Load Actual
Pecking
Waiting
Cutting
Drill Break
Drill Chng
level PARETO.
Setting
Cleaning
Wait Set
Unload
Load
Opportunity Goal (Select the area of greatest benefit and define an outcome To achieve our SMART outcome identify three focus opportunity areas from our
eg Double up-time) this Should Be: Specific, Measurable, Achievable, observations i.e. reduce waiting time, eliminate engineering hold ups, change
Relevant, Timebound machine layout
Goal or outcome Focus opportunity 1 (SMART) Focus opportunity 2 (SMART) Focus opportunity 3 (SMART)
Increase throughput by
Reduce Downtime by 50% Halve Peck Time
20%
Brainstorm ideas to improve and impact the three Focus opportunity areas
Focus opportunity 1 brainstorm I C E R Focus opportunity 2 brainstorm I C E R Focus opportunity 3 brainstorm I C E R
RANKING PROCESS Use duplicate tooling 2 1 2 4 Reduce drill peck height 5 3 3 45
ACTION PLAN. For each high scoring activity or idea prepare a simple action plan that identifies owners and deadlines.
FOR ACTIONS
EARLIEST OUT OF OUR
WITHIN OUR
ACTION WHO POSSIBLE HOW WILL WE MAKE SURE THIS HAPPENS? CONTROL, BENEFIT PROGRESS
CONTROL? CLOSEOUT DATE WHO WILL
FOLLOW UP? (ADD IN
DATES)
Shorten handle on chuck key DB YES 1/15/2002
Supply 3 small screwdrivers for removing
DB YES 1/15/2002
bushes
15
Keep 1 spare bush at each bench RH YES 1/16/2002 mins
Get To The Root Cause by Asking WHY 5 Times Challenge All Fixed Ideas
Do It Now - No Excuses! Use Your Wisdom - Not Your Money Improvement is Infinite
Better is Not Good Enough!
KWIKAIZEN
FACILITY OR PLANT PROCESS BEING OBSERVED TEAM MEMBERS DATE
Opportunity Goal (Select the area of greatest benefit and define an outcome To achieve our SMART outcome identify three focus opportunity areas from our
eg Double up-time) this Should Be: Specific, Measurable, Achievable, observations i.e. reduce waiting time, eliminate engineering hold ups, change
Relevant, Timebound machine layout
Goal or outcome Focus opportunity 1 (SMART) Focus opportunity 2 (SMART) Focus opportunity 3 (SMART)
Reduce Activation by
Eliminate Downtime Double Process Efficiency Eliminate Rework
50%
Brainstorm ideas to improve and impact the three Focus opportunity areas
Focus opportunity 1 brainstorm I C E R Focus opportunity 2 brainstorm I C E R Focus opportunity 3 brainstorm I C E R
RANKING PROCESS Move tools to Machine 4 5 5 100 Reduce Tool Travel 5 5 5 125 Modify Fixture 3 4 3 36
IMPACT High 5 Preventative Maintenance 3 5 4 60 Increase Spindle Speed 4 5 5 100 Poka-Yoke 5 5 4 100
FOR ACTIONS
EARLIEST OUT OF OUR
WITHIN OUR
ACTION WHO POSSIBLE HOW CAN WE MAKE SURE THIS WORKS? CONTROL, BENEFIT PROGRESS
CONTROL? CLOSEOUT DATE WHO WILL
FOLLOW UP? (ADD IN
DATES)
Move Tools to Machine A.N. Yes 1/1/2001 Move storage from old cell N/A 2 Hrs / Day
Run all machines O.P. Yes 1/1/2001 Run long batches on 3rd machine N/A 30% Uptime
15
Reduce Tool Travel CNC No 1/2/2001 Priority to Engineering Op Dir 20% off cycle mins
Increase Spindle Speed O.P. Yes 1/1/2001 Look up speed on chart N/A 10% off cycle
Create Poka-Yoke fixture T.R. No 1/5/2001 Work with tool room Op 5% yield inc
30% Cycle time reduction = 1-off benefit of 5 hrs Tool Room Op Director Today
Get To The Root Cause by Asking WHY 5 Times Challenge All Fixed Ideas
Do It Now - No Excuses! Use Your Wisdom - Not Your Money Improvement is Infinite
Better is Not Good Enough!
