You are on page 1of 10

Hydraulic calculation

Road Name: District:

Location - Ch /Km + 0+800


Span arrangement - 10 X 21.00

1 Discharge:-
a) Discharge from catchment area
Dicken's Discharge Q = C x M3/4 as per SP-13-2004 Clause 4.2.
(Clause 4.2 of SP-13-2004 ,C =
Where C = 11 11-14 where the annual rain fall is
60 - 120 cm.)

Catchment area sheet


Catchment Area at Site'M' = = 714.236 Sq. Km.
attached.

Q = C x M3/4
Q = (11X (714.2357)^3/4)
Q = 1519.76 m3/sec

b) Discharge By Area -Velocity Method


Cross section considered as per SP-13-2004 Clause 3.3(Table -3.1)

Velocity HFL Avg flow


Section Q(m3/sec)
(m/sec) (in Meter) depth

At 500 m d/s 13177.255 5.60 452.321 7.92

At Proposed site 1684.497 2.49 443.897 2.33

At 500 m u/s 8026.378 5.22 454.476 7.12

3
Max discharge from area velocity method 1684.50 m /sec
3
Max discharge from Dickens formula 1519.76 m /sec
3
Max discharge from S.U.H. 1319.88 m /sec

max discharge - 1684.50 m3/sec

Discharge = Q = AV
A = Q/V
Natural linear water way = LxD = Q/V
L = Q/(VxD)
= 1684/(2.49x2.33)
2 Linear water way required = 290.093 M
Provide 10 Span of 25.00 m.(total length of bridge -210.00m)
Calculation for design velocity -

The length of bridge proposed = 250 M


The average flow depth below H.F.L. = 2.329 M
No of piers proposed = 9 Nos
Thickness of proposed pier = 1 M
Width of Abutment in flow area = 0.4 M
Thus Clear water way avilable = (250-9X1- 2 x0.4)
= 240.20 M
Thus the design velocity
V = (1684.5)/(240.2X2.33)
V = 3.01 m/sec

The Design velocity = 3.01 m/sec


3 Afflux
The theoritical Afflux at proposed site shall be calculated using Moles worth formula

a = (( V^2 / 17.88) + 0.015 ) X ((A/a)^2 - 1)


Where as
A = Area of cross section at H.F.L.
site as compared to the u/s & d/s areas)
a = Area of clear water way under the proposed
bridge in sqm.
V = Velocity in m/sec
A = 675.6257 sqm
a = 2.329X240.2
559.43 sqm
V = 3.01 m/sec
((3.01^2 / 17.88 ) + 0.015 ) X
Afflux =
((675.63/559.43)^2 -1)
0.239 m
I.e. = 239.233 mm
Considered 260 mm afflux.

4 Scour Depth
For the design of foundation in accordance with the provisions of IRC-78,2000 clause 703.1.1.
above discharge has been further increased by 30% for Calculation of scour depth.

Considering the available linear water way at bridge as = 240.200 M


Thus the discharge per unit width 'Db' = 1.30 X Q design /240.2
1.3x1684.5/240.2
3
Db' = 9.12 m /sec
Thus the theoretical mean scour depth
NSD = 1.34x(Db^2/Ksf)^(1/3)

(as per IRC-78,2000 clause


= 2.4
Where 'Ksf' 703.2.2.1)
There fore NSD = 1.34x(9.12^2 /2.4)^(1/3)
4.37 M from HFL.
H.F.L. - 2 X N.S.D.(as per IRC-78,2000 clause
The scour level for pier =
703.3.2.)
443.897 -2X4.368
The scour level for pier ( as per Calculation) = 435.162 m
The scour levels as per Geotech = 441.948 m

H.F.L. - 1.27 X N.S.D.(as per IRC-78,2000


The scour level for foundation =
clause 703.3.2.)
= 443.8972 -1.27X4.368
The scour level for foundation = 438.35 m
Ground level = 332.131/330.804 m
Consider foundation level at = 329.121/327.804 m
5 Formation level calculations -

HFL at Proposed site = 443.897 m


Vertical clearance as per IRC -5 = 1.200 m
Afflux = 0.300 m
Depth of deck (Girder 1.700m + Slab .210m) = 1.910 m
Camber = 0.200 m
Depth of wearing coat = 0.065 m
Formation level by HFL Consideration at lowest edge = 447.372 m
Formation level at Centre of Carriageway = 447.572 m
Formation level AS Per Revised Profile = 336.850 m
Location - Ch /Km +

Calculation of Discharge By Area Velocity Method at Proposed Site.

