MAXIMUM FLOOD DISCHARGE :

C.A = 1.832 Sq.Km.

As per Dicken's formula

0.75
Q = 19.5 x ( 1.832 ) ( vide C.D.O.'s guide lines )

= 30.706 Cumecs

PROPOSALS :

Deep Bed Level of Drain = + 408.650


C.B.L. = + 408.260
F.S.L. = + 409.760
Since the deep Bed Level of Drain is below F.S.L, Under Tunnel
is proposed for this crossing.

TRIAL PIT PARTICULARS:

VENT WAY CALCULATIONS :

Discharge = 30.706 cumecs

Assumed Velocity in the Barrel = 3.00 m / sec

Area Required = Q / V = 10.235 Sq.mt

Considering a Vent size of 3.00 m x 3.00 m.

No.of Vents required = 1.137 no.

say 2 no.s

Velocity in the Barrel = 1.71 m / sec