the cooling water recirculation pumps
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
PUE
during cold weather conditions
PUR
PAB
Control of corrosion protection of the PAC
xFSD00366 components in the circulating water PAH EYT SSS SCP PUR NI
system PUE
PUR
PAB
PAC
Monitoring of the Cathodic protection
xFSD00367 PAH EYT SSS SCP PUR NI
system
PUE
PUR
Monitoring of the Cathodic protection
xFSD00367 30PUR, 30UPx EYT SSS SCP PUR NI
system
Protect through the protection OFF
command of the Circulating water pump ( PAB
30PAC11/12/13/14 AP001 ) if the PAC
xFSD00368 combined isolation and check valve has PAH SC4 PAS 2 PAS 2 Siemens
not reached an monitored aperture angle ( PUE
two applications ) in an required time ( PUR
30PAB11/12/13/14 CG001 )
ECCN: N
AA001/AA002
Isolation of the supply of UFA building for
xFSD00410 flooding protection with valves 30GHC73 KTA-KTE SC4 PAS 1 SCP GHC NI
AA001/AA002
AL: N
xFSD00423 AP001 when PGB (Closed cooling water SC4 PAS 2 PAS 2 Siemens
PGC
piping system) is in operation
Opening of valve 30PGB01AA003 on
pressure measurement
(30PGB10CP001/002/003) of the closed
PGB
xFSD00424 cooling water system low (incl. Warning SC4 PAS 2 PAS 2 Siemens
PGC
on pressure measurement
(30PGB10CP001/002/003) of the closed
cooling water system low)
Protective close of valve 30PGB01AA003
on pressure measurement
(30PGB10CP001/002/003) of the closed
PGB
xFSD00425 cooling water system too high (incl SC4 PAS 2 PAS 2 Siemens
PGC
Warning on pressure measurement
(30PGB10CP001/002/003) of the closed
cooling water system too high)
Alarm, Shut off closed cooling water
pumps on pressure measurement PGB
xFSD00426 SC4 PAS 2 PAS 2 Siemens
(30PGB10CP001/002/003) of the closed PGC
cooling water system very low
Protection OFF command of closed
cooling water pump (PGC11/12/13
PGB
xFSD00428 AP001) in case of difference pressure SC4 PAS 2 PAS 2 Siemens
PGC
closed cooling water pumps too high (
ECCN: N
30PGB10 CP904 )
Protection OFF command of closed
cooling water pump (PGC11/12/13
PGB
xFSD00429 AP001) in case of difference pressure SC4 PAS 2 PAS 2 Siemens
PGC
AL: N
LCR
heater 3 level 30LCC30
LCW
CL001/CL002/CL003 (CL901) >= HIGH 4)
Heater bypass operation on LP heater 3
level 30LCC30 CL001/CL002/CL003
LCC
xFSD00455 (CL901) >= HIGH 4 (incl Warning on LP EYT PAS 2 PAS 2 Siemens
LCJ
heater 3 level 30LCC30
CL001/CL002/CL003 (CL901) >= HIGH 4)
Normal drains level control on LP heater
3 level 30LCC30 CL001/CL002/CL003
within range (incl Warning on LP heater 3
LCC
xFSD00456 level 30LCC30 CL001/CL002/CL003 EYT PAS 2 PAS 2 Siemens
LCJ
(CL901) >= HIGH 1 and Warning on LP
heater 3 level 30LCC30
CL001/CL002/CL003 (CL901) =< LOW 1)
Stop protection condensate extraction
LCA
pumps on LP heater 3 level 30LCC30
LCB
xFSD00457 CL001/CL002/CL003 (CL901) >= HIGH 5 EYT PAS 2 PAS 2 Siemens
LCR
(incl. Alarm on LP heater 3 level 30LCC30
LCW
CL001/CL002/CL003 (CL901) >= HIGH 5)
level 30LCC11/12/13
CL001/CL002/CL003 (CL901) >= HIGH 2 LCA
(incl Warning on LP heater 1 level LCB
xFSD00471 EYT PAS 2 PAS 2 Siemens
30LCC11/12/13 CL001/CL002/CL003 LCR
(CL901) >= HIGH 1 and Warning on LP LCW
heater 1 level 30LCC11/12/13
CL001/CL002/CL003 (CL901) >= HIGH 2)
Heater bypass operation on LP heater 1
level 30LCC11/12/13
CL001/CL002/CL003 (CL901) >= HIGH 2
(incl Warning on LP heater 1 level LCC
xFSD00471 EYT PAS 2 PAS 2 Siemens
30LCC11/12/13 CL001/CL002/CL003 LCJ
(CL901) >= HIGH 1 and Warning on LP
heater 1 level 30LCC11/12/13
CL001/CL002/CL003 (CL901) >= HIGH 2)
Stop protection condensate extraction
pumps 30LCB11/12/13 AP001LP heater 1
LCA
level 30LCC11/12/13
LCB
xFSD00472 CL001/CL002/CL003 (CL901)>= HIGH 3 EYT PAS 2 PAS 2 Siemens
LCR
(incl. Alarm LP heater 1 level
LCW
30LCC11/12/13 CL001/CL002/CL003
(CL901) >= HIGH 3)
Stop protection condensate extraction
pumps 30LCB11/12/13 AP001LP heater 1
ECCN: N
level 30LCC11/12/13
LCC
xFSD00472 CL001/CL002/CL003 (CL901)>= HIGH 3 EYT PAS 2 PAS 2 Siemens
LCJ
(incl. Alarm LP heater 1 level
30LCC11/12/13 CL001/CL002/CL003
AL: N
system LCJ
LCC
xFSD00483 Monitoring of the LP heater drains pump EYT PAS 2 PAS 2 Siemens
LCJ
LCC
xFSD00484 Monitoring of the LP heater drains system EYT PAS 2 PAS 2 Siemens
LCJ
Close make up water supply on
xFSD00485 Condenser level 30MAG00FL921 > HIGH GHC SC4 PAS 2 PAS 2 Siemens
1
LCA
Close make up water supply on
LCB
xFSD00485 Condenser level 30MAG00FL921 > HIGH SC4 PAS 2 PAS 2 Siemens
LCR
1
LCW
Close protection Make-up water supply on
xFSD00486 Condenser level 30MAG00FL921 > HIGH GHC SC4 PAS 2 PAS 2 Siemens
2
LCA
Close protection Make-up water supply on
LCB
xFSD00486 Condenser level 30MAG00FL921 > HIGH SC4 PAS 2 PAS 2 Siemens
LCR
2
LCW
Open make up water supply on
xFSD00487 Condenser level 30MAG00FL921 < GHC SC4 PAS 2 PAS 2 Siemens
LOW1
ECCN: N
LCA
Open make up water supply on
LCB
xFSD00487 Condenser level 30MAG00FL921 < SC4 PAS 2 PAS 2 Siemens
LCR
LOW1
LCW
AL: N
LCW
LOW 3)
LCA
Open loop control condensate flow gland LCB
xFSD00498 SC4 PAS 2 PAS 2 Siemens
steam condenser 30LCA38DF001 LCR
LCW
LCA
Open loop control minimum flow main LCB
xFSD00499 SC4 PAS 2 PAS 2 Siemens
condensate pump 30LCA11/12/13EE021 LCR
LCW
LCA
Closed loop control pressure LCW/LCR LCB
xFSD00500 EYT PAS 2 PAS 2 Siemens
system 30LCW10DP001 LCR
LCW
Release seal and cooling drains system
xFSD00501 valve 30LCW10AA101 demineralized GHC EYT PAS 2 PAS 2 Siemens
water pressure 30GHC20 CP001 high
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A84 / A141
LCA
condensate pump (30LCB11/12/13
LCB
xFSD00504 AP001) in case of failure of 1 out of 2 EYT PAS 2 PAS 2 Siemens
LCR
winding or bearing measurements
LCW
