Airport Redevelopment Layout Plan: Site Development Plan Shore Protection Completed: 285.25m CHB Fence Completed: 695.02m
Airport Redevelopment Layout Plan: Site Development Plan Shore Protection Completed: 285.25m CHB Fence Completed: 695.02m
.6
5.76
53
2.84
69
5
35.02 31.71
.6
2.
90.76
93
37.29
90.76
5
.3
13
3.2
Airport Redevelopment Layout Plan
35
35.02 31.71
.90
20
9.0
2.84
.60
31.71
8 m
. CAAP AREA CENTER VIII
11
5
.60
13
COMPLETED FENCE
3 .2
69
11
BARBWIRE FENCE
.90
69
5
2.
BUILDINGS AND GROUNDS
.6
2.
3
MAINTENANCE DIVISION
93
3.1
AFFECTED C.R. BRGY. ROAD
DESIGN STAFF INITIAL/DATE
POULTRY FARM
7
.3
SITIO ROAD
35
5.76 20
LOT OWNER WILLIAM CHAN 9.0
DISCONTENTED OF SURVEY 37.29
8m
90.76 35.02 31.71 .
OF THE CONTRACTOR
.60
.6
BRGY. ROAD MANGROVE AREA
53
11
5
13
2.84
3.2
.90
69
3
5
PREPARED BY:
.6
3.1
2.
93
TOTAL AREA:10,108.01 sqm.
BRGY. ROAD
37
REY B. RAEL
10.00
35
8
5.7
12 Exist Foundation
CHECKED BY:
25.00
ROAD TO TACLOBAN PROPER 285.25 COMPLETED SHORE PROTECTION
7 FENCE DONE BY CAAP
3.6
11 ENGR. MICHAEL D. ESTORNINOS
7
85.9
RECOMMENDED APPROVAL:
APPROVED BY:
939.00
150.88
17.00
45.06
NOTE/REVISION
2+ 100
0 + 000
0 + 100
0 + 200
0 + 300
0 + 400
0 + 500
0 + 600
0 + 700
0 + 800
0 + 900
2 + 000
2 + 200
1 + 000
1 + 100
1 + 200
1 + 300
1 + 400
1 + 500
1 + 600
1 + 700
1 + 800
1 + 900
NAME OF PROJECT:
0 - 200
0 - 100
EMERGENCY COMPLETION OF
FENCING AT TACLOBAN AIRPORT
DEVELOPMENT PROJECT
L-01
AS SHOWN
L-01