H.F.L 443.897 M

Chainage Bed Level Distance Depth Below H.F.L Vertical Diff(m) Perimeter (m) Area(Sqm)
-160 444.250 0 0.000 0 0.000
-150 443.393 10 0.504 0.504 10.013 2.523
-140 443.121 10 0.776 0.272 10.004 6.404
-130 442.863 10 1.035 0.258 10.003 9.057
-120 442.650 10 1.247 0.213 10.002 11.411
-110 442.448 10 1.449 0.202 10.002 13.483
-100 442.250 10 1.648 0.199 10.002 15.485
-90 442.075 10 1.822 0.175 10.002 17.352
-80 441.948 10 1.950 0.127 10.001 18.861
-70 441.686 10 2.211 0.261 10.003 20.806
-60 441.264 10 2.633 0.422 10.009 24.229
-50 440.851 10 3.046 0.413 10.009 28.407
-40 440.454 10 3.443 0.397 10.008 32.459
-30 440.058 10 3.839 0.396 10.008 36.425
-20 439.673 10 4.225 0.386 10.007 40.334
-10 439.301 10 4.596 0.371 10.007 44.119
0 439.247 10 4.650 0.054 10.000 46.230
10 439.328 10 4.569 0.081 10.000 46.096
20 439.473 10 4.425 0.144 10.001 44.971
30 439.726 10 4.171 0.254 10.003 42.986
40 440.040 10 3.857 0.314 10.005 40.150
50 440.747 10 3.151 0.706 10.025 35.081
60 441.370 10 2.527 0.624 10.019 28.415
70 441.926 10 1.971 0.556 10.015 22.507
80 442.416 10 1.481 0.490 10.012 17.270
90 442.851 10 1.046 0.435 10.009 12.642
100 443.210 10 0.688 0.359 10.006 8.673
110 443.496 10 0.401 0.286 10.004 5.447
120 443.724 10 0.173 0.228 10.003 2.872
130 443.884 10 0.013 0.160 10.001 0.930
140 443.981 10 0.000 0.013 10.000 0.065
150 443.813 10 0.084 0.084 10.000 0.419
160 443.513 10 0.384 0.301 10.005 2.341

Avg.Depth = 2.329 290.185 675.626

Discharge Calculation by Area Velocity method

Using Mannings formula

V= (1/n)X( R )^ (2/3)X( s)^ (1/2)


A = 675.626 Sqm
P = 290.185 M
Avg. depth
of flow = 2.329 m
R= A/P
R = 675.63/290.18
2.33
S= 0.0041
n= 0.045 (As per Table 5.10, IRC:SP13-2004)
V= 2.33^0.66x0^0.5/0.05
V= 2.49 m/sec

