Professional Documents
Culture Documents
Internal comments
D 2012-01-13 FIN taken into account STURM Jochen
MODIFICATIONS /
REV. DATE AUTHOR CHECKED BY STATUS APPROVED BY
OBSERVATIONS
Olkiluoto 3 NPP
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
SIEMENS
Jochen STURM FSS 2012-01-23
AREVA NP NI-4-7500
SIEMENS AG OL3 KKS
Project Code FIN005
-
TITLE:
Test Instruction
for pretest on the motorized valves with URSULA box
N
ECCN:
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights,
including rights created by patent grant or registration of a utility model or design, are reserved.
Goods labeled with "AL not equal to N" are subject to European or German export authorization when being exported out of the EU. Goods labeled with "ECCN not
equal to N" are subject to US reexport authorization. Even without a label, or with label "AL:N" or "ECCN:N", authorization may be required due to the final whereabouts
and purpose for which the goods are to be used.
The original version of this document is stored in electronic form in the AREVA NP-EDM system. The current status of this document can be viewed only in the EDM
system.
2006.04 ANP 2268
Document type
Commissioning Instruction
Class Number of pages 37
RESTRICTED Number of appendices 3
Document Title
Test Instruction
for pretest on the motorized valves with URSULA box
Short Title
ALBRECHT
A 2011-08-15 CASSET Sebastien ReinholdCHALET First issue FIN STURM Jochen
Jerome
Contract :
Project FIN005
FSS DC 0427
File code -
No EOTP:
REVISIONS
IND STATUS
PARAGRAPH SCOPE OF THE REVISION
REV DATE
2011-09-05
3 Modification of prerequisites
7 Modification of tasks
IND STATUS
PARAGRAPH SCOPE OF THE REVISION
REV DATE
ABBREVIATIONS AUMA
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
1.3 deleted
SUMMARY
The target of this test instruction is to make a pretest on motorized valves with the URSULA box
where AUMA actuators according to [1] and [2] are used. That allows to anticipate the setting of
switches and verification of the wiring of valves and the running time of the stroke.
This TI is an internal documentation, useful for the preparation of SCI52 NI [3].
KEY WORDS
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
OL3, test instruction, URSULA, limit switch, torque switch, valve, overrun.
ABBREVIATIONS
AUMA Company AUMA
CDS Commissioning Document Sheet
CI Commissioning Instruction
CIRVAR Variants for Command Termination and Check back Signal processing of
Actuators
CRR Commissioning Result Report
DSV Data Sheet Valve
EOMR End Of Manufacturing Report
EPT Electronic Position Transmitter
ESP Electrical Skilled Person
FG Functional Group
HW Hardware
I&C Instrumentation and Control
LS Limit Switch
MCR Main Control Room
PACS Priority and Actuation Control System
N
TABLE OF CONTENTS
0. REFERENCES 8
1. INTRODUCTION 9
1.1. Objectives 9
1.2. Methods 9
1.3. Definition 9
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
2. ACCEPTANCE CRITERIA 10
4. SPECIAL PRECAUTIONS 11
4.1. Safety Requirements 11
4.2. Security of Equipment 11
4.3. Provisions 11
5. INITIAL STATUS 12
7. ORGANIZATIONAL MEASURES 14
8. INSTRUCTIONS 16
8.1. Requirement 16
8.2. Test preparation 16
8.3. Test of valves with URSULA box 18
8.4. Restoration of test of valve 27
N
9. APPENDICES 28
ECCN:
N
LIST OF APPENDICES
AL:
LIST OF FIGURES
0. REFERENCES
1. INTRODUCTION
1.1. Objectives
The test objective is to make a pretest to anticipate the motorized valves and dampers
commissioning with AUMA actuators before the SCI 52 NI [3].
The test verifies correct implementation and completeness of:
• Direction of rotation
• Adjustment of limit switches
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
• Torque setting
• Running time
• Remote indication (if used)
1.2. Methods
Before the test, the RRS must be prepared according to the parameters of the valve (KKS,
CIVAR etc). The coherence of these parameters must be checked with appropriated
documents.
For each valve tested, the URSULA box is directly connected to the valve. This tool replace the
power supply, the main control room and the I&C.
The URSULA box is used to adjust the limit switches and to verify the movement.
This procedure includes four tests:
- Actuator with command termination on torque switch (TS) in both directions
- Actuator with command termination on limit switch (LS) in both direction
- Actuator with command termination on torque switch (TS) in closed position and
command termination on limit switch (LS) n open position
- Set up the remote position (if used)
N
Note: According to the valve’s CIRVAR only one of three first tests is used
ECCN:
For each valve the command termination is taken into account (CIRVAR in [4] and “CMD term.
