LAPORAN HARIAN MOTHER STATION CNG BITUNG

12 Mei 2021

NO.DOK : PM-PG-1413-O.05-F1
A. PENERIMAAN GAS B. LOADING CNG

No. METER
Nominasi PRESS TEMP FLOW LOADING
(MMscf) Psig O
F MSCFD TIME PRESS VOLUME
KAPASITAS
NO OFFTAKER (BAR)
1 ORIFICE STREAM I 103.98 80.12 0.0000 ARMADA Start Stop SM3 MSCF
1.40
2 ORIFICE STREAM II 104.02 79.82 4.9209 1 PT. Salmah Berkah Indonesia 10 feet 16:59 17:13 200 119.75 4.2289
3 FUEL 2 0.0000
4.9209 3 0.0000
C. PENYALURAN GAS 4 0.0000
VOLUME PER-DAY 5 0.0000
No. METER DISPENSER Status
SM3 MSCFD 6 0.0000
1 DISPENSER 1 OPS 119.75 4.2289 7 0.0000
2 DISPENSER 2 STB 0.00 0.0000 8 0.0000
3 DISPENSER 3 STB 0.00 0.0000 9 0.0000
4 DISPENSER 4 STB 0.00 0.0000 10 0.0000
11 0.0000
119.75 4.2289
12 0.0000
13 0.0000
No. PENYALURAN KONSUMEN SM3 MSCFD 14 0.0000
1 PT. Cipta Niaga Gas 0.00 0.0000 15 0.0000
2 PT. Asahan Food 0.00 0.0000 16 0.0000
3 PT. Berkah Mirza Insani 0.00 0.0000 17 0.0000
4 PT. Hawkeen Jaya Perkasa 0.00 0.0000 18 0.0000
5 PT. Raja Rafa Samudra 0.00 0.0000 19 0.0000
6 PT. Cipta Karya Kamulyan 0.00 0.0000 20 0.0000
7 PT. Patra Logistik 0.00 0.0000 21 0.0000
8 PT. Mentari Fajar Gemilang 0.00 0.0000 22 0.0000
9 PT. Salmah Berkah Indonesia 119.75 4.2289 23 0.0000
10 PT. Sahabat Energi Indonesia 0.00 0.0000 24 0.0000
11 PT. Delta Prima Gas 0.00 0.0000 25 0.0000
26 0.0000
TOTAL 119.75 4.2289
27 0.0000
28 0.0000
29 0.0000
119.75 4.2289
D. OPERATIONAL UNIT ROTATING
EQUIPMENT GANTI OLI LAST PM NEXT PM
No. DESKRIPSI KEGIATAN & RENCANA PERBAIKAN
UNIT RH AWAL OPERASI STB OM RH AKHIR REPLACE NEXT RH RH
COMPRESSOR MOTHER STATION CNG

1 MC 627 4926 0 24 - 4926 4680 5180 - 1000 1. Cleaning area operasi


2 MC 628 4551 0 24 - 4551 4276 4776 1000 2000 2. Cleaning area IAC & hydrant
3 MC 629 7834 0 24 - 7834 7700 8200 2000 3000 3. Cleaning air filter Diesel pump
4 MC 630 2058 0 0 24 2058 2058 2558 2000 3000
GENERATOR SET
1 G-01 12475 0 24 - 12475 12279 12779 4000 4000
2 G-02 12294 1 23 - 12295 12125 12625 3000 4000
INSTRUMENT AIR COMPRESSOR
1 UNIT A 41043 24 0 - 41067 18000 20000
2 UNIT B 35987 0 24 - 35987 18000 20000
DRYER KONSUMEN
1 HEAT 3776 0 24 - 3776 2000
2 COOL 8437 0 24 - 8437 2000
3 BLOWER 12468 0 24 - 12468 12002 13602 12002 11889 PEMAKAIAN LISTRIK
METER AWAL METER AKHIR TOTAL KWH
24260 24268 8

F. MATERIAL G. SDM
PEMAKAIAN & STOCK PETUGAS OPERASI SHIFT Disiapkan oleh : Disetujui oleh :
NO MATERIAL AWAL PAKAI TERIMA STOCK MALAM PAGI SORE Ops 1 Station Spv Operation Station
1 MED. SAE 40 171 171 OPERASI - 1 Kusuma Lutfi Jalil
2 MED. GEO 15W40 539 539 TEKNISI Rangga Irfan
3 AQUADEST 312 312 DISPATCHER Fendi Raka
4 COOLANT NINEPRO 420 8 8 DISPENSER Sumarna\ Agus
5 Lube Gear Mobile 632 13 13 Note: Kusuma Sahroni
6 Additive (Coolant VC) 8 8
7 Coolant PG+ 228 228
8 Coolant Radiator genset 11 11
100
200
300
400
500
600

0
F. MATERIAL

PEMAKA IAN & STOCK

MATERIAL
NOAWPAKAI
AL TERIMA

MED. SAE
1 171
40

MED. GEO 15W


2 539
40

AQUADEST
3 312

COOLANT NINEPRO
4 420
8

Lube Gear Mobile


5 632
13

Additive (Coolant
6 VC)
8

Coolant7PG+
228

Coolant Radiator genset


8 11
Column H
Column G
Chart Title
600

500

400

300

200

100

0
TERIMA
PAKAI
AWAL 171 539 312 8 13 8 228 11
MATERIAL MED. SAE 40 MED. GEO AQUADEST COOLANT Lube Gear Additive Coolant PG+ Coolant Radiator genset
15W40 NINEPRO Mobile 632 (Coolant VC)
420
F. MATERIAL PEMAKAIAN NO 1 2 3 4 5 6 7 8
& STOCK

Column G Column H
DESKRIPSI KEGIATAN & RENCANA PERBAIKAN

MOTHER STATION CNG