(30LCB11/12/13CT971/973/975/977/979)
Protection OFF command of main
condensate pump (30LCB11/12/13 LCA
AP001) in case of failure of 2 out of 3 LCB
xFSD00505 EYT PAS 2 PAS 2 Siemens
feedwater heater A1/A2, A3, A4 water LCR
level measurements LCW
(30LCC11/12/13/21/22/23/30/40 CL901)
Protection OFF command of main
condensate pump (30LCB11/12/13
AP001) in case of failure of 2 out of 3 LCC
xFSD00505 EYT PAS 2 PAS 2 Siemens
feedwater heater A1/A2, A3, A4 water LCJ
level measurements
(30LCC11/12/13/21/22/23/30/40 CL901)
Protection OFF command of main
condensate pump (30LCB11/12/13 LAA
xFSD00506 AP001) in case of failure of 2 out of 3 LBS SC4 PAS 2 PAS 2 Siemens
feedwater storage tank level LBS50
measurements (30LAA10 CL901)
Protection OFF command of main
LCA
condensate pump (30LCB11/12/13
LCB
xFSD00506 AP001) in case of failure of 2 out of 3 SC4 PAS 2 PAS 2 Siemens
ECCN: N
LCR
feedwater storage tank level
LCW
measurements (30LAA10 CL901)
Protection OFF command of main
LCA
condensate pump (30LCB11/12/13
LCB
AL: N
HIGH 2
Protective shutdown of clean drains pump
30LCM21 AP001 and 30LCM22 AP001
on level measurements of the clean
drains collecting tank 30LCM20CL901 =<
xFSD00530 LCM EYT PAS 2 PAS 2 Siemens
LOW 2 (incl. Alarm on level
measurements of the clean drains
collecting tank 30LCM20CL901 =< LOW
2)
Start standby pump 30LCM21 AP001 or
30LCM22 AP001 on level measurements
xFSD00531 LCM EYT PAS 2 PAS 2 Siemens
of the clean drains collecting tank
30LCM20CL901 >= HIGH 3
Start the selected clean drains pump
30LCM21 AP001 or 30LCM22 AP001 on
xFSD00532 level measurements of the clean drains LCM EYT PAS 2 PAS 2 Siemens
collecting tank 30LCM20CL901 >= HIGH
1
PCB
Isolation of the closed cooling water heat
xFSD00533 PCC SC4 PAS 2 PAS 2 Siemens
exchangers
PCH
PCB
Monitoring of the auxiliary cooling water
xFSD00534 PCC SC4 PAS 2 PAS 2 Siemens
system
ECCN: N
PCH
Auxiliary cooling water pump
(30PCC11/12 AP001) protection through PCB
xFSD00535 the protection OFF command in case of PCC SC4 PAS 2 PAS 2 Siemens
AL: N
drains system
Close protection emergency drains valve
(30LCT11/21 AA111) on Moisture
xFSD00547 Separator Condensate Tank Level LCT EYT PAS 2 PAS 2 Siemens
30LCT11/21 CL001/002/003 (CL901) =<
LOW2
Close protection normal drains valve
(30LCT11/21 AA101) on Moisture
Separator Condensate Tank Level
30LCT11/21 CL001/002/003 (CL901] =<
xFSD00548 LCT EYT PAS 2 PAS 2 Siemens
LOW2 (incl. Warning on Moisture
Separator Condensate Tank Level
30LCT11/21 CL001/002/003 (CL901) =<
LOW2)
Emergency drains level control
(30LCT11/21 AA111) on Moisture
Separator Condensate Tank Level
30LCT11/21 CL001/002/003 (CL901] >=
HIGH 1 (incl Alarm on Moisture Separator
xFSD00549 LCT EYT PAS 2 PAS 2 Siemens
Condensate Tank Level 30LCT11/21
CL001/002/003 (CL901) >= HIGH 2 and
Alarm on Moisture Separator Condensate
Tank Level 30LCT11/21 CL001/002/003
(CL901) >= HIGH 3)
ECCN: N
LBJ
LBB
Monitoring of the cold reheat piping
xFSD00566 LBC SC4 TGI TGI (Siemens)
system
LBJ
AL: N
LBB
Pilot Control Heating Steam Reheater 1/2
xFSD00567 LBC SC4 TGI TGI (Siemens)
30LBJ60DT001
LBJ
LBB
Warm-up Valve Step Control
xFSD00568 LBC SC4 TGI TGI (Siemens)
30LBJ51/52DT001
LBJ
LBB
Cooldown Control Reheater Stage2
xFSD00569 LBC SC4 TGI TGI (Siemens)
30LBJ60FT001/2
LBJ
Calculation Waiting Time 30LBJ70FT002 LBB
xFSD00570 for warming up the turbine shaft after LBC SC4 TGI TGI (Siemens)
exceeding 160MW load LBJ
LBB
Cooldown Control Reheater Stage1
xFSD00571 LBC SC4 TGI TGI (Siemens)
30LBJ70FT001
LBJ
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A89 / A141
MAK
xFSD00584 Control of Lifting oil supply EYT TGI TGI (Siemens)
MAV
MAK
xFSD00585 Control of Turning gear EYT TGI TGI (Siemens)
MAV
AL: N
MAK
xFSD00586 Control of Oil Vapour Exhaust System EYT TGI TGI (Siemens)
MAV
MAK
xFSD00587 Control of Oil Purification System EYT TGI TGI (Siemens)
MAV
xFSD00588 Starting up Turbine Generator MYA SC4 TGI TGI (Siemens)
Control of the turbine speed MAA
xFSD00589 SC4 TGI TGI (Siemens)
(30MYA01CS901) MAC
Control of the turbine speed
xFSD00589 MYA SC4 TGI TGI (Siemens)
(30MYA01CS901)
Control of turbine Load (30 MAA
xFSD00590 SC4 TGI TGI (Siemens)
MKA01CE903A) and Load limitiation MAC
Control of turbine Load (30
xFSD00590 MYA SC4 TGI TGI (Siemens)
MKA01CE903A) and Load limitiation
Controlling of the main steam HP MAA
xFSD00591 SC4 TGI TGI (Siemens)
pressure (30LBA50CP901) MAC
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A90 / A141
xFSD00615 Turbine trip by Fire protection system MAY SC4 TGI TGI (Siemens)
Turbine trip by Generator unit protection
xFSD00616 MAY SC4 TGI TGI (Siemens)
(for electrical components) system
Turbine trip by HP casing bending HIGH 2 MAA
xFSD00617 SC4 TGI TGI (Siemens)
out of 2 MAC
Turbine trip by HP casing bending HIGH 2
xFSD00617 MAY SC4 TGI TGI (Siemens)
out of 2
Turbine trip by LP exhaust temperature MAA
xFSD00618 SC4 TGI TGI (Siemens)
HIGH 2 out of 3 MAC
Turbine trip by LP exhaust temperature
xFSD00618 MAY SC4 TGI TGI (Siemens)
HIGH 2 out of 3
Turbine trip by Lube oil pressure LOW 2 MAA
xFSD00619 SC4 TGI TGI (Siemens)
out of 3 MAC
Turbine trip by Lube oil pressure LOW 2 MAK
xFSD00619 SC4 TGI TGI (Siemens)
out of 3 MAV
xFSD00619 Turbine trip by Lube oil pressure LOW 2 MAY SC4 TGI TGI (Siemens)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A92 / A141
xFSD00623 Turbine trip by SGC steam turbine steam MAY SC4 TGI TGI (Siemens)
Turbine trip by Turbine bearing MAA
xFSD00624 SC4 TGI TGI (Siemens)
temperature HIGH 2 out of 3 MAC
Turbine trip by Turbine bearing
xFSD00624 MAD SC4 TGI TGI (Siemens)
temperature HIGH 2 out of 3
