KBM ENGINEERING RESEARCH LABORATORY

OVER 30 YEARS IN FIELD OF SOIL-CEMENT-CONCRETE TESTING

BUNGALOW NO.H79, VASANTNAGAR TOWNSHIP, GOTA-OGNAJ ROAD, AHMEDABAD 380060


PHONE: 02717 242373, 02717 241538 FAX: 02717 241538,e-mail: kbmerl@yahoo.co.in
________________________________________________________

GEOTECHINCAL INVESTIGATION REPORT


(FOR TRIAL PITS)

PROJECT : SIX/FOUR/2 LANE WITH PAVED SHOULDER OF


BHAVNAGAR-PIPAVAV-PORBANDAR-DWARKA SECTION
OF NH 8E IN THE STATE OF GUJARAT

LOCATION : BHAVNAGAR-PIPAVAV-PORBANDAR-DWARKA SECTION


OF NH 8E IN THE STATE OF GUJARAT
CH. 0/000 KM TO 470/000 KM

CLIENTS : STUP CONSULTANTS PVT. LTD., NAVI MUMBAI, INDIA

JOB NO.1650/TRIAL PITS


KBM ENGINEERING RESEARCH LABORATORY
OVER 30 YEARS IN FIELD OF SOIL-CEMENT-CONCRETE TESTING

BUNGALOW NO.H79, VASANTNAGAR TOWNSHIP, GOTA-OGNAJ ROAD, AHMEDABAD 380060


PHONE: 02717 242373, 02717 241538 FAX: 02717 241538,e-mail: kbmerl@yahoo.co.in
________________________________________________________
Index
INDEX

SECTION CONTENTS PAGE

ABSTRACT -

1.0 NATURE OF INVESTIGATIONS 1


1.1 Introduction 1
1.2 Location 1
1.3 Field Work and Laboratory 2

ACKNOWLEDGEMENTS
APPENDICES

APPENDIX A: TABLES

Table No.1: Pavement Composition/ Photographs


Table No.2: Laboratory Test Results

JOB NO.1650/TRIAL PITS


KBM ENGINEERING RESEARCH LABORATORY
OVER 30 YEARS IN FIELD OF SOIL-CEMENT-CONCRETE TESTING

BUNGALOW NO.H79, VASANTNAGAR TOWNSHIP, GOTA-OGNAJ ROAD, AHMEDABAD 380060


PHONE: 02717 242373, 02717 241538 FAX: 02717 241538,e-mail: kbmerl@yahoo.co.in
________________________________________________________
Abstract

ABSTRACT

In the following pages, is presented the Report with Analysis, prepared from the thorough
study of investigation results.

The detailed scope of work was decided in consultation with the representatives of clients
and consultants.

The work for soil/subgrade investigation along with collection of samples was undertaken to
obtain the required information to study and define the nature and behaviour of soil, under
application of loads of proposed pavements. Such informations were obtained through
following steps:

• by performing required in-situ tests.


• by testing the soil in laboratory to classify it and to determine the engineering
properties of soil.

JOB NO.1650/TRIAL PITS


KBM ENGINEERING RESEARCH LABORATORY
OVER 30 YEARS IN FIELD OF SOIL-CEMENT-CONCRETE TESTING

BUNGALOW NO.H79, VASANTNAGAR TOWNSHIP, GOTA-OGNAJ ROAD, AHMEDABAD 380060


PHONE: 02717 242373, 02717 241538 FAX: 02717 241538,e-mail: kbmerl@yahoo.co.in
________________________________________________________Page 1

SECTION I
NATURE OF INVESTIGATIONS

1.1 INTRODUCTION:

We (KBM Engineering Research Laboratory, Ahmedabad) have carried out Investigation,


covering field work and tests, laboratory tests and analysis of the same.

The entire field testing was carried out as per relevant IS codes, IRC guidelines and as per
the instructions of the representatives of the clients. The samples collected from various
test locations, were sealed, labelled and transported to our laboratory at Ahmedabad. The
required laboratory tests were conducted as per relevant IS codes.

This report has been prepared after careful study of the field and laboratory test results.

