HYDROLOGY ASSIGNMENT- 8

Rational Method
PARAHYANGAN CATHOLIC UNIVERSITY
Department of Civil Engineering
Jalan Ciumbuleuit No. 94. Telp. 233691 – 233692, Bandung 40142

Time Limit : 2 weeks


XYZ variabels is based on your NPM -> 2017410143 = 2017410XYZ -> X=1, Y=4, Z=3

Given below is the layout of a housing area.

From the image, the alphabet is the channel intersections, numbers are the lot number and the
arrows are flow direction.
Lot 1, 4, 5 and 6 are fully developed, while lot 2 and 3 are still in development. The land
characteristics data for each lot and channel are as follows.
Lot Land use Slope Channel Manning Slope
1 Spaced multi-unit housing 0.0031Z AB 0.01Y 0.0003Z
2 flat, gravel and sand, no vegetation 0.0031X CB 0.01Y 0.0003Z
3 uneven, sandy clay, grass field 0.0069Y BD 0.01Y 0.0003Z
4 Closed multi-unit housing 0.0053Y DE 0.01Y 0.0003Z
5 Spaced multi-unit housing 0.0047Z EF 0.01Y 0.0003Z
6 Spaced multi-unit housing 0.0076X FG 0.01Y 0.0003Z

All of the fully developed lot has a 20% area of asphalt road space and 10% area dedicated to
green space.
Equation for Rainfall Intensity:
A
I=
√t + B
A : 531
B : 0.643
t : time of concentration (minute)
The channel is trapezoidal, B = 2H and m = 0.2.
Tasks:
1. Calculate the discharge at each channel using rational method!
2. Calculate the dimension of each channel! (Freeboard 0.2m)
3. Based on your work, explain the correlation between land development and time of
concentration! (Provide comparison using numbers you already have)
4. In the event that a channel design failed and flooding starts to happen, to mitigate the
flood is it more effective to deepen or widen the channel? Explain!

Note:
 Read carefully before doing the assignment
 Use the maximum C value
 Provide calculation examples
 Summarize results of task 1 and 2 in a table
 Limit calculation result to a decimal for dimensions
Diketahui :
NPM : 2017410143 , maka X=1
Y=4
Z=3
Lot 1, 4, 5, dan 6 terdiri dari :
70% perumahan
20% jalanan beraspal
10% pertamanan atau greenspace
Jawab :
 Contoh perhitungan untuk saluran AB
A1 = L1 x B1
= 200 x 300
= 60000 m2
 Mencari Koefisien Runoff Area 1
C1 = ( 70% x C perumahan multi unit, terpisah-pisah ) + ( 20% x C jalanan beraspal) +
( 10% x C pertamanan / greenspace)
= (0,7 x 0,6) + (0,2 x 0,95) + (0,1 x 0,25)

= 0,635
Karena nilai C , mempunyai range nilai . Maka ambil nilai C yang paling besar.
 Menentukan Luas Efektif
= Luas Daerah 1 x C1
= 60000 x 0,635
= 38100 m2
 Menentukan Mencari Faktor Koreksi , lalu dihubungkan dengan Luas
Tangkapan Air A :
A < 20 Ha , maka K = 1
20 Ha < A < 50 Ha , maka K = 1,05
50 Ha < A < 100 Ha , maka K = 1,10
A > 100 Ha , maka K = 1,15
Luas Tangkapan efektif adalah 60000 m2 dengan kata lain , maka luasnya adalah 6 Ha.
Sehingga K yang digunakan adalah K=1.
 Menentukan Panjang Lahan = 200m ( Di dapat dari arah
aliran yang searah )
 Menentukan Kemiringan Lahan = 0,00313 ( Soal )
 Menentukan Koefisien Hathway Untuk Area 1 = 0,2
 Menentukan Waktu Di Saluran

ti = ¿¿
= 0,5196 Jam
Satuan masih dalam jam , maka harus diubah kedalam menit. Hasilnya adalah
0,50326 X 60 = 31,1765 Menit
Dengan:
L = Panjang lintasan (m)
n = Koefisien Hathway
S = Kemiringan lahan

Untuk tsaluran , diasumsikan nilainya 1 . Karena menggunakan Goal Seek


tkonsentrasi = tlahan + tsaluran
= 31,1765 + 1
= 32,1765 menit
 Menentukan Intensitas Hujan
5 31
I= = 85,27929 mm/jam
√3 2,1765+0,643

 Debit Puncak

Q=0,278 x 1 x 0,635 x 10−6 x 85,2 793 x 60000 = 0,90326 m3 / s

 Kedalaman Saluran

2 3

( )
2 3 8
0,9 0326 x 0,01 4 x ( 2+2 √ 1+ 0,2 )
h= 5 1
3 2
( 2+0,2 ) x 0,0003 3

= 0,7561 m
Dengan:
Q = Debit puncak
n = manning
z = 2 (diketahui dari soal b = 2h)
m = 0,2 (diketahui dari soal m = 0,2)
S0 = Slope

 Lebar Saluran
b = 2h
= 2 x 0,7561
= 1,5122 m
 Panjang Saluran = 300 m

 Slope = 0,00033

 Koefisien Manning = 0,014

 Luas Penampang Basah (A)


= (b + (m x h)) x h
= (1,5122 + (0,2 x 0,7561)) x 0,7561
= 1,2577 m2

 Kecepatan Aliran (V)