Turbine trip by Turbine bearing
xFSD00624 MAY SC4 TGI TGI (Siemens)
temperature HIGH 2 out of 3
Turbine trip initiation by internal failures of
xFSD00625 MAY SC4 TGI TGI (Siemens)
turbine trip system
Turbine Trip initiation by moisture
xFSD00626 MAY SC4 TGI TGI (Siemens)
separator condensate tank level high
MAA
xFSD00627 Steam turbine start up SC4 TGI TGI (Siemens)
MAC
xFSD00627 Steam turbine start up MAY SC4 TGI TGI (Siemens)
MAA
xFSD00628 Control of vacuum breaker SC4 TGI TGI (Siemens)
MAC
xFSD00628 Control of vacuum breaker MAG SC4 TGI TGI (Siemens)
xFSD00628 Control of vacuum breaker MAY SC4 TGI TGI (Siemens)
Opening of control valves have when
xFSD00629 MAY SC4 TGI TGI (Siemens)
conservation mode is active
ECCN: N
xFSD00680 Monitoring of relative shaft vibration MAD SC4 TGI TGI (Siemens)
MAA
xFSD00682 Turbine Stress Control SC4 TGI TGI (Siemens)
MAC
xFSD00683 Monitor the voltage regulator MKY SC4 TGI TGI (Siemens)
Automatic mode: automatic regulation of
xFSD00684 MKY SC4 TGI TGI (Siemens)
the generator terminal voltage
Manual mode: automatic regulation of the
xFSD00685 excitation current of the main exciter and MKY SC4 TGI TGI (Siemens)
consequently of the generator
xFSD00686 Over excitation limiting MKY SC4 TGI TGI (Siemens)
xFSD00687 Power system stabilization MKY SC4 TGI TGI (Siemens)
xFSD00688 Stator current limiting MKY SC4 TGI TGI (Siemens)
xFSD00689 U/f limiting MKY SC4 TGI TGI (Siemens)
xFSD00690 Under-excitation limiting MKY SC4 TGI TGI (Siemens)
Monitoring of LDB (Condensate
xFSD00691 LDB EYT SSS SSS Siemens
mechanical filtering system) -System
Generator trip in case of high bearing
xFSD00694 MKD SC4 TGI TGI (Siemens)
pedestal vibration
Generator trip in case of high bearing
xFSD00695 MKD SC4 TGI TGI (Siemens)
tempearture values
ECCN: N
xFSD00722 EFWS pump monitoring LAR, LAS SC3 SAS SCP LAR-LAS
xFSD00724 Risk of Heterogenous Dilution KAA, KAB SC3 SAS SCP KAA/KAB
xFSD00726 Emergency Backup Switchover KAA, KAB SC3 SAS SCP KAA/KAB
xFSD00726 Emergency Backup Switchover PEB/PEH SC3 SAS SCP KAA/KAB
xFSD00727 CCW supply temperature control KAA, KAB SC3 SAS SCP KAA/KAB
xFSD00728 CCWS high temperature KAA, KAB SC3 SAS SCP KAA/KAB
SAS differential pressure control at the
xFSD00729 KAA, KAB SC3 SAS SCP KAA/KAB
heat exchanger outlet
xFSD00730 Leak detection sequence KAA, KAB SC3 SAS SCP KAA/KAB
FAK
xFSD00731 CCWS trains abnormal flow rate SC3 SAS SCP KAA/KAB
FAL
xFSD00731 CCWS trains abnormal flow rate KAA, KAB SC3 SAS SCP KAA/KAB
xFSD00732 CCWS surge tank make-up KAA, KAB EYT PAS 1 SCP KAA/KAB
xFSD00733 Dedicated CCWS: Cooling function KAA50/80 SC3 SAS SCP KAA50/80
xFSD00734 Dedicated CCWS: Water make-up KAA50/80 SC3 SAS SCP KAA50/80
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A96 / A141
trains
FAK
xFSD00742 Physical protections for skimming pumps SC4 PAS 1 SCP FAK/FAL
FAL
Protection closing order for ILCO water FAK
xFSD00743 SC4 PAS 1 SCP FAK/FAL
make-up valve FAL
Component and system protection of fuel FAK
xFSD00744 SC4 PAS 1 SCP JN
pool purification system FAL
JAA
JAC
Component and system protection of fuel JEA
xFSD00744 SC4 PAS 1 SCP JN
pool purification system JEB
JEC
JEF, JEG
Component and system protection of fuel JNA; JND;
xFSD00744 SC4 PAS 1 SCP JN
pool purification system JNG, JNK
Component and system protection of fuel
xFSD00744 KBE SC4 PAS 1 SCP JN
pool purification system
Enable conditions for purification and FAK
xFSD00745 SC4 PAS 1 SCP FAK/FAL
skimming pumps start FAL
Motorized control valve downstream of FAK
xFSD00746 SC4 PAS 1 SCP FAK/FAL
purification pumps FAL
ECCN: N
xFSD00747 30JDH pump rooms and 30FAK pump KLL SC3 SAS SCP KLL
rooms
FAK
xFSD00748 Fuel handling hall isolation SC3 SAS SCP KLL
FAL
xFSD00748 Fuel handling hall isolation KLL SC3 SAS SCP KLL
xFSD00749 Room in front of the hatch isolation KLL SC3 SAS SCP KLL
Room in front of the emergency airlock
xFSD00750 KLL SC3 SAS SCP KLL
isolation
Maintain sub-pressure in the Fuel Building
xFSD00751 KLL SC4 PAS 1 SCP KLL
with respect to outside atmosphere
Reduce the concentration of aerosols and
xFSD00752 KLL SC4 PAS 1 SCP KLL
radioactive gases in the air of the rooms
Maintain acceptable room ambient
conditions in the Fuel Building for FAK
xFSD00753 EYT PAS 1 SCP KLL
equipment operation and personnel FAL
access
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A97 / A141
xFSD00832 in the main control room 32UJK26030 SAB90 SC3 SSS SCP SAB
during first 2hours of SBO
Isolate the volume of mechanical divisions
xFSD00833 of Safeguard Buildings when the SIS KLC SC3 SAS SCP KLC
system is used after an accident in the RB
Ensure the extraction of heat generated
by the SIS/RHR, KAA/LAR and JMU/KUL
xFSD00834 (Div 1 and 4 only) systems equipment to KLC SC3 SAS SCP KLC
maintain ambient temperatures below the
maximum limits
Maintain subpressure in the affected area
and remove iodine released in the RB or
xFSD00835 KLC SC3 SAS SCP KLC
fuel handling hall in the event of a fuel
handling accident
Maintain sub-pressure in controlled area
of Safeguard Buildings with respect to
xFSD00836 adjacent areas and the airflow direction KLC SC4 SAS SCP KLC
inside the building during normal
operation
Isolate the rooms of the SIS/RHR systems
in Divisions 1 and 4 if the plant is in RHR
xFSD00837 KLC SC3 SAS SCP KLC
mode with 30JN system temperatures >=
100°C
ECCN: N
rate
Monitoring and controls to maintain
acceptable ambient conditions in the Main
xFSD00868 SAM3 EYT PAS 1 SCP SAM3
Steam and Feedwater Valve
AL: N
SCP JYH10-20-
xFSD00880 Humidity Leakage monitoring JYH80 SC3 SSS
80
Vent and drainage inside reactor building:
