65 mm THK.
℄ OF THE STRUCTURE RCC CRASH RCC CRASH EXP. JOINT EXP. JOINT RCC CRASH
F.R.L. BARRIER 20 mm 20 mm
WEARING COAT ℄ OF THE EXISTING STRUCTURE BARRIER BARRIER
EXP. F.R.L. EXP.
SLOPE -2.50 % SLOPE -2.50 %
RETAINING 300 mm STONE JOINT JOINT
750
WALL 1.5 1.5
300 PITCHING ON
U/S
1
300
1
D/S 150 mm FILTER
1100
1000 SOFFIT MIDEA
3000 (MIN.) 3000 (MIN.) (TYP.) 1.5 1.5
350
R25
FLEXIBLE APRON RIGID FLOOR APRON 0
(TYP.)
ABT. CAP
1000
INV. LVL. 1 5000 (MIN.) 6000 (MIN.)
BL
RIGID FLOOR APRON FLEXIBLE APRON 1 450 3000 450 1
250
WEEP R50
HOLES
HFL
100
TOE
WALL
CONSTRUCTUION
2000
FOUNDATION
2500
COMPACTED COMPACTED JOINT
450
EARTH EARTH INV. LVL.
CURTAIN WALL
A CURTAIN WALL RETAINING WALL
(TYP - II)
SECTION B-B
(TYP - I) RETAINING WALL
3500
3500
DETAIL B OF CRASH
3900 BARRIER
STRUCTURE
STRUCTURE
A 150 THK.
VEIW A-A
EXISTING
℄ OF THE
℄ OF THE
LEVELLING
COURSE M15
GRADE
300 mm THK.
300 mm THK.
STONE
STONE
REVETMENT
REVETMENT
12000
AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP AGRICULTURE/BUILT-UP
DECK WIDTH
11000
SKEW ANGLE 0°
500 CARRIAGEWAY 500
EXTRA WIDENING 0 mm ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
HALF TOP
EXP.
℄ OF THE
JOINT
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
DRAINAGE
D/S
SPOUT
AGRICULTURE/BUILT-UP
℄ OF
PLAN
U/S
L.B.L
SLOPE -2.50 % SLOPE -2.50 %
HALF BOTTOM
℄ OF THE
NOTES: -
300
1. TYPE OF STRUCTURE - HIGH LEVEL BRIDGE
JOINT
EXP.
1200
COMPACTED 6. FORMATION LEVEL - RL. 223.671 m
EARTH 7. BED LEVEL - RL. 221.833 m
150 mm THK. 8. FLEXIBLE APRON SHALL BE PROVIDED AS PER THE
LEVELING COURSE IN 300
100
SPECIFICATION/ DETAIL MENTIONED IN PLATE-22 OF
PCC M-15 GRADE IRC:SP:13-2004.
9. CONCRETE SHALL BE OF DESIGN MIX AND SHALL HAVE MINIMUM
DETAIL-`A' 28 DAYS CHARACTERISTIC CUBE STRENGTH AS FOLLOW:-
300 mm THK.
300 mm THK.
REVETMENT
REVETMENT
STONE
1838
COMPACTED Ø=>30°, γ= 20 kN/CU.M
200 EARTH COMPACTED EARTH HORIZONTALLY
6. 100mm Ø PVC WEEP HOLES SPACED AT 1000c/c BOTH
125 125 200 125 (SLOPE 1:20)
125 HORIZONTALLY AND VERTICALLY SHALL BE PROVIDED IN A
STAGGERED MANNER.
600 THK.
150 300
300
450
FILTER MEDIA
T/SQ.M. ANY VARIATION ON SITE SHOULD BE INFORMED TO THE
750
750
150
150 mm THK. LEVELING 150 450 FILLING & COMPACTION SHALL BE DONE AS PER MoRTH
2000
2000
COMPACTED EARTH COMPACTED EARTH
(TYP.) SHOULD BE CHECKED AT THE SITE BEFORE STARTING THE
(TYP.)
750
800
WORK.
450 750 450 P.C.C M-20 600 550 1100 10. DRAINAGE SPOUTS OF 100mm Ø AS SHOWN SHALL BE PROVIDED
IN TOP SLAB.
P.C.C M-15 250
P.C.C M-20 11. ALL LEVELS SHOWN IN THIS DRAWING SHOULD BE VERIFIED AT
550
100 1300 100 200 SITE WITH RESPECT TO PLAN & PROFILE BEFORE EXECUTION OF
WORK
150
P.C.C M-15 2250 12. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE MENTIONED.
DETAILS OF CURTAIN
150