Professional Documents
Culture Documents
Ilovepdf Merged
Ilovepdf Merged
DISTRIBUTION STATEMENT:
NO DISTRIBUTION WITHOUT
X PERMISSION FROM THE
LOCATION RESPONSIBLE DEPARTMENT
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com. 1|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
TABLE OF CONTENTS
2. Abbreviations ................................................................................ 3
5. Deliverables ................................................................................... 5
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 2|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
1. Executive Summary
The external visual inspection and ultrasonic thickness gauging of Well
Shahdad X-1 Raw Gas Pipeline was carried out between July 01-05, 2021
at Pakistan Petroleum Limited Gambat South Field. Subjected pipeline was
buried and excavation was done to perform the direct examination on
locations where some indications were identified during DCVG survey. The
purpose of this direct examination is to determine which indications from
the indirect inspections are most severe and to assess the visual condition
of pipeline. After excavation and proper surface cleaning visual inspection
was performed to check the outside condition of pipeline as per guidelines
of API 570 and 574. Ultrasonic thickness gauging was performed to
measure the actual thickness and Ultrasonic A-scanning was also
performed at selected areas to locate metal loss (localized or uniform) due to
continuous service.
On the work order issued by M/S Pakistan Petroleum Limited, Inspectest
(Private) Limited mobilized its team for subjected work completion and
complete integrity assessment as per API 570 on the basis of visual
inspection and ultrasonic thickness gauging. Inspectest team consisted of
following personnel.
During visual inspection coating defects were noted at some points and
these coating defects were repaired by patch and sleeve applications.
Disbanded and damaged coating was removed up to the maximum
damaged extent and visual inspection of bare pipeline was performed.
Overall condition of pipeline under coating was found satisfactory and none
of the major findings which could lead any catastrophic or abrupt failure of
pipeline were found during the thorough course of inspection. UTG and A-
scanning was performed at excavated locations (08 Nos.) and overall
results of thickness was found satisfactory. The collected UTG inspection
data would be used as a reference for next inspection at due date.
2. Abbreviations
API : American Petroleum Institute
ASNT : American Society for Non-Destructive Testing
ASME : American Society for Mechanical Engineer
DCVG : Direct Current Voltage Gradient
ECDA : External Corrosion Direct Assessment
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 3|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
3. Scope of Work
Subjected Pipeline was buried and client decided to perform the direct
examination on points where some indications were identified during DCVG
survey. Direct examination of total 08 points out of 10 was performed by
API 570 inspector after excavation and proper surface preparation.
Following Inspections and NDT techniques were used for assessment and
evaluation of Well Shahdad X-1 Raw Gas Pipeline.
External visual inspection by API 570 inspector to determine the condition
of the outside of piping, coating systems and to check for signs of
misalignment and leakage.
After removal of disbanded and damaged coating external visual inspection
was performed to locate and estimate any damage (corrosion, erosion,
through holes, cracks, cuts, gouges and pitting (scattered, isolated,
clustered all types).
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 4|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
Pit Depth measurement by pit gauge of scattered pits (If any) located at
external sides of pipe.
UT thickness survey on pipe to identify low thickness areas (if any). UT A-
scanning of low thickness areas to find the detailed extent of damage.
Report all findings, recommendations and repair for corrective and
preventive actions.
Take photographs of all inspected locations (good or bad both) for recording
& reporting.
4. Reference Documents
Following international codes and standards were followed during
inspection.
1. API 570 In-service Inspection Code for Piping.
2. API 574 Inspection Practice for Piping System
3. API 571 Damage Mechanisms
4. API 578 Material Verification Program
5. ASME B 31.3 Process Piping
6. ASME Section V Nondestructive Examination
5. Deliverables
The deliverables of the work assigned as per contract were follows:
1. A comprehensive report from API-570 authorized inspector in hard form.
2. Soft copy of report in pdf format.
6. Inspection Equipment
Following equipment’s were used for inspection;
Complete visual inspection kit
GE (DMS-Go)
Cam gauge
Pit depth gauge
Meter Tape
Digital Camera
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 5|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
7. Design Details
Following design details of Well Shahdad X-1 Raw Gas Pipeline was
provided by client;
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 6|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
8. Visual Inspection
External visual inspection of pipeline was carried out as per API 570
guidance and below inspection checklists. External visual inspection of
Line was performed to determine the condition of coating systems and to
locate any signs of damage pertaining to cut, dent, gouge, crack, corrosion
general or localized, pits, misalignment and any signs of leakage on
external pipe surface after removal of damaged coating.