xFSD00881 Monitoring for normal operation, non KTA-KTE EYT PAS 1 SCP KT10/11
safety related
Vent and drainage inside reactor building:
xFSD00882 Manual or automatic orders to the KTA-KTE SC4 PAS 1 SCP KT10/11
isolation valves and pumps
Vent and drainage inside reactor building:
xFSD00883 KTA-KTE SC3 SAS SCP KT10/11
Protection of the KPL system
Vent and drainage inside reactor building:
xFSD00884 KTA-KTE SC3 SAS SCP KT10/11
Monitoring of the RCS leaktightness
Vent and drainage inside reactor building:
xFSD00885 KTA-KTE SC3 SAS SCP KT10/11
Water detection in the spreading area
Vent and drainage inside reactor building:
Monitoring of leakage by the floor drain
xFSD00886 KTA-KTE SC4 SAS SCP KT10/11
sumps to detect flooding in the annulus
building (UJB)
Vent and drainage inside reactor building:
Monitoring of leakage by the floor drain
xFSD00887 KTA-KTE SC4 SAS SCP KT10/11
sumps to detect flooding inside the reactor
building (UJA)
ECCN: N
xFSD00905 Differential pressure protection of filters KBE SC3 SAS SCP KBE
Monitoring for wrong alignment of KBA FAK
xFSD00906 SC4 SAS SCP KBE
and FAL systems within KBE FAL
Monitoring for wrong alignment of KBA
xFSD00906 KBE SC4 SAS SCP KBE
and FAL systems within KBE
xFSD00909 Level protection of degasifier column KBG SC3 SAS SCP KBG
Automatic start-up and shutdown of
xFSD00913 KBG SC4 PAS 1 SCP KBG
degasification
xFSD00914 I&C performed by BBX KBG SC4 SSS SCP KBG
Sub loop control for Operator Mode
xFSD00915 Selector and for Automatic activation of KBF SC4 PAS 1 SCP KBF
start-up/shutdown program
xFSD00919 Group control for vapor compressor KBF SC4 PAS 1 SCP KBF
Overpressure protection due to safety
xFSD00922 KBF SC3 SSS SCP KBF
switch off of the electrical heaters
xFSD00923 Monitoring and automated operation JMT SC3 SAS SCP JMT
xFSD00924 Loss of Power supply function JMT SC3 SAS SCP JMT
Subgroup control 30GDA10 EC001
GDA, GDN;
xFSD00925 backwashing of the cartridge filter EYT PAS 1 SCP GD
GDP
30GDA10 AT010
Sub loop control 30GDA13 EE001
ECCN: N
xFSD00945 transferring, processing and storing the SC4 PAS 1 SCP JYL
JEB
data.
JEC
JEF, JEG
FAMOS data acquisition, measuring,
AL: N
JNA; JND;
xFSD00945 transferring, processing and storing the SC4 PAS 1 SCP JYL
JNG, JNK
data.
FAMOS data acquisition, measuring,
xFSD00945 transferring, processing and storing the JYL SC4 PAS 1 SCP JYL
data.
FAMOS data acquisition, measuring,
KBA, KBD,
xFSD00945 transferring, processing and storing the SC4 PAS 1 SCP JYL
JEW
data.
FAMOS data acquisition, measuring,
xFSD00945 transferring, processing and storing the LAB SC4 PAS 1 SCP JYL
data.
FAMOS data acquisition, measuring,
xFSD00945 transferring, processing and storing the LAR, LAS SC4 PAS 1 SCP JYL
data.
FAMOS data acquisition, measuring,
xFSD00945 transferring, processing and storing the LBA SC4 PAS 1 SCP JYL
data.
Normal operation of rainwater collection
xFSD00946 GUA EYT SSS SCP GUA
and drain system pump
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A105 / A141
JNA; JND;
xFSD00957 LHSI/RHR flowrate control in RHR mode SC3 SAS SCP JN
JNG, JNK
JNA; JND;
xFSD00958 RHR conditioning EYT SAS SCP JN
JNG, JNK
xFSD00958 RHR conditioning KAA, KAB EYT SAS SCP JN
JNA; JND;
xFSD00959 RHR deconditioning EYT SAS SCP JN
JNG, JNK
Coolant letdown to CVCS for low pressure JNA; JND;
xFSD00960 EYT SAS SCP JN
purification JNG, JNK
JNA; JND;
xFSD00961 IRWST mixing and cooling EYT SAS SCP JN
JNG, JNK
JNA; JND;
xFSD00962 Filling the refueling cavities EYT SAS SCP JN
JNG, JNK
JNA; JND;
xFSD00963 Filling and make-up of the accumulators EYT SAS SCP JN
JNG, JNK
Depressurization and venting of the JNA; JND;
xFSD00964 EYT SAS SCP JN
accumulators JNG, JNK
JNA; JND;
xFSD00965 Sampling of the accumulators EYT SAS SCP JN
JNG, JNK
JNA; JND;
xFSD00966 Sampling of the LHSI heat exchanger EYT SAS SCP JN
JNG, JNK
ECCN: N
JNG, JNK
Monitoring of the dead legs piping
xFSD00969 JDH SC4 SAS SCP JN
sections (LCO related)
Monitoring of the dead legs piping JNA; JND;
xFSD00969 SC4 SAS SCP JN
sections (LCO related) JNG, JNK
Monitoring of the IRWST suction lines JNA; JND;
xFSD00970 SC4 SAS SCP JN
guard pipes (LCO related) JNG, JNK
Monitoring of the IRWST level and JNA; JND;
xFSD00971 SC4 SAS SCP JN
temperature (LCO related) JNG, JNK
Monitoring of the accumulators pressure JNA; JND;
xFSD00972 SC4 SAS SCP JN
and level (LCO related) JNG, JNK
JNA; JND;
xFSD00973 Pumps protection orders SC3 SAS SCP JN
JNG, JNK
JNA; JND;
xFSD00975 JN line-up Alarms (LCO related) SC4 SAS SCP JN
JNG, JNK
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A106 / A141
JAA
JAC
Automatic N°2 Seal Leak-off Tank Level JEA
xFSD00977 EYT SAS SCP JA-JE
Control JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
Automatic Closure of RCP Seal N°1 leak- JEA
xFSD00978 SC3 SAS SCP JA-JE
off Isolation Valves JEB
JEC
JEF, JEG
Automatic Closure of RCP Seal N°1 leak- JNA; JND;
xFSD00978 SC3 SAS SCP JA-JE
off Isolation Valves JNG, JNK
Automatic Closure of RCP Seal N°1 leak- KBA, KBD,
xFSD00978 SC3 SAS SCP JA-JE
off Isolation Valves JEW
JAA
JAC
Automatic Isolation of RCP Thermal
JEA
xFSD00979 Barrier for heterogenous boron dilution SC3 SAS SCP JA-JE
JEB
protection
JEC
JEF, JEG
Automatic Isolation of RCP Thermal
JNA; JND;
xFSD00979 Barrier for heterogenous boron dilution SC3 SAS SCP JA-JE
JNG, JNK
protection
JAA
JAC
Automatic Isolation of RCP Thermal JEA
ECCN: N
JAA
JAC
RCP Auto Stop Logic via Sub Group JEA
xFSD00983 EYT SAS SCP JA-JE
Control JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
RCP guide or thrust bearings excessive JEA
xFSD00984 SC3 SAS SCP JA-JE
warming JEB
JEC
JEF, JEG
JAA
JAC
JEA