1.2 LOCATION:

The locations for conducting field tests/collection of samples were as under:

TRIAL PITS

Sr.
Location (KM) Side Sr. No. Location (KM) Side
No.
1 14/000 RHS 24 260/000 LHS
2 35/000 LHS 25 270/000 RHS
3 45/000 RHS 26 280/000 LHS
4 55/000 LHS 27 290/000 RHS
5 65/000 RHS 28 300/000 LHS
6 75/000 LHS 29 310/000 RHS
7 85/000 RHS 30 320/000 LHS
8 95/000 LHS 31 330/000 RHS
9 105/000 RHS 32 340/000 LHS
10 115/000 LHS 33 350/000 RHS
11 125/000 RHS 34 360/000 LHS
12 135/000 LHS 35 370/000 RHS
13 145/000 RHS 36 380/000 LHS
14 160/000 LHS 37 390/000 LHS
15 170/000 RHS 38 400/000 LHS
16 180/000 LHS 39 410/000 RHS
17 190/000 RHS 40 420/000 LHS
18 200/000 LHS 41 430/000 RHS
19 210/000 RHS 42 440/000 LHS
20 220/000 LHS 43 450/000 RHS
21 230/000 RHS 44 460/000 LHS
22 240/000 LHS 45 470/000 RHS
23 250/000 RHS

JOB NO.1650/TRIAL PITS


KBM ENGINEERING RESEARCH LABORATORY
OVER 30 YEARS IN FIELD OF SOIL-CEMENT-CONCRETE TESTING

BUNGALOW NO.H79, VASANTNAGAR TOWNSHIP, GOTA-OGNAJ ROAD, AHMEDABAD 380060


PHONE: 02717 242373, 02717 241538 FAX: 02717 241538,e-mail: kbmerl@yahoo.co.in
________________________________________________________Page 2

1.3 FIELD WORK AND LABORATORY TESTING:

1.3.1 TRIAL PITS:

Trial pits of size 0.8m x 0.6m up to subgrade top were excavated manually at the locations
suggested by clients consultants. After excavation of trial pits field density of subgade was
determined. Pavement layers were also logged and photograph taken in a manner where
layer thickness could be self explanatory. Samples of subgrade were collected and
following laboratory tests were carried out:

• Field Moisture Content – As per IS:2720 P-2


• Atterberg’s Limits - As per IS:2720 P-5
• Grain Size Analysis- As per IS:2720 P-4
• Maximum Dry Density
And Optimum Moisture
By Heavy Compaction- As per IS:2720 P-8
• Soaked CBR & Unsoaked CBR - As per IS:2720 P-16

Test results for pavement composition along with photographs are given Table No.1
enclosed in Appendix A.

Laboratory test results are given Table No. 2 in Appendix A.

REPORT PREPARED BY
M. P. VORA (M.S., GEOTECHNICAL ENGINEERING)

JOB NO.1650/TRIAL PITS


Appendix A

APPENDIX A

(TABLES)

JOB NO.1650/TRIAL PITS


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 14/000 RHS Table No: 1.1

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown clayey sand with SC
kankar
Sub-Base GSB 200 -
Course
Base WBM 200 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 500 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 35/000 LHS Table No: 1.2

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown silty sand with SC
clay and kankar
Sub-Base GSB 300 -
Course
Base WBM 100 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 500 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 45/000 RHS Table No: 1.3

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown clayey silt with CI
sand and kankar
Sub-Base GSB 200 -
Course
Base WBM 200 -
Course
Bituminuos DBM 170 -
Surfacing
TOTAL 570 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 55/000 LHS Table No: 1.4

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey SC
sand with silt and kankar
Sub-Base GSB 200 -
Course
Base WBM 200 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 470 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

500
450
400
350
300 DBM
250 WBM
200 GSB
150
100
50
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 65/000 RHS Table No: 1.5

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey CH
silt with kankar
Sub-Base GSB 200 -
Course
Base WBM 160 -
Course
Bituminuos DBM 40 -
Surfacing
TOTAL 400 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 75/000 LHS Table No: 1.6

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey CI
silt with kankar
Sub-Base GSB 100 -
Course
Base WBM 160 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 330 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 85/000 RHS Table No: 1.7

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellow to reddish brown SC
clayey sand with kankar
Sub-Base GSB 150 -
Course
Base WBM 150 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 400 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 95/000 LHS Table No: 1.8

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey CH
silt with kankar
Sub-Base GSB 450 -
Course
Base WBM 100 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 650 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

700

600

500

400 DBM
WBM
300
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 105/000 RHS Table No: 1.9

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey CI
silt with kankar
Sub-Base GSB 300 -
Course
Base WBM 200 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 570 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 115/000 LHS Table No: 1.10

