LAPORAN HARIAN MOTHER STATION CNG BITUNG

04 Agustus 2021

NO.DOK : PM-PG-1413-O.05-F1
A. PENERIMAAN GAS B. LOADING CNG

No. METER
Nominasi PRESS TEMP FLOW LOADING
(MMscf) Psig O
F MSCFD TIME PRESS VOLUME
KAPASITAS
NO OFFTAKER (BAR)
1 ORIFICE STREAM I 109.73 77.81 0.0000 ARMADA Start Stop SM3 MSCF
1.40
2 ORIFICE STREAM II 109.73 77.25 124.5532 1 PT. Raja Rafa Samudra 10 feet 5:58 6:35 200 562.8 19.8751
3 FUEL 2 PT. Salmah Berkah Indonesia 10 feet 6:54 7:05 200 179.47 6.3379
124.5532 3 PT. Salmah Berkah Indonesia 10 feet 8:30 9:08 200 567.82 20.0524
C. PENYALURAN GAS 4 PT. Salmah Berkah Indonesia 10 feet 11:30 11:54 200 250.39 8.8424
VOLUME PER-DAY 5 PT. Salmah Berkah Indonesia 10 feet 18:43 19:10 200 360.45 12.7292
No. METER DISPENSER Status
SM3 MSCFD 6 PT. Asahan Food 10 feet 20:25 21:10 200 1384.42 48.8904
1 DISPENSER 1 OPS 1560.48 55.1079 7 0.0000
2 DISPENSER 2 OPS 360.45 12.7292 8 0.0000
3 DISPENSER 3 STB 0.00 0.0000 9 0.0000
4 DISPENSER 4 OPS 1384.42 48.8904 10 0.0000
11 0.0000
3305.35 116.7274
12 0.0000
13 0.0000
No. PENYALURAN KONSUMEN SM3 MSCFD 14 0.0000
1 PT. Cipta Niaga Gas 0.00 0.0000 15 0.0000
2 PT. Asahan Food 1384.42 48.8904 16 0.0000
3 PT. Berkah Mirza Insani 0.00 0.0000 17 0.0000
4 PT. Hawkeen Jaya Perkasa 0.00 0.0000 18 0.0000
5 PT. Raja Rafa Samudra 562.80 19.8751 19 0.0000
6 PT. Cipta Karya Kamulyan 0.00 0.0000 20 0.0000
7 PT. Patra Logistik 0.00 0.0000 21 0.0000
8 PT. Mentari Fajar Gemilang 0.00 0.0000 22 0.0000
9 PT. Salmah Berkah Indonesia 1358.13 47.9620 23 0.0000
10 PT. Sahabat Energi Indonesia 0.00 0.0000 24 0.0000
11 PT. Delta Prima Gas 0.00 0.0000 25 0.0000
26 0.0000
TOTAL 3305.35 116.7274
27 0.0000
28 0.0000
29 0.0000
3305.35 116.7274
D. OPERATIONAL UNIT ROTATING
EQUIPMENT GANTI OLI LAST PM NEXT PM
No. DESKRIPSI KEGIATAN & RENCANA PERBAIKAN
UNIT RH AWAL OPERASI STB OM RH AKHIR REPLACE NEXT RH RH
COMPRESSOR MOTHER STATION CNG

1 MC 627 5012 2 22 - 5014 4934 5434 - 1000 1. Cleaning area operasi


2 MC 628 4551 0 24 - 4276 2. Troubleshooting Gas dryer oleh PT EFK
4551 4776 1000 2000
3 MC 629 7968 3 21 - 7700 3. PM IAC A (Penggantian pelumas & cleaning air filter)
7971 8200 2000 3000
4 MC 630 2058 0 0 24 2058 2058 2558 2000 3000 4. Perbaikan kebocoran air supply MC627
GENERATOR SET
1 G-01 12643 2 22 - 12645 12279 12779 4000 4000
2 G-02 12417 3 21 - 12420 12125 12625 3000 4000
INSTRUMENT AIR COMPRESSOR
1 UNIT A 42279 0 24 - 42279 18000 20000
2 UNIT B 36767 24 0 - 36791 18000 20000
DRYER KONSUMEN
1 HEAT 3802 0 24 - 3802 2000
2 COOL 8493 0 24 - 8493 2000
3 BLOWER 12550 0 24 - 12550 12002 13602 12002 11889 PEMAKAIAN LISTRIK
METER AWAL METER AKHIR TOTAL KWH
25019 25027 8

F. MATERIAL G. SDM
PEMAKAIAN & STOCK PETUGAS OPERASI SHIFT Disiapkan oleh : Disetujui oleh :
NO MATERIAL AWAL PAKAI TERIMA STOCK MALAM PAGI SORE Ops 1 Station Spv Operation Station
1 MED. SAE 40 218 218 OPERASI - 1 Kusuma Lutfi Jalil
2 MED. GEO 15W40 469 469 TEKNISI Rangga Irfan
3 AQUADEST 149 149 DISPATCHER Fendi Raka
4 COOLANT NINEPRO 420 8 8 DISPENSER Sumarna Agus
5 Lube Gear Mobile 632 13 13 Note: Kusuma Sahroni
6 Additive (Coolant VC) 8 8
7 Coolant PG+ 228 228
8 Coolant Radiator genset 11 11
100
150
200
250
300
350
400
450
500

0
50
F. MATERIAL

PEMAKA IAN & STOCK

MATERIAL
NOAWPAKAI
AL TERIMA

MED. SAE
1 218
40

MED. GEO 15W


2 469
40

AQUADEST
3 149

COOLANT NINEPRO
4 420
8

Lube Gear Mobile


5 632
13

Additive (Coolant
6 VC)
8

Coolant7PG+
228

Coolant Radiator genset


8 11
Column H
Column G
Chart Title
500

450

400

350

300

250

200

150

100

50

0
TERIMA
PAKAI
AWAL 218 469 149 8 13 8 228 11
MATERIAL MED. SAE 40 MED. GEO AQUADEST COOLANT Lube Gear Additive Coolant PG+ Coolant Radiator genset
15W40 NINEPRO Mobile 632 (Coolant VC)
420
F. MATERIAL PEMAKAIAN NO 1 2 3 4 5 6 7 8
& STOCK

Column G Column H
DESKRIPSI KEGIATAN & RENCANA PERBAIKAN