8.1 External Visual Inspection Checklist
Item Description Yes No NA Remarks
1. Field Identification
Is pipeline labelled/tagged w/Equipment
Satisfactory
ID#.
Client representative identified the
Is pipeline adequately identified
pipeline.
Are labels / tags readable Satisfactory
Do labels / tags need replacing
2. Coating System
Damaged coating was observed
Evidence of coating deterioration and these areas were repaired by
(isolated and widespread coating failure patch and sleeve coating
application.
3. Condition of Bare Pipe
Recommendation: Nil
Recommendation: Nil
Recommendation: Nil
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 8|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
Recommendation: Nil
Recommendation:
Damaged coating should be repaired
by sleeve coating application after
necessary surface preparation.
Recommendation: Nil
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 9|P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
Recommendation: Nil
Recommendation: Nil
Recommendation: Nil
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 10 | P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
In our case
t = Required Thickness
D = 219.1 mm (API 574 Table 1 against pipe size NPS 8)
P = 2200 PSI as provided by client
S = Allowable Stress 27300 PSI as per ASME B31.3 Table A-1 for
API 5L Gr. X70 material
E = Joint efficiency 1 as per ASME B31.3 Table A-1B
Pressure design thickness for internal pressure of 2200 PSI is 8.83 mm.
As per API 574 table 7 minimum structural thickness shall be 2.8 mm
and as per API 574 section 12.1.4 The minimum required thickness is
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 11 | P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
Tprevious - Tactual
Corrosion Rate = Time between Tprevious & Tactual
(Years)
As this was the 1st inspection and previous UTG data is not available for
comparison so corrosion rate and remaining life can’t be calculated.
These values shall be calculated in next inspection interval.
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 12 | P a g e
API-570 INSPECTION REPORT OF Report:2021-11844-002
WELL SHAHDAD X-1 RAW GAS Date: 23-07-2021
PIPELINE AT PPL GAMBAT SOUTH Rev:00
FIELD
12. Conclusion
No critical observation that can hinder safe future operation was
observed during visual and UTG survey. Overall condition of the Pipeline
was found satisfactory.
Uniform thickness readings were observed on pipe and no major
deviation was observed in thickness values.
Integrity calculations were carried out as it was found that minimum
required thickness as per API 570 is surpassed by measured thickness
in current inspection. Also calculated MAWP by date of next inspection
is greater than the specified MAWP for the subjected piping.
Hence it is concluded that Well Shahdad X-1 Raw Gas Pipeline is found
fit to operate at design pressure and temperature. As per API 570 section
6.3.4.2 subjected pipeline falls in class 1 piping and as per API 570
Table 1 recommended maximum inspection interval for visual and
thickness measurement is 05 years. So, the next inspection of Well
Shahdad X-1 Raw Gas Pipeline shall be conducted after 05 year of
service so due date for next inspection is July 2026 or the next
inspection can be planned as per frequency defined for next ECDA
study.
13. Attachments
Appendix-A Ultrasonic Thickness Gauging Report
The item/s described above was/were examined in prescribed manner. The information contains hereon reflects the company’s finding
at time of inspection only and within client’s instructions & premises. Inspection and certification becomes null and void if any changes
made in equipment that alters safety features of above described equipment. This inspection report does not relieve the
contractor/user from his obligations to keep the equipment maintained and used safely.
Any unsanctioned alteration, forgery or falsification of the content or appearance of document is unlawful and delinquents may be
prosecuted to the completest extent of law.
Inspectest (Pvt.) Limited 18 km, Ferozepur Road, Lahore, Pakistan
T: + 92 42 3540 2053 -58 UAN: III-INSPEC I F: + 92 42 3540 2050 E: inspectest@inspectest.com 13 | P a g e
Ultrasonic Thickness Measurement In-service Inspection Report
Signature:
Subhan Ali
Name:
July 8, 2021
Date:
Form : NDE/008
Ultrasonic Thickness Measurement In-service Inspection Report
Signature:
Subhan Ali
Name:
July 8, 2021
Date:
Form : NDE/008