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown clayey CI
silt with kankar
Sub-Base GSB 400 -
Course
Base WBM 100 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 570 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 125/000 RHS Table No: 1.11

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown to black clayey CH
silt
Sub-Base GSB 400 -
Course
Base WBM 400 -
Course
Bituminuos DBM 120 -
Surfacing
TOTAL 920 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

1000
900
800
700
600 DBM
500 WBM
400 GSB
300
200
100
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 135/000 LHS Table No: 1.12

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown clayey silt CI
with sand and kankar
Sub-Base GSB 320 -
Course
Base WBM 350 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 740 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

800
700
600
500 DBM
400 WBM
300 GSB
200
100
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 145/000 RHS Table No: 1.13

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellowish brown clayey CI
silt with sand and kankar
Sub-Base GSB 370 -
Course
Base WBM 170 -
Course
Bituminuos DBM 50 -
Surfacing
TOTAL 590 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

700

600

500

400 DBM
WBM
300
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 160/000 LHS Table No: 1.14

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown to black clayey SC
sand with silt and kankar
Sub-Base GSB 170 -
Course
Base WBM 170 -
Course
Bituminuos DBM 40 -
Surfacing
TOTAL 380 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

400
350
300
250 DBM
200 WBM
150 GSB
100
50
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 170/000 RHS Table No: 1.15

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown sandy silt with CL
clay and kankar
Sub-Base GSB 240 -
Course
Base WBM 300 -
Course
Bituminuos DBM 30 -
Surfacing
TOTAL 570 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 180/000 LHS Table No: 1.16

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown silty sand with SM-SC
clay
Sub-Base GSB 120 -
Course
Base WBM 100 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 290 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 190/000 RHS Table No: 1.17

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellowish brown clayey CI
silt
Sub-Base GSB 80 -
Course
Base WBM 70 -
Course
Bituminuos DBM 150 -
Surfacing
TOTAL 300 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 200/000 LHS Table No: 1.18

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown clayey silt CI
with sand and kankar
Sub-Base GSB 160 -
Course
Base WBM 110 -
Course
Bituminuos DBM 60 -
Surfacing
TOTAL 330 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 210/000 RHS Table No: 1.19

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown clayey silt CI
with sand and kankar
Sub-Base GSB 500 -
Course
Base WBM 260 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 830 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

900
800
700
600
DBM
500
WBM
400
GSB
300
200
100
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 220/000 LHS Table No: 1.20

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown clayey silt CI
with sand and kankar
Sub-Base GSB 360 -
Course
Base WBM 150 -
Course
Bituminuos DBM 50 -
Surfacing
TOTAL 560 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 230/000 RHS Table No: 1.21

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown clayey silt CI
with sand and kankar
Sub-Base GSB 100 -
Course
Base WBM 100 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 300 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 240/000 LHS Table No: 1.22

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown clayey sand with SC
silt and kankar
Sub-Base GSB 300 -
Course
Base WBM 100 -
Course
Bituminuos DBM 50 -
Surfacing
TOTAL 450 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

500
450
400
350
300 DBM
250 WBM
200 GSB
150
100
50
0
1

Photograph (showing details of various layers)

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 250/000 RHS Table No: 1.23

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown to white gravelly GC
clay with stone pieces
(disintegrated rock)
Sub-Base GSB 200 -
Course
Base WBM 150 -
Course
Bituminuos DBM 60 -
Surfacing
TOTAL 410 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 260/000 LHS Table No: 1.24

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Grayish brown clayey SC
sand with kankar

Sub-Base GSB 270 -


Course
Base WBM 190 -
Course
Bituminuos DBM 120 -
Surfacing
TOTAL 580 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

700

600

500

400 DBM
WBM
300
GSB
200

100

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 270/000 RHS Table No: 1.25

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellowish brown gravelly GC
clay

Sub-Base GSB 200 -


Course
Base WBM 200 -
Course
Bituminuos DBM 80 -
Surfacing
TOTAL 480 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

600

500

400
DBM
300 WBM
GSB
200

100

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 280/000 LHS Table No: 1.26

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Greyish brown gravelly GC
clay

Sub-Base GSB 400 -


Course
Base WBM 300 -
Course
Bituminuos DBM 50 -
Surfacing
TOTAL 750 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

800
700
600
500 DBM
400 WBM
300 GSB
200
100
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 290/000 RHS Table No: 1.27