xFSD00985 Oil pump failure during RCP start-up SC3 SAS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
SSSS automatic closure in case of loss of JEA
xFSD00986 SC3 SAS SCP JA-JE
seal n°1 and seal n°2 JEB
JEC
JEF, JEG
SSSS automatic closure in case of loss of JNA; JND;
xFSD00986 SC3 SAS SCP JA-JE
seal n°1 and seal n°2 JNG, JNK
JAA
ECCN: N
JAC
JEA
xFSD00987 Locked rotor protection SC4 PAS 1 SCP JA-JE
JEB
JEC
JEF, JEG
AL: N
JAA
JAC
Detection of Pressurizer Safety Relief JEA
xFSD00991 SC3 SAS SCP JA-JE
Valves and Dedicated Valves leakages JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
Isolation of PZR degassing and venting JEA
xFSD00992 EYT SAS SCP JA-JE
lines JEB
JEC
JEF, JEG
Isolation of PZR degassing and venting JNA; JND;
xFSD00992 EYT SAS SCP JA-JE
lines JNG, JNK
JAA
JAC
Refilling IRWST by water from the EFW JEA
xFSD00993 SC4 PAS 1 SCP JA-JE
storage pools JEB
JEC
JEF, JEG
JAA
JAC
Protection of KPL and confining JEA
xFSD00994 SC3 SAS SCP JA-JE
radioactive products in the PRT JEB
JEC
JEF, JEG
JAA
ECCN: N
JAC
Protection of KTA and GHC connected JEA
xFSD00995 EYT PAS 1 SCP JA-JE
systems to PRT JEB
JEC
JEF, JEG
AL: N
JAA
JAC
JEA
xFSD00996 Slow depressurization of PRT EYT PAS 1 SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
PRT filling/draining and protection against JEA
xFSD00997 EYT PAS 1 SCP JA-JE
overfilling JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A109 / A141
JAA
JAC
Reactor Pressure Vessel JEA
xFSD01000 EYT SAS SCP JA-JE
venting/sweeping protection JEB
JEC
JEF, JEG
Reactor Pressure Vessel JNA; JND;
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAA
JAC
Reactor Pressure Vessel water level JEA
xFSD01002 SC4 PAS 1 SCP JA-JE
monitoring (during outage) JEB
JEC
JEF, JEG
JAA
JAC
Sampling of the Steam Generators JEA
xFSD01003 SC3 SAS SCP JA-JE
secondary side JEB
JEC
JEF, JEG
Sampling of the Steam Generators LCA90
xFSD01003 SC3 SAS SCP JA-JE
secondary side LCQ
ECCN: N
JAA
JAC
Monitoring of steam generator level during JEA
xFSD01004 EYT SAS SCP JA-JE
AL: N
JAA
JAC
JEA
xFSD01005 Monitoring of RCP seal 1 temperature SC3 SAS SCP JA-JE
JEB
JEC
JEF, JEG
JAA
JAC
JEA
xFSD01006 Monitoring of PRT pressure (LCO related) SC4 SAS SCP JA-JE
JEB
JEC
JEF, JEG
xFSD01007 FLIV fast closure test LAB EYT SAS SCP LAB NI
xFSD01008 FLIV partial slow closure test LAB EYT SAS SCP LAB NI
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A110 / A141
Automatic/Manual Discharge of
xFSD01052 Decontamination Waste Water Collection FKK SC4 SSS SCP FKK
tank
Decontamination Waste Water Discharge
xFSD01053 FKK SC4 SSS SCP FKK
Pump 30FKK02 AP 001 dry-run protection
Position control of the roof hatch of the
xFSD01055 FKK EYT SSS SCP FKK
Decontamination Booth
Display system status in Main Control
xFSD01056 FKK SC4 SSS SCP FKK
Room
Heater Control of Immersion and
xFSD01057 FKK EYT SSS SCP FKK
Ultrasonic Bath
Level control for Buffer Tank of High
xFSD01058 Pressure Pumps 30FKK05AP 001/ FKK EYT SSS SCP FKK
30FKK60 AP001
xFSD01059 Receiving and preparation part KPC SC4 SSS SCP KPC
Treatment part (except temperature
xFSD01060 KPC EYT SSS SCP KPC
protections)
xFSD01061 Treatment part (temperature protections) KPC SC4 SSS SCP KPC
xFSD01062 Drum preparation and transfer part KPC EYT SSS SCP KPC
Display system status in Main Control
xFSD01063 KPC SC4 SSS SCP KPC
Room
Control and protection of the sorting box
xFSD01064 KPA EYT SSS SCP KPA/KPE
ECCN: N
JAC
JEA SCP LCQ-
xFSD01086 Interlocks for the SG Isolation Valves SC4 PAS 1
JEB LCA90
JEC
JEF, JEG
LCA90 SCP LCQ-
xFSD01086 Interlocks for the SG Isolation Valves SC4 PAS 1
LCQ LCA90
LCA90 SCP LCQ-
xFSD01087 Level control of Blowdown Flash Tank SC4 PAS 1
LCQ LCA90
Protection for Safeguard Building in case
LCA90 SCP LCQ-
xFSD01088 of a break downstream the outside SC4 PAS 1
LCQ LCA90
containment isolation valve
Sub loop control 30LCQ10 / 20 / 30 / 40
LCA90 SCP LCQ-
xFSD01089 EE001Blowdown flow limitation to flash SC4 PAS 1
LCQ LCA90
tank
Sub loop control 30LCQ51 EE001
LCA90 SCP LCQ-
xFSD01090 Blowdown flow limitation to turbine SC4 PAS 1
LCQ LCA90
condenser
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A114 / A141
Seal water leak-off (inside fuel building, JNA; JND; SCP KBA-KBD-
xFSD01105 SC3 SAS
auxiliary building) JNG, JNK JEW
Seal water leak-off (inside fuel building, KBA, KBD, SCP KBA-KBD-
xFSD01105 SC3 SAS
auxiliary building) JEW JEW
Control of the pressure in the JEW seal KBA, KBD, SCP KBA-KBD-
xFSD01106 SC3 SAS
water leak off line JEW JEW
Seal water injection (inside fuel building, KBA, KBD, SCP KBA-KBD-
xFSD01107 SC3 SAS
auxiliary building) JEW JEW
SLC Seal water leak-off flow rate to KBA, KBD, SCP KBA-KBD-
xFSD01108 SC3 SAS
VCT/KTA (JEW50 EE001) JEW JEW
Seal Water Leak-off (component KBA, KBD, SCP KBA-KBD-
xFSD01109 SC3 SAS
protection) JEW JEW
KBA, KBD, SCP KBA-KBD-
xFSD01110 Letdown line pressure control SC3 SAS
JEW JEW
Position control of the adjusting valve
JNA; JND; SCP KBA-KBD-
xFSD01111 KBA34 AA101 in the charging line (KBA34 SC3 SAS
JNG, JNK JEW
DG001)
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A115 / A141
Black Box for operating of the chemical KBA, KBD, SCP KBA-KBD-
xFSD01129 EYT SSS
control system JEW JEW
Detection and localization of loose parts in
xFSD01136 RCS to prevent damages of primary JYF SC4 SSS SCP JYF
AL: N
components
Valve Monitoring: Providing sufficient
information for conditioning based
xFSD01137 maintenance and detection of failure of JYV SC4 SSS SCP JYV
electrical actuated valves and their
actuators (MOV and SOV)
Detection of changes in the vibration
xFSD01138 JYE SC4 SSS SCP JYE
behavior of rotating machinery.
Measurement of component vibrations for
early detection of mechanical changes:
xFSD01139 JYG SC4 SSS SCP JYG
Vibration Monitoring of RPV internals and
primary circuit components
Measurement of component vibrations for
xFSD01140 early detection of mechanical changes: JYG SC4 SSS SCP JYG
Vibration Monitoring of RCPs
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A116 / A141
conditions
Monitoring of pressure, temperature and
xFSD01264 KTA-KTE SC3 SAS SCP KT10/11
level in the Reator coolant drain tank
Sub loop control switch of hydrogen
xFSD01265 JMT SC3 SAS SCP JMT
AL: N
mixing dampers
Component Protection KBC: KBC20/30 JNA; JND;
xFSD01266 SC3 SAS SCP KBC
Part JNG, JNK
Component Protection KBC: KBC20/30
xFSD01266 KBC SC3 SAS SCP KBC
Part
Monitoring of the position of the safety
xFSD01267 KBB SC3 SAS SCP KBB
valves 30KBB10-16 AA191
xFSD01268 Resin waste tank level measurement KBE SC4 SSS SCP KBE
JNA; JND; SCP KBA-KBD-
xFSD01270 Automatic Functions in Charging line SC3 SAS
JNG, JNK JEW
KBA, KBD, SCP KBA-KBD-
xFSD01270 Automatic Functions in Charging line SC3 SAS
JEW JEW
xFSD01271 Electrical interlocks BB SC4 PAS 1 SCP BB-BD
SCP
BFJ
xFSD01272 Electrical interlocks SC4 PAS 1 BF/BH/BK/BL/B
BFK
M/BN/BR
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A117 / A141
xFSD01277 Interlocking for resin flush pump KBE SC4 PAS 1 SCP KBE
xFSD01277 Interlocking for resin flush pump KBE SC4 PAS 1 SCP KBE
Interlocking for KLE and KPL systems
xFSD01278 KBE SC4 PAS 1 SCP KBE
with 30KBE17AA500
Interlocking for KLE and KPL systems
xFSD01278 KBE SC4 PAS 1 SCP KBE
with 30KBE17AA500
Degasifier heater output control
xFSD01279 KBG SC4 PAS 1 SCP KBG
(30KBG10 DE001)
Degasifier column level control (30KBG10
xFSD01281 KBG SC4 PAS 1 SCP KBG
DL001)
Degasifier column pressure control
xFSD01282 KBG SC4 PAS 1 SCP KBG
(30KBG10 DP003)
Condenser temperature control (30KBG10
xFSD01283 KBG SC4 PAS 1 SCP KBG
DT004)
Sub loop control black box electrical
xFSD01285 KBG SC4 PAS 1 SCP KBG
heater (30KBG10 EE001)
xFSD01287 Interlocking for Pumps and compressors KBG SC4 PAS 1 SCP KBG
xFSD01288 Interlocking for Valves KBG SC4 PAS 1 SCP KBG
xFSD01289 Interlocking for Sub group control BF, BH, BK SC4 PAS 1 SCP KBG
xFSD01289 Interlocking for Sub group control KBG SC4 PAS 1 SCP KBG
Interlocking for degasifier heater / Black
ECCN: N
xFSD01292 30KBF10 EC001 for operating mode 1: KBF SC4 PAS 1 SCP KBF
Evaporation
Start-up and shutdown programs:
xFSD01293 30KBF10 EC003 for operating mode 4: KBF SC4 PAS 1 SCP KBF
Degasification of replenishment water
Closed loop control for : Boric acid column
xFSD01294 KBF SC4 PAS 1 SCP KBF
level control (30KBF20 DL901)
Closed loop control for : Condensate tank
xFSD01295 KBF SC4 PAS 1 SCP KBF
level control (30KBF20 DL903)
Closed loop control for : Condensate
xFSD01296 KBF SC4 PAS 1 SCP KBF
collector level control (30KBF20 DL905)
Closed loop control for : Excess vapor
xFSD01297 KBF SC4 PAS 1 SCP KBF
control (30KBF20 DP002)
Closed loop control for : Boric acid
xFSD01298 KBF SC4 PAS 1 SCP KBF
concentration control (30KBF20 DQ901)
Closed loop control for : Condensate
xFSD01299 KBF SC4 PAS 1 SCP KBF
cooler temperature control (30KBF20
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A118 / A141
recycling or release.
Start-up and shutdown programs:
30KBF10 EC002 for operating modes 2 & KPF
xFSD01304 SC4 PAS 1 SCP KBF
3: Evaporation & degasification with KPK
recycling or release.
Sub Loop Controls: Automatic activation
xFSD01305 of start-up/shutdown program (30KBF00 KBF SC4 PAS 1 SCP KBF
EE002)
Sub Loop Controls: Automatic activation
KPF
xFSD01305 of start-up/shutdown program (30KBF00 SC4 PAS 1 SCP KBF
KPK
EE002)
Sub Loop Controls: Aggregate change-
xFSD01306 over evaporator feed pumps (30KBF10 KBF SC4 PAS 1 SCP KBF
EE001)
Sub Loop Controls: Aggregate change-
xFSD01307 KBF SC4 PAS 1 SCP KBF
over circulating pumps (30KBF20 EE001)
Sub Loop Controls: Aggregate change-
xFSD01308 over boric acid metering pumps (30KBF20 KBF SC4 PAS 1 SCP KBF
EE002)
Sub Loop Controls: Aggregate change-
xFSD01309 over boric acid delivery pumps (30KBF20 KBF SC4 PAS 1 SCP KBF
EE003)
ECCN: N
of components)
xFSD01334 Manual Function: Mixed bed filter filling KBE SC4 PAS 1 SCP KBE
xFSD01335 Manual Function: Resin flushing KBE SC4 PAS 1 SCP KBE
xFSD01335 Manual Function: Resin flushing KBE SC4 PAS 1 SCP KBE
AL: N
MAA
xFSD01367 Monitoring of Absolute shaft vibration SC4 TGI TGI (Siemens)
MAC
xFSD01367 Monitoring of Absolute shaft vibration MAD SC4 TGI TGI (Siemens)
AL: N
MAA
xFSD01369 Monitoring of Absolute shaft expansion SC4 TGI TGI (Siemens)
MAC
xFSD01369 Monitoring of Absolute shaft expansion MAD SC4 TGI TGI (Siemens)
Safety function of KU system: Backfeed
tank level control; Sampling lines
KUA, KUB, SCP KUA-KUB-
xFSD01370 temperature protection; Sampling lines SC3 SAS
KUF KUF
overpressure protection; Backfeed pump
dry protection; Other interlocks
Sub loop controls 30KUA10/30 JNA; JND; SCP KUA-KUB-
xFSD01371 SC3 SAS
EE001/002/003 - Switch of sample points JNG, JNK KUF
Sub loop controls 30KUA10/30 KUA, KUB, SCP KUA-KUB-
xFSD01371 SC3 SAS
EE001/002/003 - Switch of sample points KUF KUF
Sub loop control 30KUA20 EE003 - Open KUA, KUB, SCP KUA-KUB-
xFSD01372 SC3 SAS
sample stream from Pressurizer KUF KUF
Sub loop control 30KUA10 EE004 – KUA, KUB, SCP KUA-KUB-
xFSD01373 SC3 SAS
Enabling automatic Close orders KUF KUF
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A121 / A141
xFSD01379 Sequencer for Sodium monitoring QUC SC4 PAS 1 SCP QUC NI
xFSD01380 Sampling lines temperature protection QUC SC4 PAS 1 SCP QUC NI
SGBS/SG samples overpressure
xFSD01381 QUC SC4 PAS 1 SCP QUC NI
protection
xFSD01382 SGBPS samples overpressure protection QUC SC4 PAS 1 SCP QUC NI
xFSD01383 Backfeed pump protection QUC SC4 PAS 1 SCP QUC NI
Vent and drainage outside reactor building
xFSD01384 KTA-KTE EYT SSS SCP KTC/D/E
in UKS building
Level control of the auxiliary boiler when
30QHA11/12 CL001 XV03> >1175mm
(incl ALARM level HIGH 30QHA11/12
QHA
CL001 XV03> >1175mm; WARNING level
QHE
xFSD01385 HIGH 30QHA11/12 CL004 XH01 > EYT SSS SSS Siemens
QHG