KWIKMAP DETAIL WORK SHEET
FACILITY/PLANT PROCESS BEING OBSERVED TEAM MEMBERS DATE
Step
No. Description Operation Travel Inspect Delay Time Distance Comment
1 Open Package 10
2 Check Documents 20
3 Find Drawing 50
4 Calculate Dimensions 70
5 Find Gauges 45
6 Orientate Part 5
7 Check Dim#1 10
8 Set Bore Gauge 25
9 Orientate Part 5
10 Check Dim#2 15
11 Set Bore Gauge 25
12 Orientate Part #2 5
13 Check Dim#2 15
14 Return Gauges 45
OBSERVATIONS
OPERATION TRAVEL INSPECT DELAY
Pie chart of Value Added and Waste Overall % Pie chart of Value Added and Waste Overall % Pie chart of Value Added and Waste Overall % Pie chart of Value Added and Waste Overall %
Bar chart of waste by category showing pareto Bar chart of waste by category showing pareto Bar chart of waste by category showing pareto Bar chart of waste by category showing pareto
Calc Dims 10
Search
Gauge Gauge
Set Bore
Drawing
Orien Orien
Opportunity Goal (Select the area of greatest benefit and define an outcome To achieve our SMART outcome identify three focus opportunity areas from our
eg eliminate all unnecessary operations or travel) this Should Be: Specific, observations i.e. eliminate duplicated activities, unnecessary inspection, redesign area or
Measurable, Achievable, Relevant, Timebound process
SMART Goal or outcome Focus opportunity 1 (SMART) Focus opportunity 2 (SMART) Focus opportunity 3 (SMART)
Brainstorm ideas to improve and impact the three Focus opportunity areas
Focus opportunity 1 brainstorm I C E R Focus opportunity 2 brainstorm I C E R Focus opportunity 3 brainstorm I C E R
RANKING PROCESS Pre-Set Gauges 4 5 2 40 Change Drawings 5 5 2 50 Move Gauge Stores 3 5 3 45
Low 1 Make check fixture 4 2 3 24 Create Insp. Sheets 5 5 4 100 Build Gauge Sets 4 3 4 48
COST FREE 5 20
>$500 1
EASE Easy 5
Hard 1
IMPACT x COST x EASE
MAX = 125
ACTION PLAN. For each high scoring activity or idea prepare a simple action plan that identifies owners and deadlines.
FOR ACTIONS
EARLIEST OUT OF OUR
WITHIN OUR
ACTION WHO POSSIBLE HOW CAN YOU GUARANTEE TO DO THIS WITH EASE? CONTROL, WHO BENEFIT PROGRESS
CONTROL? CLOSEOUT DATE WILL FOLLOW
UP?
Purchase plug gauges in common sizes QA Y 10-Jan Analyse RRS to find common sizes N/A 14%
Ccreate Inpection Sheets QA Y On-going Create for common parts as they are inspected N/A 35%
Build Gauges Sets QA Y On-going Analyse RRS to find part families N/A 26%
15
30% Cycle time reduction = 1-off benefit of 5 hrs Tool Room Op Director Today
40% increase in uptime = 16 hrs / week Engineering Op Director Today
5% scrap reduction = $500 / month
MEASURE FOLLOW ON IDEAS / BIG ISSUES DAILY REVIEW TIME
A graphical representation that will demonstrate
convergence towards our goal Check Fixtures 1:00 PM
MANAGEMENT FOLLOW UP 5
mins
Inspection Jobs Complete / Week Who Date Time
Op Dir 1-Jan 10:20
Op Dir 2-Jan 3:40
Approved Suppliers Op Dir 3-Jan 1:00
Op Dir 4-Jan 2:00
Op Dir 5-Jan 9:30
KWIKSMED WORK SHEET
FACILITY/PLANT PROCESS BEING OBSERVED TEAM MEMBERS DATE
Step
No. Description Fixture Tooling Program Time Distance Comment
1 Clean Fixture 2
2 Shim Fixture 45
3 Load Parts 2
4 Clamp Fixture in Machine 3
5 Set Origin 12
6 Check Drawing 1
7 Calculate Dimensions 3
8 Find Tooling 4
9 Assemble Tooling 7
10 Load Tools 0.5
11 Touch-Off Tools 3
OBSERVATIONS
FIXTURE TOOLING PROGRAM / GEOMETRY
Pie chart of INTERNAL and EXTERNAL Overall % Pie chart of INTERNAL and EXTERNAL Overall % Pie chart of INTERNAL and EXTERNAL Overall %
Bar chart of waste by category showing pareto Bar chart of waste by category showing pareto Bar chart of waste by category showing pareto
10
Opportunity Goal (Select the area of greatest benefit and define an outcome To achieve our SMART outcome identify three focus opportunity areas from our
eg eliminate all unnecessary operations or travel) this Should Be: Specific, observations i.e. eliminate duplicated activities, unnecessary inspection, redesign area or
Measurable, Achievable, Relevant, Timebound process
SMART Goal or outcome Focus opportunity 1 (SMART) Focus opportunity 2 (SMART) Focus opportunity 3 (SMART)
Brainstorm ideas to improve and impact the three Focus opportunity areas
Focus opportunity 1 brainstorm I C E R Focus opportunity 2 brainstorm I C E R Focus opportunity 3 brainstorm I C E R
RANKING PROCESS
IMPACT High 5
Low 1
COST FREE 5 20
>$500 1
EASE Easy 5
Hard 1
IMPACT x COST x EASE
MAX = 125
ACTION PLAN. For each high scoring activity or idea prepare a simple action plan that identifies owners and deadlines.
FOR ACTIONS
EARLIEST OUT OF OUR
WITHIN OUR
ACTION WHO POSSIBLE HOW CAN YOU GUARANTEE TO DO THIS WITH EASE? CONTROL, WHO BENEFIT PROGRESS
CONTROL? CLOSEOUT DATE WILL FOLLOW
UP?
15