VAR” on RRS)
N
AL:
1.3. Definition
Overrun: Distance traveled after engine shutdown due to time delay of the PLC length of signal
path and inertia of masses in movement.
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 10 / 29
2. ACCEPTANCE CRITERIA
Sheet Valve
- In accordance with the Data
Torque settings (label)
Sheet Valve
- Running time In accordance with the Data
Sheet Valve
- Remote indication (if used) In accordance with the Data
Sheet Valve
• Temporary power supply is ready to start the test. Every features of power supply are
ECCN:
• The RRS of the tested valve has to be ready (expected values known)
• For dedicated types of valve, the closing and opening movements have to be carried out
under fluid conditions. Refer to the Data Sheet Valve
• AUMA actuator according to [1] and [2] is used
• Adjustment of limit switches for AUMA actuator is possible as long as it is authorized by
the installation instructions. By the document KKS-Catalogue of valve [11] the link to the
installation instruction for each valve is available (Batch2-ID).
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 11 / 29
4. SPECIAL PRECAUTIONS
# Requirement
Electrical Clearance
1
Test Personnel shall be able to identify the location of main power.
Electrical Protection/Shock
a. 24VDC and 48VDC are present inside the URSULA box and personnel
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
Operating the change-over lever while the motor is running can lead to
3
increased wear at the change-over mechanism (see [2] § 6)
N
4.3. Provisions
ECCN:
# Requirement
N
1 For each valve, prepare the test with their “Data Valve Sheet”
AL:
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 12 / 29
5. INITIAL STATUS
Available
- Valve For the relevant valves, the pipes are filled in
water
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 13 / 29
1 Lamp - -
- Grease (white Vaseline) Non acidic
N
ECCN:
N
AL:
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 14 / 29
7. ORGANIZATIONAL MEASURES
These operations are done under erection activities because ECCs are not signed.
The responsibilities of the operation (during the preparation, during the test, after the test) are
shared between the I&C commissioning team and the system commissioning team:
• The I&C commissioning team is in charge of:
- Preparing the SCI52 RRS of the valve (validity of the criteria)
- Preparing all the needs for the test (URSULA box, power supply cables to be
requested to the Intervention group, tools …)
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
Note: Find a summary in Appendix B concerning data, features, document of valves useful for
the preparation of the test and during the test
N
ECCN:
N
AL:
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 15 / 29
For the performance of the test the following number of workers is needed:
• 1 technician with the URSULA box knowledge performing orders on the box.
• 1 I&C Commissioning Engineer / technician with valve knowledge to adjust limit switch
(with the qualification SFS 6002, AUMA certificate and ESP).
• 1 System Commissioning Engineer / technician from the FG owner of the valve
Note : When the I&C Engineers / technician and System Engineers / technicians shall be
qualified to use the URSULA box, the team in charge of the test valve will be reduce to 2
persons (I&C Engineer/technician and System Commissioning Engineer/technician)
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 16 / 29
8. INSTRUCTIONS
8.1. Requirement
# Requirement
2. Verify all test equipment has been recorded in result record sheet
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
7. Collect the result of erection tests (insulation test, cleaning, pressure test)
According to the CIRVAR of the valve, use the test associated ( to 8.3.1 or 8.3.2
8. or 8.3.3)
Attention: CIRVAR is very important to prepare the URSULA box
According to the EPT used, use the § 8.3.4.1 for “Poti” or § 8.3.4.2 for “4-20
9. mA”
In office
Prepare the RRS according to the data sheet valve (KKS in each pages,
N
1
in/out fluid, CIRVAR and EPT)
AL:
Check the coherence of parameters (e.g. stroke time, CIRVAR) between the
2
SCI52’s RRS and DSV the Technical Data Sheet (see [9])
3 In case of discrepancies, report to the System Commissioning Engineer
On site
Conduct a Pre-job Brief
4
(including information about the special precautions (see §4)
5 Ensure that the valve is accessible
In the URSULA box, choose the menu “Default setting” and for each features (Control variant,
4 Actuator protection and EPT type) choose the correct parameter (found in DSV)
Control Variant: Choose the type of valve, CIRVAR 01x
5 Note: With this information, URSULA stops the valve properly according to the command
termination and avoid to destroy the valve
Actuator Protection: Choose “Yes”
6
URSULA box can detect whether an actuator protection is present
EPT type: Choose the type of EPT (“Poti” or “4-20 mA”)
7 Be careful, it’s possible to destroy the “Poti” if you choose “4-20 mA”. “Poti” works with 1V
and “4-20 mA” works with 24 V
Basic test (Switch test)
In the switch compartment, check the setup of the torque switch, note on RRS (criteria) and
9 compare it with the data in the DSV. If the values do not match, report but don’t setup the
torque by yourself!