>1093mm; WARNING level LOW
QHX
30QHA11/12 CL004 XH52 <300mm,
ALARM level LOW 30QHA11/12 CL002
XV54 <250mm)
Ventilation component protection
xFSD01386 SAC SC3 SAS SCP SAC
functions
Ventilation component protection
xFSD01387 SAC EYT PAS 1 SCP SAC
functions
Alarm on I&C rooms 1/4UJK18 024/025
ECCN: N
30QHA03 CL091))
QHX
Monitoring of QJC (Gas Distribution
xFSD01408 QJA-QJE EYT SSS SCP QJ NI
system)
Opening and closing of FAK sampling FAK
xFSD01409 SC4 SAS SCP FAK/FAL
valves FAL
Opening and closing of FAK sampling KUA, KUB,
xFSD01409 SC4 SAS SCP FAK/FAL
valves KUF
Opening and closing of FAL sampling FAK
xFSD01410 SC4 SAS SCP FAK/FAL
valves FAL
Opening and closing of FAL sampling KUA, KUB,
xFSD01410 SC4 SAS SCP FAK/FAL
valves KUF
KUA, KUB, SCP KUA-KUB-
xFSD01411 Control of sample box KUA67 EYT SSS
KUF KUF
KUA, KUB, SCP KUA-KUB-
xFSD01412 Control of sample box KUA70 EYT SSS
KUF KUF
KUA, KUB, SCP KUA-KUB-
xFSD01413 Control of sample box KUA80 EYT SSS
KUF KUF
KUA, KUB, SCP KUA-KUB-
xFSD01414 Control of sample box KUB10 EYT SSS
KUF KUF
Component protection function of the
xFSD01415 PEB/PEH SC3 SAS SCP PE
ECCN: N
functions
Controlled Area Isolation function in case
xFSD01442 KLC SC4 SAS SCP KLC
of external hazards
Provide emergency exhaust in mechanical
AL: N
xFSD01493 Time Signal per division CYF SC4 SSS SCP CYF
Failures indication of the CCTV System
xFSD01494 CYP SC4 SSS SCP CYP01
power supply
Malfunction indication, under-voltage
xFSD01495 monitoring for the incoming feeder cable BZL SC4 SSS SCP BZL
of the lighting and installation system
Failures indication of the Public Address
xFSD01496 CYC SC4 SSS SCP CYC
and Alarm System power supply
XJA10-40 SCP XJA-
xFSD01498 EDG Operational Preheating Monitoring SC4 PAS 1
XKA10-40 XKA10-20-30-40
XJA10-40 SCP XJA-
xFSD01499 EDG Operational Component Protection SC4 PAS 1
XKA10-40 XKA10-20-30-40
EDG Operational Excitation Control XJA10-40 SCP XJA-
xFSD01501 SC4 PAS 1
Actuation XKA10-40 XKA10-20-30-40
XJA10-40 SCP XJA-
xFSD01502 Diesel engine compressed air control SC4 PAS 1
XKA10-40 XKA10-20-30-40
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A126 / A141
xFSD01566 grids and blast valves during winter time - SC3 SSS SCP AIH
(for AIH systems: 30QKA)
Prevent icing of the physical protection
xFSD01567 grids and blast valves during winter time - SC4 SSS SCP AIH
AL: N
CT/MKA
Component protection of the safety chiller
xFSD01575 QKA-QKC SC3 SAS SCP QK
water actuation system
Position indication of Containment and
xFSD01576 CYE SC4 PAS 1 SCP SG
Building isolation valves
Position indication of Containment and
xFSD01576 SGB SC4 PAS 1 SCP SG
Building isolation valves
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01577 monitoring of fuel pool cooling system SC3 SAS SCP FAK/FAL
BR
(FAK)
Restart after loss of power: Undervoltage
FAK
xFSD01577 monitoring of fuel pool cooling system SC3 SAS SCP FAK/FAL
FAL
(FAK)
Restart after loss of power: Undervoltage
xFSD01578 monitoring of fuel pool purification system BF, BH, BK SC4 PAS 1 SCP FAK/FAL
(FAL)
Restart after loss of power: Undervoltage
FAK
xFSD01578 monitoring of fuel pool purification system SC4 PAS 1 SCP FAK/FAL
FAL
(FAL)
Restart after loss of power: Undervoltage
xFSD01579 monitoring of demineralized water BF, BH, BK SC4 PAS 1 SCP GHC NI
distribution system
ECCN: N
injection system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01585 monitoring of medium head safety SC3 SAS SCP JN
BR
injection system
Restart after loss of power: Undervoltage
JNA; JND;
xFSD01585 monitoring of medium head safety SC3 SAS SCP JN
JNG, JNK
injection system
Restart after loss of power: Undervoltage
xFSD01586 monitoring of component cooling water BD SC3 SAS SCP KAA/KAB
system
Restart after loss of power: Undervoltage
xFSD01586 monitoring of component cooling water KAA, KAB SC3 SAS SCP KAA/KAB
system
Restart after loss of power: Undervoltage SCP KBA-KBD-
xFSD01587 BD SC3 SAS
monitoring of volume control system JEW
Restart after loss of power: Undervoltage KBA, KBD, SCP KBA-KBD-
xFSD01587 SC3 SAS
monitoring of volume control system JEW JEW
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01588 monitoring of reactor boron and water SC3 SAS SCP KBC
BR
makeup system
Restart after loss of power: Undervoltage
xFSD01588 monitoring of reactor boron and water KBC SC3 SAS SCP KBC
ECCN: N
makeup system
Restart after loss of power: Undervoltage SCP KBA-KBD-
xFSD01589 BF, BH, BK EYT PAS 1
monitoring of chemical control system JEW
Restart after loss of power: Undervoltage KBA, KBD, SCP KBA-KBD-
xFSD01589 EYT PAS 1
AL: N
ventilation system
Restart after loss of power: Undervoltage
xFSD01599 monitoring of nuclear auxiliary building KLE SC4 PAS 1 SCP KLE
ventilation system
Restart after loss of power: Undervoltage
xFSD01601 monitoring of radioactive waste BF, BH, BK SC4 PAS 1 SCP KLF
processing building ventilation system
Restart after loss of power: Undervoltage
xFSD01601 monitoring of radioactive waste KLF SC4 PAS 1 SCP KLF
processing building ventilation system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01602 monitoring of sampling activity monitoring SC3 SAS SCP JYK - KLK
BR
systems
Restart after loss of power: Undervoltage
xFSD01602 monitoring of sampling activity monitoring KLK SC3 SAS SCP JYK - KLK
systems
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01603 monitoring of fuel building ventilation SC3 SAS SCP KLL
BR
system
Restart after loss of power: Undervoltage
xFSD01603 monitoring of fuel building ventilation KLL SC3 SAS SCP KLL
system
ECCN: N
xFSD01604 monitoring of fuel building ventilation KLL EYT PAS 1 SCP KLL
system
Restart after loss of power: Undervoltage
KPF
xFSD01605 monitoring of liquid waste processing SC4 SSS SCP KPF-KPK
KPK
system
Restart after loss of power: Undervoltage KPF
xFSD01606 EYT SSS SCP KPF-KPK
monitoring of liquid waste storage system KPK
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01607 monitoring of gaseous waste processing SC4 PAS 1 SCP KPL
BR
system
Restart after loss of power: Undervoltage
xFSD01607 monitoring of gaseous waste processing KPL SC4 PAS 1 SCP KPL
system
