1 0.00 2 10.00 20
0
1 0.00 0
0
1 0.00 0
0.00 0
SF2 0
1 0.00 0
0
1 0.00 0
0
1 0.00 0
0.00 20.00
SF1' 0.40
1 0.00
8.00 deduction for G.B on massonary
1 0.00 8.00 TOTAL LEAN UNDER BEAM
1 0
0.00
MF1
1 0.00
36.97 TOTAL LEAN UNDER PAD
1
No LxWxH Total Description No LxWxH Total Description
C1'
0.00 total AREA
TOTAL VOLUME IN M3
C2
C3 132.50 132.50
0.3
0.20 7.95 TOTAL VOLUME IN M3
C4
C5
C6
C7
C8
C1'
0.00 TOTAL VOLUME IN M3
flight 3
2.00 belly
1.30
0.15 0.39
0.28 riser and tread
0.15
5 0.65 0.14
2.37 TOTAL VOLUME IN M3
No LxWxH Total Description No LxWxH Total Description
SUPPER STRUCTURE
In G.F TO ROOF SLAB floor
column In M.F TO TOP TIE BEAMS
1 12.17 12.17 MF1
4.00 C1 1 6.35 6.35 MF2
0.50 4 12.7 50.8 MF3
3 0.50 3.00 1 29 29 MF4
2.60 1 8.45 8.45 MF5
0.40 1 5.3 5.3 MF6
12 0.40 4.99 1 2.25 2.25 MF7
7.99 1 3.54 3.54 MF8
4.00 C1' 1 2.88 2.88 MF9
0.50 1 7.2 7.2 MF10
1 0.39 0.78 1 11.5 11.5 MF11
2.60 1 11.45 11.45 MF12
0.45 1 2.77 2.77 MF13
2 0.35 0.82 1 5.27 5.27 MF14
2.60 1 25.3 25.3 MF15
0.40 1 27 27 MF16
2 0.31 0.65 1 24.2 24.2 MF17
2.25 235.43 235.43
2.00 C2 0.25
0.60 0.5 29.42875
1 0.70 0.84 1 12.17 12.17 FF1
2.00 1 6.35 6.35 FF2
0.60 1 12.7 12.7 FF3
1 0.60 0.72 4 14.41 57.64 FF4
2.60 1 8.3 8.3 FF5
0.40 1 5.3 5.3 FF6
4 0.40 1.66 1 2.25 2.25 FF7
3.22 1 3.54 3.54 FF8
2.00 C3 1 2.88 2.88 FF9
0.60 1 6.35 6.35 FF10
1 0.60 0.72 1 11.5 11.5 FF11
2.00 1 11.53 11.53 FF12
0.50 1 2.77 2.77 FF13
1 0.50 0.50 1 5.27 5.27 FF14
2.60 1 27 27 FF15
0.40 1 24.18 24.18 FF16
4 0.40 1.66 1 199.73 199.73
2.88 0.25
4.00 C4 0.5 24.96625
0.40 1 12.17 12.17 SF1
2 0.40 1.28 1 6.35 6.35 SF2
2.60 1 12.7 12.7 SF3
0.40 1 13.8 13.8 SF4
8 0.40 3.33 1 14.64 14.64 SF5
2.60 1 15 15 SF6
0.30 1 8.35 8.35 SF7
2 0.30 0.47 1 5.4 5.4 SF8
5.08 1 2.3 2.3 SF9
4.00 C5 1 3.54 3.54 SF10
0.50 1 2.9 2.9 SF11
2 0.50 2.00 1 3.15 3.15 SF12
2.60 1 6.35 6.35 SF13
0.40 1 11.55 11.55 SF14
8 0.40 3.33 1 11.53 11.53 SF15
2.60 1 2.8 2.8 SF16
0.30 1 5.25 5.25 SF17
2 0.30 0.47 1 27 27 SF18
5.80 1 24.18 24.18 SF19
4.00 C6 188.96 188.96
0.50 0.25
2 0.50 2.00 0.5 23.62
2.60 3 12.17 36.51 TB1
0.40 3 6.35 19.05 TB2
8 0.40 3.33 3 12.7 38.1 TB3
5.33 3 13.8 41.4 TB4
4.00 C7 3 14.64 43.92 TB5
0.40 3 15 45 TB6
4 0.40 2.56 3 8.35 25.05 TB7
2.60 3 5.4 16.2 TB8
0.40 3 2.3 6.9 TB9
16 0.40 6.66 3 3.54 10.62 TB10
9.22 3 2.9 8.7 TB11
4.00 C8 3 3.15 9.45 TB12
0.40 3 6.35 19.05 TB13
2 0.40 1.28 3 11.55 34.65 TB14
2.60 3 11.53 34.59 TB15
0.40 3 2.8 8.4 TB16
8 0.40 3.33 3 5.25 15.75 TB17
4.61 3 27 81 TB18
46.37 TOTAL COLUMN VOLUME IN M3 3 24.18 72.54 TB19
1 8.35 8.35 RB1 566.88 566.88
1 5.45 5.45 RB2 0.25
2 5.25 10.5 RB3 0.5 70.86
24.3 24.3
0.25 In M.F TO ROOF SLAB flOOR
0.45 2.73375 FIRST FLOOR
32 PR1 19.3 shop 1
0.15 23 shop 2
0.45 2.16 13.8 shop 3
153.76875 TOTAL BEAM VOLUME IN M3 20 shop 4
14.9 shop 5
In M.F TO ROOF SLAB flOOR 28.7 shop 6