In the switch compartment, activate manually limit switch and torque switch :
N
16 Adjust the limit switch close according to [1] § 9 or [2] § 9 and add a note in RRS
18 In manual, close the valve and check on the URSULA box the change of state of the LS
Upon reaching the final position, turn back the handwheel by approximately ½ of turn.
22 Take into account of the clearance of the handwheel
Check the limit switch open (change of state) and fill out the RRS (criteria). If it doesn’t match
23
continue in step 24, else continue in step 27
24 Adjust the limit switch open according to [1] § 9 or [2] § 9 and add a note in RRS
26 In manual, open the valve and check on the URSULA box the change of state of the LS
With the URSULA box, perform CLOSE command and check correct command termination
27 by the corresponding switch (LS first and TS second). If the TS is activated before LS, correct
ECCN:
31 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
The valve is fully closed
32
With the URSULA box, perform OPEN command
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 20 / 29
33 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
34 Fill out the RRS (criteria) and sign
Before the first movement, check and note the position of the valve. At the end of the test, the
2 valve must be placed into this position
16 Adjust the limit switch close according to according to [1] § 9 or [2] § 9 and add a note in RRS
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 22 / 29
18 In manual, close the valve and check on the URSULA box the change of state of the LS
opening but before travel limit is reached (travel limit can be check with the graduate on the
valve)
20 Check that drive stops and measure the overrun
24 Adjust the limit switch open according to [1] § 9 or [2] § 9 and add a note in RRS
26 In manual, open the valve and check on the URSULA box the change of state of the LS
31 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
The valve is fully closed.
32
With the URSULA box, perform OPEN command
33 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
34 Fill out the RRS (criteria) and sign
Project OL3 N° ° FSS DC 0427
Confidentiality:
RESTRICTED REV. D 23 / 29
8.3.3. Actuator termination command on TS for closed position and LS for opened
position: CIRVAR 03x
Before the first movement, check and note the position of the valve. At the end of the test, the
2 valve must be placed into this position
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
16 Adjust the limit switch close according to [1] § 9 or [2] § 9) and add a note in RRS
18 In manual, close the valve and check on the URSULA box the change of state of the LS
24 Adjust the limit switch open according to [1] § 9 or [2] § 9) and add a note in RRS
26 In manual, open the valve and check on the URSULA box the change of state of the LS
31 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
The valve is fully closed
32
With the URSULA box, perform OPEN command
33 Compare the measuring result of URSULA box with the required running time (referenced in
the “data sheet valve”)
34 Fill out the RRS (criteria) and sign
4 Perform fine-tuning of the 0 point at external setting potentiometer (for remote indication)
6
AL:
9. APPENDICES
Test equipment
Type/Model Identification reference Calibration certificate Comment
SPECIAL PRECAUTIONS
Verify that the Test Personnel has fulfilled the Safety Requirements according section 4.
Completed by
Name (Print) Signature Date
Test Performer
TEST PREPARATION
Completed by
Name (Print) Signature Date
Test Performer
N
AL:
TEST PROCEDURE
Test
Scope of test: see section 8.3.1 or 8.3.2 or 8.3.3 and/or 8.3.4.
For each valve the RRS is composed of this appendix and the RRS of the SCI52 NI.
In the SCI52’s RRS, only the part “Adjustment / Measurements drive” is used for this pretest. It must
be labeled with “PRE-TESTING” (stamp). See an example in Appendix C Figure 1
To be filled:
1 Measure the position of the valve before to start the test (step2)
4 Setup end position CLOSED and OPEN (to fill out SCI52’s RSS)
6 Setup the remote indication, if used (to fill out SCI52’s RSS)
AL:
Acceptance Criteria
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contrac
Check that criteria listed in section 2 have been met with section CHECK LIST of this RRS
The detail of test criteria could be added here.
with comments (see section COMMENTS)
Characteristic Checked
Performed by / /
Name (Print) Signature Date
Test Performer
N
AL:
Verified by / /
Name (Print) Signature Date
Test Supervisor
TEST RESTORATION
Completed by / /
Name (Print) Signature Date
Test Performer
Project OL3 N° FSS DC 0427
Confidentiality:
RESTRICTED REV. D PAGE Page A5 of A5
COMMENTS
CONFIDENTIAL as defined under the Olkiluoto 3 Plant Contract
N
ECCN:
N
AL:
• Supplier
• Drawing
Note: Valves operated via black box are not listed in this document. In this case some
information can be found in the black box documentation.
• Running time
• Gear ratio
• Hand Gear ratio
• Torque switch OPEN/CLOSE
N
Contact :
Note: for this pretest, use the SCI52’s RSS of each valve and fill out only the part indicate in
the Figure 1