1. ALL DIMENSIONS ARE IN MM.

2. DRAWINGS ARE NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS


ARE TO BE FOLLOWED.
3. ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED SURFACES.
4. ALL LEVELS ARE UNFINISHED LEVELS.
UP

T= 300 MM
R= 161 MM

DN
SL-9
LEGEND

125

200

300
360
C31 590 OP-1 100MM THK WALL CHECKERED PLATE
2150 x 200MM
SL-10 250
W3B
M.TOILET 800 SLEEVE IN
2.35 X 1.45M 150MM THK WALL BEAM/WALL

250
TERRACE AT 1ST D2 OP-1
FLOOR LEVEL LMR
2.00 X 3.75M 200MM THK WALL LEDGE WALL
BEDROOM LIVING ROOM
C27
2.36 X 2.92M 2.77 X 3.44M 200x3300MM CUTOUT ON
KITCHEN C30 500MM SUNK
1.80 X 2.07M 200 x 1200MM C28B C34B
675 X 200 MM
SLAB/BEAM
675 X 200 MM
BEDROOM-2
0.90M WIDE PASSAGE C28A 4.37X 2.90M
200 x 3675MM C34A TERRACE
SLAB LVL. - 107.3M 200 x 2825MM 150 MM WATER 37.42 sq.mt
C26 PROOFING 200
M.TOILET C.TOILET 200 x 1520MM TREAD - 275MM
1.80 X 1.27M SSL-108.65M
SSL. - 107.3M SL- 4
1.93 X 1.27M DUCT RISER - 161MM FFL - 107.5M
09
08 10
01 07 11

840
C25 06 12
1200x 300MM 05 13
02 FHC 04 14
BEDROOM-1
03 15 D1 3.30 X 2.85M
TREAD - 275MM
02 16 RISER - 161MM DN
LIVING ROOM SL- 3
01 17
3.48 X 2.72M 10 11 12 13 14 15 16 17 18
SLAB LVL. - 107.3M UP 18 DN
SL- 4
D3
UP
C21
0.90M WIDE PASSAGE

1520 x 200MM SLAB LVL. - 107.3M


2M WIDE CORRIDOR
LS4 300MM 09 08 07 06 05 04 03 02 01 120
C20 C.TOILET
1150 x 300MM
4550 x 200MM HIGH SOCIETY
1.80 X 1.27M RCC
BUND BALWADI-2 OFFICE
C16B

COMMON PASSAGE
KITCHEN 25.03 SQMTS 7.10 SQMTS
300x 1000MM BALWADI - 1 SL- 3 KITCHEN
2.11 X 1.85M LS1
21.45 SQMTS SLAB LVL. - 107.3M SLAB LVL. - 107.3M
ELECTRICAL DUCT

300 x 2650MM LS3 50 3.65 X 2.40M


300 x 2650MM SL- 4
SLAB LVL. - 107.3M SL-10
OP-10 SL-9 SL-8
D1
LIFT 1 LIFT 2 120 SL- 4 115

875

180
TOILET SL-9

300
1.9 X 2.5M

390
1.9 X 2.5M 1.85 X 1.25M DUCT 1900
DUCT TOILET
LIFT 1 LIFT 2
FIRE LIFT TOILET (1.25X0.925)M

25
DUCT 1.85 X 1.25M 1.775 X 2.5M 1.775 X 2.5M

275
200MM
TOILET
BEDROOM C15 (1.25X0.95)M C17A SUNK
OP-5

850
400 x 750MM C18 D2

1090
200MM
2.11 X 3.20M 250 x 3635 SUNK
MM 250x750MM
C16A

450
400x 750MM SL- 24 SL- 3

200
W3B
ELV 50
250 SL-10
OP-2 SL- 4 1.55M WIDE CORRIDOR 2.40 X 1.50M 300
325
2M WIDE CORRIDOR 2M WIDE CORRIDOR C.TOILET

250 586
M.TOILET SL- 22 SL- 23
1.27 X 1.80M SLAB LVL. - 107.3M SLAB LVL. - 107.3M 600 600 OP-1

370
1115 300 D1
C11 C12 C37
400 x 750MM 400x 750MM 400 x 750MM 750

420

570
1320
200 SL-9

250
FHC ELE SL- 4
C10
C3 C6
3270 x 200MM 250 x 3420MM 250X750MM
TOILET (TILL 5TH 1620
1.85 X 1.25M DUCT TOILET TOILET 1900 FLOOR) OP-3 D3
COMMON PASSAGE (1.25X0.95)M 100 SL- 4