MIZZANIN FLOOR 20.7 shop 7
8 office 22.6 shop 8
8 office 75.7 corridor
7.3 store 40 verendah
10 lobby 7.3 m.toilet
42.5 corridor 8.6 f. toilet
15 shop 3.5 disable toilet
7.3 m.toilet 298.1
8.6 f.toilet 298.1
33 branch bank 113 addition from h.c.b wall possition
139.7 0.2 22.6
94.6 addition from h.c.b wall possition 199.73 deduction from beam possition
0.2 18.92 -0.25 -49.9325
-135 deduction from beam possition 270.7675
0.25 -33.75
124.87
No LxWxH Total Description No LxWxH Total Description
3.40 F1
4/4 1.10 59.84 2 1.35 C2
3.00 F2 1.30 3.51
4/2 1.00 24.00 9 1.35 C3
2.60 F3 1.00 12.15
4/3 0.90 28.08 2 1.35 C4
2.00 F4 1.00 2.70
4/1 0.70 5.60 6 1.35 C5
3.00 SF1 1.00 8.10
4/1 1.20 14.40 4 1.35 C6
2.70 1.20 6.48
4/1 1.20 12.96
2.00 SF2
4/1 1.20 9.60
2.00
4/1 1.20 9.60 36.18 TOTAL COLUMN FORMWORK
3.00 SF1'
4/1 1.20 14.40
2.70 2.5.3To BASMENT floor beam
4/1 1.20 12.96 20.00
8.00 MF1 1 1.00 20.00 TOTAL beam FORMWORK
2/1 1.20 19.20
3.40
2/1 1.20 8.16 2.5.4 To shear wall
0.00
STRAP BEAMS 2 3.00 0.00
4.7 SF1 0.00
4.2 SF2 2 1.80 0.00
5.20 SF1' 0.00 TOTAL shearwall FORMWORK
14.10
2/1 0.60 16.92
235.72 TOTAL PAD FORMWORK
No LxWxH Total Description No LxWxH Total Description
basment floor column
2 2.50 C1
2.40 12.00
1 2.50 C1'
2.60 6.50
1 2.50 C2
2.60 6.50
1 2.50 C3
2.40 6.00
2 2.50 C4
2.00 10.00
2 2.50 C5
2.40 12.00
2 2.50 C6
2.40 12.00
4 2.50 C7
2.00 20.00
2 2.50 C8
2.00 10.00
95.00 TOTAL COLUMN FORMWORK
To shear wall
79.90
2 3.00 479.40
12.70
2 3.00 76.20
555.60 TOTAL shearwall FORMWORK
0.00
555.60 TOTAL shearwall FORMWORK
staircase B.F-G.F
flight 1
2.00 belly
1 1.35 2.70
1.30 landing
1 1.35 1.76
0.15 riser
5 1.30 0.98
flight 2
3.00 belly
1 1.30 3.90
1.34 landing
1 1.30 1.74
0.15 riser
8 1.30 1.56
flight 3
2.00 belly
1 1.30 2.60
0.15 riser
5 1.30 0.98
side form work
flight 1
2.00 belly
2 0.30 1.20
1.30 landing
1 0.15 0.20
flight 2
3.00 belly
2 0.30 1.80
1.34 landing
1 0.15 0.20
flight 3
2.00 belly
2 0.15 0.60
20.20 TOTAL staircase FORMWORK m2
No LxWxH Total Description No LxWxH Total Description
To shear wall
0.00
2 3.00 0.00
12.70
14 3.00 533.40
-0.50 DEDUCTION FROM HIGHT D/F
14 12.70 -88.90
444.50 TOTAL shearwall FORMWORK
4. ROOFING -
1.2 Clay Roof Roofing m 2
70 1050 73,500.00
1.3 5*7 cm Zigba wood purline c/c 36CM ml 200 280 56,000.00
1.4 Diameter 10 Eucalyptus 4*5 cm Zigba ml 220 110 24,200.00
1.5 5*7 cm Zigba Ceiling Battens ml
SUB TOTAL 153,700
5. FINISHING WORK
5.1 Carpentry and joinery
A. Supply and fix flush type of internal doors 40mm thick with
semi solid cord frames and covered quality 4mm walnut
veneer. The price includes coats of varnish,3pcs approved
standard hinges. M2 111 3,600 399,600
b. gypsum board ceiling M2
300 450 135,000
5.2 metal work -
A. Supply and fix aluminum or imitation iron type door for the
