1. REFER TO GENERAL NOTES DRAWING.

13000 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL


OTHER ENGINEERING DRAWINGS SUCH AS ARCHITECTURAL

A1 STRUCTURAL, PLUMPING, ELECTRO-MECHANICAL,---- etc.


3. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN
METERS U.N.O.
4. THE 28 DAY CYLINDER COMPRESSIVE DESIGN STRENGTH
SHALL NOT BE LESS THAN:
1-BLINDING
11mpa
TOP SLAB = 450mm 2-REINFORCEMENT CONCRETE 30mpa
3-SCREEED 30mpa
5. THE CLEAR CONCRETE COVER TO REINFORCEMENT SHALL BE AS
FOLLOWS:
FOUNDATIONS ........................................................................70mm
SUB-STRUCTURE ELEMENTS IN CONTACT WITH SOIL ..........50mm
COLUMN ..............................................................................50mm
CONSTRUCTION JOINT WALLS AND BEAMS ...............................................................40mm

2900
SOLID SLABS .........................................................................30mm
6. ALL REINFORCING BARS SHALL BE DEFORMED NEW BILLET
THICKNESS = 300mm CONSTRUCTION JOINT STEEL CONFORMING TO ASTM DESIGNATION A615M/A615
GRADE 420 (60).
7. IN CASE OF ANY DISCREPANCY BETWEEN STRUCTURAL
DRAWINGS AND ANY OTHER DISCIPLINE, SITE ENGINEER MUST
REFER BACK TO SHOP DRAWING DEPARTMENT TO CHECK
AND FINALIZE WITH CONSULTING ENGINEER
BOTTOM = 450mm 8. FOR LOCATION AND LEVELS OF OPENING AND SLEEVES IN ALL
MEMBERS REFER TO GENERAL ARRANGEMENT DRAWINGS IN
CONJUNCTION WITH ALL OTHER ENGINEERING DRAWINGS
9. THE CEMENT FOR CONCRETE SHALL BE ORDINARY PORTLAND
CEMENT TO B.S.12 OR AASHTO M&S TYPE-I

10 T20-01-200-B1/T1
A1 SPACING
LAYER

BAR MARK
DIA. OF BAR
4900 13000 4900 NO. OF BARS

300 300 500 300


4600 300 4100

A2
1000

TOP SLAB = 450mm


1850

CONSTRUCTION JOINT 10mm EXP. JOINT


WING WALL THICKNESS = 300mm CONSTRUCTION JOINT WING WALL
UPSTREAM UPSTREAM
600

600
400 600

BOTTOM = 450mm
1000

1000
100
1000
BOX CULVERT 633 (OROGUN) A2 1000
WING WALL ELEVATION 04
REVISION
ISSUED FOR CONSULTANT APPROVAL 23-07-2021

Scale 1:100 03 ISSUED FOR CONSULTANT APPROVAL 08-02-2021


02 ISSUED FOR CONSULTANT APPROVAL 11-02-2021
01 ISSUED FOR CONSULTANT APPROVAL 01-02-2021
00 ISSUED FOR CONSULTANT APPROVAL 20-12-20

REVISION DESCRIPTION ACTION DATE BY


NO. CODE

DESIGN DRAWING REFERENCES


NO. DWG. No. DRAWING TITLE REV. DATE

01 N17036-0100D-TD-RO1-BR-0001 GENERAL NOTES 1 17-4-2018

02 N17036-0100D-TD-RO1-BR-2001 BOX CULVERTS G.A. 1 17-4-2018


DETAILS

03 N17036-0100D-TD-RO1-BR-2002 BOX CULVERTS R.C. 1 17-4-2018


DETAILS

LETTERS & RFI'S REFERENCES


NO. DOC. No. DOCUMENT DESCRIPTION DATE

01

700
02
300 400
950

03

KEY PLAN

450
Construction 250
400 Joint 300
350 300
950

559 559
500 300
500

2000

1400
400
1100
1100

300
1450

500 PROJECT:

CONSTRUCTION OF FIRST POOL OF LONNG TERM

100
559 INV.FOR FLOOD CONTROL IN IBADAN, OYO STATE.
500
250
Construction Construction
CLIENT:
250 Joint Joint
P.V.C Waterstop
450
800

250mm wide 400 Construction


100 Construction
450

Joint Joint
100mm Kicker
100 CONSULTANT:

Dar Al - Handasah Consultant

800
750

Shair & Partners


GENERAL CONTRACTOR:

100
ZONE NAME:

SECTION A2- A2 DRAWING TITLE:

Scale 1:50
SECTION A1 - A1
Scale 1:50 DRAWN BY: T. OSHO DATE: 23-7-2021
CHECKED BY: L.LAWAL
SCALE: 1:70
REVIEWED BY: M.DENG

APPROVED BY: SHEET SIZE: A3

DRAWING & TRANSMITTAL No.

SHD-CGGC-01-A01-0042-BR-19-2002-0002-04