300
1.85 X 1.25M DUCT 200MM
SUNK
70 325
SL- 4 OP-1

50

50
SL-10A OP-10

515
SOCIETY OFFICE D2

735
FOR REHAB SOCIETY OFFICE BEDROOM-2
C2 WELFARE CENTER - 1 WELFARE CENTER - 2 LVING ROOM
300 x 1000MM SOCIETY OFFICE FOR REHAB 200 MM FOR SALE 3.05 X 3.76M
25.64 SQMTS 12.59 SQMTS 17.56sqmt SL- 4 RAISED 4.35 X 4.56M
14.84 SQMTS TOILET
SLAB LVL. - 107.3M SLAB LVL. - 107.3M
C4 SLAB LVL. - 107.3M
SL-10A 15.30 sqmt 1.5 X2.1M
SL-10
C1 300x 1000MM C36 1000
45.19 sq.mt
200 x 2020MM 300x 1000MM
UP SL-09 SL-9 300

SL- 4 SL- 3 W3B 900


SL- 3
690

240

415
200 110 SL-10B
685

315 500
SL-10 1110
SL- 3
TERRACE

465
200 MM WATER PROOFING
SL-10

150
SSL. - 107.3M
FFL - 107.55M

FOR ESTIMATE FOR APPROVAL/CHECKING

ADVANCE COPY FOR MUNICIPAL SUBMISSION

FOR INFORMATION VALID FOR CONSTRUCTION

SECOND FLOOR SLEEVE DIMENSION PLAN REV. NO. DATE DESCRIPTION


R1 22-07-2019 SALE UNIT ADDED.
R2 17-03-2020 SALE UNIT REVISED.

OPENING SCHEDULE IN WALL AND BEAM OPENING SCHEDULE IN SLAB

SR.NO SLEEVE NO. OPENING SIZE QTY PURPOSE BOTTOM OF BOTTOM OF REMARKS SR.NO SLEEVE NO. OPENING SIZE QTY PURPOSE REMARKS
OPENING FROM OPENING
1 OP-1 AS MARKED 04 ELECTRICAL / FLOOR CUTOUT
SSL LEVEL DRAWING TITLE
PLUMBING
1 SL-8 Ø150 01 PLUMBING -0.150 107.15 BEAM
2 OP-2 450 X 325 01 ELV RISER FLOOR CUTOUT SECOND FLOOR SALE WING SLEEVE DIMENSION PLAN
2 SL-9 Ø50 06 PLUMBING +0.500 107.80 BEAM
3 OP-3 750 X 250 01 FHC RISER FLOOR CUTOUT
3 SL-10 150 X 150 12 PLUMBING SUNK BOTTOM - WALL PROJECT TITLE
4 OP-5 850 X 250 01 PLUMBING RISER FLOOR CUTOUT
4 SL-10A 150 X 150 02 PLUMBING SSL - WALL
5 OP-10 900 X 300 02 PLUMBING RISER FLOOR CUTOUT
5 SL-10B 500 X 250 01 PLUMBING SUNK BOTTOM - WALL
6 SL- 3 Ø50 07 FIRE FIGHTING -0.45 106.85 BEAM
DRAWN BY : NORTH :

N
7 SL- 4 Ø75 11 FIRE FIGHTING -0.462 106.83 BEAM
AARJU RAGJI.
8 SL- 22 Ø75 01 FIRE FIGHTING -0.29 107.01 BEAM
02 SCALE : DATE :
9 SL- 23 200 X 100 ELECTRICAL -0.35 106.95 BEAM
10 SL- 24 Ø100 01 ELV -0.35 106.95 BEAM 1:100/ A2 03.10.18

DRAWING NO : CHECKED BY :

48A VATSAL MISTRY

514/515 ATLANTA ESTATE, G.M.LINK


ROAD, GOREGAON (EAST), MUMBAI -
400063
TEL/FAX -29277456/19
EMAIL - f.s.n.d.architects@gmail.com
WEBSITE - www.fsndarchitects.com

CLIENT :
OPENING AND SLEEVE SCHEDULE M/s LODHA DEVELOPERS PVT.LYD.