RESIDENCE BUILDING price shall include hinges, locks and
all other necessary accessories (including glazing.). -
a.aluminum made window frame M2
60 3,000 180,000
b.aluminum made window door frame M2
115 3,000 345,000
SUB TOTAL 1,059,600
6. PAINTING
6.1 Apply two coats of approved type and color plastic paint :-
A, internal beams, column and walls M2 2,057 45 92,570
B. apply one coat of Gypsum paint to internal beam column
and walls M2 525 65 34,139
C. apply one coat of quartz plastering to external beams,
column and walls M2 799 220 175,780
SUB TOTAL 302,488
7. FLOOR FINISHING
7.1 A. 60* 60 porclien Ceramic tiles M2 500 700 350,000
7.2 B. 45*30 toilet ceramics M2
110 610 67,100
7.3 E. ceramic skearting ML 500 90 45,000
7.4 F. Plastic skearting ML - 40 -
7.5 I. stair case marble ML 86 2,000 172,000
7.6 J. Door window sill ML 170 800 136,000
SUB TOTAL 770,100
8. SANITARY INSTALLATION
8.1 sanitary equipment
All fixtures differ from those specified below shall be
Subjected to the owner approval.
a.Single bowl hand wash basin NO 9 3,200 28,800
b.Water closet made of white vitreous NO 9 3,800 34,200
c.Supply and fix shower unites NO 9 4,500 40,500
d. Supply and fix floor drains made of polish steel with a size of
50mm diameter. NO 9 350 3,150
e.Supply and fix vent caps with a diameter of 50mm. NO 8 65 520
f. Sink NO 2 1,500 3,000
f. bath tab NO 8,000 -
8.2 Plumbing water supply system
A. Supply, install test commissioning domestic water Supply
galvanized steel Pipes, including Pipe fitting, anchors and
necessary accessories as shown on the drawing.
A, dia. 15mm Pipe ML 60 -
B, dia. 20mm Pipe ML 80 -
C. dia 25 mm ML 600 90 54,000
D. dia 32 mm ML 110 100 11,000
8.3 West vent and storm water pipes
1. Supply and lay internal Upvc waste and vent pipes
according to where shown on the Drawing. Complete with all
the necessary Fitting and accessories.
a) Dia
50 mm ML 65 -
b) Dia
110mm ML 280 80 22,400
2. Supply and lay approved quality storm water Upvc dawn
pipes according to where shown on the drawings price shall
include all the necessary connecting pieces. Dia 110mm ML 190 80 15,200
8.4 Site works
1. Supply and install 20mm dia G.S.P pipes from municipal
water supply to roof water tank as where shown on the
drawings. Complete with all the necessary Fitting and
accessories.
ML 30 150 4,500
2. Supply and install commission water meter of approved
quality with gate valves before and after water meter as
where shown on the drawings using dia 20 mm pipe.
pcs 2 1,700 3,400
8.5 site west and storm water drainage system
1. Supply and lay Upvc pipe according to the drawing shown
with a minimum slope of 15%.the price shall include
excavation of trench and cart away.dia 160mm pipe ML 40 180 7,200
8.6 Manholes
144
80
128
570
BOQ FOR G+4 BUILDING
A. SUB-STRUCTURE
B. SUPER-STRUCTURE