Q= A*V
Q= 2.49x675.63
Q= 1684.497 m3/sec
Location - Ch /Km +

Calculation of Discharge By Area Velocity Method at 500U/S

H.F.L 454.476 M

Chainage Bed Level Distance Depth Below H.F.L Vertical Diff Perimeter Area
150.00 456.713 0 0.000 0 0.000
145.00 455.092 5 0.000 0.000 0.000 0.000
140.00 454.984 5 0.000 0.000 0.000 0.000
135.00 454.370 5 0.106 0.106 5.001 0.265
130.00 453.451 5 1.025 0.919 5.084 2.851
125.00 452.501 5 1.975 0.950 5.089 7.567
120.00 451.251 5 3.225 1.250 5.154 13.200
115.00 451.251 5 3.225 0.000 5.000 16.125
110.00 451.251 5 3.225 0.000 5.000 16.125
105.00 451.251 5 3.225 0.000 5.000 16.125
100.00 451.251 5 3.225 0.000 5.000 16.125
95.00 451.251 5 3.225 0.000 5.000 16.125
90.00 450.620 5 3.856 0.631 5.040 17.773
85.00 450.504 5 3.972 0.116 5.001 19.573
80.00 449.670 5 4.806 0.834 5.069 22.097
75.00 449.385 5 5.091 0.285 5.008 24.763
70.00 448.735 5 5.741 0.650 5.042 27.194
65.00 448.085 5 6.391 0.650 5.042 30.458
60.00 447.795 5 6.681 0.290 5.008 32.707
55.00 447.360 5 7.116 0.435 5.019 34.558
50.00 447.095 5 7.381 0.265 5.007 36.268
45.00 446.079 5 8.397 1.016 5.102 39.848
40.00 445.729 5 8.747 0.350 5.012 42.912
35.00 445.374 5 9.102 0.355 5.013 44.679
30.00 444.169 5 10.307 1.205 5.143 49.217
25.00 443.144 5 11.332 1.025 5.104 54.660
20.00 442.876 5 11.600 0.268 5.007 57.371
15.00 442.346 5 12.130 0.530 5.028 59.491
10.00 441.521 5 12.955 0.825 5.068 63.136
5.00 441.641 5 12.835 0.120 5.001 64.484
0.00 441.296 5 13.180 0.345 5.012 65.115
5.00 441.256 5 13.220 0.040 5.000 66.001
10.00 441.656 5 12.820 0.400 5.016 65.204
15.00 442.496 5 11.980 0.840 5.070 62.434
20.00 443.446 5 11.030 0.950 5.089 58.040
25.00 443.778 5 10.698 0.332 5.011 54.380
30.00 444.628 5 9.848 0.850 5.072 51.733
35.00 445.828 5 8.648 1.200 5.142 46.897
40.00 446.017 5 8.459 0.189 5.004 42.783
45.00 446.017 5 8.459 0.000 5.000 42.295
50.00 446.627 5 7.849 0.610 5.037 40.921
55.00 448.017 5 6.459 1.390 5.190 36.448
60.00 448.867 5 5.609 0.850 5.072 30.386
65.00 450.742 5 3.734 1.875 5.340 24.152
70.00 451.692 5 2.784 0.950 5.089 16.441
75.00 454.192 5 0.284 2.500 5.590 8.123
80.00 457.842 5 0.000 0.284 0.000 0.355
85.00 460.091 5 0.000 0.000 0.000 0.000
90.00 460.471 5 0.000 0.000 0.000 0.000
95.00 458.971 5 0.000 0.000 0.000 0.000
100.00 458.835 5 0.000 0.000 0.000 0.000
105.00 458.533 5 0.000 0.000 0.000 0.000
110.00 459.058 5 0.000 0.000 0.000 0.000
115.00 459.738 5 0.000 0.000 0.000 0.000
120.00 459.688 5 0.000 0.000 0.000 0.000
125.00 459.753 5 0.000 0.000 0.000 0.000
130.00 459.808 5 0.000 0.000 0.000 0.000
135.00 459.653 5 0.000 0.000 0.000 0.000
140.00 459.741 5 0.000 0.000 0.000 0.000
145.00 459.781 5 0.000 0.000 0.000 0.000
150.00 459.851 5 0.000 0.000 0.000 0.000

avg.Depth = 7.115 217.777 1537.404


`
Discharge Calculation by Area Velocity method

Using Mannings formula


V= (1/n)X( R )^ (2/3)X( s)^ (1/2)
A = 1537.404 Sqm
P =
Avg. 217.777 M
depth of 7.115 m
R= A/P
R= 1537.4/217.78
7.06
S= 0.004075143
n= 0.045 (As per Table 5.10, IRC:SP13-2004)
V= 7.06^0.66x0^0.5/0.05
V= 5.22 m/sec