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Dark brown to black CH
clayey silt

Sub-Base GSB 100 -


Course
Base WBM 150 -
Course
Bituminuos DBM 80 -
Surfacing
TOTAL 330 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 300/000 LHS Table No: 1.28

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey SC
sand with kankar

Sub-Base GSB 430 -


Course
Base WBM 0-
Course
Bituminuos DBM 30 -
Surfacing
TOTAL 460 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

465
460
455
450
445 DBM
440 WBM
435 GSB
430
425
420
415
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 310/000 RHS Table No: 1.29

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey SC
sand with kankar
(disintegrated rock)
Sub-Base GSB 100 -
Course
Base WBM 50 -
Course
Bituminuos DBM 150 -
Surfacing
TOTAL 300 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 320/000 LHS Table No: 1.30

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown gravelly GC
clay with sand
(disintegrated rock)
Sub-Base GSB 300 -
Course
Base WBM 0-
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 400 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 330/000 RHS Table No: 1.31

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown silty SM
sand with kankar

Sub-Base GSB 200 -


Course
Base WBM 50 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 350 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

400
350
300
250 DBM
200 WBM
150 GSB
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 340/000 LHS Table No: 1.32

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown medium to SP
fine sand

Sub-Base GSB 130 -


Course
Base WBM 0-
Course
Bituminuos DBM 130 -
Surfacing
TOTAL 260 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

300

250

200
DBM
150 WBM
GSB
100

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 350/000 RHS Table No: 1.33

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown clayey SC
sand with kankar
(disintegrated rock)
Sub-Base GSB 100 -
Course
Base WBM 0-
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 200 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

250

200

150 DBM
WBM
100 GSB

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 360/000 LHS Table No: 1.34

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown medium to fine SP
sand

Sub-Base GSB 150 -


Course
Base WBM 0-
Course
Bituminuos DBM 60 -
Surfacing
TOTAL 210 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

250

200

150 DBM
WBM
100 GSB

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 370/000 RHS Table No: 1.35

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellowish brown gravelly GC
clay with sand
(disintegrated rock)
Sub-Base GSB 200 -
Course
Base WBM 0-
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 270 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

300

250

200
DBM
150 WBM
GSB
100

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 380/000 LHS Table No: 1.36

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Grayish brown gravelly GC
clay with sand
(disintegrated rock)
Sub-Base GSB 0-
Course
Base WBM 140 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 210 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

250

200

150 DBM
WBM
100 GSB

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 390/000 LHS Table No: 1.37

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Yellowish brown silty SM
sand with kankar

Sub-Base GSB 0-
Course
Base WBM 70 -
Course
Bituminuos DBM 70 -
Surfacing
TOTAL 140 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

160
140
120
100 DBM
80 WBM
60 GSB
40
20
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 400/000 LHS Table No: 1.38

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Grayish brown clayey SC
sand with kankar

Sub-Base GSB 150 -


Course
Base WBM 50 -
Course
Bituminuos DBM 130 -
Surfacing
TOTAL 330 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

350

300

250

200 DBM
WBM
150
GSB
100

50

0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 410/000 RHS Table No: 1.39

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Grayish brown gravelly GC
clay with sand

Sub-Base GSB 180 -


Course
Base WBM 180 -
Course
Bituminuos DBM 40 -
Surfacing
TOTAL 400 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 420/000 LHS Table No: 1.40

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown gravelly GC
clay with sand

Sub-Base GSB 250 -


Course
Base WBM 150 -
Course
Bituminuos DBM 60 -
Surfacing
TOTAL 460 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

500
450
400
350
300 DBM
250 WBM
200 GSB
150
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 430/000 RHS Table No: 1.41

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown gravelly GC
clay with sand
(disintegrated rock)
Sub-Base GSB 180 -
Course
Base WBM 0-
Course
Bituminuos DBM 30 -
Surfacing
TOTAL 210 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

215
210
205
200
195 DBM
190 WBM
185 GSB
180
175
170
165
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 440/000 LHS Table No: 1.42

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Grayish brown gravelly GC
clay with sand

Sub-Base GSB 110 -


Course
Base WBM 0-
Course
Bituminuos DBM 50 -
Surfacing
TOTAL 160 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

180
160
140
120
DBM
100
WBM
80
GSB
60
40
20
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 450/000 RHS Table No: 1.43

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Reddish brown gravelly GC
clay with sand

