Professional Documents
Culture Documents
1/2
P = 4.80 x Q ( vide cl.8.1.2 of IS 7784 ( part I ) - 1993 )
= 4.80 x 5.541334
= 26.598 m.
Considering 60 % fluming
= 14.55 m
= 9.7 m
DESIGN OF TAIL CHANNEL
Discharge = 30.706 cumecs
Bed width = 16.00 mts.
Bed fall = 1 in 3300
n = 0.025
side slope = 1.5 : 1 1.820
By trial and error d = 1.820 mts.
404.860
Area A = (b+n*d)*d 16.00
Area = 34.089 sq.mt.
Perimeter P = b + ( 1 + n2 ) *2*d
Perimeter = 22.562 mts.
R = A/P
R = 1.511 mts.
2/3
R = 1.317
V = ( 1 / n ) * ( R2/3 ) * ( 1 / S )1/2
V = 0.917 mts/sec
Discharge Q = VxA
Q = 31.253 cumecs > 30.706 cumecs