Restart after loss of power: Undervoltage
xFSD01608 monitoring of nuclear island drain and BF, BH, BK EYT PAS 1 SCP KT10/11
vent systems
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01608 monitoring of nuclear island drain and EYT PAS 1 SCP KT10/11
BR
vent systems
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A132 / A141
xFSD01618 monitoring of main control room air SAB SC3 SAS SCP SAB
conditioning system
Restart after loss of power: Undervoltage
xFSD01619 monitoring of electrical division of BF, BH, BK EYT PAS 1 SCP SAC
safeguard building ventilation system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01619 monitoring of electrical division of EYT PAS 1 SCP SAC
BR
safeguard building ventilation system
Restart after loss of power: Undervoltage
xFSD01619 monitoring of electrical division of SAC EYT PAS 1 SCP SAC
safeguard building ventilation system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01620 monitoring of electrical division of SC3 SAS SCP SAC
BR
safeguard building ventilation system
Restart after loss of power: Undervoltage
xFSD01620 monitoring of electrical division of SAC SC3 SAS SCP SAC
safeguard building ventilation system
Restart after loss of power: Undervoltage
xFSD01621 monitoring of switchgear area of nuclear BF, BH, BK EYT PAS 1 SCP SAC80
auxiliary building ventilation system
ECCN: N
xFSD01622 monitoring of diesel building ventilation BF, BH, BK EYT PAS 1 SCP SAD-SAL
system
Restart after loss of power: Undervoltage
SAD
xFSD01622 monitoring of diesel building ventilation EYT PAS 1 SCP SAD-SAL
SAL
system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01623 monitoring of diesel building ventilation SC3 SAS SCP SAD-SAL
BR
system
Restart after loss of power: Undervoltage
SAD
xFSD01623 monitoring of diesel building ventilation SC3 SAS SCP SAD-SAL
SAL
system
Restart after loss of power: Undervoltage
xFSD01624 monitoring of smoke confinement system BF, BH, BK SC4 PAS 1 SCP SAG
of nuclear island
Restart after loss of power: Undervoltage
xFSD01624 monitoring of smoke confinement system SAG SC4 PAS 1 SCP SAG
of nuclear island
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A134 / A141
xFSD01638 Manual main trip breaker actuation BU SC4 SAS SCP JDA/BU NI
xFSD01639 Rodpilot reset BU SC4 SAS SCP JDA/BU NI
xFSD01640 Avoid smoke distribution in case of fire CYE SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire KLA SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire KLB SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire KLC SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire KLE SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire SAB SC4 SAS SCP SAG
xFSD01640 Avoid smoke distribution in case of fire SAC SC4 SAS SCP SAG
SAD
xFSD01640 Avoid smoke distribution in case of fire SC4 SAS SCP SAG
SAL
Overpressure protection due to safety
switch off of the electrical heaters
30KBG10AH001 (30KBG GH001) by
xFSD01641 KBG SC3 SSS SCP KBF
activating of safety temperature limiter
30KBG10CT191/192 connected to BBX
30KBF50CH001
Measures to safeguard against tube
QMA, QME,
xFSD01642 rupture inside the nuclear auxiliary EYT PAS 1 SCP QM NI
QMK, QMS
building
ECCN: N
LCA
Monitoring of the correct running of the LCB SCP LCQ-
xFSD01643 SC4 PAS 1
Condensate system LCR LCA90
LCW
AL: N
xFSD01702 MSIV oil pressure control LBA EYT SAS SCP LBA NI
KBA, KBD, SCP KBA-KBD-
xFSD01703 CVCS safety valve monitoring SC3 SAS
JEW JEW
AL: N
JAA
JAC
JEA
xFSD01707 RCP motor monitoring (PAS) EYT PAS 1 SCP JA-JE
JEB
JEC
JEF, JEG
Project OL3 N° PEPS-G/2015/en/1050
Confidentiality:
RESTRICTED REV. A PAGE A138 / A141
JAA
JAC
JEA
xFSD01709 PZR monitoring EYT PAS 1 SCP JA-JE
JEB
JEC
JEF, JEG
JAA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
JAC
RCP coast down test: simultaneous trip of JEA
xFSD01710 EYT SAS SCP JA-JE
all pumps JEB
JEC
JEF, JEG
JAA
JAC
Monitor CCWS flowrate to RCP motor and JEA
xFSD01711 SC4 SAS SCP KAA-KAB
bearing coolers. JEB
JEC
JEF, JEG
Monitor CCWS flowrate to RCP motor and
xFSD01711 KAA, KAB SC4 SAS SCP KAA-KAB
bearing coolers.
JAA
JAC
JEA
xFSD01712 Pressure monitoring in nitrogen tank EYT PAS 1 SCP JA-JE
JEB
JEC
JEF, JEG
JAA
ECCN: N
JAC
Flow monitoring at activity monitoring JEA
xFSD01713 SC4 SAS SCP JA-JE
points JEB
JEC
JEF, JEG
AL: N
xFSD01731 Avoid smoke distribution in case of fire KLE SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire KLF SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire SAB SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire SAC SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire SAC80 SC4 PAS 1 SCP SAG
SAD
xFSD01731 Avoid smoke distribution in case of fire SC4 PAS 1 SCP SAG
SAL
xFSD01731 Avoid smoke distribution in case of fire SAG SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire SAM3 SC4 PAS 1 SCP SAG
xFSD01731 Avoid smoke distribution in case of fire SAM4 SC4 PAS 1 SCP SAG
RFFR00803 isolation valve 30JMQ12/42AA004 in the JMQ SC3 SICS SCP JMQ
flooding line
Manual closing of the containment
xFSD01732 isolation valves 30JMM23AA002 in case JMM SC3 SSS SCP JMM
of SA and postulated pipe break
Restart after loss of power: Undervoltage KUA, KUB, SCP KUA-KUB-
xFSD01733 SC3 SSS
monitoring of nuclear sampling system KUF KUF
Restart after loss of power: Undervoltage
xFSD01734 monitoring of essential service water PEB/PEH EYT SSS SCP PE
piping system
Restart after loss of power: Undervoltage
xFSD01735 monitoring of dedicated essential service PEB/PEH EYT SSS SCP PE
water piping system
Restart after loss of power: Undervoltage
xFSD01736 monitoring of dedicated essential service PEB/PEH SC3 SAS SCP PE
water piping system
Restart after loss of power: Undervoltage
BM, BN, BL,
xFSD01736 monitoring of dedicated essential service SC3 SAS SCP PE
BR
water piping system
Restart after loss of power: Undervoltage
xFSD01737 QKA-QKC SC3 SSS SCP QK
monitoring of safety chilled water system
ECCN: N
xFSD01750 Start and Trip of a CCWS train KAA, KAB SC4 SAS SCP KAA/KAB
xFSD01751 Monitoring CCWS system parameters KAA, KAB EYT SAS SCP KAA/KAB
xFSD01752 Monitoring CCWS system parameters KAA, KAB EYT PAS 1 SCP KAA/KAB