Sub-Base GSB 80 -
Course
Base WBM 50 -
Course
Bituminuos DBM 40 -
Surfacing
TOTAL 170 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

180
160
140
120
DBM
100
WBM
80
GSB
60
40
20
0
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 460/000 LHS Table No: 1.44

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown gravelly GC
clay with sand
(disintegrated rock)
Sub-Base GSB 240 -
Course
Base WBM 0-
Course
Bituminuos DBM 30 -
Surfacing
TOTAL 270 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

275
270
265
260
255 DBM
250 WBM
245 GSB
240
235
230
225
1

KBM ENGINEERING RESEARCH LABORATORY


Project: Subgrade and Material Investigation for MP/Maharashtra Border-Dhule Section of NH3 from KM
168.500 to KM 265.000

Clients: Feedback Ventures Private Ltd.

Location: Trial Pit Chainage: KM 470/000 RHS Table No: 1.45

Pavement Composition

Pavement Layer Thickness Remarks


Composition (mm)
Subgrade Brown sandy silt CL
with kankar

Sub-Base GSB 250 -


Course
Base WBM 50 -
Course
Bituminuos DBM 100 -
Surfacing
TOTAL 400 -

PAVEMENT COMPOSITION
Thickness and Composition (mm)

450
400
350
300
DBM
250
WBM
200
GSB
150
100
50
0
1

KBM ENGINEERING RESEARCH LABORATORY


PROJECT: GEOTECHNICAL INVESTIGATION FOR SIX/FOUR/2 LANE WITH PAVED SHOULD OF BHAVNAGAR-PIPAVAV-PORBANDAR SECTION
OF NH 8E IN THE STATE OF GUJARAT
CLIENTS: STUP CONSULTANTS PVT. LTD., NAVI MUMBAI, INDIA TABLE 2

LABORATORY TEST RESULTS OF SUBGRADE SAMPLES COLLECTED FROM TRIAL PITS


LABORATORY TEST RESULTS

Sr. No. Location Side Lab. CBR


Field Dry Water Content Grain Size Analysis Atter berg's Limit Maximum Optimum CLASSIFICATION
Value