Q 0 ,90 326
V ¿ = = 0,7182 m/s
A 1,257 7
 Menentukan Waktu Aliran

= 300 / ( 60 x 0,718)
= 6,9637 menit

 Delta t = t aliran – tsaluran


= 6,9637 – 1
= 5,9637

Setelah delta t diubah menjadi 0 , nilai t saluran menjadi 7,125 menit


 t saluran = 7,125 menit

 t konsentrasi = 38,302 menit

 I (intensitas hujan) = 77,724 mm/jam

 Q ( debit puncak) = 0,823 m3 /s

 h ( kedalaman saluran) = 0,73 m

 b ( lebar saluran ) = 1,46 m

 A ( luas penampang saluran) = 1,173 m2

 V ( kecepatan aliran) = 0,702 m/s

 t ( waktu aliran ) = 7,125 menit

 delta t = 0
Tabel kesimpulan :
KEDALAMAN
SALURAN Q (m3/s) LEBAR [m] KEDALAMAN + FREEBOARD [m]
[m]
AB 0,8232 1,5 0,7300 0,9300
CB 0,3775 1,1 0,5500 0,7500
BD 1,8697 2,0 0,9900 1,1900
DE 2,8492 2,3 1,1600 1,3600
EF 3,4781 2,5 1,2500 1,4500
FG 3,6980 2,6 1,2800 1,4800
Lot Land Use Slope Channel Manning Slope
spaced multi unit-
1 0,00313 AB 0,014 0,00033
housing
flat, gravel, and sand, no
2 0,0031 CB 0,014 0,00033
vegetation
uneven, sandy clay,
3 0,00694 BD 0,014 0,00033
grass field
closed multi-unit
4 0,00534 DE 0,014 0,00033
housing
spaced multi unit-
5 0,00473 EF 0,014 0,00033
housing
spaced multi unit-
6 0,00761 FG 0,014 0,00033
housing
NAMA LUAS DAERAH Koefisien Luas Efektif faktor
DAERAH LAYANAN
SALURAN (m2) runoff (m2) koreksi
AB AREA 1 60000 0,635 38100 1
CB AREA 3A 50000 0,370 18500 1
AREA 1 60000 0,635 38100 1
AREA 2 60000 0,350 21000 1
BD AREA 3A 50000 0,370 18500 1
AREA 3B 50000 0,370 18500 1
TOTAL AREA 220000 0,437 96100 1,05
AREA 1 60000 0,635 38100 1
AREA 2 60000 0,350 21000 1
AREA 3A 50000 0,370 18500 1
DE
AREA 3B 50000 0,370 18500 1
AREA 4 75000 0,740 55500 1
TOTAL AREA 295000 0,514 151600 1,05
AREA 1 60000 0,635 38100 1
AREA 2 60000 0,350 21000 1
AREA 3A 50000 0,370 18500 1
EF AREA 3B 50000 0,370 18500 1
AREA 4 75000 0,740 55500 1
AREA 5 60000 0,635 38100 1
TOTAL AREA 355000 0,534 189700 1,05
AREA 1 60000 0,635 38100 1
AREA 2 60000 0,350 21000 1
AREA 3A 50000 0,370 18500 1
AREA 3B 50000 0,370 18500 1
FG
AREA 4 75000 0,740 55500 1
AREA 5 60000 0,635 38100 1
AREA 6 30000 0,635 19050 1
TOTAL AREA 385000 0,542 208750 1,05
intensitas
Panjang koefisien t lahan t saluran t konsentrasi
Slope Lahan hujan
Lahan (m) hathway [menit] [menit] [menit]
[mm/jam]
200 0,00313 0,2 31,177 7,125 38,302 77,724
250 0,00694 0,4 39,696 5,803 45,499 71,870
200 0,00313 0,2 38,302      
300 0,0031 0,4 52,194      
250 0,00694 0,4 45,499      
250 0,00694 0,4 39,696      
      52,194 3,889 56,084 65,298
200 0,00313 0,2      
300 0,0031 0,4      
56,084
250 0,00694 0,4      
250 0,00694 0,4      
300 0,00534 0,2 33,249      
      56,084 4,376 60,459 63,075
200 0,00313 0,2      
300 0,0031 0,4      
250 0,00694 0,4 60,459      
250 0,00694 0,4      
300 0,00534 0,2      
300 0,00473 0,2 34,206      
      60,459 3,330 63,790 61,531
200 0,00313 0,2      
300 0,0031 0,4      
250 0,00694 0,4      
63,790
250 0,00694 0,4      
300 0,00534 0,2      
300 0,00473 0,2      
200 0,00761 0,2 25,325      
      63,790 4,920 68,710 59,448
debit
kedalaman lebar panjang slope dasar Koef. luas penampang
puncak
saluran [m] saluran [m] saluran [m] saluran Manning basah [m2]
[m3/s]
0,82324 0,7302 1,460 300 0,00033 0,014 1,173
0,36963 0,5408 1,082 200 0,00033 0,014 0,643
             
             
             
             
1,83172 0,9856 1,971 200 0,00033 0,014 2,137
             
             
             
             
             
2,79119 1,1543 2,309 250 0,00033 0,014 2,931
             
             
             
             
             
             
3,40716 1,2439 2,488 200 0,00033 0,014 3,404
             
             
             
             
             
             
             
3,62243 1,2728 2,546 300 0,00033 0,011 3,564
kecepatan aliran waktu aliran
delta t
[m/s] [menit]
0,702 7,125 0,000
0,574 5,803 0,000
     
     
     
     
0,857 3,889 0,000
     
     
     
     
     
0,952 4,376 0,000
     
     
     
     
     
     
1,001 3,330 0,000
     
     
     
     
     
     
     
1,016 4,920 0,000