Q= A*V
Q= 5.22x1537.4
Q= 8026.378 m3/sec
Location - Ch /Km +

Calculation of Discharge By Area Velocity Method at 500D/S

H.F.L 452.321 M

Chainage Bed Level Distance Depth Below H.F.L Vertical Diff Perimeter Area
150.00 453.719 0.000
145.00 451.219 5 1.102 1.102 5.120 2.788
140.00 450.639 5 1.682 0.580 5.034 6.983
135.00 450.949 5 1.372 0.310 5.010 7.642
130.00 450.099 5 2.222 0.850 5.072 9.049
125.00 450.074 5 2.247 0.025 5.000 11.173
120.00 450.019 5 2.302 0.055 5.000 11.373
115.00 449.965 5 2.356 0.054 5.000 11.645
110.00 449.951 5 2.370 0.014 5.000 11.815
105.00 450.401 5 1.920 0.450 5.020 10.747
100.00 447.841 5 4.480 2.560 5.617 16.988
95.00 447.731 5 4.590 0.110 5.001 22.678
90.00 446.231 5 6.090 1.500 5.220 27.288
85.00 445.731 5 6.590 0.500 5.025 31.779
80.00 444.731 5 7.590 1.000 5.099 35.801
75.00 444.241 5 8.080 0.490 5.024 39.269
70.00 443.991 5 8.330 0.250 5.006 41.051
65.00 443.701 5 8.620 0.290 5.008 42.411
60.00 443.151 5 9.170 0.550 5.030 44.609
55.00 443.101 5 9.220 0.050 5.000 45.976
50.00 441.901 5 10.420 1.200 5.142 49.797
45.00 441.101 5 11.220 0.800 5.064 54.444
40.00 440.771 5 11.550 0.330 5.011 56.987
35.00 440.421 5 11.900 0.350 5.012 58.697
30.00 440.271 5 12.050 0.150 5.002 59.888
25.00 438.921 5 13.400 1.350 5.179 64.764
20.00 438.121 5 14.200 0.800 5.064 69.439
15.00 438.011 5 14.310 0.110 5.001 71.284
10.00 437.891 5 14.430 0.120 5.001 71.860
5.00 437.621 5 14.700 0.270 5.007 72.878
0.00 437.221 5 15.100 0.400 5.016 74.619
5.00 437.721 5 14.600 0.500 5.025 74.435
10.00 438.621 5 13.700 0.900 5.080 71.319
15.00 439.821 5 12.500 1.200 5.142 66.430
20.00 439.801 5 12.520 0.020 5.000 62.550
25.00 440.301 5 12.020 0.500 5.025 61.503
30.00 442.801 5 9.520 2.500 5.590 57.028
35.00 443.301 5 9.020 0.500 5.025 46.466
40.00 442.991 5 9.330 0.310 5.010 45.919
45.00 443.041 5 9.280 0.050 5.000 46.526
50.00 442.731 5 9.590 0.310 5.010 47.220
55.00 443.311 5 9.010 0.580 5.034 46.656
60.00 443.491 5 8.830 0.180 5.003 44.614
65.00 443.541 5 8.780 0.050 5.000 44.026
70.00 443.281 5 9.040 0.260 5.007 44.580
75.00 443.141 5 9.180 0.140 5.002 45.559
80.00 445.206 5 7.115 2.065 5.410 42.406
85.00 446.156 5 6.165 0.950 5.089 33.497
90.00 447.656 5 4.665 1.500 5.220 27.671
95.00 447.546 5 4.775 0.110 5.001 23.603
100.00 445.606 5 6.715 1.940 5.363 29.768
105.00 445.466 5 6.855 0.140 5.002 33.932
110.00 445.516 5 6.805 0.050 5.000 34.151
115.00 445.541 5 6.780 0.025 5.000 33.963
120.00 445.791 5 6.530 0.250 5.006 33.296
125.00 445.906 5 6.415 0.115 5.001 32.367
130.00 445.972 5 6.349 0.067 5.000 31.910
135.00 448.172 5 4.149 2.200 5.463 27.456
140.00 450.092 5 2.229 1.920 5.356 16.510
145.00 450.992 5 1.329 0.900 5.080 8.964
150.00 452.552 5 0.000 1.329 0.000 1.661

avg.Depth = 7.922 299.732 2351.707

Discharge Calculation by Area Velocity method

Using Mannings formula


V= (1/n)X( R )^ (2/3)X( s)^ (1/2)
A = 2351.707 Sqm
P =
Avg. 299.732 M
depth of 7.922 m
R= A/P
R = 2351.71/299.73
7.85
S= 0.0040751
n= 0.045 (As per Table 5.10, IRC:SP13-2004)
V= 7.85^0.66x0^0.5/0.05
V= 5.60 m/sec

Q= A*V
Q= 5.6x2351.71
Q= 13177.255 m3/sec
Location - Ch /Km +

L - Section of River/nalla

U/S side
Chainage ( M ) G .L ( M )
-500.000 441.296
-480.000 441.211
-460.000 441.126
-440.000 441.041
-420.000 440.957
-400.000 440.872
-380.000 440.787
-360.000 440.702
-340.000 440.618
-320.000 440.533
-300.000 440.448
-280.000 440.363
-260.000 440.278
-240.000 440.194
-220.000 440.109
-200.000 440.024
-180.000 439.939
-160.000 439.854
-140.000 439.770
-120.000 439.697
-100.000 439.592
-80.000 439.497
-60.000 439.432
-40.000 439.367
-20.000 439.252
0.000 439.247
20.000 439.245
40.000 439.132
60.000 439.082
80.000 438.987
100.000 438.897
120.000 438.817
140.000 438.733
160.000 438.649
180.000 438.565
200.000 438.481
220.000 438.397
240.000 438.313
260.000 438.229
280.000 438.145
300.000 438.061
320.000 437.977
340.000 437.893
360.000 437.809
380.000 437.725
400.000 437.641
420.000 437.557
440.000 437.473
460.000 437.389
480.000 437.305
500.000 437.221
D/S side
Slope = (441.295842857143-437.22)/(500--500)
0.00408
Location - Ch /Km +

Catchment of River/nalla

Data obtained from Indo Geo - Platform of ISRO

Reffrence http://bhuvan.nrsc.gov.in

Catchment Area at Site'M' = 714.236 Sq. Km.


Location - Ch /Km +

By Unit Hydrograph Method

Step:- 1 Determination Of Physiographic Parameter

Catchment Area at Site (A) = 714.236 Sq. Km.

Length of the Longest Stream (L): = 64.852 km

Length of main stream from bridge gauging site to a point nearest to


centriod of the stream basin along stream course, L C
= 26.838 km
Name & number of Subzone = Lower Godawari Sub
Zone (3f)
Equivalent Stream Slope

Reduced Reduced Length of Height Above Li x (D i-1


Sl. No. Distance level of Each Datum * (Di)= ( D i-1 + + Di) (m x
Starting River Bed Segment(Li) Difference Di) (m) Km)
1 0.000 438.000 - -
2 5.000 446.843 5.000 8.84 8.84 44.21
3 10.000 453.714 5.000 15.71 24.56 122.78
4 15.000 460.984 5.000 22.98 38.70 193.49
5 20.000 462.269 5.000 24.27 47.25 236.27
6 25.000 474.000 5.000 36.00 60.27 301.35
7 30.000 477.121 5.000 39.12 75.12 375.60
8 35.000 488.000 5.000 50.00 89.12 445.60
9 40.000 496.000 5.000 58.00 108.00 540.00
10 45.000 503.000 5.000 65.00 123.00 615.00
11 50.000 518.000 5.000 80.00 145.00 725.00
12 55.000 532.000 5.000 94.00 174.00 870.00
13 60.000 550.652 5.000 112.65 206.65 1033.26
14 63.672 577.000 3.672 139.00 251.65 923.97
SUM 63.672 6426.54

(*) Reduce level of River bed at the point of study, i.e. 438 m

2
S = [Sum( Li x (D i-1 + Di))]/Li From 3.4.1.4 (b) of 3c
= 1.59 (m x Km)/Km

Step:- 2 Determination Of Synthetic (1-hr) Unitgraph Parameters From table 3.3 of 3c

Time from the center of Unit rainfall duration to the peak of Unit Hydrograph
tp = 0.348X(LXLc/(S)^0.5)^0.454
= 9.200 hrs
= 9.300 hrs
Peak discharge of hydrograph per unit area
qp = 1.842X[tp]^-0.804
= 0.307 Cum per Sq.Km

Width of U.G. measured at 50% maximum discharge ordinate


W 50 = 2.353X[qp]^(-1.005)
= 7.72 hrs

Width of U.G. measured at 75% maximum discharge ordinate


W 75 = 1.351 x [ qp]^(-0.992)
= 4.36 hrs
(( V^2 / 17.88) + 0.015 ) X ((A/a)^2 - 1)
Width of the rising side of U.G. measured at 50% of maximum discharge ordinate
WR50 = 0.936 x [ qp]^(-1.047)
= 3.23 hrs

Width of the rising side of U.G. measured at 75% of maximum discharge ordinate
WR75 = 0.579 x [ qp]^(-1.004)
= 1.90 hrs

Base width of Unit Hydrograph


TB = 4.589 x [ tp]^(0.894)
= 33.693 hrs
= 34.000 hrs

Time from start of rise to the peak of unit hydrograph


Tm = tp+tr/2
= 9.800 hrs
= 10.000 hrs

Peak discharge of Unit Hydrograph


Qp = qp x A
3
= 219.0135 m /sec
3
= 219.10 m /sec

Step:- 3 Drawings of Synthetic Unitgraph

Estimated parameter of Unitgraph in step‐2 were plotted to scale. The plotted points were joined to draw

Discharge indicated by unit hydrograph

Qth = 2.78 x A/ tr From 3.4.4 iii) of 3c


3
= 1985.58 m /sec Eq 1

Time (in 1-hr


hrs) Synthetic

0 0.000
1 3.133
2 12.533 250.000
3 28.200
5 50.133
6 78.332 200.000
7 112.937
8 161.176
9 204.002
10 217.576 150.000
11 193.178
Discharge (cum)

13 160.850
14 125.413
100.000
15 105.114
16 92.889
17 81.420
18 70.707 50.000
19 60.749
21 51.546
22 43.099
23 35.407 0.000
24 28.471 0 5 10 15 20 25 30 35 40 45
25 22.290
26 16.864
-50.000
27 12.194 Times (in Hrs)
29 8.280
30 5.121
31 2.717
32 1.069
33 0.176
34 0.000
36 0.000
37 0.000
38 0.000
39 0.000
Sum 1985.575 Eq 2

Since Eq 1 = Eq 2, so unitgraph drawn is in order


Step:- 4 Estimation of design storm duration

The design storm duration


TD = 1.1 x tp From 5.2 Step-2 of 3c
= 10.230 hrs
= 11.000 hrs (*As for catchment Given Catchment and
Calculated Storm duration is 12 hrs thus
Step:- 5 Estimation of point rainfall and areal rainfall taking Storm duration as 12hrs)

50 Yr, 24 hr rainfall = 20.00 cm From Plate-9


Ratio of 12 hr rainfall to 24 hr rainfall = 0.79 cm From Fig-10
So, 50 Yr 12 hr point rainfall = 15.8 cm

Areal reduction factor correspondings to area


714.236 Sq.Km
and TD = 11.000 hrs
= 0.796 Annexure 4.4
So, 50 yr 5 hr areal rainfall = 12.57 cm

Step:- 6 Time distribution of Areal Rainfall and calulation of Rainfall Excess

50-Yr 12-Hr areal rainfall = 12.57 cm was distributed with the distribution coefficeints to get 1 hr
1 hr rainfall as follows:

Storm
Distribution rainfall =
Rainfall X 1 hr rainfall
Durations coefficient
increment
(hr) (Annexure Distributi
on (cm)
4.3)
coefficien
t (cm)
1 0.35 4.40 4.40
2 0.5 6.29 1.89
3 0.64 8.05 1.76
4 0.72 9.05 1.01
5 0.79 9.93 0.88
6 0.85 10.69 0.75
7 0.89 11.19 0.50
8 0.92 11.57 0.38
9 0.95 11.94 0.38
10 0.97 12.20 0.25
11 0.99 12.45 0.25
12 1.00 12.57 0.13

Step:- 7 Estimation of effective Rainfall Units

Design
loss rate 1 hr rainfall
Durations 1 hr rainfall
(cm/hr) increment
(hr) (cm)
as per 3.6 (cm)
of 3c
1 4.40 0.10 4.30
2 1.89 0.10 1.79
3 1.76 0.10 1.66
4 1.01 0.10 0.91
5 0.88 0.10 0.78
6 0.75 0.10 0.65
7 0.50 0.10 0.40
8 0.38 0.10 0.28
9 0.38 0.10 0.28
10 0.25 0.10 0.15
11 0.25 0.10 0.15
12 0.13 0.10 0.03

Step:- 8 Estimation of base flow

Adopting a design base flow of 0.05 cumec per sq Km recommended for this zone (3c)

Total base flow = 35.71 cumecs

Step:- 9 Estimation of 50 - Year Flood (Peak only) From 3.7 of 3c

1 - Hr
S.U.G.
Effective Direct Runoff
Time (hr) Ordinates
rainfall (cumecs)
(cumecs)
(cm)
1 2.39 0.03 2.36
2 9.55 0.15 9.40
3 21.49 0.15 21.34
4 38.21 0.28 37.93
5 59.70 0.28 59.42
6 85.97 0.40 85.56
7 117.68 0.65 117.02
8 160.47 0.78 159.69
9 198.49 0.91 197.58
10 219.10 1.66 217.44
11 205.39 1.79 203.61
12 177.11 4.30 172.81
Total 1284.17
50 Year Flood Peak 1319.88