(KM) Density Density (%) GRAVEL % SAND % SILT /CLAY% Liquid Plastic Plasticity Dry Moisture Unsoaked Soaked OF
(gms/cc) (gms/cc) (g) COARSE(c) MEDIUM(m) FINE (f) Limit Limit Index Density Content Condition Condition SOIL
>4.75mm 4.75mm>c>2mm 2mm>m>425μ 425μ>f>75μ cl<75μ (%) (%) (%) (gms/cc) (%) (%) (%)
1 14/000 RHS 1.65 1.51 9.44 37 16 15 10 22 33 17 16 2.00 11 9.1 4.3 SC
2 35/000 LHS 1.81 1.60 13.42 10 15 24 27 24 25 16 9 1.90 10 7 3.5 SC
3 45/000 RHS 1.77 1.44 23.00 6 3 11 15 65 36 19 17 1.89 13 3.2 2 CI
4 55/000 LHS 1.82 1.55 17.68 15 22 15 8 40 32 21 11 2.11 9 8 3.8 SC
5 65/000 RHS 2.00 1.63 23.00 3 8 8 7 74 58 25 33 1.76 16 2 2 CH
6 75/000 LHS 1.81 1.45 25.22 18 9 11 7 55 39 19 20 1.79 16 5.2 2.4 CI
7 85/000 RHS 1.80 1.65 9.09 26 25 20 7 22 40 20 20 1.97 11 8.6 4.1 SC
8 95/000 LHS 1.83 1.54 18.90 23 2 4 7 64 56 27 29 1.82 16 2.8 2 CH
9 105/000 RHS 1.90 1.71 10.88 2 4 13 15 66 49 22 27 1.87 12 2 2 CI
10 115/000 LHS 1.96 1.71 14.79 15 9 16 9 51 49 20 29 1.91 11 4 2 CI
11 125/000 RHS 1.72 1.42 21.20 1 6 10 5 78 61 22 39 1.73 15 2 2 CH
12 135/000 LHS 1.81 1.43 26.20 5 6 12 9 68 45 18 27 1.91 12 3.2 2 CI
13 145/000 RHS 2.03 1.76 15.65 0 7 24 15 54 41 18 23 1.89 13 2.5 2 CI
14 160/000 LHS 2.01 1.68 19.58 8 13 22 16 41 40 15 25 2.04 11 7.6 3.7 SC
15 170/000 RHS 2.18 1.88 15.68 2 4 11 24 59 28 15 13 2.02 9 7.3 3.3 CL
16 180/000 LHS 2.02 1.80 12.30 0 4 9 53 34 23 16 7 2.03 10 14.9 7.7 SM-SC
17 190/000 RHS 2.09 1.75 19.66 0 1 9 21 69 40 15 25 1.88 13 2.5 2 CI
18 200/000 LHS 2.09 1.81 15.39 7 14 16 11 52 38 18 20 1.99 11 3.4 2 CI
19 210/000 RHS 1.98 1.62 22.39 0 3 9 19 69 45 19 26 1.82 13 2.4 2 CI
20 220/000 LHS 1.85 1.55 19.65 5 2 7 14 72 49 20 29 1.98 12 3.7 2 CI
21 230/000 RHS 1.89 1.65 14.78 16 4 10 11 59 41 22 19 1.95 11 3.4 2 CI
22 240/000 LHS 1.86 1.62 14.94 7 4 20 23 46 41 18 23 2.00 11 5.7 2.4 SC
23 250/000 RHS 2.10 1.91 9.92 63 10 7 6 14 40 18 22 2.10 9 25.9 9.7 GC
24 260/000 LHS 1.81 1.61 12.27 8 20 15 48 9 26 15 11 2.01 10 13.2 7.6 SC
25 270/000 RHS 1.78 1.66 7.52 62 8 6 5 19 36 18 18 2.11 11 27.8 10.2 GC
26 280/000 LHS 1.64 1.49 10.01 48 7 5 10 30 43 16 27 1.92 12 22.1 8.3 GC
27 290/000 RHS 1.81 1.54 17.46 1 3 7 5 84 53 23 30 1.76 14 2.4 2 CH
28 300/000 LHS 1.98 1.72 14.91 18 7 13 27 35 33 14 19 1.92 12 9.3 4.2 SC
29 310/000 RHS 2.16 1.96 10.28 14 8 13 23 42 33 14 19 2.15 8 21.4 8.9 SC
30 320/000 LHS 2.23 2.03 9.93 46 10 10 14 20 51 16 35 1.99 11 26.7 9.6 GC
31 330/000 RHS 2.08 1.93 7.65 8 11 26 25 30 NP - - 2.00 11 15.6 10.8 SM
32 340/000 LHS 1.81 1.73 4.49 0 0 81 15 4 NP - - 1.89 12 13.9 7.7 SP
33 350/000 RHS 2.05 1.85 10.73 11 8 21 17 43 32 16 16 1.90 12 20.2 10.3 SC
34 360/000 LHS 1.52 1.47 3.52 0 0 64 32 4 NP - - 1.87 10 15.3 8.7 SP
35 370/000 RHS 2.01 1.93 4.37 41 9 13 20 17 27 17 10 2.03 9 29.4 15.2 SC
36 380/000 LHS 2.06 1.87 10.24 69 5 12 13 1 - - - 2.20 7 35.1 20.2 GP
37 390/000 LHS 1.64 1.54 6.24 8 2 10 46 34 NP - - 1.94 9 15.2 13.8 SM
38 400/000 LHS 1.83 1.68 8.88 9 10 33 19 29 30 14 16 1.96 11 9.4 5.2 SC
39 410/000 RHS 1.81 1.68 7.42 58 7 5 10 20 31 13 18 2.18 6 30.2 10.2 GC
40 420/000 LHS 1.81 1.65 9.91 56 8 7 9 20 33 15 18 2.15 7 27.3 9.8 GC
41 430/000 RHS 2.08 1.87 11.17 45 2 11 13 29 24 13 11 2.11 7 32.1 15.3 GC
42 440/000 LHS 1.62 1.45 11.49 44 15 11 7 23 32 17 15 2.12 7 30.1 12.3 GC
43 450/000 RHS 1.75 1.61 8.72 50 10 7 7 26 30 14 16 2.11 8.5 25.6 10.6 GC
44 460/000 LHS 2.13 1.97 8.38 49 15 8 9 19 32 15 17 2.20 7 41.4 9.5 GC
45 470/000 RHS 1.83 1.67 9.89 19 9 8 11 53 27 16 11 1.76 14 8.2 4.3 CL

Mihir Vora
for, KBM Engineering Research Laboratory