You are on page 1of 11

WILD Juergen BECHTOLD Bela

BECHTOLD Bela
A 2005-03-10 PREL

MODIFICATIONS /
REV. DATE AUTHOR CHECKED BY STATUS APPROVED BY
OBSERVATIONS

Olkiluoto 3 NPP
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract

SIEMENS
CONSORTIUM : WORK PACKAGE
FRAMATOME ANP NI-1-3720
SIEMENS AG OL3 KKS
Project Code FIN005
3 0JYF
TITLE:

General Wiring Diagram


of JYF System
N
ECCN:
N
AL:

DOCUMENT KIND : DCC : CONFIDENTIALITY :

Piping and instrument diagram (P & ID) PFB RESTRICTED

Framatome ANP FGF SGD/2005/en/1017


Name of the issuing company COMPANY CODE DOCUMENT NUMBER

The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for
damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved.
Goods labeled with "AL not equal to N" are subject to European or German export authorization when being exported out of the EU. Goods labeled with
"ECCN not equal to N" are subject to US reexport authorization. Even without a label, or with label "AL:N" or "ECCN:N", authorization may be required due
to the final whereabouts and purpose for which the goods are to be used.
The original version of this document is stored in electronic form in the FANP-EDM system. The current status of this document can be viewed only in the
EDM system.
2004.10 ANP 2268
Document type

Piping and instrument diagram (P & ID)


Class Pages 11
Number
RESTRICTED Appendices 0
Document Title

General Wiring Diagram


of JYF System
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract

Short Title
General Wiring Diagram
of JYF System
WILD Juergen BECHTOLD Bela BECHTOLD Bela
A 2005-03-10 PREL
N
ECCN:
N
AL:

Rev Date Author Checked by Modifications / Observations Status Approved by

Contract :
Project FIN005

File code 3 0JYF


SGD/2005/en/1017
No EOTP:

Subdivision INTERNAL IDENTIFICATION NUMBER

This document is the property of FRAMATOME ANP.


It must not be used reproduced, transmitted or disclosed without the prior written permission of FRAMATOME ANP.
2004.10 ANP 0313
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 3 / 11

REVISIONS

IND STATUS
PARAGRAPH SCOPE OF THE REVISION
REV DATE

A 2005-03-10 Original issue


CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 4 / 11

TABLE OF CONTENTS

1. INTRODUCTION 5

2. OVERVIEW 6

3. PREAMPLIFIER STATION 1 7

4. PREAMPLIFIER STATION 2 8
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract

5. PREAMPLIFIER STATION 3 9

6. PREAMPLIFIER STATION 4 10

7. CONTROL ROOM UNIT 11


N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 5 / 11

1. INTRODUCTION

The following drawings show the sensor positions of the loose parts monitoring system KÜS
JYF on the reactor primary components.

The drawing “Overview” gives a general overview about the sensor locations, the following
pages show the locations of the junction boxes, preamplifier stations and penetrations.
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract

The final arrangement of penetrations and preamplifier stations (penetration before


preamplifiers as shown on the drawings or preamplifier inside of the containment with
penetrations behind the preamplifiers) will be decided till the first design freeze.
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 6 / 11

1.2. OVERVIEW Formatted: Bullets and Numbering


CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 7 / 11

3. PREAMPLIFIER STATION 1
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 8 / 11

4. PREAMPLIFIER STATION 2
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 9 / 11

5. PREAMPLIFIER STATION 3
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 10 / 11

6. PREAMPLIFIER STATION 4
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° SGD/2005/en/1017
Confidentiality:
RESTRICTED REV. A PAGE 11 / 11

7. CONTROL ROOM UNIT


CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract