0% found this document useful (0 votes)
701 views125 pages

Structural Drawing Notes Guide

This document contains notes for reinforced concrete structures and sample drawings. The notes specify design standards, reinforcement requirements, construction joint placement, and other details. Sample drawings show plan views of building layouts with labeled elements. Dimensioned coordinates are provided for boundary points.

Uploaded by

Li Clayton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
701 views125 pages

Structural Drawing Notes Guide

This document contains notes for reinforced concrete structures and sample drawings. The notes specify design standards, reinforcement requirements, construction joint placement, and other details. Sample drawings show plan views of building layouts with labeled elements. Dimensioned coordinates are provided for boundary points.

Uploaded by

Li Clayton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Appendix A Sample Drawings

-Software 1
-Software 2
Software 1
BD REF :

BIM REF :

N 4.1

N 819792760.292
POINT
BOUNDARY COORDINATES
E (m) N (m)
STRE
YYY E 835350861.425 A 835335.928 819789.845
4.0
ET B B 835350.861 819792.76
* REINFORCEMENT CONSISTING OF EXPANDED METAL LATH OR A WIRE FABRIC NOT LIGHTER THAN A 819703.101
GENERAL NOTES FOR REINFORCED CONCRETE STRUCTURE:
0.5 kg/m2 WITH 2mm DIAMETER WIRE AT NOT MORE THAN 100mm CENTRES OR A CONTINUOUS
N 819789844.87 C 835368.366
1. DESIGN TO COMPLY WITH : E 835335928.356
ARRANGEMENT OF LINKS AT NOT MORE THAN 200mm CENTRES SHALL BE INCORPORATED IN THE D 835353.433 819700.186

NO.98
a. HONG KONG BUILDING (CONSTRUCTION) REGULATION, 1990

B LO C
CONCRETE COVER AT A DISTANCE NOT EXCEEDING 20mm FROM THE FACE OF THE STRUCTURAL
b. STRUCTURAL USE OF CONCRETE, 2013
MEMBERS SURROUNDING THE PLANT/MACHINE ROOMS AND AT OTHER AREAS REQUIRING 120 MINS.
c. CODE OF PRACTICE ON WIND EFFECTS, HONG KONG, 2004

2
K A
F.R.R. AS SPECIFIED IN THE GENERAL BUILDING PLANS.
d. CODE OF PRACTICE FOR FIRE SAFETY IN BUILDINGS, 2011
e. CODE OF PRACTICE FOR DEAD AND IMPOSED LOADS, 2011
12. CONSTRUCTION JOINTS TO BE POSITIONED AS FOLLOWS :-
2. ALL STRUCTURAL DRAWINGS MUST BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS AND
a. THE JOINT IN A BEAM TO BE VERTICAL AND AT ONE-THIRD OF THE SPAN.
OTHER RELEVANT DRAWINGS.
b. THE JOINT IN A SLAB TO BE VERTICAL, AT ONE-THIRD OF THE PANEL AND PARALLEL TO THE
3. STEEL REINFORCEMENTS FOR CONCRETE SHALL COMPLY WITH THE CONSTRUCTION STANDARD CS2 :
REINFORCEMENT. 19.3
2012 MINIMUM CHARACTERISTIC STRENGTH OF : 500MPa FOR RIBBED STEEL REINFORCING BARS GRADE 500B/C,
c. THE JOINT IN COLUMNS TO BE AT THE UNDERSIDE OF THE LOWEST BEAM OVER THE COLUMNS OR AT
250MPa FOR PLAN REINFORCING BARS GRADE 250.

XXX
75mm ABOVE FLOOR LEVEL.
4. MINIMUM BOND / LAP LENGTH OF REINFORCEMENT FOR ALL STRUCTURAL ELEMENTS SHALL BE AS
13. CONSTRUCTION JOINTS WHERE NOT SHOWN SHOULD BE LOCATED TO THE APPROVAL OF THE ENGINEER. NO.9
78
SPECIFIED IN THE FOLLOWING SCHEDULE:
FOR REFERENCE
14. DURING CONSTRUCTION THE STRUCTURE ONLY IN A STABLE CONDITION AND NO PART
SHOULD BE MAINTAINED 12.7
SHALL BE OVERSTRESSED.

STRE
SCHEDULE OF LAP & ANCHORAGE LENGTH FOR DESIGN TO COP 2013 NO.9
76
15. SIZE OF CONCRETE ELEMENTS DOES NOT INCLUDE THICKNESS OF APPLIED FINISHES.
16. NO HOLES OR CHASES OTHER THAN THOSE SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE MADE.
74
FOR RIBBED STEEL 17. PIPES OR CONDUITS SHALL NOT BE PLACED WITHIN THE CONCRETE COVER TO REINFORCEMENT WITHOUT NO.9

ET
THE APPROVAL OF THE ENGINEER. THE CONCRETE COVER TO EMBEDDED PIPES OR CONDUITS SHALL BE A

ZZZ
REINFORCING BARS
72
GRADE C45/20D
MINIMUM OF 20mm.
18. WATER BORNE PIPES SHALL NOT BE PLACED WITHIN R.C. CONCRETE WITHOUT THE APPROVAL OF THE
NO.9
SITE
DIAMETER BUILDINGS DEPARTMENT, AP AND RSE. 70
NO.9
K.I.L 201

ROAD
OF BAR ANCHORAGE 19. SPACER BARS SHALL BE OF DIAMETER = 25mm OR DIAMETER OF MAIN BAR WHICHEVER IS GREATER
TL CL @1.5m c/c. 68
NO.9
20. ALL ROOF SCREEDING TO BE LIGHT WEIGHT CONCRETE OF DENSITY BETWEEN 1600 TO 1700kg/m3 AND
33 x Dia. 26 x Dia. MINIMUM CUBE STRENGTH Uw=21N/mm2 AT 28 DAYS.
66
21. ALL BEAM SIZE TO BE READ AS BREADTH x DEPTH NO.9
10 330 260
22. ALL LEVELS SHOWN IN FRAMING PLANS TO BE STRUCTURAL FLOOR LEVEL.
12 400 320 64
(LEGEND : 108.7 SFL STRUCTURAL FLOOR LEVEL AT 108.7 mPD.) NO.9
16 530 420 23. ALL DIMENSION ARE IN MILLIMETRE & LEVEL IN mPD EXCEPT OTHERWISE STATED.
24. ALL EARTH BACKFILLING TO BE COMPACTED TO 95% OF MAX. DRY DENSITY TO BS 1377-TEST 12.

SITTIN
20 660 520
25. ALL BENT TO STEEL REINFORCEMENT SHALL COMPLY WITH BS 8666:2000
25 830 650

G- O U
32 1060 840

T AR
40 1320 1040

EA
NOTES FOR ANNOTATION OF BARS :

NO.95
1. ALL DIMENSIONS SHOWN ARE IN mm.

B LCO
LEGEND :
1. TL = LAP OR ANCHORAGE LENGTH UNDER TENSION OR LAP LENGTH UNDER COMPRESSION 2. ANY DISCREPANCY FOUND BETWEEN THE DETAILS SHOWN IN THIS DRAWING AND THAT SHOWN IN REV DATE AMENDMENT
DETAILED DRAWINGS SHALL BE REPORTED TO THE ENGINEER FOR DIRECTION.

0-95
K B
CL = ANCHORAGE LENGTH UNDER COMPRESSION PROJECT
2. NO SPLICING OF REINFORCEMENT OTHER THAN THOSE SHOWN ON THE DRAWING IS ALLOWED 3. BAR REFERENCING : FOR REFERENCE ONLY 3.8
CIC SAMPLE PROJECT

4
UNLESS OTHERWISE APPROVED BY THE ENGINEER AND TL SHALL BE PR0VIDED. EXAMPLE : 16T32-200 N 819703101.028
3. NOMINAL LAP AND ANCHORAGE FOR DISTRIBUTION BARS TO BE 300 OR WHICHEVER THE NUMBER OF BARS: 16 C E 835368365.835
GREATER. LAP LENGTH FOR UNEQUAL SIZE BARS SHALL BE BASED UPON THE SMALLER BAR. FOR TYPE OF STEEL: T (RIBBED STEEL REINFORCING BARS GRADE 500B/C) D WWW
DIAMETER OF BARS: 32mm
STRE
THE FOLLOWING PROVISIONS a) OR b) APPLY, THE LAP LENGTH SHOULD BE INCREASED BY A N 819700185.607
ET
FACTOR OF 1.4. PITCH OF BARS (IF APPLICABLE): 200 mm 3.7
E 835353432.766
a) WHERE A LAP OCCURS AT THE TOP OF A SECTION AS CAST AND THE MINIMUM COVER IS LESS DRAWING TITLE
THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT.
b) WHERE A LAP OCCURS AT THE CORNER OF A SECTION AND THE MINIMUM COVER TO EITHER NOTES FOR CONSTRUCTION OF CANTILEVERED BEAM & SLAB : GENERAL NOTES FOR SUPERSTRUCTURE
FACE IS LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT, OR WHERE THE CLEAR 1. ALL CANTILEVERED PROJECTIONS SHOULD BE CAST MONOLITHICALLY WITH AND AT THE SAME TIME AS
DISTANCE BETWEEN ADJACENT LAPS IS LESS THAN 75mm OR SIX TIMES THE SIZE OF THE THE DIRECTLY SUPPORTING MEMBERS. CONSTRUCTION JOINTS MUST NOT BE LOCATED ALONG THE
LAPPED REINFORCEMENT, WHICHEVER IS THE GREATER. EXTERNAL EDGE OF THE SUPPORTING MEMBERS.
IF BOTH PART a) & b) CONDITION APPLY, THE LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 2. ADEQUATE BAR SPACERS SHOULD FORBE PROVIDED TO MAINTAIN
REFERENCE ONLYTHE POSITION AND ALIGNMENT OF THE
2.0. STEEL REINFORCEMENT.
FOR REFERENCE ONLY 3. DURING CONCRETING, ADEQUATE COMPACTION SHOULD BE GIVEN TO ENSURE GOOD QUALITY SCALE AS SHOWN@A1
CONCRETE. EVERY ENDEAVOUR SHOULD ALSO BE MADE TO AVOID STEEL REINFORCEMENT FROM
BEING DISPLACED OR DEPRESSED.
BLOCK PLAN DRAWING NO. REV. NO.
5. ALL NOMINAL LAPS OF DISTRIBUTION BAR FOR SLABS AND WALLS SHALL BE 300 MINIMUM UNLESS
4. ALL PROPPING TO THE SOFFIT OF THE FORMWORK FOR THE CANTILEVERED PROJECTIONS SHOULD BE 1 : 500
OTHERWISE SPECIFIED.
MAINTAINED FOR AT LEAST 14 DAYS.
S001
6. FOR DETAILS OF STRUCTURAL FALLS, SEE APPROPRIATE STRUCTURAL AND ARCHITECTURAL DRAWINGS.
7. CONCRETE TO BE DESIGNED MIX CONCRETE AS SPECIFIED IN THE FOLLOWING SCHEDULE TO CS1:2010
NOTES FOR WATERPROOFING CONSTRUCTION :
SOURCE ---
AND THE GRADE DESIGNATIONS GIVEN ARE THE CHARACTERISTIC CUBE STRENGTH AT 28 DAYS AND THE
MAXIMUM AGGREGATE SIZE 20mm. UNLESS OTHERWISE STARTED ON THE DRAWINGS. 1. WATERSTOP :
a) FOR LOCATIONS AND DETAILS OF WATERSTOP AT EXPANSION JOINTS, CONSTRUCTION JOINTS ETC.
REFER TO ALL RELEVANT DRAWINGS. JOINT NOT SPECIFIED SHALL RECEIVE THE PRIOR APPROVAL
MEMBER GRADE BY THE ENGINEER. 90mm (W) x 40mm (H) space
BEAMS, SLABS AND WALLS C45/20 b) TYPE OF WATERSTOPS SHALL BE AS SPECIFIED IN THE CONTRACT OR TO THE APPROVAL OF THE for COMPANY LOGO
ENGINEER.
COLUMNS C45/20
c) DETAIL OF FIXING OF WATERSTOPS SHALL BE IN ACCORDANCE WITH THE RECOMMENDATION OF
WATER TANKS C45/20 THE MANUFACTURER. FOR REFERENCE ONLY
d) PRIOR TO CONCRETING, THE WATERSTOP SHALL BE NAILED, CLIPPED OR TIED WITH WIRE TO ITS
CORRECT POSITION SECURELY AND ADEQUATELY. DETAIL AND SPACING OF SUCH NAILING, CLIPS
8. THE EQUIVALENT SODIUM OXIDE IN CONCRETE MIX SHALL NOT EXCEED 3.0 kg/m3 OF CONCRETE.
AND TIES SHALL BE IN ACCORDANCE WITH THE RECOMMENDATION OF THE MANUFACTURER AND TO
CORRESPONDING TEST CERTIFICATES ON ALKALI CONTENT IN CEMENT, ADMIXTURES, AGGREGATE ETC.,
THE APPROVAL OF THE ENGINEER.
ISSUED BY A HOKLAS LABORATORY AND CALCULATION OF THE EQUIVALENT SODIUM OXIDE SHOULD BE
e) CARE SHALL BE TAKEN TO AVOID ANY AIR VOIDS BEING TRAPPED BETWEEN THE WATERSTOP AND
SUBMITTED TO THE RSE QUARTERLY.
THE SURROUNDING CONCRETE.
9. CONCRETE CUBES SHALL BE MADE AND TESTED WITH TEST REPORT IN ACCORDANCE WITH THE
f) SURROUNDING STEEL REINFORCEMENT SHALL NOT BE PLACED IN CONTACT WITH THE WATERSTOP,
PROVISIONS OF THE HONG KONG BUILDING (CONSTRUCTION) REGULATIONS : 1990 AND THE
MINIMUM SPACING TO BE 40mm. 90mm (W) x 60mm (H) space
CONSTRUCTION STANDARD CS1 : 2010, EXCEPT SECTION 7.1 .
2. ALL CONCRETE USED IN WATER RETAINING STRUCTURE SHALL BE WATERPROOFING CONCRETE AND for AP/RSE/RGE's
10. UNLESS OTHERWISE STATED, CONCRETE COVER TO ALL REINFORCEMENT SHALL BE AS SPECIFIED IN THE
COMPLY WITH BS8007. signature/ and stamp chop
FOLLOWING SCHEDULE OR EQUAL TO THE DIAMETER OF THAT REINFORCEMENT, WHICHEVER IS THE
GREATER :

IN CONTACT WITH EARTH SLAB STAIR BEAM COLUMN WALL


1) CAST ON BLINDING 50 50 50 50 50
2) CAST AGAINST SOIL 75 75 75 75 75
BD's OFFICAL USE
11. CONCRETE COVER SHALL ALSO FULFIL THE REQUIREMENT FOR APPROPRIATE FIRE RESISTANCE RATING
AS SPECIFIED IN THE CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION OR NOMINAL COVER FOR
DURABILITY WHICHEVER IS GREATER.

CONCRETE COVER TO
MAIN REINFORCEMENT NOMINAL
COVER FOR
120 MINS. 60 MINS. 240 MINS. DURABILITY
F.R.P. F.R.P. F.R.P.

SLAB, SIMPLY SUPPORTED 35 25 55 * 35


SLAB, CONTINUOUS 25 25 45 * 35
STAIR 35 25 55 * 35 90mm (W) x 150mm (H) space
for BD's approval stamp /
BEAM, SIMPLY SUPPORTED 50 * 30 80 * 40 certification of copies of
BEAM, CONTINUOUS 50 30 60 * 40 approved plans
(PNAP ADM-10 APP A)
COLUMN 35 25 35 35
WALL 25 25 25 35
WALL SLAB FOR WATER TANK 40 40 40 40
LEGEND: BD REF :

BIM REF :

SITE BOUNDARY

COLUMN / WALL ABOVE

COLUMN / WALL BELOW

WALL ABOVE & BELOW

A 7010
B 4025
C 6225
D 2025
E 6650
F 1675
G 6225
H 4025
J 7210
K 2557 COLUMN ABOVE & BELOW
4936 1950 300 1950 1500 1425 300 1425 1500 1950 300 1950 1500 1425 300 1425 1499 1951 300 1950 1500 1425 300 1425 1500 1950 300 1950 4799 85

BEARING (B.W.) /

235 CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

235 CTB1 (200 x 300)


CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)

CTB1 (200 x 300)


HANGER WALL (H.W.)

VOID
3450 825 TS12 TS12 TS12 TS12 825 3396
TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12
1240

1365
1365

C1B C2B

175

175

175

175

175

175

175

175

175

175

175

175

175

175
5 TB3 (400 x 600) TB12 (400 x 600) +26.50

235
PROPOSED STRUCTURE

CTB56 (400 x 600)


FLOOR LEVEL

CTB83 (400 x 600)

1160
1160

TB4 (400 x 600) TB5 (400 x 600) TB6 (400 x 600) TB7 (400 x 600) TB8 (400 x 600) TB11 (400 x 600)

TB59 (400 x 600)


CTB1 (200 x 300) TB9 (400 x 600) TB10 (400 x 600) CTB1 (200 x 300)

TB80 (400 x 600)


825 2635 100150 1100 150 250 3200 150 1925 250 150 850 100 250 TS3 TB1
TS3 PROPOSED BEAM MARK
2740

175

TS12
TS2 (300X450)
TS12

4810

4810
175 TS1 TS1 TS1 TS1 TS1 TS1 AND BEAM SIZE

5035

5035

5035
350 1405

350 1405
TS2

W5A

4710

W5G
W5E

W5F
CTB1 (200 x 300) 184 591 CTB1 (200 x 300)
4785

W5C

W5D
W5B
TB13 (250 x 600) TB14 (250 x 600) TS1 TS2 PROPOSED SLAB MARK
250

250
C1A 450 375 1060 1000 250 1600 C2A
590 285 1500 250 1000 1060 375 450 AND SPAN DIRECTION

TS10 (350 x 650)


TS10 (350 x 650)

100 200 745 275


CTB1 (200 x 300) CTB1 (200 x 300)

1045 275
75 1600 250 1600
1520

1520
1600 250 1590 185

1795
175 100 TB22 (400 x 600) C2C 175
TS12

TS12
C1C TB15 (400 x 600)
TB16 (200 x 600) TB17 (200 x 600) TB18 (200 x 600) TB19 (200 x 600) TB20 (200 x 600) TB21 (200 x 600)

TB67 (250 x 600)


1

100 200

100 200
100 200

100 200

50 x 600
100 200
TB55 (400 x 600)

625

525

525

TB82 (400 x 600)


4 CTB1 (200 x 300) S004

TS10
CTB1 (200 x 300)

TS10
TB58 (450 x 600)

TB60 (250 x 600)

TS10

TB63 (200 x 600)

TS10

TB75 (200 x 600)


TB65 (200 x 600)

TB72 (200 x 600)

TB78 (250 x 600)


WC1D WC2D

TS10
550 1050
1510

1510
TB79 (450 x 600)
225 50
1285

TS4 TB23 (200 x 600) TB25 (200 x 600) TB27 (200 x 600) TB28 (200 x 600) TB29 (200 x 600)

TB69 (2
TB24 (200 x 600)
CTB1 (200 x 300) TB26 (250 x 600) TS2 TS4 CTB1 (200 x 300)
C10

TB66A (200 x 600)

TS10
TB71 (200 x 600)

TS10
TS2 200 734 200 1475 200

TS10
175

TS10

TB68 (300 x 600)

TS10
UP UP2500
3850

3040 C5 200 1475 200

TS12
175 TB31 (500 x 600) TB41 (500 x 600)

TS11 TS10
4815 85
TS12

2055
2055

320 450

2700
250 810 41 TB37 (200 x 600) C9

1150 450

1150 450
2565

TB35 (200 x 600)

200 450
3 4

125 150 1325


135 4815

W3

W9
TS13 W7 CTB1 (200 x 300)

125 1475

75 1550
TS13

TS11

TS11
TS11

100 1150
S010 S010

TB77 (250 x 600)


75 1550
495 250

250

495 250
TB33 (200 x 600) W4 W10 TB32 (200 x 600) 210 250 600
W6

TB62 (250 x 600)


CTB1 (200 x 300) W1 TB30 (250 x 600) 1274
TB2 (200 x 300)

TB42 (250 x 600)

TB2 (200 x 300)


3 175 175

200
TB36 (200 x 600) TB39 (200 x 600) 175
175 2500

CTB1 (200 x 300)


TS7 200 200

TB64 (200 x 600)

CTB1 (200 x 300)


TS12 TS12 300190 985 200

1975
1975

TS6 TS12 463 6587 300 TS6 TS12

W8
C4 TB34 (200 x 600) TB38 (200 x 600)
TS8
W2
TB57 (400 x 600)

1135 300

1135 300
C8
2260

4095
TS8

TB81 (400 x 600)


440 TS7
3725

REV DATE AMENDMENT

CTB73 (200 x 600)


TB43 (300 x 600) TB48 (300 x 600)

CTB65 (200 x 600)


250 810 1692 675 C3 675 1440
CTB1a (200 x 300) 300 PROJECT
CTB1a (200 x 300)
2
285

285
C7 1060 775
2 CIC SAMPLE PROJECT

1990
1990

TB45 (250 x 600) TB47 (250 x 600)

CTB76 (250 x 600)


CTB1 (200 x 300)
S004 TS6 TB49 (250 x 600) TB50 (250 x 600) TS6
1265

C11 C12
CTB1 (200 x 300) CTB1 (200 x 300)
1
580 295

580 295
175

175
CTB1 (200 x 300)

CTB1 (200 x 300)


855

CTB1 (200 x 300)

175 175

TS12

1025
860 1025

TS12

CTB51 (200 x 600) TS12 TS12 WC6


1815

200

CTB1 (200 x 300)

WC2 CTB53 (200 x 600) CTB54 (200 x 600) CTB1 (200 x 300) DRAWING TITLE

860
CTB1 (200 x 300)
TYPICAL FLOOR FRAMING PLAN
1835 1475

1475 775 810

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

TYP FLOOR FRAMING PLAN S002


1 1 : 100 SOURCE ---
NOTES
1. ALL BEAM SIZE TO BE 400(B)x600(D), UNLESS OTHERWISE STATED.
2. ALL SLAB SIZE TO BE 150mm THK, UNLESS OTHERWISE STATED.
90mm (W) x 40mm (H) space
for COMPANY LOGO

COLUMN SCHEDULE A B C D E FG H J K TOWER FLOOR LEVEL

COLUMN MARK SIZE (mm) 7010 4025 6225 2025 6650 1675 6225 4025 7210 2557 LEVEL S.F.L.
C1A 250 x 875 5/F +26.525
1240

C1B 235 x 825 5 6/F +29.850


90mm (W) x 60mm (H) space
4785

C1C 275 x 450 7/F +33.175


for AP/RSE/RGE's
C2A 250 x 775 8/F +36.500
C2B 235 x 825
4 9/F +39.825
signature/ and stamp chop
3850

C2C 275 x 450 10/F +43.150


C3 250 x 675 3 11/F +46.475
2260

C4 300 x 300 2 12/F +49.800


1
1265

C5 200 x 450 15/F +53.125


1815

BD's OFFICAL USE


C7 250 x 675 16/F +56.450
C8 300 x 300 17/F +59.775
C9 200 x 450 18/F +63.100
C10 275 x 550 TYP FLOOR LOADING KEY PLAN 19/F +66.425
C11 775 x 875 1 : 300 20/F +69.750
C12 775 x 875 21/F +73.075
22/F +76.400
LOADING KEY PLAN 23/F +79.725
USAGE LEGEND L.L. (kPa) FIN. (kPa) F.R.R. (MIN) 25/F +83.050
26/F +86.375
STAIRCASE 3.0 1.25 60/60/60
27/F +89.700
90mm (W) x 150mm (H) space
LOBBY 3.0 1.25 60/60/60
28/F +93.025
for BD's approval stamp /
29/F +96.350 certification of copies of
DOMESTIC 2.0 0.50 60/60/60 approved plans
(PNAP ADM-10 APP A)
PLANT ROOM 7.5 1.25 60/60/60

FLAT ROOF 5.0 5.60 60/60/60


BD REF :

BIM REF :

R.C. BEAM SCHEDULE

BEAM SIZE REINFORCEMENT REINFORCEMENT DIMENSION


BEAM MARK (BXD) ELEV. REFER a a1 a2 b b1 c d e f g LINKS 1 LINKS 2 LINKS 3 A B C D
TB1 200 x 300 E9 2T20 - - - 2T16 - - - - - <------------------------ T10-150(2 LEGS) -------------------> 2550 - - -
TB1a 200 x 300 E9 2T20 - - - 2T16 - - - - - <------------------------ T10-150(2 LEGS) -------------------> 2550 - - -
TB2 200 x 300 E10 2T16 - - 2T16 - - - - - - <------------------------ T10-200(2 LEGS) -------------------> - - - -
TB3 400 x 600 E5 4T25 - - 4T25 - 4T25 4T25 4T25 4T20 - <------------------------ T10-200(4 LEGS) -------------------> - 1300 1000 -
TB4 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1000 1800 -
TORSIONAL LINKS + T10
TB5 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1800 -
TORSIONAL LINKS + T10
TB6 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1800 -
TORSIONAL LINKS + T10
TB7 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1800 -
TORSIONAL LINKS + T10
TB8 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1800 -
TORSIONAL LINKS + T10
TB9 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1800 -
TORSIONAL LINKS + T10
TB10 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1800 1000 -
TORSIONAL LINKS + T10
TB11 400 x 600 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(2 LEGS) -------------------> - 1000 1300 -
TORSIONAL LINKS + T10
TB12 400 x 600 E3 4T25 - - 4T25 - - 4T25 - 4T20 - <------------------------ T10-200(4 LEGS) -------------------> - - - -
TB13 250 x 600 E10 2T25 - - 2T25 - - - - - - <------------------------ T10-200(2 LEGS) 8T16-200(2 LEGS) - - - -
TB14 250 x 600 E10 2T25 - - 2T25 - - - - - - <------------------------ T10-200(2 LEGS) 8T16-200(2 LEGS) - - - -
TB51 200 x 600 E9a 2T20 2T20 2T20 2T20 - - - - - T10-225 E.F. <------------------------ T10-150(2 LEGS) -------------------> 1000 - - -
TB54 200 x 600 E9a 2T20 2T20 2T20 2T20 - - - - - T10-225 E.F. <------------------------ T10-150(2 LEGS) -------------------> 1000 - - -

CL OF SUPPORT CL OF SUPPORT
CL OF SUPPORT
f g-225 DIM B a,a2 a1 a3 DIM A
300 g-225
500 b b1 500

a2
e1 c1 LINKS 1 LINKS 2 LINKS 3 REV DATE AMENDMENT
b1
LINKS 2 LINKS 1 b LINKS PROJECT
CIC SAMPLE PROJECT
DIM D SPACERS a a1 a2 DIM D d b,b1 DIM B

E3 E9
DRAWING TITLE
2 LEGS BEAM R.C. SCHEDULE
CL OF SUPPORT
CL OF SUPPORT CL OF SUPPORT a a1 g-225 a2
300 DIM A

f g-225 DIM B DIM C


500 b3 b1 b 500
LINKS
SCALE 1 : 100@A1
LINKS 2 LINKS 1 LINKS DRAWING NO. REV. NO.
e1 d2 b2
c1 LINKS 1 LINKS 2 LINKS 3
S003
SPACERS b1 b
d1
SOURCE ---
SPACERS a a1 a2 d
DIM D DIM D
E9a
E4 6 LEGS
90mm (W) x 40mm (H) space
for COMPANY LOGO

CL OF SUPPORT CL OF SUPPORT
a a1 g-225
CL OF SUPPORT CL OF SUPPORT
DIM A f g-225 DIM B DIM C
e1 e 500 500 b b1 500
LINKS 3 LINKS 2 LINKS 3

d2 b2 90mm (W) x 60mm (H) space


LINKS 1 LINKS 2 LINKS 3 SPACERS b1 b for AP/RSE/RGE's
signature/ and stamp chop
c1 d1
c DIM D a a1 DIM D d
SPACERS

E10
E5 BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

T20 T20
K A
S004

2T20
T10 -150

75 T10-150 2 LEGS
2T16 T16 T16

CTB1 (200 x 300)


_______________
1:25 SECTION A
A 1 : 10

5 B
4 C
3
S004 S004
4785 3850
4T25
4T25 4T25
4T25

REV DATE AMENDMENT

6 T10 -300 PROJECT


18 T10 -150
CIC SAMPLE PROJECT
T10-150 2 LEGS 75
75 T10-150 2 LEGS 150 T10-300 2 LEGS 150 T10-150 2 LEGS 75 4T25 4T25
4T25 18 T10 -150 C1A
W1
4T25
2740 5150 DRAWING TITLE
BEAM R.C. DETAIL
CTB56 (400 x 600)
_________________ TB55 (400 x 600)
________________
1:25 1:25
SECTION B SECTION C
B 1 : 25 C 1 : 25
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

S004
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

A B K J
T16 T20 450 T20
590 285 T16 184 591 T16 450

29/F 5 5

235
275
235

275
250

250
TO
825 2735 2989 T16 825

1795
T16

1795
T16 T20 T20
5/F
4
4
COLUMN MARK C1A C1B C1C C2A C2B C2C
COLUMN SIZE 250x875 235x825 275x450 250x775 235x825 275x450
VERT. BARS 14T25+2T16 (3.30%) 14T25+2T16 (3.80%) 8T32+4T20 (3.60%) 14T25 (3.50%) 14T25+2T16 (3.80%) 8T25 (3.20%)
BINDERS IN TYPICAL REGION T10-175 T10-175 T10-175 T10-175 T10-175 T10-175
BINDERS IN CRITICAL REGION T10-125 T10-125 T10-125 T10-125 T10-125 T10-125
CRITICAL REGION H (mm) 1000 1000 1000 1000 1000 1000

C C J H F
675 1658 440 300 200
675 1440 300 190
200
4

1050
29/F
35 250

35 250

300
300

450
450
TO
2 2 T20

550
1135

1135
5/F

2 2 T20
225 50

COLUMN MARK C3 C4 C5 C7 C8 C9 C10


COLUMN SIZE 250x675 300x300 200x450 250x675 300x300 200x450 275x550
VERT. BARS 12T25 (3.50%) 6T25 (3.30%) 6T25 (3.30%) 12T25 (3.50%) 6T25 (3.30%) 6T25 (3.70%) 10T25+2T20 (3.70%)
BINDERS IN TYPICAL REGION T10-175 T10-175 T10-175 T10-175 T10-175 T10-175 T10-175
BINDERS IN CRITICAL REGION T10-125 T10-125 T10-125 T10-125 T10-125 T10-125 T10-125
REV DATE AMENDMENT
CRITICAL REGION H (mm) 1000 1000 1000 1000 1000 1000 1000
PROJECT
CIC SAMPLE PROJECT

DRAWING TITLE
COLUMN R.C. DETAIL

B
1
IF H > hc BEAM ALONG
2 Y DIRECTION SCALE AS SHOWN@A1
COLUMN BINDERS SHOULD BE
COULUMN DRAWING NO. REV. NO.
ACCORDING TO CRITICAL ZONE REINFORCEMENT
hc = CLEAR HEIGHT OF STOREY S005
SOURCE ---
SHEAR REINFORCEMENT WITHIN
BEAM/COLUMN JOINT
A A
90mm (W) x 40mm (H) space
for COMPANY LOGO
BEAM ALONG COULUMN
X DIRECTION BINDERS
Y

CRITICAL ZONE FROM


H COLUMN TOP WITH
ENHANCED TRANSVERSE X
REINFORCEMENT B
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
TYPICAL DETAIL FOR COLUMN-BEAM JOINT signature/ and stamp chop
hc NORMAL TRANSVERSE (PLAN VIEW)
REINFORCEMENT
COLUMN COLUMN COLUMN
COLUMN

COLUMN

COLUMN
BINDER

BINDER

BINDER
REINFORCEMENT REINFORCEMENT REINFORCEMENT

CRITICAL ZONE FROM


T.L.L.

BD's OFFICAL USE


COLUMN BOTTOM HORIZONTAL JOINT HORIZONTAL JOINT HORIZONTAL JOINT
H WITH ENHANCED TRANSVERSE SHEAR LINKS SHEAR LINKS SHEAR LINKS
REINFORCEMENT
T.L.L.

T.L.L.
BEAM BEAM BEAM
REINFORCEMENT VERTICAL JOINT REINFORCEMENT VERTICAL JOINT REINFORCEMENT VERTICAL JOINT
SHEAR LINKS SHEAR LINKS SHEAR LINKS
COLUMN

COLUMN

COLUMN
BINDER

BINDER

BINDER
(U-BAR)
90mm (W) x 150mm (H) space
for BD's approval stamp /
CRITICAL ZONE IN COLUMN CASE 1 CASE 2 CASE 3 certification of copies of
NOTES: approved plans
SECTION A - A VERTICAL JOINT SHEAR REINFORCEMENT SHOULD CONSIST OF INTERMEDIATE (PNAP ADM-10 APP A)
COLUMN BARS ADEQUATELY ANCHORED IN THE COLUMN AND PLACED
BETWEEN THE CORNER BARS AND WITH IN THE EFFECTIVE JOINT AREA AS
DEFINED IN CLAUSE 6.8.1.3 OF THE CODE OF PRACTICE FOR STRUCTURAL
USE OF CONCRETE 2013.
BD REF :

BIM REF :

LEGEND:

CONFINED AREA
R.C. WALL SCHEDULE

CONCRETE THICKNESS HORIZONTAL BINDER


A B
FLOOR WALL MARK VERTICAL BARS STEEL RATIO
GRADE (mm) BARS HORIZONTAL VERTICAL (%)
3/F W1 C60 250 T40-150 T10-150 T12-300 150 3.4 BINDERS:
3/F W2 C60 250 T25-125 T12-125 1.3 VERTICAL BAR
3/F W3 C60 200 T20-125 T10-100 1.3 HORIZONTAL BAR HORIZONTAL SPACING
3/F W4 C60 150 T20-150 T10-150 1.4 T10-200
7010 BINDER
3/F W4 C60 200 T20-125 T10-100 1.3
250 201 400 250
3/F W5A C60 200 T20-125 T10-100 1.3
3/F W5A C60 250 T25-125 T12-125 1.6

200 450
TYPICAL DETAIL OF WALL
3/F W5B C60 150 T20-100 T10-150 T12-200 150 2.1 135 4815

200
(N.T.S.)
3/F W5C C60 200 T20-125 T10-100 1.3

495 250
3/F W5C C60 250 T25-125 T12-125 1.6
401 W1 399
3/F W5D C60 150 T20-125 T10-150 1.7
3/F W5E C60 200 T20-125 T10-100 1.3 3
3/F W5E C60 250 T25-125 T12-125 1.6
3/F W5F C60 150 T20-100 T10-150 T12-200 150 2.1
3/F W5G C60 200 T20-125 T10-100 1.3

2260

W2
4095
3/F W5G C60 250 T32-175 T12-125 1.8
3/F W6 C60 200 T25-150 T10-100 1.6
3/F W6 C60 250 T20-125 T12-125 1.0
3/F W6 C60 300 T32-100 T10-150 2.7
3/F W7 C60 250 T25-150 T12-125 1.3 2
3/F W8 C60 250 T32-175 T12-125 1.8

1265
3/F W9 C60 200 T20-125 T10-100 1.3

400
3/F W10 C60 150 T20-150 T10-150 1.4 250 810

295
3/F W10 C60 200 T20-125 T10-100 1.3 1
3/F WC1D C60 200 T20-125 T10-100 1.3

855
3/F WC2 C60 200 T20-125 T10-100 1.3 400 WC2 400
3/F WC2D C60 200 T20-125 T10-100 1.3

200
REV DATE AMENDMENT

3/F WC6 C60 200 T20-125 T10-100 1.3 1475 1585 PROJECT
CIC SAMPLE PROJECT

DRAWING TITLE
WALL R.C. DETAIL (1 OF 2)

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

S006
C D E F G H SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

6225 2025 6650 1675 6225


400

200 734
1900
2800
400

400
65 235
400

400
W6

90mm (W) x 60mm (H) space


for AP/RSE/RGE's

200 400 250 400


signature/ and stamp chop
525

525

W10
660

1475

1475
W4

1550
W3

W9
1150
W6

150 400
W4 W10
550

W6

500
75 490

200 400
150

3
125

75
100

100

125
400 400 200 600 1700 400
250 400 400 300 2700 290 985 200
540 2500 200
465 6885 BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

C D E
B 6225 2025
T2 T2

400

400

400
5 5

1500
L2
Horizontal Bars (H.B.)

4635

4635
W5B

4710
Vertical Bars (V.B.)

L1

2035
L2A

W5C
W5A

L2
L2
4785

Horizontal Bars (H.B.)

Vertical Bars (V.B.)

1500
L2
400

400
WC1D W5A
100 600

1100 W5C

625
T1

T3
T1
4 4

T3
100
400 260 400 1000 100 550 800 400 400 800 400 250 400 790 400
100

L1 L3
L3
6225 2025

THINKNESS (mm) THINKNESS (mm)


FL. MARK FL. MARK
T1 T2 T3 L1 % L2 % L3 % T1 T2 T3 L1 % L2 % L2A % L3 %
V.B. (E.F.) T16-150 0.48 T16-200 0.45 T16-180 0.9 V.B. (E.F.)
27/F to 18/F 200 250 200 H.B. (CRI.) 27/F to 18/F 200 250 200 H.B. (CRI.)
H.B. (TYP.) H.B. (TYP.)
V.B. (E.F.) V.B. (E.F.)
REV DATE AMENDMENT
18/F to 11/F 200 250 200 H.B. (CRI.) 18/F to 11/F 200 250 200 H.B. (CRI.)
H.B. (TYP.) H.B. (TYP.) PROJECT
V.B. (E.F.) V.B. (E.F.) CIC SAMPLE PROJECT
11/F to 4/F 200 250 200 H.B. (CRI.) 11/F to 4/F 200 250 200 H.B. (CRI.)
H.B. (TYP.) H.B. (TYP.)

DRAWING TITLE
WALL R.C. DETAIL (Schedule)

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

S007
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

LEGEND: BIM REF :

CONFINED AREA

BINDERS:
B C D E F G VERTICAL BAR

HORIZONTAL BAR HORIZONTAL SPACING


T10-200
BINDER

4025 6225 2025 6650 1675 TYPICAL DETAIL OF WALL


250 (N.T.S.)

400

400

400

400

400
5
4635

W5B

4710

W5D

4810
5035

5035
W5C
W5A

W5E
5235
4785

400

400

100 200 400


100 200 400
WC1D W5A W5C W5E
3200 150
100 600

1100 150

625
100 200

525
200

4 400 260 400 1000 100 550 800 400 400 800 400 250 400 790 400 400 800 400 250 400 800 400
1060 1850 3440 3450 REV DATE AMENDMENT

6225 2025 6650 1675 PROJECT


CIC SAMPLE PROJECT

DRAWING TITLE
WALL R.C. DETAIL (2 OF 2)

J K SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
H J S008
SOURCE ---
7210
250 600 250
4025

250 400
90mm (W) x 40mm (H) space
400 for COMPANY LOGO

400 200
W7 400

495 250
400

400

865

865
5 4815 85

2260

W8
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
4810

W5F

3230
signature/ and stamp chop
5035
W5G

2
1265

400
BD's OFFICAL USE
295

1
400

855
W5G WC2D
400

150 850 WC6


100 200
100 200
525

200
400 800 400 400 260 400
400 675 400
1500 350 1000 1060 1835 1475

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

A B C D E F G H J K
7010 4025 6225 2025 6650 1675 6225 4025 7210

T10- 250 (B2)

T10- 250 (B1)


T10- 250 (T2)

T10- 250 (T1)


5
4785

TS1 TS1
TS4

4 T10- 250 (T1)

TS10
T10- 250 (B2)
T10- 250 (B1)
T10- 250 (T2) T10- 250 (T1)

TS10
UP
3850

T10- 250 (B2)

TS10

TS10
T10- 250 (T2)

TS12
T10- 250 (B2)

TS11

TS11
TS7
3 TS6
L.L. TS8 TS8

T10- 250 (B2)

T10- 250 (B1)


T10- 250 (T2)

T10- 250 (T1)


T10- 200 (B1) TS13
2260

T10- 200 (T1)

2 T10- 300 (T2)


REV

PROJECT
DATE AMENDMENT
1265

T10- 300 (B2) TS6

T10- 250 (B1)


T10- 250 (B2)

T10- 250 (T1)


T10- 250 (T2)
CIC SAMPLE PROJECT
T10- 200 (B2)

T10- 200 (B1)


T10- 200 (T2)

T10- 200 (T1)


1
T10- 200 (B1)

T10- 250 (B2)


T10- 200 (T1)

T10- 250 (T2)

DRAWING TITLE
SLAB R.C. DETAIL

TYP FLOOR SLAB R.C. DETAILS


1 1 : 100
SCALE 1 : 100@A1
DRAWING NO. REV. NO.

S009
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

C
H

TS10

TS10

TS10
TS10

TS10
TB25 (200 x 600)

TS10
TB63 (200 x 600)

TB75 (200 x 600)


TB65 (200 x 600)

TB72 (200 x 600)


TB23 (200 x 600) TB28 (200 x 600) TB29 (200 x 600)
TB24 (200 x 600)

TS10

TS10
TS10
200 734 UP 200 UP

TB71 (200 x 600)


TB31 (500 x 600) 200 1475 200 2500
3040 TB41 (500 x 600)

TS10
ST-01 C9 ST-02
TB34 (200 x 600) TB38 (200 x 600)

1325
3 4

W3

W9
TS13 S010

1475
S010

1550
TS11
TS11
TS13
W10
1550
W4

150
TB33 (200 x 600) TB32 (200 x 600)
TB62 (250 x 600)

TB77 (250 x 600)


1274 TB36 (200 x 600)
3 3

125

75
75

CTB1 (200 x 300)


175

125
CTB1 (200 x 300)
200 2500 200

TB64 (200 x 600)


175 985 200
TS8 TS12
C4 TS12

300

TYPICAL FLOOR PART PLAN OF STAIRCASE ST-02


TYPICAL FLOOR PART PLAN OF STAIRCASE ST-01 2
1 1 : 50
1 : 50

REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT

C H
DRAWING TITLE
STAIRCASE R.C. DETAIL

SCALE AS SHOWN@A1
T10 -250 T10 -250
DRAWING NO. REV. NO.

S010
5/F T12 -100 T.A.L. 5/F
+26.525 +26.525 +26.525 +26.525
T.A.L.
T12 -100
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

W3

200mm THK. T10 -250


STRUCTURAL
WALL T10 -250

W4 W9
T12 -100
90mm (W) x 60mm (H) space
3325

3325

T12 -100 200mm THK.


200mm THK. for AP/RSE/RGE's
STRUCTURAL
STRUCTURAL signature/ and stamp chop
2727

2727
WALL W10
WALL
200mm THK.
STRUCTURAL
WALL

T10 -250 BD's OFFICAL USE


T10 -250

T12 -100
4/F T12 -100 4/F
+23.200 +23.200

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of

ST-01 (250) ST-02 (250) approved plans

3 1 : 25 4 1 : 25
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

1 2 3
H J
H
3/F 3/F 418 1375 1375 857
+17.775 +17.775

150
200 250 240 2010 250250

250 400 150

50 550
T10 -150 (T1) T10 -150 (B1)

450
T10 -150 (T2) T10 -150 (B2)

50
W2TB6 (500 x 600)
T10 -150 (T1) T10 -150 (T1)

575
3 T10 -150 (B2) T10 -150 (T2) T10 -150 (T2)

525
W.L. +16.40 W.L. +16.40
250

250
T10 -150 T10 -150 (B1)

100

400
268 500 T10 -150
1300

T10 -150 T10 -150 2T10

965
T10 -150 (B1)
W2TB1 (500 x 450)

W2TB3 (250 x 450)

W2TB4 (250 x 450)

2175

700
T10 -150 T10 -150 T10 -100 (B2)

3075
+14.750

1650

1650
T10 -150
T10 -150

600

1000
3 T10 -150 (T2) T10 -150 (T1)
WTS1 T10 -150 (EXTRA) +14.75 T10 -150 (T2) +14.75 T10 -150 (EXTRA)
S011 T10 -150 (B1) T10 -150 (EXTRA)
1450

(250) 100 T10 -150 (EXTRA)

300 250
2 685
2/F 2/F

100
+14.100 T10 -150 (T1) +14.100 T10 -150 (B2)

400
T10 -150 (B1) T10 -150 (B1)
392

392
633 142

W2TB5 (500 x 600) W2TB5 (500 x 600) W2TB6 (500 x 600)


768 1532 618 250
1 2
S011

6.6m³ FLUSHING WATER TANK AT 2/F WATER TANK SECTION 1 WATER TANK SECTION 2
1 1 : 50 2 1 : 50 3 1 : 50
REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT

DRAWING TITLE
WATER TANK R.C. DETAIL

SCALE 1 : 50@A1
DRAWING NO. REV. NO.

S011
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

GENERAL NOTES FOR STRUCTURAL STEEL WORKS:

N YYY
4.1 1. UNLESS NOTED OTHERWISE, ALL STRUCTURAL STEEL WORKS SHALL BE GRADE S355 J0 COMPLYING WITH BS EN
10025:2004 (Py = 355 MPa) EXCEPT HOLLOW SECTION TO BS EN 20210 AND CLASS 1 COMPLYING WITH CODE OF
PRACTICE FOR THE STRUCTURAL USE OF STEEL 2011.
STRE
ET
4.0 2. ALL STEELWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CODE OF PRACTICE FOR THE
STRUCTURAL USE OF STEEL 2011. STRUCTURAL USE OF STEEL MATERIALS PROPERTIES SHALL COMPLY WITH BS
EN 10025:2004, FOR PERMANENT STRUCTURES. MINIMUM DESIGN STRENGTH ARE AS FOLLOWS:

NO.9
BLO C
THICKNESS LESS
GRADE THAN OR EQUAL DESIGNN/mmSTRENGTH
2

82
TO (mm)

K A
S355 16 355
* THE STRUCTURAL STEEL ARE CLASSIFIED AS CLASS 1 IN ACCORDANCE WITH CODE OF PRACTICE FOR THE
STRUCTURAL USE OF STEEL 2011.

3. THE STEELWORK CONTRACTOR IS RESPONSIBLE FOR ENSURING THE STEEL HAS ADEQUATE THROUGH THICKNESS
19.3 PROPERTIES TO SATISFY THE REQUIREMENTS OF HIS WELDING PROCEDURES AND WELDING SEQUENCE AND THAT
THE MATERIAL AT OR ADJACENT TO WELDED LOCATIONS IS FREE OF LAMINATIONS, CENTRELINE SEGREGATION,

XXX
OR OTHER CRACK LIKE INDICATIONS ON COMPLETION OF WELDING. THE STEELWORK CONTRACTOR IS
78 RESPONSIBLE FOR DETERMINING THE QUALITY CLASS OF STEEL WITH ENHANCED THROUGH THICKNESS
NO.9
12.7 PROPERTIES WHICH MAY BE REQUIRED TO BE COMPATIBLE WITH HIS CHOSEN METHOD OF WORKING.

STRE
76
NO.9
4. ANY DAMAGED SURFACES OF GALVANISED STEEL SHALL BE COATED WITH ANTI-CORROSIVE COLD GALVANISED
74 PRIMER PRIOR TO PAINTING.
NO.9

ET
ZZZ
5. PRIOR TO ERECTION ALL STEELWORK SHALL BE SPRAY WASHED WITH WATER AND DETERGENT THEN SPRAY
72
NO.9 RINSED WITH CLEAN WATER. THEY SHOULD BE FREE FROM RUST, GREASE AND LOOSING SCALES BEFORE
APPLICATION OF SURFACE PROTECTION.
70
NO.9
ROAD

6. THE CONTRACTOR SHOULD EMPLOY QUALIFIED WELDERS WITH VALID WELDING CERTIFICATE.
68
NO.9
7. ALL WELDING WORK SHALL BE CARRIED OUT BY CERTIFIED WELDERS TESTED BY A HOKLAS APPROVED
66 LABORATORY TO BS EN 15614-8:2002 ALL WELDING WORK TO COMPLY WITH BS EN 1011 SITE WELDING SHALL ONLY
NO.9
BE CARRIED OUT WITH PRIOR WRITTEN CONSENT OF THE ARCHITECT.
64
NO.9
8. ALL WELD AND BLOT CONNECTIONS SHALL BE INSPECTED BY THE ENGINEER BEFORE BEING COVERED UP AND
REPRESENTATIVELY TESTED TO THE SATISFACTORY OF THE ENGINEER.
SITTIN

B 9. THE WELDING STANDARDS SHALL BE IN ACCORDANCE WITH BS EN 1011 PART 1:2009 AND PART 2:2001.
A
G-OUT

10. THE WELDING PROCEDURES SHALL BE IN ACCORDANCE WITH BS EN ISO 15614 PART 1: 2004 AND PART 8:2002.
AR EA

11. THE WELDERS SHALL BE APPROVED IN ACCORDANCE WITH BS EN 287 PART 1:2004.
REV DATE AMENDMENT

SITE 12. THE WELDING TESTS SHALL BE IN ACCORDANCE WITH BS EN 1714:1998 AND BS EN ISO 9934 PART 1:2001. PROJECT
NO.9
BLCO

13. UNLESS NOTED OTHERWISE, ALL WELDING SHALL BE 6mm CONTINUOUS FILLET WELD ALL ROUND. CIC SAMPLE PROJECT
50-95
K B

14. ABBREVIATIONS FOR WELDING :-


3.8 FOR REFERENCE ONLY
4

FW -FILLET WELD
FPBW -FULL PENETRATION BUTT FILLET WELD
C WWW PPBW -PARTIAL PENETRATION BUTT FILLET WELD
STRE DRAWING TITLE
D ET
3.7 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROVISION OF ALL SHIMMING/PACKING REQUIRED TO STEEL STRUCTURE BLOCK PLAN AND
ACHIEVE ADEQUATE TOLERANCE AT THE CONNECTIONS. GENERAL NOTES
16. THE CONTRACTOR SHOULD VERIFY THE SETTING OUT DIMENSIONS ON STRUCTURAL AND BUILDING PLANS ON
SITE. ANY DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT/ENGINEER BEFORE CONSTRUCTION WORK IS
PROCEEDED.
SCALE
3.4 17. THE CONTRACTOR SHOULD SUBMIT THE FABRICATION AND SHOP DRAWING TO THE ENGINEER FOR CHECKING.
DRAWING NO. REV. NO.
18. ALL STEEL WORKS SHALL BE GALVANIZED TO BS EN ISO 1461:2009 WITH MIN. ZINC COATING THICKNESS OF 85
MICRONS AND WITH 2 COATS OF ZINC PRIMER.
R001
BLOCK PLAN SOURCE ---
1 : 500 19. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING TO STABILIZE THE STEEL WORKS DURING ERECTION.

20. ALL EXISTING FINISHES SHALL BE REMOVED PRIOR TO FIXING END PLATES AND ANCHOR BARS.

21. ALL ORDINARY BOLTS SHALL BE ISO GRADE 8.8 BLACK BOLT TO BS 3692:1967, UNLESS NOTED OTHERWISE. 90mm (W) x 40mm (H) space
for COMPANY LOGO
22. ALL EXISTING REINFORCEMENT IN THE EXISTING CONCRETE STRUCTURES SHALL BE LOCATED WITH COVERMETER
PRIOR TO DRILLING FOR ANCHOR BAR INSTALLATION. NO STEEL BAR SHALL BE CUT FOR DRILLING.

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

S-F S-E 150mm THK Concrete Slab S-D S-C S-B S-A

10000 6000 4000 3500 4500

1
150 5000 5000 R004 5000 1000 4000 150
3
R003 CC1
SC2-01 SB6-01 (T.L. +4.330) SB6-07 (T.L. +4.330) CC3
S-5
4
1000

1000
R003

1500
SB2-01 (T.L. +4.330) SB2-11

2000
SB4-03 (T.L. +4.330)
1000

1000
SB2-02 (T.L. +4.330) SB2-14 (T.L. +4.330)

1000
SB3-01 (T.L. +4.330)

4500
SB2-15 (T.L. +4.330)
1000

1000
1500
SB2-03 (T.L. +4.330) SB2-14 (T.L. +4.330)

2 +4.480
SB3-02 (T.L. +4.330)
1000

2000

1000
R004

SB2-05 (T.L. +4.330) SB2-17 (T.L. +4.330)


SB4-01 (T.L. +4.510)

SB6-03 (T.L. +4.330)

SB4-09 (T.L. +4.330)


SB6-05 (T.L. +4.330)

SB4-10 (T.L. +4.510)


1000
500

500
SB4-05 (T.L. +4.330)
S-4
500

500
SB2-07 (T.L. +4.330) SB2-18 (T.L. +4.330)

1000
1750
1000

1000
REV DATE AMENDMENT
2 SB3-04 (T.L. +4.330)
SB2-09 (T.L. +4.330) SB2-19 (T.L. +4.330)
R003 PROJECT
SB2-06 (T.L. +4.330)
CIC SAMPLE PROJECT

1500
805

1000
1800
SB2-10 (T.L. +4.330)

4500
SB3-06 (T.L. +4.330)
1750
1065

SB2-20 (T.L. +4.330)


SB2-12 (T.L. +4.330)

DRAWING TITLE

1000
1 STEEL STRUCTURE FLOOR PLAN
SB2-13 (T.L. +4.330)
2195

R003 SB4-07 (T.L. +4.330) SB2-21 (T.L. +4.330)

2000
1000

1000
CC2
SC2-04 SB5-01 (T.L. +4.330) SB5-03 (T.L. +4.330) CC4 SCALE As indicated@A1
S-3
6 5 DRAWING NO. REV. NO.
1000

1000

1000

1000
R003 R003
R002
S-2 SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


Level 2 Framing Plan for AP/RSE/RGE's
1 1 : 50
signature/ and stamp chop

BD's OFFICAL USE


STEEL BEAM SCHEDULE SCHEDULE OF STEEL COLUMN SCHEDULE OF CONCRETE COLUMN
TYPE STEEL STEEL Mark SIZE
MARK SIZE GRADE MARK SIZE GRADE CC1 300 x 600
SB2 UB152x89x16 S355 SC2 UB610x305x179 S355 CC2 300 x 600
SB3 UB203x102x23 S355 CC3 300 x 600
SB4 UB356x171x57 S355 CC4 300 x 600
SB5 UB457x191x74 S355
SB6 UB533x210x101 S355
LEGEND

90mm (W) x 150mm (H) space


PINNED JOINT
for BD's approval stamp /
certification of copies of
MOMENT JOINT
approved plans
(PNAP ADM-10 APP A)

CONCRETE GRADE OF ALL CONCRETE COLUMNS TO BE C40


BD REF :

BIM REF :

4NOS. M10-HSL-3
ANCHOR BOLTS
2NOS. M10-HSL-3
ANCHOR BOLTS
13
2NOS. M10-HSL-3
ANCHOR BOLTS
12

STEEL ANGLE BRAKET


12 +4.33 +4.33
1A

22 105 25
42 60 50
R003
13

152

152
4NOS. M10-HSL-3 12 89 10 89
ANCHOR BOLTS
2NOS. M10-HSL-3
ANCHOR BOLTS 13
1B
R003

CONNECTION DETAIL FOR STEEL BEAM Section 1A Section 1B


1 1 : 10 1A 1 : 10 1B 1 : 10

REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT
S-F
S-F
DRAWING TITLE
STEEL STRUCTURE DETAIL

SCALE As indicated@A1
4
2A
R003
4
4 S-E DRAWING NO. REV. NO.

+4.33
8NOS M16 R003
ANCHOR BOLT
09 SOURCE ---
01

75
260 260 75
01
4 +4.33

80 320 320 80
09 90mm (W) x 40mm (H) space
for COMPANY LOGO

90mm (W) x 60mm (H) space


CONNECTION DETAIL FOR STEEL BEAM (WELDING) Section 2A CONNECTION DETAIL FOR CONCRETE COLUMNS AND STEEL BEAM for AP/RSE/RGE's
2 1 : 10 2A 1 : 10 4 1 : 50 signature/ and stamp chop

S-F BD's OFFICAL USE

CL

6A
S-F SHEAR
MS BASEPLATE
975 1050 975
STUD SC2-04
RC SLAB 8 STIFFENER
1050

975
T25 REBAR
1050
150

8
SC2-01
+4.33

1050

1050
MS BASE PLATE
457

1500

TAL

TAL
MS STIFFENER
T25 REBAR 90mm (W) x 150mm (H) space
4 for BD's approval stamp /
4 01
01 certification of copies of

975
PILE CAP approved plans
3000 REBAR (UNDER SEPARATE SUBMISSION) (PNAP ADM-10 APP A)
REBAR

6A
SECTION 6A

CONNECTION DETAIL FOR STEEL COLUMN AND STEEL BEAM CONNECTION DETAIL FOR CONCRETE SLAB AND STEEL BEAM CONNECTION DETAIL FOR STEEL COLUMN AND PILE CAP
3 1 : 50 5 1 : 25 6 1 : 50
BD REF :

BIM REF :

S-5 S-4 S-3


2
R004

Level 3
+7.970 02 04 01 17 03 06 05 08 07 08 02

06

150mm THK Concrete Slab


4500 4500

4
R003
1500 500 1500 1000 1000 1500 1000 1000 5
R003
Level 2
+4.480
01 03 01 15 02 05 04 06 06 07 01

05

CC1 CC2

REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT
Level 1
+0.250

+0.025 +0.025
DRAWING TITLE
FOUNDATION OF STRUCTURE STEEL STRUCTURAL SECTIONS
(UNDER SEPARATE SUBMISSION)

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

Section 1 R004
1 1 : 50 SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO
S-F S-E S-D S-C
10000 6000 4000
1
R004

Level 3
+7.970
02 12
04 16 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
04 17 signature/ and stamp chop
06
11

150mm THK Concrete Slab


BD's OFFICAL USE

150 5000 5000 5000 1000 4000 150

Level 2 5005 5000 1000


+4.480

01 14 10
03 15 09
03 05

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

Section 2
2 1 : 50
BD REF :

BIM REF :

1. DESIGN REFERENCE

a.
b.
CODE OF PRACTICE FOR STRUCTURAL USE OF STEEL, 2011, B.D. H.K.
CODE OF PRACTICE FOR STRUCTURAL USE OF GLASS, 2018, B.D. H.K. N N 819792760.292
c. CODE OF PRACTICE ON WIND EFFECTS IN HONG KONG 2019, B.D. H.K.
d. CODE OF PRACTICE FOR STRUCTURAL USE OF CONCRETE 2013, B.D. H.K. E 835350861.425
f. BRITISH STANDARD - STRUCTURAL USE OF ALUMINIUM BS8118:1991
External wall of the building for the purpose of B
g. BUILDING (CONSTRUCTION) REGULATIONS A
measurement of GFA and site coverage N 819789844.87
h. STRUCTURAL DESIGN OF STAINLESS STEEL (SCI PUBLICATION 291) E 835335928.356
Curtian wall system

MINIMUM 300mm from floor level


2. GLASS: Projection of the curtain wall
system not exceeding 200mm Internal finishes
a. TP10+12A+TP10mm SILVER GREY GLASS PANEL GLASS W/LOW-E COATING ON (domestic building) /250mm (non- Raised floor
SURFACE (GL-01) domestic building) from the outer INTERIOR
face of structural elements
b. DEFLECTION LIMIT : SPAN/60
PERMISSIBLE STRESS OF TEMPERED GLASS = 50 N/mm2
YOUNG'S MODULUS, E = 73 kN/mm2
DENSITY OF GLASS = 2600 kg/m3
Fire seal
c. GASKETS: DENSE : NEOPRENE - 60 : 5 DURO - FOR SOLD PROFILES GMS bracket
- 75 : 5 DURO - FOR HOLLOW PROFILES Glass

d. SETTING BLOCKS : NEOPRENE ( DURO ) Insulation panel


150mm LONG AT QUARTER POINT OF GLASS SITE
e. 100% HEAT SOAK TESTING FOR ALL TEMPERED GLASS Suspended ceiling
THE QUALITY CONTROL ON THE FABRICATION OF INSULATED GLASS UNIT K.I.L 201
SHOULD STRICTLY FOLLOW TAE RECOMMENDATION OF ASTM E773.

f. ALL GLASS PANEL COMPLY TO B.S. 952


Section of Curtain Wall System installed at New Building

FOR REFERENCE ONLY


3. DESIGN CRITERIA

a. -WIND LOAD
THE BASIC DESIGN PRESSURE : 2.37 kPa
External wall of the building for the purpose of
TOPOGRAPPY FACTOR, Sa = 1.3
measurement of GFA and site coverage
2.37 x 1.0 x 1.3 = 3.08 kPa (COMPRESSION)
2.37 x 1.4 x 1.3 = 4.31 kPa (SUCTION) REV DATE AMENDMENT
Curtian wall system
- IMPACT LOAD PROJECT
- 3kN/m AT 1.1m ABOVE FFL.
- UDL LOAD = 1.5 kN/m2 MINIMUM 300mm from floor level CIC SAMPLE PROJECT
- POINT LOAD = 1.5kN External finishes
b. CONCRETE Projection of the curtain wall
Internal finishes
MINIMUM COMPRESSIVE fc' = 60 MPa AT 28 DAYS system not exceeding 200mm N 819703101.028
(domestic building) /250mm (non- C E 835368365.835
STRENGTH Raised floor D
domestic building) from the outer INTERIOR
FOR REFERENCE ONLY face of structural elements DRAWING TITLE
N 819700185.607 CURTAIN WALL GENERAL NOTES
4. STRUCTURAL STEEL E 835353432.766

a. B.S. EN. 10210 FOR STEEL HOLLOW GRADE S275 J0 CLASS 1.


Fire seal
b. B.S. EN. 10025 FOR OTHER STRUCTURAL STEEL GRADE S275 J0 CLASS 1. GMS bracket
Glass SCALE
c. ALL MILD STEEL BRACKETS TO BE SECURED BY Insulation panel
WELDING TO B.S. EN. 1011 DRAWING NO. REV. NO.
ALL FILLET WELD TO BE 4mm THK, UNLESS OTHERWISE STATED. Suspended ceiling
C001
d. MAKE GOOD DAMAGE TO ZINC COATINGS AND GALVANISING, TREAT CUT
Existing window BLOCK PLAN
ENDS OF GALVANISED SECTIONS WITH TWO COATS OF METALLIC ZINC-RICH 1 : 500 SOURCE ---
PRIMING

e. ALL STRUCTURAL MILD STEEL WORKS AND BRACKETS, ETC, Section of Curtain Wall System installed at Existing Building
FOR FIXING SHALL BE HOT-DlP GALVANIZING OF ZNC 90mm (W) x 40mm (H) space
PAINT TO B.S. 4652,1995 for COMPANY LOGO
COMPLYING WITH B.S. E.N. ISO 1461 WITH 85 MICRONS THICKNESS.

5. ANCHOR BOLT

1) THE INSTALLATION OF ANCHOR BOLTS SHALL STRICTLY IN ACCORDANCE WITH THE


MANUFACTURER'S SPECIFICATIONS

2) THE MINIMUM EMBEDMENT, SPACING & EDGE DISTANCE FOR THE VARIOUS TYPES
OF ANCHOR BOLTS USED ARE AS FOLLOWS: 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
BD 'HILT' MIN. MIN. EDGE EFFECTIVE BASE TENSILE SHEAR TEST LOAD signature/ and stamp chop
REFERENCE 'HST30R' SPACING DISTANCE EMBEDMENT MATERIAL (kN) (kN) (kN)
NO. LENGTH THICKNESS TENSILEx1.5

6. ALLOWABLE TOLERANCE:
BD's OFFICAL USE
ALLOWABLE TOLERANCE OF THE POSITIONING OF WINDOW SUPPORTS AND
ARRANGEMENTS IS ±25mm

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

UNDER SEPARATE SUBMISSION

W1

D5
TB30 (250 x 600) OUTSIDE INSIDE

495
GL-02

3
TB2 (200 x 300)
SLAB EDGE

455
+26.350
ALUM. MULLION (D6)

TB57 (400 x 600)


D5
GLASS PANEL (GL-02)
200 ALUM. MULLION (D4)
ALUM. WINDOW FIXED (D7)
B
STRUCTURAL SEALANT

860
M6X16 S.S SCREW 2 NOS.

W2
200

23
50

50
150
TB1a (200 x 300) D2 GL-02
TB43 (300 x 600)

90

90
660

465
D21

50

50
90

23
D4
M8X28 S.S BACK ANCHOR
GL-02 M6X16 S.S. SCREW @300c/c MAX.
2 STONE PANEL (TYPE 2)
830

740

STRUCTURAL SEALANT ALUM. MULLION (D6)


D21 ALUM. WINDOW FIXED (D7)
50 80 70
2 GLASS PANEL (GL-02)
C002
90

D4
REV DATE AMENDMENT
GL-02
D21 PROJECT
605

CIC SAMPLE PROJECT


800

TB1 (200 x 300) D2


A
1 C003
C11
+26.525 (775 x 875) DRAWING TITLE
+26.350 TYPICAL MULLION FIXING DETAIL CURTAIN WALL LAYOUT PART PLAN
735

2 1:5
D5
TB51 (200 x 600)
GL-01 S1
90

WC2 SCALE
TB1 (200 x 300)
245

DRAWING NO. REV. NO.

1137 1182 1430 SPANDREL PANEL C002


D3 D21 D3 D21 D3 D21 D3 SOURCE ---

90mm (W) x 40mm (H) space


5/F CURTAIN WALL LAYOUT PART PLAN (FLAT B) for COMPANY LOGO
1 1 : 25

NOTES:
1. ALL CONCRETE ELEMENTS ARE UNDER SEPARATED SUBMISSION

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :
A

UNDER SEPARATE SUBMISSION 1


INSIDE OUTSIDE

W1
955 100130 115
2
TB30 (250 x 600) C003

D21

350
6/F

395
175 +29.850

TB2 (200 x 300)

150
TB57 (400 x 600)
+26.350

645
450
B SPANDREL PANEL

D24

W2
GLASS PANE SASH

1100
100
E1
TB1a (200 x 300) TB43 (300 x 600) FOR APPROVAL IN LOCKED POSITION ONLY

560
E1
D23
505

2725
2 GLASS PANE FIXED

830

1185
E1
100
700

+26.525
D21

5/F

350

395
TB1 (200 x 300) REV DATE AMENDMENT
A +26.525 E2
1 E1
C003 PROJECT

150
C11
(775 x 875)
CIC SAMPLE PROJECT
+26.350 175

TB51 (200 x 600)


TB1 (200 x 300) E2 E2 E2
DRAWING TITLE
WC2 CURTAIN WALL CAST-IN LAYOUT PART
PLAN
1
C004

SCALE

Section A DRAWING NO. REV. NO.


A 1 : 25 C003
SOURCE ---
5/F CAST-IN LAYOUT PART PLAN (FLAT B)
1 1 : 25
Y
90mm (W) x 40mm (H) space
for COMPANY LOGO

6
6
GLASS PANEL FIXED (GL-01)

7
SMOKE SEAL
FIRE STOP Y

80
ALUM. TRANSOM (D21)
NON-STRUCTURAL RC CURB (NOT FOR APPROVAL) 6 6
4

ALUM. BRACKET (D46) 35 90mm (W) x 60mm (H) space


for AP/RSE/RGE's
X signature/ and stamp chop
2NOS. #14X38 S.S. SCREW
35

70
M16X55 S.S HEX. BOLT
395

180
ALUM. BRACKET (D40) 4 X

6
120

M20X75 S.S HEX. BOLT 6


35

SFL ALUM. BRACKET (D41)


35

6
160

100
20.5 22.5 6 6
BD's OFFICAL USE
SPANDREL PANEL
645

350 40
EMBED TYPE E2 3mm THK. ALUM PANEL

7
ALUM. TRANSOM (D24)

50 40
90
ALUM. WINDOW SASH (D30)
60 35

STRUCTURAL SEALANT
22

D1 ALUM. TRANSOM SECTION PROPERTY D3 ALUM. MULLION SECTION PROPERTY


GLASS PANEL (GL-01) ALLOY 6063-T6 ALLOY 6063-T6
Area (mm2) : 922.5 Area (mm2) : 2311.8
Moments of inertia - X (mm4) : 592951 Moments of inertia - X (mm4) : 4509546
INSIDE OUTSIDE Moments of inertia - Y (mm4) : 211886 Moments of inertia - Y (mm4) : 629163 90mm (W) x 150mm (H) space
Radii of gyration - X (mm) : 25 Radii of gyration - X (mm) : 44 for BD's approval stamp /
Radii of gyration - Y (mm) : 15 Radii of gyration - Y (mm) : 16 certification of copies of
approved plans
elastic Modulus - Zx (mm3) : I/y - max = 16941 elastic Modulus - Zx (mm3) : I/y - max = 63137
(PNAP ADM-10 APP A)
elastic Modulus - Zy (mm3) : J/ x- max = 9326 elastic Modulus - Zy (mm3) : J/ x- max = 25172

TYPICAL GLASS AND TRANSOM FIXING DETAIL TRANSOM DETAIL (D1) MULLION DETAIL (D3)
2 1 : 10 3 1:2 4 1:2

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

75 150 150 75

UNFACTORED FORCES FOR CAST-IN EMBED TYPE E2


25 25
D.L. W.L.
⌀6 CLEAR HOLE
Fx (kN) 0 0

Fy (kN) 0 39.5

135
M20 BOLT (GR. 8.8)
Fz (kN) -14 0

12
Mx (kNm) 0.9 2 70x70x12mm THK. G.M.S. PLATE (GR. S275)

25
My (kNm) 0 0
M20 NUT (GR. 8.8)
Mz (kNm) 0 0
ELEVATION VIEW
CAST-IN EMBED TYPE E2

*(W.L.) WIND LOAD ARE REVERSIBLE

450

75 150 150 75
25

⌀6 CLEAR HOLE

160
M20 NUT (GR. 8.8)
160

70x70x12mm THK. G.M.S. PLATE (GR. S275)

Fz Fx
M20 NUT (GR. 8.8)
320
320

70

Mz Mx
M20 BOLT (GR. 8.8)
My
160

20mm THK. G.M.S. PLATE GRADE S275


160

Fy

REV DATE AMENDMENT


25

PROJECT
123 12 25 INSIDE CIC SAMPLE PROJECT

160
OUTSIDE

DRAWING TITLE
SIDE VIEW PLAN VIEW EMBED DETAIL
CAST-IN EMBED TYPE E2 CAST-IN EMBED TYPE E2

SCALE

EMBED E2 DETAIL
1 1:5
DRAWING NO.

C004
REV. NO.

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :
LEGEND:

TP10+12A+TP10mm SILVER GREY GLASS PANEL


GLASS W/LOW-E COATING ON SURFACE (GL-01)

K J H G F E D C B A A B C SPANDREL PANEL

OPENABLE WINDOW
ROOF ROOF
+100.000 +100.000
3650

29/F 29/F
+96.350 +96.350
3325

28/F 28/F
+93.025 +93.025
3325

27/F 27/F
+89.700 +89.700
A
3325

26/F 26/F A
+86.375 +86.375 C003
260
1216 100 1237 1182 1580
3325

25/F 25/F
+83.050 +83.050
3325

23/F 23/F D21


+79.725 +79.725 6/F
+29.850

395
3325

22/F 22/F

645
+76.400 +76.400 D24
3325

21/F 21/F REV DATE AMENDMENT


+73.075 +73.075 D23 PROJECT
CIC SAMPLE PROJECT

2285
3325

20/F 20/F
+69.750 +69.750 D3
3325

19/F 19/F D21


+66.425 +66.425 5/F DRAWING TITLE
+26.525 CURTAIN WALL ELEVATIONS AND

395
SECTIONS
3325

18/F 18/F
+63.100 +63.100

SCALE
3325

17/F 17/F AS SHOWN@A1


+59.775 +59.775
DRAWING NO. REV. NO.

C005
3325

16/F 16/F
+56.450 +56.450
SOURCE ---
PARTIAL ELEVATION
3
3325

15/F 15/F
+53.125 +53.125 1 : 50
90mm (W) x 40mm (H) space
for COMPANY LOGO
3325

12/F 12/F
+49.800 +49.800
3325

11/F 11/F
+46.475 +46.475
3325

10/F 10/F
+43.150 +43.150
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
3325

9/F 9/F signature/ and stamp chop


+39.825 +39.825
3325

8/F 8/F
+36.500 +36.500

BD's OFFICAL USE


3325

7/F 7/F
+33.175 +33.175
3325

6/F 6/F
+29.850 +29.850
3325

5/F 5/F 3
+26.525 +26.525 C005 SAFETY TEST
3325

4/F 4/F
+23.200 +23.200

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

ELEVATION 1 ELEVATION 2
1 1 : 200 2 1 : 200

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :
GENERAL NOTES NOTES ON PROOF TEST BY CORE-DRILLING
1. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS OTHERWISE STATED. 1. CORE-DRILLING SHOULD BE TAKEN THROUGH THE FULL DEPTH OF THE PILE AND CARRIED DOWN TO A DISTANCE OF AT LEAST
2. ALL LEVELS ARE IN METERS ABOVE PRINCIPAL DATUM(mPD) UNLESS OTHERWISE STATED. HALF A DIAMETER OF THE BASE, OR 00mm, WHICHEVER IS LARGER, INTO THE GROUND UPON WHICH THE PILE IS FOUNDED.
3. ALL PROPOSED CAP TOP LEVEL SHOULD BE -3.98mPD. THICKNESS OF CAP TO BE 2500mm. CONCRETE GRADE OF PILE 2. THE COMPLETED CORE TAKEN SHOULD BE PROPERLY MARKED AND ARRANGED IN ORDER FOR INSPECTION.
CAP IS C45/20 (UNDER SEPARATE SUBMISSION) 3. THE CONCRETE CORES SHOULD NOT SHOW EVIDENCE OF HONEY COMBING OR SEGREGATION OF INDIVIDUAL MATERIALS AND
4. ALL PILE CAP SHOULD BE UNDER SEPARATE SUBMISSION. THE ASSESSMENT OF EXCESS VOIDAGE (%)FORIN THE CORES SHOULD
REFERENCE ONLYNOT BE MORE THAN FIGURE NO. "(16(b))" IN ACCORDANCE
BORED PILE DIAMETER
5. ALL FOUNDING LEVELS OF BORED PILES AS SHOWN ARE TENTATIVE ONLY. WITH THE CLASSIFICATION DEFINED IN TABLE 4 OF CS1:2010.
6. HEIGHT OF BUILDING TO BE 113m. 4. ANY ROCK CORE OBTAINED SHALL BE VISUALLY EXAMINED TO CONFORM TO THE REQUIRED ROCK MATERIAL SPECIFIED IN THE
7. FOR BE
THE DESIGN OF BORED PILING WORKS SHALL REFERENCE ONLY
IN ACCORDANCE WITH HONG KONG BUILDING (CONSTRUCTION) DESIGN. COLUMN / WALL BY OTHER
REGULATIONS 1990, THE STRUCTURAL USE OF CONCRETE 2013, CODE OF PRACTICE ON WIND EFFECTS IN HONG 5. THE CORES SHALL ALSO BE EXAMINED TO CONFIRM THE ADEQUACY OF THE INTERFACE BETWEEN THE CONCRETE AND ROCK. (UNDER SEPARATE SUBMISSION)
KONG 2019, CODE OF PRACTICE FOR FOUNDATION 2017 AND PRACTICE NOTES FROM THE BUILDINGS DEPARTMENT.
8. HIGHEST POSSIBLE GROUND WATER LEVEL TO BE +6.42mPD. EXISTING GROUND LEVEL IS +6.42mPD.
9. FLEXIBLE CAP THEORY IS ADAPTED IN PILE DESIGN. NOTES ON MINOR IMPERFECTION OF PILE / ROCK INTERFACE PILE CAP
(UNDER SEPARATE
10. ALL LATERAL LOADS ARE RESISTED BY BORED PILES & SOCKETED H-SHEET PILES.

T.A.L.
11. WIND LOAD SHALL BE REVERSIBLE. 1. SHOULD ANY SEDIMENT AND/OR SEGREGATION MORE THAN 50mm THICK BE FOUND AT THE CONCRETE / ROCK INTERFACE SUBMISSION)
DURING THE INTERFACE PROOF DRILLING. REMEDIAL WORKS BY MEANS OF PRESSURE GROUTING SHALL BE CARRIED OUT 1000
12. CONSIDERATION OF N.S.F. IS NOT REQUIRED. CUT-OFF LEVEL
13. THE PILE HEAD FOR BORED PILES IS ASSUMED AS FIXED. UNDER THE SUPERVISION OF RSE.
2. THE PILE BASE SHOULD BE CLEANED BY HIGH WATER JETTING WITH MINIMUM JET PRESSURE OF 200 BARS PRIOR TO

75
PRESSURE GROUT.
3. THE GROUT SHOULD BE CEMENT GROUT AND THE GROUT STRENGTH SHOULD NOT BE LESS THAN THE CONCRETE STRENGTH
GENERAL NOTES FOR BORED PILE OF BORED PILES. FOR REFERENCE ONLY
ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND BUILDING 4. THE GROUT PRESSURE SHALL NOT BE LESS THAN 25 BAR AND SHALL BE MAINTAINED FOR AT LEAST 5 MINUTES UNTIL NO BINDERS :
REFER BORED PILE
SERVICES DRAWINGS. SETTING OUT TO BE IN ACCORDANCE WITH RELEVANT ARCHITECTURAL DRAWINGS. SIGNIFICANT GROUT INTAKE IS NOTED.
LOADING SCHEDULE
5. DETAILED METHOD STATEMENT FOR THE GROUTING WORKS SHALL BE SUBMITTED BY CONTRACTOR TO THE RSE FOR HIS
ACCEPTANCE PRIOR TO CARRYING OUT THE GROUTING WORKS. THE GROUTING WORKS SHALL BE SUPERVISED BY THE RSE
1. CONCRETE USED IN BORED PILE SHALL HAVE PFA CONTENTS COMPLYING WITH PNAP APP-33 AND NOT EXCEED 25% OF THE
CEMENT CONTENT AND COMPLY WITH PNAP APP-74. THE REACTIVE ALKALI OF CONCRETE EXPRESSED AS THE EQUIVALENT AND ALL RELEVANT RECORDS SHALL BE KEPT ON SITE FOR INSPECTION AT ALL TIMES.
1 1
SODIUM OXIDE PER CUBIC METER OF CONCRETE SHOULD NOT EXCEED 3.0kg. 6. FULL DETAILS OF THE REMEDIAL GROUTING WORKS INCLUDING IDENTIFICATION OF THE PILES FOR GROUTING, NATURE AND
2. ALL DESIGN IS IN ACCORDANCE WITH "HONG KONG (CONSTRUCTION) REGULATION 1990" WITH LOAD COMBINATION IN THICKNESS OF THE SEDIMENT/SEGREGATION DISCOVERED, EFFECTIVENESS OF FLUSHING AND GROUTING WORKS,
ACCORDANCE WITH TABLE 2.1 OF "THE CODE OF PRACTICE FOR STRUCTURAL USE OF CONCRETE 2013" FOR REINFORCED GROUTING RECORDS AND GROUT CUBE TEST REPORTS SHALL BE INCORPORATED IN THE PILING REPORTS TO BE SUBMITTED

T.L.L.
CONCRETE DESIGN. THE LOAD COMBINATIONS INCLUDE 1.4D+1.6L, 1.4D+1.4W, 1.2D+1.2L+1.2W, 1.0D - 1.4W TO THE BUILDING AUTHORITY UPON COMPLETION OF THE PILING WORKS.
REINFORCEMENT REFERS
3. THE CONTRACTOR SHALL ESTABLISH THE BASE SETTING OUT POINTS AND LINES FOR THE ENGINEERS. TO LOADING SCHEDULE
4. THE CONTRACTOR IS ADVISED TO INSPECT THE CONDITIONS ON SITE AND TO RECORD THE EXISTING LANDSCAPING METAL CASING TO
FEATURES AND UTILITIES WITHIN AND CLOSE TO THE EXCAVATION AREA. THE CONTRACTOR SHALL CARRY OUT PRE- BE REMOVED AFTER
CONSTRUCTION DIVERSION OF THE EXISTING UNDERGROUND UTILITIES WITHIN THE WORK AREA. CONCRETING
5. ALL REINFORCEMENTS ARE HIGH TENSILE DEFORMED STEEL BAR (Y) AND MILD STEEL ROUND BAR (R) COMPLYING WITH
CS2 :2012 WITH MINIMUM YIELD STRESS AS FOLLOWS :
• HIGH TENSILE DEFORMED STEEL BAR = 500 N/mm2
• MILD STEEL ROUND BARS = 250 N/mm 2
FOR REFERENCE ONLY
6. CONCRETE MIX FOR ALL BORED PILES TO BE GRADE C45 COMPLYING WITH HONG KONG BUILDING (CONSTRUCTION)
REGULATION CONCRETING METHOD TO BE BY TREMIE. A REDUCTION FACTOR OF 0.8 SHALL BE APPLIED FOR CONCRETE
STRENGTH.
7. ALL LAP LENGTHS OF REINFORCEMENT SHALL BE 46D WHERE D IS THE DIAMETER OF REINFORCEMENT. GRADE BEDROCK

300mm MIN.
8. CUT-OFF LEVEL AND TENTATIVE FOUNDING LEVEL FOR ALL PILES ARE SHOWN IN THE BORED PILE SCHEDULES. BEDROCK OR BETTER
9. COVER TO MAIN REINFORCEMENT FOR BORED PILES TO BE 75mm. COVER THE MAIN COVER THE MAIN M.S. PIPE FOR
10. ALL DIMENSIONS ARE IN mm. REINFORCEMENT = 75mm EFFECTIVE ROCK SOCKET LENGTH INTERFACE CORING
REINFORCEMENT = 75mm
11. ALL LEVELS ARE IN mPD.
12. ESTIMATED PILE LENGTHS GIVEN IN THE PILING SCHEDULE ARE MEASURED FROM THE CUT-OFF LEVEL OF INDIVIDUAL PILES. SHAFT SHAFT REFER TO LOADING SCHEDULE
ROCK SOCKET DIAMETER REV DATE AMENDMENT
13. ESTIMATED PILE LENGTHS GIVEN ARE TENTATIVE. ACTUAL PILE LENGTH FOR INDIVIDUAL PILES SHALL BE VERIFIED ON SITE. DIAMETER BINDERS DIAMETER BINDERS 1 PROJECT
14. THE TENTATIVE FOUNDING LEVELS OF BORED-PILES ARE APPROXIMATE AS DETERMINED FROM THE BOREHOLE 2
INFORMATION. LAYER 1
MAX.3 TENTATIVE CIC SAMPLE PROJECT
BELLOUT DEPTH 0° FOUNDING LEVEL
15. CONCRETE SHALL BE COMPILED WITH CS1 : 2010, EXCEPT CLAUSE 7.1.
16. BORED PILE IS DESIGNED AS FIXED HEAD AND PILE CAP TO BE DESIGNED AS FLEXIBLE CAP. PILE CAP SHALL BE PROVIDED

400
VERTICAL VERTICAL
AT B2/F (UNDER SEPARATE SUBMISSION)
REINFORCEMENT
600
17. NO NEGATIVE SKIN FRICTION TO BE CONSIDERED FOR PILE DESIGN DUE TO COMPLETION OF CONSOLIDATION AND REINFORCEMENT
BELL-OUT
REDUCTION OF OVERBURDEN PRESSURE FROM THE BASEMENT CONSTRUCTION. LAYER 2/ SPACER OF T16 DIAMETER DRAWING TITLE
18. CORRESPONDING GBP SUBMISSION AND SUBSEQUENT AMENDMENT SHALL BE SUBMITTED TO TALLY WITH THE AS-BUILT 135° LINK 135° LINK WITH MAX. SPACING OF 1000mm
SETTING OUT OF BORED PILES. TYPICAL BORED PILE DETAILS GENERAL NOTES FOR FOUNDATION
LAP LENGTH=46D LAP LENGTH=46D 135° LINK
(D=DIAMETER OF REBAR) (D=DIAMETER OF REBAR) (WITH BELL-OUT)
NOTES ON FOUNDING CRITERIA AND PREDRILLING N.T.S.
ALL BORED PILES SHOULD BE FOUNDED AT THE PRESCRIBED LEVELS WHICH ARE DETERMINED BY THE FOLLOWING CRITERIA: BORED PILE WITH BORED PILE WITH
1. THE FOUNDING STRATUM SHALL BE SLIGHTLY TO MODERATELY DECOMPOSED MODERATELY STRONG ROCK OR MATERIAL SCALE 1 : 100@A1
WEATHERING CAT (1C) ROCK OF BETTER, WITH A TOTAL CORE RECOVERY OF MORE THAN 85% OF THE GRADE AND MINIMUM
SINGLE LAYER REINF'T DOUBLE LAYER REINF'T
UNIAXIAL COMPRESSION STRENGTH (UCS) NOT LESS THAN 25MPa OR EQUIVALENTLY POINT LOAD INDEX STRENGTH (PLI50) NOT TYPE1 TYPE2 DRAWING NO. REV. NO.
LESS THAN 1MPa. THE ALLOWABLE BEARING CAPACITY SHOULD BE 5000 kPa
2. PRE-DRILLING SHALL BE CARRIED OUT FOR EACH PILE TO ASCERTAIN THAT THE FOUNDING TO A DEPTH 5m OR THE DESIGNED SECTION 1-1 P001
FORINTO
LENGTH OF THE ROCK SOCKET OF THE PILE REFERENCE
CONTINUOUSONLY
CAT (1C) ROCK OR BETTER WITH TCR > 85% WHICHEVER IS N. T. S.
DEEPER.
50% OF VERTICAL BAR OF PILE
SOURCE ---
3. PRIOR TO THE COMMENCEMENT OF BORED PILE WORKS, PRE-DRILLING RECORDS SHALL BE SUBMITTED TO THE SATISFACTION OF

LAP LENGTH
THE ENGINEER. IN CASE CHANGE IN FOUNDING LEVEL IS REQUIRED, CORRESPONDING AMENDMENT SHALL BE SUBMITTED TO BD
FOR APPROVAL.
4. THE ALLOWABLE BOND BETWEEN ROCK AND CONCRETE SHOULD BE 700 kPA UNDER COMPRESSION OR TRANSIENT TENSION, AND 50% OF VERTICAL BAR OF PILE
90mm (W) x 40mm (H) space
350kPA UNDER PERMANENT TENSION. for COMPANY LOGO

LAP LENGTH = 46D


BORED-PILE
METHOD STATEMENT OF BORED PILE CONSTRUCTION
1. BEFORE THE COMMENCEMENT OF THE BORED PILE CONSTRUCTION, PREDRILLHOLES TO BE CARRIED OUT AT PILE
POSITION TO VERIFY THE FOUNDING LEVEL. 50 50 50
2. SET OUT THE BORED PILE LOCATION CORRECTLY ON SITE.
3. THE HYDRAULIC OSCILLATOR OR ROTATOR SHALL BE SET UP IN CONJUNCTION WITH A CRANE AND THE TEMPORARY
STEEL CASING OF THE REQUIRED DIAMETER SHALL BE INSTALLED INTO THE GROUND.
PNEUMATIC CONTROL 3 3
4. EXCAVATION OF SOIL WITHIN THE TEMPORARY CASING SHALL BE CARRIED OUT BY A HAMMER GRAB. EXCAVATION IN
ROCK/BOULDER SHALL BE CARRIED OUT BY RCD. RING STABILIZER CASING 90mm (W) x 60mm (H) space
5. A CONSTANT HEAD EQUAL TO GROUND LEVEL OF DRILLING FLUID SHALL BE MAINTAINED SO AS TO CREATE A"BALANCED for AP/RSE/RGE's
HEAD CONDITION" TO PREVENT ANY INGRESS OF MATERIALS AT THE BOTTOM OF CASING. LAPPING DETAILS (STAGGERED LAP) signature/ and stamp chop
6 NOS
6. THE TEMPORARY STEEL CASING SHALL BE EXTENDED BY BOLTING OR WELDING ON ADDITIONAL CASING AND BE
OSCILLATED AND JACKED DOWN BY A OSCILLATOR OR BE ROTATED DOWN BY A ROTATOR. THE TEMPORARY CASING TENTATIVE
M.S. PIPE FOR FOR TENSION BORED PILE
SONIC TEST
SHALL MAINTAIN A MINIMUM OF 1.5m EMBEDMENT LENGTH FROM EXCAVATION LEVEL. 3 ARMS FOUNDING LEVEL (BOTTOM OF SLEEVE N. T. S.
7. VERTICALITY OF THE CASING SHALL BE MONITORED BY MEANS OF SPIRIT LEVEL FROM TIME TO TIME. TO BE SEALED)
8. TOLERANCE FOR BORE PILES : THE MAX. DEVIATION OF THE CENTRE OF THE HEAD OF EACH PILE FROM THE DESIGNED F.L.
CENTRE POINT SHALL NOT BE MORE THAN 75mm IN ANY DIRECTION. THE MAX. DEVIATION FROM THE VERTICAL AXIS OF EFFECTIVE SHAFT DIAMETER

100

100
THE PILE THROUGH THE CENTROID OF THE FINISHED PILE SHALL NOT BE MORE THAN 1 IN 100.
9. CONTINUE PROCEDURES 4 TO 7 UNTIL THE FOUNDING LEVELS OF PILES HAVE BEEN REACHED. BD's OFFICAL USE
10. FOR PILE ENLARGEMENT / BELLOUT, IT SHALL BE FORMED BY EMPLOYING A BELLING OUT TOOL. BORED PILE DIAMETER
DIAMETER OF SHAFT CASING
11. THE CONTRACTOR SHALL CARRY OUT KODEN PILE MONITORING TESTS ON ALL (100%) BORED PILES OR SIMILAR
ELECTRONIC CALIBRATION TEST METHOD APPROVED BY THE ENGINEER TO CHECK THE DIMENSION, ALIGNMENT AND BORED PILE
INTEGRITY OF THE PILE ROCK SOCKET ANDFOR REFERENCE
BELLOUT. ONLY SHALL SUBMIT THE PROPOSED METHOD FOR
THE CONTRACTOR DIAMETER OF BELLOUT TYPICAL TUBE INSTALLATION REINFORCEMENT

MIN. 300
APPROVAL PRIOR TO COMMENCEMENT OF THE WORKS. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE
ENGINEER IMMEDIATELY AFTER TESTING AND SUBMITTED TO BD TOGETHER WITH FORM BA14. RCD BELLOUT TOOL (FOR INFORMATION ONLY) (FOR BORED PILE)
12. STEEL REINFORCEMENT SHALL BE PRE-FABRICATED INTO CAGES AND LOWERED INTO THE TEMPORARY STEEL CASING. 1 : 100
(N.T.S.)
13. FINAL CLEANING SHALL BE ACHIEVED BY MEANS OF HAMMER GRAB/RCD AND AIR LIFTING METHOD USING HIGH PRESSURE ROCK
AIR COMPRESSORS. SOCKET
14. THE MUDDY WATER WITHIN THE STEEL CASING SHALL BE CLEANED AND DELIVERED INTO A DESILTING TANK BEFORE F.L.
DIAMETER
DISCHARGED INTO DRAINS.
15. THE PILE SHAFT SHALL THEN BE CONCRETED USING HIGH SLUMP TREMIE CONCRETE THROUGH TREMIE PIPE DISPLACING THICKNESS OF CASING
1000

FLUID UPWARDS. R10 @ 1000 C/C VERTICAL


16. DURING CONCRETING OPERATION, THE TEMPORARY STEEL CASING SHALL BE EXTRACTED SIMULTANEOUSLY BY THE 150 M.S. PIPE FOR INTERFACE CORING
DETAIL OF BORED PILE DIAMETER
OSCILLATOR OR ROTATOR. A HEAD OF APPROX. 2m IS MAINTAINED BETWEEN THE TOP OF THE CONCRETE AND THE BASE STIFFENING LINK, T16 @ 3000 C/C N. T. S. 90mm (W) x 150mm (H) space
OF THE TEMPORARY STEEL CASING. for BD's approval stamp /
CASING
17. THE BASE OF THE TREMIE PIPE SHALL BE KEPT AT A MINIMUM DEPTH OF APPROX. 2m BELOW THE SURFACE OF THE certification of copies of
CONCRETE. 2 FULL STRENGTH V-BUTT 2 TAP WELD WITH 4mm
WELD WITH LOW approved plans
18. CONCRETING SHALL BE CARRIED OUT IN ONE CONTINUOUS OPERATION UNTIL 1.0m.ABOVE THE CUT-OFF LEVEL 2 . THE HYDROGEN ELECTRODE (PNAP ADM-10 APP A)
45°
45°

TREMIE PIPE WILL BE EXTRACTED.


19. CORING TEST OF PILES SHALL BE CONDUCTED IN ACCORDANCE WITH PNAP APP-18 AFTER THE CONCRETE IS MATURED.
50 M.S. PIPE FOR SONIC TEST
3

20. THE CONTRACTOR SHALL CARRY OUT SONIC LOGGING TEST FOR 100% AT THE TOTAL NUMBER OF LARGE DIAMETER
BORED PILE BY AN INDEPENDENT APPROVED LABORATORY
21. NO PILE EXCAVATION SHALL CARRIED OUT WITHIN DISTANCE NO LESS THAN 10m FORM AN ADJACENT PILING BEING
UNDER EXCAVATION OR AN ADJACENT PILE HAS BEEN CONCRETING LESS THAN 24 HRS PREVIOUSLY.

NOTES ON CONTINGENCY PLAN FOR BORED PILE CONSTRUCTION BORED PILE DIAMETER

1. IF COLLAPSE OF PILE SHAFT EXCAVATION AT AND BELOW THE TIP OF TEMPORARY STEEL CASING OCCURS, WORKS ON BORED PILES
SHOULD BE CEASED IMMEDIATELY AND THE
FORENGINEER SHOULD
REFERENCE BE INFORMED.
ONLY
TYPICAL DETAIL FOR SPLICES
2. CONCRETE SHALL THEN BE POURED INTO THE PILE SHAFT AND COMPACTED WITH DROP MASS TO FORM A CONCRETE PLUG IN ORDER TO SECTION 3-3
PREVENT FURTHER COLLAPSE OF PILE SHAFT.
OF TEMPORARY STEEL CASING 1 : 50
N. T. S.
BD REF :

LEGEND AND NOTES: N 4.1

N 819792760.292
POINT
BOUNDARY COORDINATES
E (m) N (m)
BIM REF :

C1 STRE
YYY E 835350861.425 A 835335.928 819789.845
BOUNDARY LINE COLUMN / WALL ABOVE (UNDER SEPARATE 4.0
ET B B 835350.861 819792.76
SUBMISSION) A 819703.101
N 819789844.87 C 835368.366
E 835335928.356
BORED PILE D 835353.433 819700.186

NO.98
BP1 BASEMENT SCREEN WALL (UNDER SEPARATE

B LO C
SUBMISSION)
-6.35

2
K A
CAP TOP LEVEL (mPD)
PILE CAP (2000mm THICK) (UNDER SEPARATE SUBMISSION)
CP1
CP1 - PILE CAP MARK
3040 PILE CAP (UNDER SEPARATE SUBMISSION)

-50 INFERRED ROCK HEAD LEVEL 19.3


1540 1375

SOCKET H-PILE MARK


F2HP01

XXX
BH1(P) BORED HOLE (WITH PIEZOMETER)
SOCKET H-PILE (BH1 (P), BH2 (P) AND BH5 (P) NO.9
78
705 1629 705
BH6 (P), BH9 (P) AND BH10 (P) 6NOS.) 12.7
F2 PILE CAP MARK

STRE
76
NO.9
BH2
BORED HOLE
PILE CAP (UNDER SEPARATE SUBMISSION) (BH3, BH4, BH7 AND BH8 4 NOS.) NO.9
74

ET
ZZZ
3040 4.15 72
F6HP02 SOCKET H-PILE MARK EXISTING GROUND LEVEL NO.9
SITE
1375

-8.85 70
STRUCTURAL FLOOR LEVEL NO.9
K.I.L 201

ROAD
F6 SOCKET H-PILE

68
NO.9
PILE CAP MARK
66
TIE BEAM (UNDER SEPARATE SUBMISSION) NO.9
TB1
64
(1000x800) NO.9

(600) (600) BASEMENT SLAB (UNDER SEPARATE SUBMISSION)

SITTIN
G- O U
T AR
EA
NO.95
B LCO
1 Date 1 Revision 1

0-95
K B
REV DATE AMENDMENT
3.8

4
N 819703101.028 PROJECT
C
D WWW E 835368365.835 CIC SAMPLE PROJECT
STRE
N 819700185.607
ET
3.7
E 835353432.766

DRAWING TITLE
BLOCK PLAN PILING LAYOUT PLAN
1 : 500

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

P002 1
SOURCE ---
4.1

XXX STREET 90mm (W) x 40mm (H) space


for COMPANY LOGO

WWW STREET
P-A P-B P-C P-D P-E P-F P-G P-H P-J

3.8
702 10740 12240 11055 9620 15355 12365 6500 9200 3575

-42 B BH4 BH6(P) C


BH2(P) BH10(P)

475 550
TB13
BH8
1640

SP2A SP4A (1000 x 800) SP8A 90mm (W) x 60mm (H) space
2005

for AP/RSE/RGE's
885 755

885 755

885 755

P-4 3000

3000
SP2B SP2C SP4B SP4C SP6B SP6A SP8B SP8C signature/ and stamp chop
-44 TB15 TB3 TB5 830 1060 F6 TB8 TB16 BP2 4315 -6.350
(1000 x 800) 882 1008 F4 (1000 x 800) (1000 x 800) F8 945 945 (1000 x 800) 5000
F2 (1000 x 800) DIA. = 2500 mm BP4 4225
5535

2478 1890 B.O. = 3750 mm


-46 6 DIA. = 3000 mm BP6
(1000 x 800)

-3 B.O. = 4500 mm DIA. = 3000 mm

1940

1940
-38
(1000 x 800)

(1000 x 800)

(1000 x 800)

475 550
TB10

BP3
-40

(600) B.O. = 4500 mm


P-3 (600)
TB1

TB4

TB7

-48
-42

(600) (600) (600) DIA. = 2500 mm

2500

2900
7985
2150

BD's OFFICAL USE


-44

B.O. = 3750 mm 400


945 945 BP1 17975
P-2 BP5
1640 1100

F7 5430 DIA. = 3000 mm


-46

2478 1890 TB9 CP1 6500 1500 DIA. = 3000 mm


F1 882 1008 F3 B.O. = 4500 mm BH7
3175

TB14 TB2 TB6 BH3 (1000 x 800) SP7B SP7C B.O. = 4500 mm
(1000 x 800) (1000 x 800) 1890 -8.850
(1000 x 800) SP5B SP5A
1100 540
1100 540

P-1 TB17 BH9(P)


-48

8
SP1B SP1C SP3B SP3C F5
3000
350

TB11 SP7A

-4
(1000 x 800)
(600)

C
2350

(1000 x 800)

475
P004 BH1(P)SP1A SP3A TB12
(1000 x 800) BH5(P)
-46 A D
YYY STREET

A
B P003

NO.982 P003
19.3

SITTING-OUT AREA NO.950-954 90mm (W) x 150mm (H) space


for BD's approval stamp /
BLOCK A certification of copies of
BLCOK B approved plans
(PNAP ADM-10 APP A)
NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964

PILING LAYOUT PLAN


1 1 : 200
BD REF :

BIM REF :

LEGENDS:

BOUNDARY LINE
B.L.
P-1 P-2 P-3 P-4 B.L.
P-1 P-2 P-3 P-4 B.L.
2350 3175 2150 5535 2005 2350 3175 2150 5535 2005 COLUMN/ WALL
mPD mPD B.L.
BH1(P) BH2(P) (UNDER SEPARATE SUBMISSION)
+5.0 EXISTING GROUND +5.0
BH9(P) BH10(P) (OFFSET 2.24 m) EXISTING GROUND
+4.03 (OFFSET 1.90 m)
(OFFSET 0.02 m) +3.80 (OFFSET 0.16 m)
PILE CAP
(UNDER SEPARATE SUBMISSION)
F3
PILE CAP MARK
NO.950-954 NO.982
BLOCK B N=10 BLOCK A N=9 F3HP03 F3HP02 SOCKET H-PILE
FILL FILL
+0.0 DESIGN B1 LEVEL FILL +0.0 B1 LEVEL DESIGN
G.W.T. G.W.T.
-1.20 N=19 -1.00 FILL -1.00 -1.20 N=11 SOCKET H-PILE MARK
N=14
N=10
TIE BEAM
N=4 TB1 (UNDER SEPARATE SUBMISSION)
N=4 (1000x800)
MD
N=11
CP1 PILE CAP (2000mm THICK)
-5.0 N=4 B2 LEVEL N=5 -5.0 B2 LEVEL N=10 CP1 - PILE CAP MARK
-6.00 N=15 CDG -6.00 (UNDER SEPARATE SUBMISSION)

MD
-50 INFERRED ROCK HEAD LEVEL
N=6 N=9 N=11
II BASEMENT SCREEN WALL
CP1 F1 F2
-8.85 MD (UNDER SEPARATE SUBMISSION)
N=13 N=18 N=17
N=15 CDG
-10.0 -10.0

N=20 -11.35 N=20 N=22


N=19

N=8 ALLU N=21 N=32


N=24

-15.0 ALLU -15.0 N=200/10


N=25 N=22
N=26 II

N=65 N=54 II
N=72 REV DATE AMENDMENT
N=200/10 IV
CDG PROJECT
N=59 N=52
N=76 N=29
CIC SAMPLE PROJECT
-20.0 -20.0 CDG
N=82 N=65
N=97 N=200/30

DRAWING TITLE
N=87 N=68
N=100 II PILING SECTION A & SECTION B
CDG
(INDICATIVE ONLY)
-25.0 N=80 N=81 -25.0
N=97
N=200/20
1500 1500 415 1500 1500 45
N=88 N=111 N=95 CDG
N=105 SCALE AS SHOWN@A1
CDG DRAWING NO. REV. NO.
N=200/60 N=200/70 N=200/20
-30.0 -30.0
N=200/60 IV
II P003
1100 540 885 755
N=200/70 N=200/70 SP1A SP1B SP2B SP2A
SOURCE ---
DRIVEN STEEL H PILES
(INDICATIVE ONLY) III
III
BP5 BP6
N=200/70 IV N=200/60
N=131 CDG
III 90mm (W) x 40mm (H) space
IV for COMPANY LOGO
-35.0 N=200/60 IV N=200/60 -35.0
N=200/20
III
III
N=200/60 N=200/50 IV
IV
II
N=200/50 N=200/40
III
-40.0 II -40.0
II
III 90mm (W) x 60mm (H) space
N=200/50 III
IV II for AP/RSE/RGE's
IV IV
N=200/550 III signature/ and stamp chop
II TENTATIVE ROCK HEAD II
IV III III III
II IV II
-45.0 -45.0
III
IV III
N=200/40 IV
III II BD's OFFICAL USE
III

IV
III
-50.0 TENTATIVE ROCK HEAD II -50.0
III III
-51.40
IV N=200/20
IV
-53.30

-55.0 II -55.0

-56.80
90mm (W) x 150mm (H) space
III for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
-60.0 -60.0

PILING SECTION A PILING SECTION B


A 1 : 150 B 1 : 150
II

-65.30
BD REF :

BIM REF :

P-A P-B P-C P-D P-E P-F P-G P-H P-J


mPD B.L. 525 10740 12240 11055 9620 15355 12365 6500 9200 3575
B.L.
+5.0 BH1(P) EXISTING GROUND BH3 BH5(P) BH7 EXISTING GROUND BH9(P)
(OFFSET 1.02 m) +4.04 (OFFSET 1.45 m) (OFFSET 0.66 m) (OFFSET 1.69 m) +3.76 (OFFSET 0.05 m)

N=11
FILL
N=11
DESIGN N=9 FILL B1 LEVEL FILL DESIGN
+0.0 FILL
G.W.T. N=15 G.W.T.
-1.20 FILL -1.00 -1.20
N=11 N=19
N=13
N=10
N=13
N=12 N=4
MD N=9
N=62
-5.0 ALLU B2 LEVEL
N=14 N=4
N=15 CDG -6.00
-6.35 MD
N=17
N=25

350
MD
N=16 N=6
II MD

2500
TB14 F1 TB2 F3 TB6 F5 TB9 F7 TB17 CP1
N=25 -8.85 -8.85 -8.85
145

CDG N=18 N=24 N=13


N=15
-10.0

2500
N=44

2100

45.0
N=13 ALLU N=20

45.0
N=19 N=13


N=97
N=15 N=8 ALLU
N=24 III N=18
N=30
-15.0 N=25
N=26 N=49
N=43 N=53

N=65 REV DATE AMENDMENT


N=72 N=27
N=44 PROJECT
CDG CDG N=41
N=59 CIC SAMPLE PROJECT
N=76 N=38
-20.0 N=71

950 940 N=60


2478 945 945 1307 583 945 945 3930 1500 1500 1250 950 300 1500 1500 2815 800 3000 N=82
N=97 N=48
N=69
CDG N=62 DRAWING TITLE
CDG N=87
N=100 III N=51 PILING SECTION C
N=65 CDG
-25.0 N=73
CDG N=80
N=97 N=64
N=66
N=77
N=105 N=52 SP5B
III
SP7A
N=88 SCALE 1 : 150@A1
SP5A N=78
SP7B SP7C DRAWING NO. REV. NO.
N=85
N=200/60 IV N=82
CDG
N=200/60
P004
-30.0 SP3A
SP1A
SP3B SP3C
N=92 N=102
N=200/70
SOURCE ---
SP1B SP1C
N=102
IVBP2 BP1 BP3 BP4 BP5 BP6
III
N=200/60 IV N=120
III N=200/70 IV
II 90mm (W) x 40mm (H) space
II IV III for COMPANY LOGO
IV III N=109 IV
-35.0 N=200/50 N=200/60
II III
III III III
II N=200/170
N=200/60
II
III IV
II N=168 CDG
IV IV N=200/50
III IV
E AD II
-40.0 CK H III
II E RO
TATIV
T EN III IV 90mm (W) x 60mm (H) space
III III N=200/50
III IV for AP/RSE/RGE's
II
signature/ and stamp chop
III IV N=200/550
II
II III II
III IV IV
II III II
-45.0
III III
-46.30 IV
II
N=200/40
II -47.30 BD's OFFICAL USE
III
N=200/110 IV
-49.30 III TENTATI IV
VE ROCK
-50.0 HE AD
-50.90 III III
-51.15 -51.40
IV

-53.30 II

-54.90 III
-55.0

-56.80 90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
-60.0

PILING SECTION C
C 1 : 150
BD REF :

BIM REF :

P-A P-B P-C P-D P-E P-F P-G P-H P-J


702 10740 12240 11055 9620 15355 12365 6500 9200 3575

BW11 BW10 BW9 BW8 BW7


B 6802 9600 11350 12600 48975 C

2005

620 980
500 500
635 365

635 365
635 365
P-4 TC4
3370 450 162 288 110 340 225 225 725 TC8
TC2 1000 500 TC7 TC10
BW12
6990
PC2 PC4 PC6 PC8
5535

P-3

450 2150 100


450 2150 100

14115
BW6
TW6C
TW6A
2150

TW6B
P-2 730 770 545 455 1000 1205
6500 1850
BW13
7125

PC1 PC3
3175

PC5 TC5

100 1300
1175 300

100 1300
3193 450 162 450135
710 290

500 1100

710 290

1000 325
PW7
P-1

650
850150
TC1 TC3 TC9
2350

A BW1 BW2 BW3 BW4 BW5 D


6832 9600 11300 12600 48995

COLUMN & WALL LAYOUT PLAN


1 1 : 200 REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT

DRAWING TITLE
COLUMN / WALL LOADING PLAN

LOCAL AXIS DIRECTION OF WIND LOAD CASE UNLESS OTHERWISE STATED ALL
Y MOMENTS AND FORCES ACT ON
Y
THE CENTROID OF EACH
SCALE AS SHOWN@A1
WIND ALONG
GLOBAL X WX ELEMENT WITH RESPECT TO ITS DRAWING NO. REV. NO.
0° LOCAL AXIS AND DISTRIBUTED
X P005
UNIFORMLY ON THE CROSS
SECTION OF EACH ELEMENT. SOURCE ---
LOCAL AXIS SHOWN ABOVE WY
APPLIES TO COLUMNS & WALLS

(+ve)
(+ve)
WITH ANGLE 0°. MY VY MX
WIND ALONG
90

GLOBAL Y (+ve) 90mm (W) x 40mm (H) space


°

for COMPANY LOGO


X
VX
WU (+ve)
Y
X

LOCAL AXIS SHOWN ABOVE APPLIES SIGN CONVENTION


TO WALL WITH ANGLE 90°. Θ
Θ

WIND ALONG AXIAL LOAD : +VE = COMPRESSION (DOWNWARD)


(P) -VE = TENSION (UPWARD)
Y 90mm (W) x 60mm (H) space
VX = SHEAR FORCE ALONG LOCAL X-AXIS for AP/RSE/RGE's
signature/ and stamp chop
10° VY = SHEAR FORCE ALONG LOCAL Y-AXIS
X WV MX = MOMENT ALONG LOCAL X-AXIS
MY = MOMENT ALONG LOCAL Y-AXIS
LOCAL AXIS SHOWN ABOVE APPLIES
TO WALL WITH ANGLE 10°. α
WIND ALONG α
BD's OFFICAL USE
Y

WMAX = ABSOLUTE MAXIMUM OF WX, WY, WU, WV


X 10°
LOCAL AXIS SHOWN ABOVE APPLIES
TO WALL WITH ANGLE -10°.

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

COLUMN LOADING SCHEDULE ABOVE PILE CAP (1 OF 2)

SDL DEAD LOAD (DL) = Dmin + SDL LIVE LOAD (LL) DL + LL


COLUMN MARK ANGLE
P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm)
PC1 0 1600 0 0 0 0 0 800 0 0 0 0 0 2400 0 0 0 0 0 700 0 0 0 0 0 3100 0 0 0 0 0
PC2 0 2100 0 0 0 0 0 1400 0 0 0 0 0 3500 0 0 0 0 0 900 0 0 0 0 0 4400 0 0 0 0 0
PC3 0 2400 0 0 0 0 0 1700 0 0 0 0 0 4100 0 0 0 0 0 1000 0 0 0 0 0 5100 0 0 0 0 0
PC4 0 2300 0 0 0 0 0 2000 0 0 0 0 0 4300 0 0 0 0 0 1000 0 0 0 0 0 5300 0 0 0 0 0
PC5 0 2300 0 0 0 0 0 1400 0 0 0 0 0 3700 0 0 0 0 0 900 0 0 0 0 0 4600 0 0 0 0 0
PC6 0 2500 0 0 0 0 0 1400 0 0 0 0 0 3900 0 0 0 0 0 1000 0 0 0 0 0 4900 0 0 0 0 0
PC8 0 3200 0 0 0 0 0 1100 0 0 0 0 0 4300 0 0 0 0 0 1300 0 0 0 0 0 5600 0 0 0 0 0
PW7 0 4200 0 200 0 0 0 1600 0 300 0 0 0 5800 0 500 0 0 0 1800 0 100 0 0 0 7600 0 600 0 0 0
TC1 0 12700 0 0 0 0 0 5600 0 0 0 0 0 18300 0 0 0 0 0 4500 0 0 0 0 0 22800 0 0 0 0 0
TC2 0 19400 0 0 0 0 0 9300 0 0 0 0 0 28700 0 0 0 0 0 6400 0 0 0 0 0 35100 0 0 0 0 0
TC3 0 17200 0 0 0 0 0 7200 0 0 0 0 0 24400 0 0 0 0 0 7100 0 0 0 0 0 31500 0 0 0 0 0
TC4 0 18000 0 0 0 0 0 7400 0 0 0 0 0 25400 0 0 0 0 0 8100 0 0 0 0 0 33500 0 0 0 0 0
TC5 0 24200 0 0 0 0 0 10900 0 0 0 0 0 35100 0 0 0 0 0 9300 0 0 0 0 0 44400 0 0 0 0 0
TC7 0 16200 0 0 0 0 0 7300 0 0 0 0 0 23500 0 0 0 0 0 6100 0 0 0 0 0 29600 0 0 0 0 0
TC8 0 13400 0 0 0 0 0 6700 0 0 0 0 0 20100 0 0 0 0 0 4200 0 0 0 0 0 24300 0 0 0 0 0
TC9 0 13200 0 0 0 0 0 7200 0 0 0 0 0 20400 0 0 0 0 0 4700 0 0 0 0 0 25100 0 0 0 0 0
TC10 0 13000 0 0 0 0 0 7500 0 0 0 0 0 20500 0 0 0 0 0 4300 0 0 0 0 0 24800 0 0 0 0 0
Grand total: 17 167900 0 200 0 0 0 80500 0 300 0 0 0 248400 0 500 0 0 0 63300 0 100 0 0 0 311700 0 600 0 0 0

COLUMN LOADING SCHEDULE ABOVE PILE CAP (2 OF 2)

WX WY WU WV WMAX
COLUMN MARK ANGLE
P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm)
PC1 0 -200 10 30 0 0 0 -1000 10 300 0 0 0 -400 10 80 0 0 0 -700 -10 230 0 0 0 1000 10 300 0 0 0
PC2 0 100 10 30 0 0 0 1000 -10 290 0 0 0 200 10 80 0 0 0 800 -10 230 0 0 0 1000 10 290 0 0 0
PC3 0 -200 10 30 0 0 0 -1600 -10 390 0 0 0 -500 10 90 0 0 0 -1200 -10 300 0 0 0 1600 10 390 0 0 0
PC4 0 200 10 30 0 0 0 1600 10 370 0 0 0 400 10 90 0 0 0 1300 -10 290 0 0 0 1600 10 370 0 0 0
PC5 0 -200 10 30 0 0 0 -1800 10 380 0 0 0 -500 10 90 0 0 0 -1400 -10 300 0 0 0 1800 10 380 0 0 0
PC6 0 100 10 20 0 0 0 1500 10 350 0 0 0 300 10 80 0 0 0 1200 -10 280 0 0 0 1500 10 350 0 0 0
PC8 0 -200 10 10 0 0 0 1300 -10 200 0 0 0 -200 10 40 0 0 0 1300 -10 170 0 0 0 1300 10 200 0 0 0 REV DATE AMENDMENT
PW7 0 -400 270 10 0 1200 0 -1100 -80 10 0 -400 0 -700 450 10 0 2000 0 -600 -330 10 0 -1400 0 1100 450 10 0 2000 0
PROJECT
TC1 0 -1300 10 20 0 0 0 -11400 -30 510 0 0 0 -3800 -10 90 0 0 0 -8300 -20 420 0 0 0 11400 30 510 0 0 0
CIC SAMPLE PROJECT
TC2 0 -500 50 20 0 0 0 15200 -20 540 0 0 0 1400 80 90 0 0 0 13100 -60 450 0 0 0 15200 80 540 0 0 0
TC3 0 -500 -10 -10 0 0 0 -13100 -10 340 0 0 0 -2700 -10 40 0 0 0 -10400 10 290 0 0 0 13100 10 340 0 0 0
TC4 0 -1400 -10 -20 0 0 0 -13000 -50 350 0 0 0 -4100 -20 20 0 0 0 -9500 -40 310 0 0 0 13000 50 350 0 0 0
TC5 0 -600 50 10 0 0 0 20600 -20 400 0 0 0 2100 80 60 0 0 0 17600 -60 330 0 0 0 20600 80 400 0 0 0
DRAWING TITLE
TC7 0 -1500 50 -10 0 0 0 19000 20 -490 0 0 0 300 90 -70 0 0 0 17100 -30 -400 0 0 0 19000 90 490 0 0 0
COLUMN / WALL LOADING SCHEDULE
TC8 0 600 60 20 0 0 0 17000 30 -470 0 0 0 3400 90 -50 0 0 0 13500 -40 -410 0 0 0 17000 90 470 0 0 0
TC9 0 3100 -40 10 0 0 0 -17300 230 330 0 0 0 2700 -30 50 0 0 0 -17100 220 280 0 0 0 17300 230 330 0 0 0
TC10 0 2100 40 -10 0 0 0 13300 60 360 0 0 0 5400 70 40 0 0 0 9100 10 310 0 0 0 13300 70 360 0 0 0
Grand total: 17 0 -800 540 220 0 1200 0 30200 140 4160 0 -400 0 3300 860 830 0 2000 0 25800 -410 3390 0 -1400 0 150800 1250 6080 0 2000 0
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

P006
WALL LOADING SCHEDULE ABOVE PILE CAP (1 OF 2)

MIN DEAD LOAD (Dmin) SDL DEAD LOAD (DL) = Dmin + SDL LIVE LOAD (LL) DL + LL
SOURCE ---
WALL MARK ANGLE
P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm) P (kN) Mx (kNm) My (kNm) Vx (kN) Vy (kN) Mz (kNm)
BW1 0 2300 0 -900 0 0 0 700 0 -500 0 0 0 3000 0 -1400 0 0 0 400 0 -200 0 0 0 3400 0 -1600 0 0 0
BW2 0 3200 0 -600 0 0 0 1100 0 -300 0 0 0 4300 0 -900 0 0 0 700 0 -100 0 0 0 5000 0 -1000 0 0 0 90mm (W) x 40mm (H) space
BW3 0 3200 0 -600 0 0 0 900 0 -300 0 0 0 4100 0 -900 0 0 0 600 0 -100 0 0 0 4700 0 -1000 0 0 0 for COMPANY LOGO
BW4 0 2600 0 -300 0 0 0 400 0 -100 0 0 0 3000 0 -400 0 0 0 400 0 -100 0 0 0 3400 0 -500 0 0 0
BW5 0 11300 0 -2500 0 0 0 2200 0 2600 0 0 0 13500 0 100 0 0 0 4000 0 -3300 0 0 0 17500 0 -3200 0 0 0
BW6 90 4000 0 -2200 0 0 0 1000 0 -800 0 0 0 5000 0 -3000 0 0 0 1100 0 -600 0 0 0 6100 0 -3600 0 0 0
BW7 0 19600 0 -11400 0 0 0 5800 0 1800 0 0 0 25400 0 -9600 0 0 0 6000 0 -14700 0 0 0 31400 0 -24300 0 0 0
BW8 0 3400 0 500 0 0 0 800 0 300 0 0 0 4200 0 800 0 0 0 600 0 100 0 0 0 4800 0 900 0 0 0
BW9 0 2000 0 -200 0 0 0 200 0 -100 0 0 0 2200 0 -300 0 0 0 200 0 -200 0 0 0 2400 0 -500 0 0 0
BW10 0 2000 0 -100 0 0 0 400 0 -100 0 0 0 2400 0 -200 0 0 0 100 0 -200 0 0 0 2500 0 -400 0 0 0
BW11 0 1700 0 -100 0 0 0 400 0 100 0 0 0 2100 0 0 0 0 0 200 0 -100 0 0 0 2300 0 -100 0 0 0 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
BW12 90 1600 0 -400 0 0 0 300 0 -200 0 0 0 1900 0 -600 0 0 0 200 0 -100 0 0 0 2100 0 -700 0 0 0 signature/ and stamp chop
BW13 90 1500 0 -400 0 0 0 400 0 -200 0 0 0 1900 0 -600 0 0 0 200 0 -100 0 0 0 2100 0 -700 0 0 0
TW6A 90 4700 0 200 0 0 0 2000 0 200 0 0 0 6700 0 400 0 0 0 2100 0 -100 0 0 0 8800 0 300 0 0 0
TW6B 0 24200 0 1200 0 0 0 10400 0 200 0 0 0 34600 0 1400 0 0 0 9600 0 1000 0 0 0 44200 0 2400 0 0 0
TW6C 90 4600 0 300 0 0 0 2100 0 100 0 0 0 6700 0 400 0 0 0 1900 0 -100 0 0 0 8600 0 300 0 0 0
Grand total: 16 91900 0 -17500 0 0 0 29100 0 2700 0 0 0 121000 0 -14800 0 0 0 28300 0 -18900 0 0 0 149300 0 -33700 0 0 0
BD's OFFICAL USE

WALL LOADING SCHEDULE ABOVE PILE CAP (2 OF 2)

WX WY WX WU WV WMAX
WALL MARK ANGLE
P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm) P (kN) Vx (kN) Vy (kN) Mx (kNm) My (kNm) Mz (kNm)
TW6A 90 -2600 -280 -10 0 -1100 0 8300 4880 -10 0 25500 0 -3300 200 -10 0 1800 0 9400 4330 -10 0 2220 0 9400 4880 10 0 25500 0
TW6B 0 900 3170 10 0 27700 0 -47600 -160 -10 0 600 0 -5300 5340 -10 0 46800 0 -40200 -3190 -10 0 -26100 0 47600 5340 10 0 46800 0
TW6C 90 2400 120 -10 0 300 0 9100 5150 10 0 26700 0 5300 910 10 0 4100 0 5300 4160 10 0 21900 0 9100 5150 10 0 26700 0
Grand total: 3 700 3010 -10 0 26900 0 -30200 9870 -10 0 52800 0 -3300 6450 -10 0 52700 0 -25500 5300 -10 0 -1980 0 66100 15370 30 0 99000 0

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

LOADING INTENSITY PLAN AT B2

FINISHES LIVE LOAD


P-A P-B P-C P-D P-E P-F P-G P-H P-J DESCRIPTION LEGEND
(kPa) (kPa)

702 10740 12240 11055 9620 15355 12365 6500 9200 3575 LOBBY 1.2 3.0

CARPARK 1.2 3.0


B C
CAR LIFT PIT 1.2 7.5
2005

P-4 LIFT PIT 1.2 7.5

PLANT ROOM 1.2 7.5


5535

WATER TANK 1 14.7 + 1.2 20.0

P-3 WATER TANK 2 17.0 + 1.2 30.0


2150

P-2
3175

P-1
2350

A D

LOADING INTENSITY PLAN AT B2


1 1 : 200

REV DATE AMENDMENT

P-A P-B P-C P-D P-E P-F P-G P-H P-J PROJECT
CIC SAMPLE PROJECT
702 10740 12240 11055 9620 15355 12365 6500 9200 3575

LOADING INTENSITY PLAN FOR UPTHRUST AT B2


B C
UPTHRUST DRAWING TITLE
2005

LEGEND
(kPa) LOADING INTENSITY PLAN
P-4
129.5
5535

154.5
SCALE AS SHOWN@A1
P-3 DRAWING NO. REV. NO.
2150

P-2 P007
---
3175

SOURCE

P-1
2350

90mm (W) x 40mm (H) space


A D for COMPANY LOGO

LOADING INTENSITY PLAN FOR FILL AT B2


2 1 : 200

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

P-A P-B P-C P-D P-E P-F P-G P-H P-J


702 10740 12240 11055 9620 15355 12365 6500 9200 3575

BD's OFFICAL USE


B C
LOADING INTENSITY PLAN FOR FILL AT B2
2005

P-4 FILL
LEGEND
(kPa)
5535

12.3

25.8
P-3
2150

61.3
P-2
NO FILL
3175

90mm (W) x 150mm (H) space


for BD's approval stamp /
P-1 certification of copies of
2350

approved plans
(PNAP ADM-10 APP A)
A D

LOADING INTENSITY PLAN FOR UPTHRUST AT B2


3 1 : 200
BD REF :

BORED PILE LOADING SCHEDULE (1 OF 2) BIM REF :

(X) (AA) (W) (Z) (AB)=(AA)-(Z) (Y) (a) (b) (c)=(a)+(b) (d) (b)+(d) (e) (f)=(b)+(d)+(e) (h) (i) (j) (k)
BORED PILE SELF-WEIGHT TOTAL UPLIFT ADDITIONAL LOAD DUE TO
BORED PILE CAP TENTATIVE TENTATIVE EFFECTIVE TOTAL DEAD STEPPING EFFECT
BORED PILE EFFECTIVE ROCK SOCKET PILE BASE TENTATIVE PILE OF BORED PILE LIVE LOAD (LL) FORCE DUE TO
BORED PILE THICKNESS (FOR BELLOUT DEPTH CUT-OFF LEVEL ROCKHEAD FOUNDING ROCK SOCKET Dmin (total) Dmin + SWP SDL(total) LOAD (DL) = Dmin DL + SDL + LL Wmax (total)
DIAMETER SHAFT DIAMETER DIAMETER LENGTH (SUBMERGED) (total) GROUND WATER
MARK REFERENCE ONLY) LEVEL LEVEL LENGTH + SDL WITHOUT WIND WITH WIND
DIAMETER (SWP) (U)
(m) (m) (m) (m) (m) (m) (mPD) (mPD) (mPD) (m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
BP1 2.5 3.0 2.80 2.80 4.5 1.50 -8.775 -45.5 -50.90 42.125 3.6 3820 43000 46820 14700 57700 13700 71400 18500 -20400 80 99
BP2 2.5 2.5 2.35 2.35 3.75 1.25 -8.775 -44.5 -49.15 40.375 3.1 2580 33700 36280 14100 47800 9100 56900 18000 -9600 0 0
BP3 2.5 2.5 2.35 2.35 3.75 1.25 -8.775 -46.5 -51.15 42.375 3.1 2700 37500 40200 13500 51000 13000 64000 14700 -15500 0 0
BP4 5.0 3.0 2.80 2.80 4.5 1.50 -11.275 -47.0 -54.90 43.625 3.6 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0
BP5 5.0 3.0 2.80 2.80 4.5 1.50 -11.275 -50.0 -56.80 45.525 5.0 4120 49000 53120 18100 67100 15900 83000 24900 -25300 49 61
BP6 2.5 3.0 2.80 2.80 4.5 1.50 -8.775 -46.0 -51.40 42.625 3.6 3860 38400 42260 17700 56100 10500 66600 24600 -12800 0 0

BORED PILE LOADING SCHEDULE (2 OF 2)

(n)=(b)-1.5*(h)+1.5 (a1)=Min (u1)=Min (b)+0.9*(u1)-1.5


(f) (f)+(h) (f)+(a)+(j) (f)+(h)+(a)+(k) (l)=(b)+(i) (m)=(b)-(h)+(i) (o) (p)=(o)*1.25 (q) (r)=(q)*1.25 (r1) (p1) (u)=(o)+(q) (v)=(u)*1.25 (b)+(a1)-(h)+(i)>0
*(i) of(((r1),(p1)/3))+(a) of(((r1)*2,(p1))+(a) *(h) +1.5*(i)>0
PILE BARING CAPACITY BORED PILE BEARING CAPACITY
MAX. PILE LOAD MIN. PILE LOAD ROCK FRICTION (COMPRESSION) UPLIFT RESISTANCE STABILITY CHECK
(COMPRESSION) ROCK/SOIL (COMPRESSION)
ROCK FRICTION
BORED PILE DL + SDL + LL + VERTICAL BARS MASS REFERENCE
DL + SDL + LL + DL + SDL + LL + Dmin + SWP - Dmin + SWP - LINKS (TENSION) Dmin + 0.9*Ru Dmin + Ra -
MARK DL + SDL + LL Wmax + Stepping Dmin + SWP -U WITHOUT WIND WITH WIND WITHOUT WIND WITH WIND (SUBMERGED) ALLOWABLE ULTIMATE WITHOUT WIND WITH WIND BORED HOLE
Wmax Stepping Load Wmax - U 1.5Wmax - 1.5U -1.5Wmax - 1.5U Wmax - U
Load
(kN) (kN) (kN) (kN) (kN) (kN) (kN) LAYER 1 LAYER 2 (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
BP1 71400 89900 75300 93819 26420 7920 -11530 54 T40 50 T40 T16 / 300 (2 rings) 79530 99413 17250 21563 11090 21101 10854 24921 96780 120975 7079 14954 BH5
BP2 56900 74900 59480 77480 26680 8680 -5120 44 T50 40 T50 T16 / 200 (1 rings) 55230 69038 12150 15188 8020 14707 7482 17287 67380 84225 7858 13582 BH6
BP3 64000 78700 66700 81400 24700 10000 -5100 44 T50 40 T50 T16 / 200 (1 rings) 55230 69038 12150 15188 8020 15477 7859 18177 67380 84225 8559 15159 BH8
BP4 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 79530 99413 17250 21563 11090 21899 11250 25849 96780 120975 13064 19650 BH8
BP5 83000 107900 87169 112081 27820 2920 -22180 54 T40 50 T40 T16 / 300 (2 rings) 79530 99413 17250 21563 15400 32120 14827 34920 96780 120975 5128 13627 BH9
BP6 66600 91200 70460 95060 29460 4860 -13840 54 T40 50 T40 T16 / 300 (2 rings) 79530 99413 17250 21563 11090 21367 10982 25227 96780 120975 5004 11982 BH10

SOCKET H-PILE LOADING SCHEDULE (1 OF 2)

(A) (A) (AA) (w) (Z) (AB) (Y) (P1) (P2) (P3) = (P1) + (P2) (a) (P4) = (P3) + (a) (b) (d) (b) + (d) (e) (f) = (b) + (d) + (e) (h) (i) (j) (k) = (j) * 1.25
PILE CAP SOIL MASS ROCK/SOIL MASS SELF-WEIGHT ROCK / SOIL MASS UPLIFT FORCE ADDITIONAL LOAD DUE TO
PIPE EFFECTIVE TANTATIVE TANTATIVE TENTATIVE PILE EFFECTIVE TOTAL DEAD STEPPING EFFECT
THICKNESS (FOR ROCK SOCKET PILE CAP BASE TENTATIVE PILE ROCK MASS SURROUNDING (SUBMERGED W/O (SUBMERGED) W/ Min DEAD LOAD SDL PER PILE (AT
SHAFT CUT-OFF LEVEL ROCKHEAD FOUNDING LENGTH ABOVE ROCK SOCKET (SUBMERGED) LOAD (DL) = Dmin LIVE LOAD (LL) DL + SDL + LL Wmax PER PILE REV DATE AMENDMENT
PILE MARK REFERENCE DIAMETER LEVEL LENGTH (SUBMEGED) PILE PILE PILE SELF PER PILE (Dmin) PER PILE THE BOTTOM OF
ONLY) DIAMETER LEVEL LEVEL RH LENGTH SELF-WEIGHT (SWP) WEIGHT + SDL WITHOUT WIND WITH WIND PROJECT
(SUBMERGED) CAP) (U)
(m) (m) (mPD) (mPD) (mPD) (m) (m) (m) (m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) CIC SAMPLE PROJECT
SP1A 2.0 0.61 0.61 -8.35 -8.275 -46.3 -53.3 45.025 38.025 7 200 5112 5312 230 5542 2197 1233 3430 1067 4497 333 -2500 441 551
SP1B 2.0 0.61 0.61 -8.35 -8.275 -46.3 -53.3 45.025 38.025 7 200 5112 5312 230 5542 2197 1233 3430 1067 4497 333 -2500 441 551
SP1C 2.0 0.61 0.61 -8.35 -8.275 -46.3 -53.3 45.025 38.025 7 200 5112 5312 230 5542 2197 1233 3430 1067 4497 333 -2500 441 551
SP2A 2.0 0.61 0.61 -8.35 -8.275 -58.3 -65.3 57.025 50.025 7 200 6704 6904 290 7194 2297 1433 3730 1167 4897 333 -2933 190 238 DRAWING TITLE
SP2B 2.0 0.61 0.61 -8.35 -8.275 -58.3 -65.3 57.025 50.025 7 200 6704 6904 290 7194 2297 1433 3730 1167 4897 333 -2933 190 238 PILE LOAD SCHEDULE
SP2C 2.0 0.61 0.61 -8.35 -8.275 -58.3 -65.3 57.025 50.025 7 200 6704 6904 290 7194 2297 1433 3730 1167 4897 333 -2933 190 238
SP3A 2.0 0.61 0.61 -8.35 -8.275 -42.3 -49.3 41.025 34.025 7 200 5096 5296 210 5506 2397 1600 3997 1200 5197 533 -3000 626 783
SP3B 2.0 0.61 0.61 -8.35 -8.275 -42.3 -49.3 41.025 34.025 7 200 5096 5296 210 5506 2397 1600 3997 1200 5197 533 -3000 626 783
SP3C 2.0 0.61 0.61 -8.35 -8.275 -42.3 -49.3 41.025 34.025 7 200 5096 5296 210 5506 2397 1600 3997 1200 5197 533 -3000 626 783 SCALE AS SHOWN@A1
SP4A 2.0 0.61 0.61 -8.35 -8.275 -52.8 -59.8 51.525 44.525 7 200 6638 6838 260 7098 1997 1567 3563 1100 4663 533 -3467 96 120
DRAWING NO. REV. NO.
SP4B 2.0 0.61 0.61 -8.35 -8.275 -52.8 -59.8 51.525 44.525 7 200 6638 6838 260 7098 1997 1567 3563 1100 4663 533 -3467 96 120
SP4C 2.0 0.61 0.61 -8.35 -8.275 -52.8 -59.8 51.525 44.525 7 200 6638 6838 260 7098 1997 1567 3563 1100 4663 533 -3467 96 120 P008
SP5A 2.0 0.61 0.61 -8.35 -8.275 -39.3 -46.3 38.025 31.025 7 200 9395 9595 190 9785 2180 1500 3680 800 4480 900 -3300 107 134 SOURCE ---
SP5B 2.0 0.61 0.61 -8.35 -8.275 -39.3 -46.3 38.025 31.025 7 200 9395 9595 190 9785 2180 1500 3680 800 4480 9000 -3300 107 134
SP6A 2.0 0.61 0.61 -8.35 -8.275 -38.3 -45.3 37.025 30.025 7 200 9106 9306 190 9496 2920 1250 4170 600 4770 300 -4200 0 0
SP6B 2.0 0.61 0.61 -8.35 -8.275 -38.3 -45.3 37.025 30.025 7 200 9106 9306 190 9496 2920 1250 4170 600 4770 300 -4200 0 0
90mm (W) x 40mm (H) space
SP7A 2.0 0.61 0.61 -8.35 -8.275 -40.3 -47.3 39.025 32.025 7 200 5436 5636 200 5836 2963 1133 4097 833 4930 367 -4367 54 68 for COMPANY LOGO
SP7B 2.0 0.61 0.61 -8.35 -8.275 -40.3 -47.3 39.025 32.025 7 200 5436 5636 200 5836 2963 1133 4097 833 4930 367 -4367 54 68
SP7C 2.0 0.61 0.61 -8.35 -8.275 -40.3 -47.3 39.025 32.025 7 200 5436 5636 200 5836 2963 1133 4097 833 4930 367 -4367 54 68
SP8A 2.0 0.61 0.61 -8.35 -8.275 -39.3 -46.3 38.025 31.025 7 200 5271 5471 190 5661 2763 967 3730 700 4430 433 -3333 0 0
SP8B 2.0 0.61 0.61 -8.35 -8.275 -39.3 -46.3 38.025 31.025 7 200 5271 5471 190 5661 2763 967 3730 700 4430 433 -3333 0 0
SP8C 2.0 0.61 0.61 -8.35 -8.275 -39.3 -46.3 38.025 31.025 7 200 5271 5471 190 5661 2763 967 3730 700 4430 433 -3333 0 0

SOCKET H-PILE LOADING SCHEDULE (2 OF 2) 90mm (W) x 60mm (H) space


for AP/RSE/RGE's
(n)=(b)-1.5*(h)+1.5 (a1)=Min (u1)=Min (b)+0.9*(u1)-1.5 signature/ and stamp chop
(f) (f)+(h) (f)+(a)+(j) (f)+(h)+(a)+(k) (l)=(b)+(a)+(i) (m)=(b)-(h)+(i) (o) (p)=(o)*1.25 (r1) (p1) = (P3) (b)+(a1)-(h)+(i)>0
*(i) of(((r1),(p1)/3))+(a) of(((r1)*2,(p1))+(a) *(h) +1.5*(i)>0
PILE BARING CAPACITY
MAX. PILE LOAD MIN. PILE LOAD UPLIFT RESISTANCE STABILITY CHECK
(COMPRESSION) ROCK/SOIL
ROCK FRICTION
BORED PILE DL + SDL + LL + DL + SDL + LL + MASS REFERENCE
DL + SDL + LL + Dmin + SWP - Dmin + SWP - (TENSION) Dmin + 0.9*Ru Dmin + Ra -
MARK DL + SDL + LL SWP + Stepping Wmax + SWP + Dmin + SWP -U WITHOUT WIND WITH WIND (SUBMERGED) ALLOWABLE ULTIMATE BORED HOLE
Wmax Wmax - U 1.5Wmax - 1.5U -1.5Wmax - 1.5U Wmax - U
Load Stepping Load
BD's OFFICAL USE
(kN) (kN) (kN) (kN) (kN) (kN) (kN) (m) (kN) (kN) (kN) Ra (kN) Ru (kN) (kN) (kN)
SP1A 4497 4830 5168 5611 -73 -407 -1823 6106 9159 3053 5312 2001 5542 2934 1364 BH1
SP1B 4497 4830 5168 5611 -73 -407 -1823 6106 9159 3053 5312 2001 5542 2934 1364 BH1
SP1C 4497 4830 5168 5611 -73 -407 -1823 6106 9159 3053 5312 2001 5542 2934 1364 BH1
SP2A 4897 5230 5377 5730 -347 -680 -2313 6106 9159 3053 6904 2591 6396 3153 1621 BH2
SP2B 4897 5230 5377 5730 -347 -680 -2313 6106 9159 3053 6904 2591 6396 3153 1621 BH2
SP2C 4897 5230 5377 5730 -347 -680 -2313 6106 9159 3053 6904 2591 6396 3153 1621 BH2
SP3A 5197 5730 6033 6722 -393 -927 -2693 6106 9159 3053 5296 1975 5506 2052 839 BH1
SP3B 5197 5730 6033 6722 -393 -927 -2693 6106 9159 3053 5296 1975 5506 2052 839 BH1
SP3C 5197 5730 6033 6722 -393 -927 -2693 6106 9159 3053 5296 1975 5506 2052 839 BH1
SP4A 4663 5197 5019 5565 -1210 -1743 -3743 6106 9159 3053 6838 2539 6366 1726 536 BH2
SP4B 4663 5197 5019 5565 -1210 -1743 -3743 6106 9159 3053 6838 2539 6366 1726 536 BH2 90mm (W) x 150mm (H) space
for BD's approval stamp /
SP4C 4663 5197 5019 5565 -1210 -1743 -3743 6106 9159 3053 6838 2539 6366 1726 536 BH2 certification of copies of
SP5A 4480 5380 4777 5704 -930 -1830 -3930 6106 9159 3053 9595 3243 6296 1546 1223 BH3 approved plans
SP5B 4480 13480 4777 13804 -930 -9930 -16080 6106 9159 3053 9595 3243 6296 -10604 -6877 BH3 (PNAP ADM-10 APP A)

SP6A 4770 5070 4960 5260 -1090 -1390 -3640 6106 9159 3053 9306 3243 6296 1836 1663 BH4
SP6B 4770 5070 4960 5260 -1090 -1390 -3640 6106 9159 3053 9306 3243 6296 1836 1663 BH4
SP7A 4930 5297 5184 5564 -1203 -1570 -3937 6106 9159 3053 5636 2079 5836 1116 309 BH5
SP7B 4930 5297 5184 5564 -1203 -1570 -3937 6106 9159 3053 5636 2079 5836 1116 309 BH5
SP7C 4930 5297 5184 5564 -1203 -1570 -3937 6106 9159 3053 5636 2079 5836 1116 309 BH5
SP8A 4430 4863 4620 5053 -380 -813 -2697 6106 9159 3053 5471 2014 5661 2208 1010 BH6
SP8B 4430 4863 4620 5053 -380 -813 -2697 6106 9159 3053 5471 2014 5661 2208 1010 BH6
SP8C 4430 4863 4620 5053 -380 -813 -2697 6106 9159 3053 5471 2014 5661 2208 1010 BH6
BD REF :

T9 T10 T11 BIM REF :

S9 S10

4.1
XXX STREET

WWW STREET
P-A P-B P-C P-D P-E P-F P-G P-H P-J

3.8
U10
U8 U1 U11
SP1(P) SP2(P)
RW1 OW2 V10 RW2 OW4 RW3 OW6
-42 B C
S4 V1 S6 S7 V11 S8
S1
U12
P1 OW1 P2 OW3 P3 OW5
P-4 BH2(P)
BH4 BH6(P) BH10(P)
-44 BH8
(TOE LEVEL -18.9 mPD)

(TOE LEVEL -18.9mPD)


TYPE AA SHEET PILE
-46
TYPE C SHEET PILE

6 U7
-3
OW7 OW8

-38

-40
-48 P-3

-42
V8

-44
V7 U6

T8
T7

P-2 P4 RW4

-46
BH1(P) BH5(P)
P-1 BH9(P)
-48

8
-4
P7 OW13 BH3 P6 OW11 BH7 P5 OW9
U3 U5

SP3(P) SP4(P) SP5(P)


-46 A T1 RW7 OW14 T2 T3 RW6 OW12 T5 RW5 OW10 D
U2 S3
V6
YYY STREET

S1 U1 V1 BS2 V2 BS4 V3 BS6 V4 T4 BS8 V5 BS10 S2 U4 BS12 T6

NO.982
19.3 SITTING-OUT AREA NO.950-954
BLOCK A REV DATE AMENDMENT

BLCOK B PROJECT
CIC SAMPLE PROJECT

NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964
DRAWING TITLE
FOUNDATION MONITORING PLAN
BS1 BS3 BS5 BS7 BS9 BS11

FOUNDATION MONITORING PLAN SCALE AS SHOWN@A1


2
OPENABLE STEEL COVER

BACKFILL WITH CONCRETE 1 : 200 DRAWING NO. REV. NO.


EXISTING CONCRETE PAVEMENT P009
AAA TRIGGER LEVELS OPENABLE STEEL COVER
CONC.PAVEMENT
12mm DIA. FREE DRAINAGE GRANULAR MATERIAL SOURCE ---
OR GRD. COVERING BACKFILLED WITH CONC. STAINLESS STEEL LEGEND AND NOTES:
100100100100 SCREW COMPACTED GRANULAR FILL
INSTRUMENT CRITERION ALERT ALARM ACTION
GRD. LEV. Ø25mm MILD STEEL ROD
EXISTING STRUCTURE WALL BOUNDARY LINE GAS GAS PIPE
GROUND SETTLEMENT TOTAL SETTLEMENT 12mm 18mm 20mm WELDED TO STEEL PLATE
CHECK POINT (S1-S10) Ø75mm PVC PIPE
75MM DIA. PVC PIPE 90mm (W) x 40mm (H) space
UTILITY SETTLEMENT CHECK TOTAL SETTLEMENT 12mm 18mm 25mm LOCATION '1'
WELL COMPACTED
SOFT BACKFILL
STEEL PLATE OF 250x250x12mm THICK BH2(P) BORED HOLE (WITH PIEZOMETER) S WAT SALT WATER PIPE
POINT (U1-U12) MASS CONCRETE (BH1 (P), BH2 (P) AND BH5 (P) for COMPANY LOGO
10MM DIA. MILD STEEL ROD STEEL PLATE OF
TILTING CHECK POINT LOCATION '2'
WELDED TO STEEL PLATE 150 x 150 x 10MM BH6 (P), BH9 (P) AND BH10 (P) 6NOS.) ELECTRIC CABLE
(T1-T11)
ANGULAR DISTORTION 1:1000 1:750 1:500 GAS PIPE TO BE MONITORED FOR ELEC
BACKFILLED WITH 75mm
VIBRATION CHECK PEAK PARTICLE LEAN CONCRETE SETTLEMENT BH2
7.5mm/s 10mm/s 15mm/s BORED HOLE FOUL WATER PIPE
POINT (V1 TO V11) VELOCITY
(BH3, BH4, BH7 AND BH8 4 NOS.) FOUL
BUILDING SETTLEMENT
LOCATION OF TILTING CHECK DETAIL OF SETTLEMENT/ TILTING MARKER DETAILS OF MONITORING
TOTAL SETTLEMENT 12mm 18mm 25mm
CHECK POINT (BS1-BS12) POINT ON STRUCTURAL WALL ON EXISTING BUILDING/ RETAINING WALL STATION ON UTILITY 4.15 F WAT FRESH WATER PIPE
EXISTING GROUND LEVEL
STANDPIPE/ RISE OF GROUND
+2.0mPD +2.25mPD +2.5mPD N.T.S. N.T.S. N.T.S.
PIEZONEMETER WATER LEVEL NOTES:
1. THE PRIOR AGREEMENT FOR THE UTILITY OWNERS SHOULD BE
STANDPIPE/PIEZONEMETER DRAIN OF GROUND
-0.4mPD -0.5mPD -0.6mPD
UTILITY SETTLEMENT MARKER (USM)
OUTSIDE COFFERDAM WATER LEVEL OBTAINED BEFORE THE INSTALLATION WORK COMMENCE.
N.T.S. 90mm (W) x 60mm (H) space
INSTRUMENT SCHEDULE for AP/RSE/RGE's
1. WHEN THE ALERT LEVEL IS REACHED, RESPONSE ACTION SHALL BE TAKEN: signature/ and stamp chop
OPENABLE STEEL SYMBOL TYPE NUMBER
a. RC TO NOTIFY AND SUBMIT WRITTEN REPORT TO RSE/RGE. COVER (150mm x 150mm)
BUILDING SETTLEMENT MARKER 12
b. RSE/RGE TO ACCESS EFFECT OF MOVEMENTS AND PREDICT FUTURE MOVEMENTS. INSCRIBE BACKFILLED WITH BS1
PIEZOMETER NUMBER GROUND LEVEL (BS1-BS12)
c. RSE/RGE TO AGREE WITH RC ON THE SUITABLE ACTION PLAN WHCH MAY INCLUDE THE INSTALLATION OF ADDITIONAL STANDARD LOCKABLE IN CONCRETE
CONCRETE

CHECK POINTS AND/OR INCREASING MONITORING FREQUENCY, AND THE REMEDIAL/MITIGATING MEASURES TO BE TAKEN C.I. HINGED COVER SURROUND CONCRETE CONCRETE
T1
BUILDING TILTING CHECK POINT WITH 11
UPON REACHING THE “ALARM LEVEL”.
PAVEMENT / PAVEMENT / VERTICAL DISPLACEMENT (T1-T11)
GROUND GROUND
PVC CAP WITH VENT HOLE
19mm I.D. PVC PIPE GROUND SETTLEMENT CHECK POINT 10 BD's OFFICAL USE
S1
2. WHEN THE ALARM LEVEL IS REACHED, RESPONSE ACTION SHALL BE TAKEN: PVC TUBING
(S1-S10)
a. RC TO NOTIFY AND SUBMIT UPDATED REPORT TP RSE/RGE. THE BD AND THE RELEVANT PARTIES SHOULD BE NOTIFIED 75Ø PVC SLEEVE PIPE FREE DRAINING OW1 OBSERVATION WELL (OW1-OW14) 14
GRANULAR MATERIAL
IMMEDIATELY. 20mmØPVC PIPE
CONCRETE BOX P1 PUMP WELL (P1 TO P7) 7
GRADE 20/20
b. RSE/RGE AND RC TO CONDUCT JOINT SITE INSPECTION TO DETERMINE IF ANY CONSTRUCTION ACTIVITIES SHOULD BE LAID TO NOMINAL 1
IN 50 FALL RW1 RECHARGE WELL (RW1-RW7) 7
APPROVED FILLING COMPACTED
TEMPORARILY SUSPENDED. 25Ø MILD SLEEVE ROD GRANULAR BACKFILL STANDPIPE (WITH PIEZOMETER) (SP1(P) 5
c. RC TO IMPLEMENT THE NECESSARY REMEDIAL/MITIGATING MEASURES IN ACCORDANCE WITH THE AGREED ACTION PLAN. WELDED TO STEEL SP1(P)
PLATE TO SP5(P))
d. RSE/RGE AND RC TO DISCUSS THE INSTRUMENT RESPONSE AND REVIEW THE EFFECTIVENESS OF THE RESPONSE ACTION. STEEL PLATE OF
e. RSE/RGE TO AGREE WITH RC ON THE EMERGENCY PLAN DETAILING THE MEASURES TO BE TAKEN UPON REACHING
BENTONITE BALLS / PELLETS
150x150x10mm THICK U1
UTILITY SETTLEMENT MONITORING POINT 12
“ACTION LEVEL”. MASS CONCRETE ON GROUND (U1-U12)
f. ANY CONSTRUCTION ACTIVITIES MAY BE SUSPENDED IF THE RESPONSE ACTION HAS BEEN IMPLEMENTED AND ON THE V1 VIBRATION CHECK POINT (V1-V11) 11
DETAILS OF GROUND SETTLEMENT
ADVICE OF THE RSE/RGE AS NECESSARY.
g. RSE/RGE TO REVIEW THE METHOD STATEMENTS OF THE PILING/ELS WORKS TO DETERMINE WHETHER MODIFICATION TO CHECK POINTS
THE CONSTRUCTION METHODS IS REQUIRED TO PREVENT ACTION LEVEL FROM BEING REACHED. SAND FILTER SURROUND (BUILDING SETTLEMENT CHECK 90mm (W) x 150mm (H) space
GROUND INVESTIGATION TALBE OF ROCK HEAD
POINTS SIMILAR) for BD's approval stamp /
3. WHEN THE ACTION LEVEL IS REACHED, RESPONSE ACTION SHALL BE TAKEN: N.T.S. DRILL HOLE MARK ROCKHEAD LEVEL (mPD) certification of copies of
a. ALL WORKS THAT WILL CAUSE GROUND MOVEMENT ARE TO BE CEASED. approved plans
POROUS ELEMENT
BH1(P) -42.58 (PNAP ADM-10 APP A)
b. RC TO NOTIFY AND CARRY OUT A JOINT SITE INSPECTION WITH THE RSE/RGE IMMEDIATELY. THE BD AND THE RELEVANT
CAST IRON PAVEMENT BH2(P) -59.31
PARTIES SHOULD BE NOTIFIED IMMEDIATELY. HINGE
c. RC TO IMPLEMENT THE NECESSARY EMERGENCY MEASURES IN ACCORDANCE WITH THE AGREED EMERGENCY PLAN. COVER
BH3 -38.48
d. RC TO SUBMIT AN INCIDENT REPORT TO RSE/RGE AND THE BD DETAILING THE FULL HISTORY OF THE MOVEMENTS AND BH4 -34.69
REMEDIAL/EMERGENCY MEASURES IMPLEMENTED. BENTONITE BALLS / PELLETS BH5(P) -44.93
e. RSE/RGE TO REVIEW THE INCIDENT AND AGREE WITH RC ON FURTHER REMEDIAL AND PREVENTIVE MEASURES TO ENABLE STEEL CASING (3mm) BH6(P) -44.18
RESUMPTION OF THE SUSPENDED WORKS. BH7 -49.11
CONNECTION WIRE
f. CONSTRUCTION ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE NECESSARY REMEDIAL AND PREVENTIVE MEASURES END OF HOLE
CONCRETE PLINTH BH8 -45.57
HAVE BEEN COMPLETED TO THE SATISFACTION OF THE BD. VIBRATION MONITORING DEVICE
g. IF THE TRIGGER VALUES AND REPONSE ACTION ARE REVISED, THE AMENDED PLANS SHOULD BE SUBMITTED TO THE BD BH9(P) -51.71
DETAILS OF PIEZOMETER DETAILS OF VIBRATION CHECK POINT
FOR APPROVAL. THE SUSPENDED CONSTRUCTION ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE AMENDED PLANS ARE N.T.S.
BH10(P) -44.58
N.T.S.
APPROVED BY THE BA AND THE CONSENT IS GIVEN.
BD REF :

BIM REF :

LEGEND

PROPOSED COLUMN/ WALL

T32 -200 (T1)


(UNDER SEPARATE SUBMISSION)
1 1

T40 -200 (B1)


P010 P010

3040 3040
LEGENDS FOR SHEAR LINK DIAGRAM:
PATTERN LINK ARRANGEMENT

1375
1375
T32 -200 (T2) T32 -200 (B2)

2 2
P010 P010
2915

2915
T16 SHEAR LINKS
AT 150mm C/C

1540

1540
BOTH WAYS

705 1630 705 705 1630 705

MAIN REINFORCEMENT

T16 SHEAR LINKS


PILE CAP F1 (2000mm THK.) TOP BAR PILE CAP F1 (2000mm THK.) BOTTOM BAR AT 175mm C/C
BOTH WAYS
1 : 50 1 : 50

REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT

T32 -200 (T1) DRAWING TITLE


T32 -200 (T1)
T32 -200 (T2)
T32 -200 (T2) PILE CAP REINFORCEMENT LAYOUT
PLAN (1 OF 2)

T16 -200 (SIDE BAR) T16 -200 (SIDE BAR)


SCALE

DRAWING NO. REV. NO.

P010
75

75

T32 -200 (B2) T32 -200 (B2) SOURCE ---


T32 -200 (B2) 75mm THK T32 -200 (B2) 75mm THK
BLINDING LAYER BLINDING LAYER

90mm (W) x 40mm (H) space


SECTION 1 SECTION 2
1 1 : 50 2 1 : 50
for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :
P-E P-F P-G P-H P-J

T40- 200 (B2,B4,B6)


BIM REF :

T40- 200 (T2,T4)


15355 12365 6500 9200

T40 -200 (B1,B3,B5)


T40 -200 (B1,B3,B5)
P-4

-6.350
5535

T40- 200 (B1,B3,B5)

T40- 200 (T1,T3)

P-3

2500

2900
A
2150

P010A
-9.250
400 T40- 200 (T1,T3,T5)

P-2 -8.850
-6.350
T40- 200 (T1,T3,T5,T7)
3175

P-1

T40- 200 (B2,B4,B6)

T40- 200 (T2,T4,T6)


PILE CAP PC1 (2500mm THK.)
1 1 : 100
REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT

P-E P-F P-G P-H P-J LEGEND


15355 12365 6500 9200
DRAWING TITLE
PILE CAP REINFORCEMENT LAYOUT
PROPOSED COLUMN/ WALL
(UNDER SEPARATE SUBMISSION) PLAN (2 OF 2)

P-4
SCALE 1 : 100@A1
DRAWING NO. REV. NO.
LEGENDS FOR SHEAR LINK DIAGRAM:
P010A
5535

PATTERN LINK ARRANGEMENT


SOURCE ---

90mm (W) x 40mm (H) space


P-3 for COMPANY LOGO

2500

2900
T16 SHEAR LINKS
AT 150mm C/C
2150

BOTH WAYS
400

P-2
3175

BP1 MAIN REINFORCEMENT


90mm (W) x 60mm (H) space
for AP/RSE/RGE's
P-1 T16 SHEAR LINKS
AT 175mm C/C
signature/ and stamp chop
BOTH WAYS

PILE CAP F5 (2000mm THK.) BD's OFFICAL USE

(SHEAR REINFORCEMENT)
3 1 : 100

P-E P-F P-G P-H P-J


15355 12365 6500 9200
T40 -200 (T1) T40 -200 (T2)
T40 -200 (T3) T40 -200 (T2) T40 -200 (T1)
T40 -200 (T1) T40 -200 (T2) T40 -200 (T5) T40 -200 (T4) T40 -200 (T3) T40 -200 (T4)
-6.00 T40 -200 (T7) T40 -200 (T6) T40 -200 (T5) T40 -200 (T6)
T40 -200 (T3) T40 -200 (T4)

T20 -250 (SIDE BAR)


90mm (W) x 150mm (H) space
2500

for BD's approval stamp /


T.

T20 -250 (SIDE BAR)


A.
L.

certification of copies of
-8.85 -8.85 T20 -250 (SIDE BAR) -8.85
approved plans
-9.25
T40 -200 (B5) (PNAP ADM-10 APP A)
T40 -200 (B6)
T40 -200 (B3) T40 -200 (B4)
T40 -200 (B1) T40 -200 (B2)
0
20

T40 -200 (B1,B3,B5)


-11.35
BP3 BP6
T40 -200 (B5) T40 -200 (B6) T40 -200 (B1,B3,B5)
BP4 T40 -200 (B3) T40 -200 (B4)
T40 -200 (B1) T40 -200 (B2)

PILE CAP (PC1) RC SECTION A


A 1 : 100
BD REF :

BIM REF :
P-A P-A P-B P-B P-C P-C
3193 450 3193 450 162 288 162 288 450 135 110 340

150
P-1

290
290

365
365
P-1 P-1

500
G/F
P-4 P-4
TO
P-4

850
710

710

635
PILE CAP

635

500
COLUMN MARK PC1 PC2 PC3 PC4 PC5 PC6
COLUMN SIZE 450x1000 450x1000 450x1000 450x1000 450x1000 450x1000
VERT. BARS 14T40 (3.59%) 14T40 (3.83%) 14T40 (3.82%) 14T40 (3.53%) 14T40 (3.90%) 14T40 (3.83%)

P-E P-E P-F P-F


1000 500
P-D 545 455 1000 7200
P-D 225 225
G/F

TO 730 770

980
365
PILE CAP
P-4

00
P-4
1175 300

1300

1300
16
ø
P-4

635
P-1

620
100

100
P-1 P-1
COLUMN MARK PW7 PC8 TC1 TC2 TC3 TC4
COLUMN SIZE 300x1500 450x1000 1000x1300 Ø1600 1000x1300 1000x1600
VERT. BARS 14T40 (3.83%) 14T40 (3.91%) 48T40 (3.67%) 36T40 (4.00%) 48T40 (3.67%) 56T40 (3.97%)

P-G P-H P-J P-J


P-F 75 725
1205
REV DATE AMENDMENT
500 1100
PROJECT
P-1
325

CIC SAMPLE PROJECT


G/F

TO

00
00

00
00
P-4 P-4 P-4

16
16

16
16
1000

DRAWING TITLE

ø
PILE CAP

ø
ø
ø

COLUMN AND WALL STARTER DETAILS

650
P-1
SCALE AS SHOWN@A1
COLUMN MARK TC5 TC7 TC8 TC9 TC10 DRAWING NO. REV. NO.
COLUMN SIZE 1000x1600 Ø1600 Ø1600 Ø1600 Ø1600
VERT. BARS 56T40 (3.97%) 36T40 (4.00%) 36T40 (4.00%) 36T40 (4.00%) 36T40 (4.00%) P011
SOURCE ---

90mm (W) x 40mm (H) space


WALL STARTER BAR SCHEDULE SFL
for COMPANY LOGO

THICKNESS STEEL RATIO


WALL MARK FLOOR (mm) STARTER BAR (%)
TW6A PILE CAP TO B1/F 350 T40-210 2.7 SFL
TW6B PILE CAP TO B1/F 450 T40-130 2.9
TW6C PILE CAP TO B1/F 350 T40-210 2.7

90mm (W) x 60mm (H) space


COLUMN SIZE, for AP/RSE/RGE's
REFER TO ARCHITECTURAL PLAN

0.3T.L.L

BINDER & REINFORCEMENT


DETAIL PLEASE REF. TO signature/ and stamp chop
SUPERSTRUCTURE DWG.
LEGEND:
T.L.L

REFER TO ARCHITECTURAL PLAN


FLOOR HEIGHT H

T.L.L

MECHANICAL COUPLER

T.L.L.
FLOOR HEIGHT H

BD's OFFICAL USE

T.L.L.
300

0.3
>3H/8

T.L.L.

T.L.L.

WATER STOP
>1/4 FLOOR
HEIGHT

STARTER BAR DETAILS


1000

PROPOSED PILE CAP OR FFL


FOOTING TOP LEVEL
PROPOSED PILE CAP OR
OR FOOTING THICKNESS
PILE CAP OR TIE BEAM

FFL FOOTING TOP LEVEL


TAL.+8D

FOOTING THICKNESS

90mm (W) x 150mm (H) space


for BD's approval stamp /
0.75T

PILE CAP OR

certification of copies of
TAL.+8D

3T16 BINDERS
STARTER BARS
0.75T

approved plans
T

300 (PNAP ADM-10 APP A)


300 MIN.
MIN.

300 75 BLINDING LAYER


300 75 BLINDING LAYER MIN.
MIN.

TYPICAL DETAIL FOR WALL STARTER BAR TYPICAL DETAIL FOR COLUMN STARTER BAR
(N.T.S.) (N.T.S.)
WHERE D = DIAMETER OF REBAR WHERE D = DIAMETER OF REBAR
BD REF :

BIM REF :

TIE BEAM R.C. DETAILS SCHEDULE

TIE BEAM BEAM SIZE LENGTH TIE BEAM TOP PILE CAP TOP LEVEL PILE CAP TOP LEVEL STEEL BAR SECTION ELEVATION
MARK (D x B) (m) LEVEL (mPD) (P1) (Lv1) (mPD) (P2) (Lv2) (mPD) T1 T2 B1 B2 SB LINK REFERENCE REFERENCE
TB1 1000 x 800 10.935 -6.35 F1 -6.35 F2 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB2 1000 x 800 7.385 -6.35 F1 -6.35 F3 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB3 1000 x 800 7.400 -6.35 F2 -6.35 F4 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB4 1000 x 800 10.936 -6.35 F3 -6.35 F4 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB5 1000 x 800 12.293 -6.35 F4 -6.35 F6 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB6 1000 x 800 11.818 -6.35 F3 -6.35 F5 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB7 1000 x 800 11.220 -6.35 F5 -6.35 F6 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB8 1000 x 800 10.941 -6.35 F6 -6.35 F8 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB9 1000 x 800 11.530 -6.35 F5 -6.35 F7 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB10 1000 x 800 9.451 -6.35 F7 -6.35 F8 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB11 1000 x 800 3.075 -8.08 F7 -8.08 - -8.08 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB12 1000 x 800 1.450 -6.35 F5 -6.35 - -6.35 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB13 1000 x 800 1.455 -6.35 F6 -6.35 - -6.35 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB14 1000 x 800 3.595 -6.35 F1 -6.35 - -6.35 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB15 1000 x 800 3.595 -6.35 F2 -6.35 - -6.35 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB16 1000 x 800 7.065 -6.35 F8 -6.35 PC1 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB17 1000 x 800 7.045 -6.35 F7 -6.35 PC1 -6.35 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1

LENGTH (L)
LENGTH (L)
SB LV2 REV DATE AMENDMENT

LV1 TAL SB
1.0 TL T1 PROJECT
T1
1000
Tie Beam Top Level LV2 CIC SAMPLE PROJECT
Tie Beam Top Level
T12 T12
T12 T12

1000
TAL T12 T12
TAL T12 T12
TAL
1.0 TL B1 T12 T12
B1 DRAWING TITLE
2900
LINK
T12 TIE BEAM DETAILS & SCHEUDLE
LINK
(D x B)
(D x B)
ELEVATION E1 ELEVATION E2 SECTION S1
SCALE 1 : 50@A1
DRAWING NO. REV. NO.

P012
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

LEGEND AND NOTES: N 4.1

N 819792760.292 POINT
BOUNDARY COORDINATES
E (m) N (m)
BIM REF :

C1 STRE
YYY E 835350861.425 A 835335.928 819789.845
BOUNDARY LINE COLUMN / WALL ABOVE (UNDER SEPARATE
SUBMISSION) 4.0
ET B B 835350.861 819792.76
A 819703.101
N 819789844.87 C 835368.366
BORED PILE (UNDER SEPARATE SUBMISSION) E 835335928.356
BP1 BASEMENT SCREEN WALL (UNDER SEPARATE D 835353.433 819700.186

NO.98
B LO C
SUBMISSION)
-6.35 CAP TOP LEVEL (mPD)

2
K A
PILE CAP (2000mm THICK)
CP1
CP1 - PILE CAP MARK
3040 PILE CAP

-50 INFERRED ROCK HEAD LEVEL


1540 1375

SOCKET H-PILE MARK 19.3


F2HP01

XXX
BH1(P) BORED HOLE (WITH PIEZOMETER)
SOCKET H-PILE (UNDER SEPARATE SUBMISSION) (BH1 (P), BH2 (P) AND BH5 (P) 78
705 1629 705 NO.9
BH6 (P), BH9 (P) AND BH10 (P) 6NOS.) 12.7
F2 PILE CAP MARK

STRE
76
BH2 BORED HOLE
NO.9

PILE CAP (BH3, BH4, BH7 AND BH8 4 NOS.) 74


NO.9

ET
3040

ZZZ
4.15 EXISTING GROUND LEVEL
SOCKET H-PILE MARK 72
F6HP02 NO.9
SITE
1375

SOCKET H-PILE (UNDER SEPARATE SUBMISSION) 70


NO.9
K.I.L 201

ROAD
F6
68
PILE CAP MARK NO.9

TIE BEAM 66
NO.9
TB1
(1000x800) NO.9
64

(600) (600) BASEMENT SLAB (UNDER SEPARATE SUBMISSION)

SITTIN
G-OUT
AR EA
NO.95
B LCO

0-95
K B
REV DATE AMENDMENT
3.8

4
N 819703101.028 PROJECT
C E 835368365.835
D WWW CIC SAMPLE PROJECT
STRE
N 819700185.607
ET
3.7
E 835353432.766

DRAWING TITLE
BLOCK PLAN PILE CAP LAYOUT PLAN
1 : 500

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

P013
SOURCE ---
4.1

XXX STREET 90mm (W) x 40mm (H) space


for COMPANY LOGO

WWW STREET
P-A P-B P-C P-D P-E P-F P-G P-H P-J

3.8
702 10740 12240 11055 9620 15355 12365 6500 9200 3575

-42 B BH4 BH6(P) C


BH2(P) BH10(P)

475 550
TB13 BH8 90mm (W) x 60mm (H) space
2005

(1000 x 800)
1460 1455

1460 1455

1460 1455
685 665

for AP/RSE/RGE's
635 365

P-4
365

365

TC2 TC4
signature/ and stamp chop
TB15 TB3 F4 TB5 F6 TB8 F8 -6.350 TC10
-44 1405 1635(2000) TB16 BP2 TC7 TC8 BP6
(1000 x 800) F2 (1000 x 800) (2000) (1000 x 800) (1000 x 800) 1520 1520 (2000) (1000 x 800)
1457 1583
5535

1898 3040 (2000) 2555


-46 6 500 500 BP3 BP4
(1000 x 800)

-3
(1000 x 800)
(1000 x 800)

-38
(1000 x 800)

475 550
TB10
TB4

-40
TB1

(600)
P-3
TB7

-48
-42

(600) (600) (600) (600)

2500

2900
3418 437 563

TW6C
TW6A
2150

BD's OFFICAL USE


-44

1520 1520 400


P-2 F7
TW6B
2915 525

1898 3040 1457 1583 1880 1160 CP1


-46

F1 F3 TB9 (2000) (2500) 6500 1500


TC1 BH7 TC9
825 1000
3175

TB14 (2000) TB2 (2000) TB6 BH3 F5 (1000 x 800) BP1 -8.850 BP5
(1000 x 800) (1000 x 800) (1000 x 800) (2000)
1800 1115

1800 1115

TC3
1025 325

P-1 TB17 TC5 BH9(P)


-48 -4
8
710

710

TB11 (1000 x 800)


(600)

C
2350

TB12 (1000 x 800)


P004 BH1(P) (1000 x 800)
860 140 500 500 BH5(P)
-46 A D
YYY STREET

A
B P003

NO.982 P003
19.3

SITTING-OUT AREA NO.950-954 90mm (W) x 150mm (H) space


for BD's approval stamp /
BLOCK A certification of copies of
BLCOK B approved plans
(PNAP ADM-10 APP A)
NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964

PILE CAP LAYOUT PLAN


1 1 : 200
BD REF :

GENERAL NOTES ON PILE CAP NOTES ON PROTECTION OF EARTHWORKS DETAILS OF MINIMUM TRANSVERSE REINFORCEMENT IN LAP ZONE BIM REF :
AGAINST HEAVY RAINFALL
1. ALL DESIGN SHALL COMPLY WITH HONG KONG BUILDING (CONSTRUCTION)
REGULATIONS AND THE CODE OF PRACTICE FOR STRUCTURAL USE OF
TALBE : TRANSVERSE REINFORCEMENT LAP ZONE
1. SURFACE WATER FLOWING INTO AND OUT OF THE SITE SHALL
CONCRETE 2013, CODE OF PRACTICE FOR FOUNDATIONS BE INTERCEPTED AND CONDUCTED FORM THE SITE TO A SAFE
TRANSVERSE REINFORCEMENT REQUIRED WITHIN LAP ZONE TRANSVERSE
2. ALL DIMENSIONS ARE IN mm AND ALL LEVEL ARE IN METERS ABOVE DISCHARGE POINT AT EACH INTERSECTION AND ABRUPT CHANGE MAIN REINFORCEMENT REINFORCEMENT
PRINCIPAL DATUM UNLESS OTHERWISE STATED. IN DIRECTION OF SURFACE CHANNEL, ACCESSIBLE CATCHPIT AT LAP (THE SMALLER WITHIN LAP ZONE
(WITHOUT STAGGERED LAP)
SHALL BE PROVIDED ALL DRAINAGE WORKS SHALL BE KEPT OF ∅1 OR ∅2) (WITH STAGGERED LAP)
3. 75mm THICK BLINDING LAYER OF GRADE 10/20 CONCRETE SHALL BE LAID CLEAR OF DEBRIS. 1.0TL 1.4TL 2.0TL TRANSVERSE
UNDERNEATH ALL PILE CAP
2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WITHIN REINFORCEMENT
< 20 NO EXTRA REQUIREMENT

∅1
4. ALL REINFORCEMENT SHALL COMPLY WITH BS4449:1997 AND CONSTRUCTION THE SITE A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE OUTSIDE LAP ZONE
STANDARD, CS2, 1995 `T' INDICATES HIGH TENSILE STEEL, WITH MINIMUM TENSILE FOR REFERENCE ONLY
DISCHARGE POINT. (BAR SIZE TO BE
4T10
STRESS EQUAL TO 500 MPa. 20 2x3T10-100 2x3T10-125 2x4T10-125 TRANSVERSE SAME AS

∅2
3. DURING EXCAVATION A METHOD OF WORKING SHALL BE ADOPTED 3T12
5. CONCRETE FOR ALL PILE CAP SHALL COMPLY WITH CS1:2010 (EXCEPT SECTION 7.1), REINFORCEMENT TRANSVERSE
THE CONCRETE DESIGN MIX SHALL BE GRADE 45D/20 AND MINIMUM CONCRETE
IN WHICH THE MINIMIUM OF BARE SOIL IS EXPOSED AT ANY TIME. FOR
7T10 REFERENCE ONLY OUTSIDE LAP ZONE REINFORCEMENT
EXCAVATION TO FORM THE FINAL FACE SHALL BE FOLLOWED UP 25 2x3T12-125 2x4T10-100 2x5T10-125
COVER SHALL BE 40mm. 5T12 (BAR SIZE TO BE WITHIN LAP ZONE)
IMMEDIATELY WITH SURFACE PROTECTION AND DRAINAGE WORKS.
11T10 SAME AS TRANSVERSE
6. THE REACTIVE ALKALI OF CONCRETE EXPRESSED AS THE EQUIVALENT SODIUM OXIDE 4. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE. 32 2x4T12-150 2x5T12-125 2x6T12-150
8T12 REINFORCEMENT 4∅MAX. 4∅MAX.
PER CUBIC METER OF OF CONCRETE SHALL NOT EXCEED 3.0kg WHEN DETERMINED THEY SHALL BE PROTECTED WITH HEAVY DUTY SHEETING ADEQUATELY
IN ACCORDANCE WITH THE SPECIFIED ITEM GIVEN IN APPENDIX A OF PNAP APP-74. 16T10 WITHIN LAP ZONE)
SECURED AT THE EDGES, SEALED AT THE CREST, AND LAPPED AT 40 2x6T12-100 2x6T12-125 2x7T12-150
7. ANY ADDITIVE OR ADMIXTURE SHALL COMPLY WITH BS5075 AND SHALL NOT BE JOINTS WHERE SLOPE FACES ARE TO BE TEMPORARILY EXPOSED 12T12 LAP LENGTH/3 LAP LENGTH/3
USED WITHOUT PRIOR AGREEMENT OF THE ENGINEER. FOR MORE THAN TWO WEEKS, TEMPORARY DRAINS SHALL BE 25T10
INSTALLED IN ADDITION TO SURFACING. 50 2x5T16-125 2x5T16-150 2x9T12-200
8. SAMPLES OF ALL MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE 18T12 WITHOUT STAGGERED LAP
SUBMITTED TO THE ENGINEER FOR APPROVAL ALL WORKS, MATERIALS AND TESTING (N.T.S)
SUCH AS TESTING OF STEEL BAR &CONCRETE CUBES SHALL COMPLY WITH GENERAL
SPECIFICATION FOR CIVIL ENGINEERING WORKS 1992 EDITION AND HONG KONG BUILDING NOTES ON COMPACTED BACKFILL (FOR INFORMATION ONLY) 4∅MAX. 4∅MAX.
(CONSTRUCTION) REGULATION UNLESS OTHERWISE LAP ZONE
FOR REFERENCE ONLY STATED IN THE DRAWING. TRANSVERSE CONCRETE SURFACE
9. DETAILS SETTING OUT OF THE BUILDING SHALL REFER TO BUILDING PLANS. 1. FILL MATERIAL SHALL BE GRADED, CONTAINING NO PARTICLES REINFORCEMENT
COARSER THAN 200mm AND THE PERCENTAGE BY MASS PASSING OUTSIDE LAP ZONE TRANSVERSE REINFORCEMENT
10. THE CONTRACTOR SHALL CHECK ALL RELEVANT DRAWINGS AND VERIFY LEVELS 75mm BS TEST SIEVE SHALL BE 75% TO 100%. WITHIN LAP ZONE
AND DIMENSIONS IN ADVANCE OF THE WORK AND REPORT ANY DISCREPANCY
TO THE ARCHITECT/ENGINEER IMMEDIATELY. 2. FILL MATERIAL SHALL BE PLACED IN LAYERS OF NOT MORE THAN
300mm THICK, AND EACH LAYER SHALL BE COMPACTED TO NOT LAP ZONE MAIN REINFORCEMENT TRANSVERSE

∅1
11. THE WIND LOAD OF BUILDING IS BASED ON CODE OF PRACTICE ON WIND LESS THAN 95% MAXIMUM DRY DENSITY. TRANSVERSE REINFORCEMENT
EFFECTS HONG KONG 2004. REINFORCEMENT OUTSIDE LAP ZONE
3. FILL MATERIALS SHALL BE AT OPTIMUM MOISTURE CONTENT DURING (IN FORM OF LINKS/
12. ALL STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT COMPACTION THE TOLERANCE ON THE OPTIMUM MOISTURE CONTENT (BAR SIZE TO BE
U-BAR IF WITHOUT
ARCHITECT'S AND SERVICES ENGINEER'S DRAWINGS THE CONTRACTOR SHALL CHECK PERCENTAGE SHALL BE 3%, PROVIDED THAT THE FILL MATERIAL IS TRANSVERSE SAME AS

∅2
STAGGERED LAP)
ALL DRAWINGS AND VERIFY LEVELS AND DIMENSIONS IN ADVANCE OF THE WORK AND STILL CAPABLE OF BEING COMPACTED IN ACCORDANCE WITH REINFORCEMENT TRANSVERSE
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. THE SPECIFIED REQUIREMENTS. 4∅MAX. OUTSIDE LAP ZONE REINFORCEMENT
ADDITIONAL TRANSVERSE
13. HIGH TENSILE STEEL BARS (DENOTED BY T) SHALL BE HOT ROLLED TYPE 2 (BAR SIZE TO BE WITHIN LAP ZONE)
4. COMPACTION OF THE SOFT FILL SHALL BE PERFORMED IN REINFORCEMENT OUTSIDE 4∅MAX. CONCRETE SURFACE
DEFORMED BAR OF GRADE 500 TO CS2-2012. MILD STEEL BARS (DENOTED BY R) ACCORDANCE WITH THE REQUIREMENT STIPULATED IN SAME AS TRANSVERSE
LAP ZONE 4∅MAX. 4∅MAX.
SHALL BE PLAIN ROUND GRADE 250 TO CS2-2012. ALL REINFORCEMENT CLAUSE 6.46 - 6.48 OF GENERAL SPECIFICATION FOR REINFORCEMENT
TRANSVERSE REINFORCEMENT FOR SLAB WITHIN LAP ZONE)
TO BE CUT AND BENT IN ACCORDANCE WITH BS4466. CIVIL ENGINEERING WORKS, PNAP APP-8 AND PNAP APP-64.
14. ALLOW SUFFICIENT STEEL CHAIRS TO SUPPORT TOP REINFORCEMENTS IN PILE CAP 5. FILL MATERIAL SHALLFOR REFERENCE
CONTAIN ONLY
NO ORGANIC MATTER.
AND TIE BEAM TO KEEP VERTICAL WALL REINFORCEMENTS IN THEIR CORRECT ALIGNMENTS. NOTES : WITH STAGGERED LAP
6. IF THE FRACTION OF FILL MATERIAL PASSING A 420 MICRO SIEVE IS (N.T.S)
15. UNLESS NOTED OTHERWISE, MINIMUM LAP LENGTHS AND MINIMUM ANCHORAGE LENGTHS PLASTIC, THE LIQUID LIMIT SHALL NOT EXCEED 45% AND THE PLASTIC 1. ∅ IS THE SMALLER OF ∅1 AND ∅2
OF BEAM BARS AND COLUMN BARS SHALL COMPLY WITH CODE OF PRACTICE FOR LIMIT SHALL NOT EXCEED 20%.
STRUCTURAL USE OF CONCRETE 2013 OR BE AS FOLLOW, WHICHEVER IS THE GREATER. 2. TRANSVERSE REINFORCEMENT SHOULD BE PLACE PERPENEDICULAR TO REV DATE AMENDMENT
7. THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT SHALL ΣAst/2 ΣAst/2 ΣAst/2 ΣAst/2
THE DIRECTION OF THE LAPPED REINFORCEMENT AND BETWEEN THAT AND
(A) MINIMUM TENSION ANCHORAGE LENGTH (T.A.L.) BE DETERMINED IN ACCORDANCE WITH GEO REPORT NO 36 TEST PROJECT
THE SURFACE OF THE CONCRETE Lo/3 Lo/3 Lo/3 Lo/3
HIGH YIELD DESIGNED MIX (CONC GRADE) NO 4.3.3 EACH SOIL TYPE SHALL BE TESTED WHEN FIRST USED AND
3. TRANSVERSE REINFORCEMENT SHALL INCLUDE HORIZONTAL BARS
CIC SAMPLE PROJECT
BAR DIA. THEREAFTER AT THE SAME TIME AS EVERY SET OF FIELD DENSITY TESTS
(mm.) 45D BARS OF WALL, BINDERS OF COLUMN OR SHEAR LINKS OF BEAM
RECORDS SHALL SHOW CLEARLY SOIL TYPE, TEST LOCATION AND <150mm <150mm
10 300
12 360 ELEVATION IN mPD FOR EACH TEST TOGETHER WITH THE MAXIMUM DRY
16 480 DENSITY AND OPTIMUM MOISTURE CONTENT RESULTS. Fs Fs
20 600 Fs Fs

∅2
25 8. THE INSITU FIELD DENSITY AND MOISTURE CONTENT SHALL BE
750 DRAWING TITLE
DETERMINED IN ACCORDANCE WITH GEO REPORT NO 36 TEST NO 9.2.1

∅1
32 960
40 1200 AND PNAP APP-8. GENERAL NOTES FOR PILE CAP
9 ONLY LABORATORIES ACCREDITED UNDER HOKLAS FOR THE RELEVANT Lo Lo
(B) MINIMUM TENSION LAP LENGTH (T.L.L.)
TESTS SHALL BE EMPLOYED IN ACCORDANCE WITH PNAP APP-64 AND <4∅ <4∅
HIGH YIELD DESIGNED MIX (CONC GRADE) THE TEST RESULTS SHALL BE ISSUED ON HOKLAS-ENDORSED
BAR DIA.
45D TEST CERTIFICATES OR REPORTS. FOR BAR IN TENSION FOR BAR IN COMPRESSION
(mm.)
(L.L.) 300 TRANSVERSE REINFORCEMENT IN LAP ZONE (FOR OUTER MOST REBAR)
10 (1.4 L.L.) 420 2000 SCALE 1 : 100@A1
(2.0 L.L.) 600 (N.T.S)
(L.L.) 360 TAL DRAWING NO. REV. NO.
300 THK. T12-100
12 (1.4 L.L.) 510 +136.7
(2.0 L.L.) 720 300 THK. HANGER WALL P014
(L.L.) 480 HANGER WALL CONNECTING COLUMN/ WALL COLUMN/ WALL
16 (1.4 L.L.) 680 CONNECTING PILE CAP PEDESTAL PEDESTAL SOURCE ---

2000
(2.0 L.L.) 960 PILE CAP TAL 250 250 (GRADE 60 250 (GRADE 60
(L.L.) 600 APPROX. 200 TOP OF CAP CONCRETE) TOP OF CAP CONCRETE)
20 (1.4 L.L.) 840 +136.3 T12-100

300

300
(2.0 L.L.) 1200

DEPTH OF CAP

DEPTH OF CAP
(L.L.) 750
90mm (W) x 40mm (H) space

2650
25 (1.4 L.L.) 1050
(2.0 L.L.) 1500 T16-125 T16-125 T12-100 for COMPANY LOGO
FOOTING/ PILE CAP FOOTING/ PILE CAP
(L.L.) 960 T10-175
32 (1.4 L.L.) 1350
(2.0 L.L.) 1920 T10-200 T10-200
(L.L.) 1200 T10-175
40 (1.4 L.L.) 1680 T10-175 DETAIL OF PEDESTAL FOR COLUMN/ WALL
(2.0 L.L.) 2400 T12-100 T10-175 +136.7 (N.T.S)
NOTES : TAL D

1650)
(MIN.
1. TENSION LAP LENGTH (T.L.) NORMALLY EQUAL TO LAP LENGTH (L.L.)
+136.3
2. LAP LENGTH FOR UNEQUAL SIZE BARS JULY BE BASED UPON THE SMALLER BAR.
3. (2.0 L.L.) APPEARS ON TOP MOST LAYERS OF STEEL BARS ONLY.
WALL THICK 90mm (W) x 60mm (H) space

B
FOR REFERENCE ONLY TAL TAL
TAL for AP/RSE/RGE's
(C) SPECIAL CASE FOR TENSION LAP LENGTH
TAL TAL signature/ and stamp chop
(a) WHERE A LAP OCCURS AT THE TOP OF A SECTION AS CAST AND THE MINIMUM T12-100
TYPICAL DETAIL FOR LOCAL TYPICAL ARRANGEMENT OF
COVER IS LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT, THE TYPICAL DETAILS OF LIFT PIT SLAB (800)
LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 1.4. (N.T.S) SUMP PIT AT LIFT PIT STARTER BAR DETAIL FOR COLUMN
(N.T.S) (N.T.S) STARTER
(b) WHERE A LAP OCCURS AT THE CORNER OF A SECTION AND THE MINMUM COVER
TO EITHER FACE IS LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT * CONCRETE COVER FOR STARTER BAR TO BE 40mm. BAR
OR, WHERE THE CLEAR DISTANCE BETWEEN ADJACENT LAPS IS LESS THAN 75mm
OR SIX TIMES THE SIZE OF THE LAPPED REINFORCEMENT, WHICHEVER IS THE
G/F G/F BD's OFFICAL USE
GREATER, THE LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 1.4.
(c) IN CASE WHERE BOTH CONDITIONS (a) & (b) APPLY, THE LAP LENGTH SHOULD
PROPOSED BOTTOM LEVEL OF PILE CAP

3/8H
BE INCREASED BY A FACTOR OF 2.0. COLUMN & WALL SIZE, BINDER COLUMN & WALL SIZE, BINDER
& REINFORCEMENT DETAIL REFER
TO SUPERSTRUCTURE DWG.
& REINFORCEMENT DETAIL REFER
TO SUPERSTRUCTURE DWG. TYPICAL ARRANGEMENT
e.g TOP BARS AS CAST ( NOTES : ∅ = BAR DIA ) (UNDER SEPARATE SUBMISSION) (UNDER SEPARATE SUBMISSION)
OF STARTER BAR

1/4H
H
TAL
< 2∅

< 2∅

< 2∅

> 2∅

> 2∅

CENTRE OF LAPPING AT DETAIL FOR WALL


MID-QUARTER OF STOREY HEIGHT (N.T.S)

3/8H
< 2∅ <75mm >75mm >75mm >75mm < 2∅
OR 6∅ OR 6∅ OR 6∅ OR 6∅ 25° - B/F B/F
FACTOR 2 2 1.4 1.0 1.4 40° FTA

300mm
PROPOSED TOP OF PILE CAP LEV. TO CAP TOP

300mm
PROPOSED TOP OF PILE CAP LEV. TO LEVEL
e.g. BOTTOM BARS AS CAST PROPOSED LIGHT BE AS SHOWN ON SEC. DETAIL BE AS SHOWN ON SEC. DETAIL
300 MAX

WEIGHT CONCRETE PILE REBAR


< 2∅ <75mm >75mm >75mm > 2∅ FILL UNDERLYING THE 1/2D OR 8∅ 1/2D OR 8∅
OR 6∅ OR 6∅ OR 6∅ PROPOSED CONC. MIX. WHICHEVER PROPOSED CONC. MIX. WHICHEVER EXTRA T16
PROPOSED PILE CAP 90mm (W) x 150mm (H) space
AS SHOWN ON SEC.

AS SHOWN ON SEC.

FOR PILE CAP TO BE


DEPTH OF CAP

DEPTH OF CAP

IS LESSER FOR PILE CAP TO BE IS LESSER


45D/20 (DESIGNED MIX.) for BD's approval stamp /
45D/20 (DESIGNED MIX.)
< 2∅

< 2∅

< 2∅

< 2∅

500 (MAX.) ∅=BAR ∅=BAR CAP certification of copies of


DETAIL

DETAIL

* THE ANGLE WILL BE ADJUSTED DIAMETER DIAMETER


approved plans
H

H
FACTOR 1.4 1.4 1.0 1.4 TO SUIT STEEPER CUTTING (PNAP ADM-10 APP A)
AS NECESSARY T10-200
60°

EXCAVATION LINE
16. THE PILE CAP DESIGN IS ADOPTED BY FLEXIBLE CAP ASSUMPTION. 46∅ 46∅ 46∅ 46∅
T16-125
17. THE CONCRETE COVER TO REINFORCEMENT BAR OF PILE CAP SHALL BE 40mm.
BENCHES TO BE CUT IMMEDIATELY PRIOR
18. PULVERISED FUEL ASH (PFA) WILL BE USED AS A PARTIAL CEMENT REPLACEMENT
TO CARRY OUT LIGHT WEIGHT
300
IN CONCRETE OF PILE CAP:
MASS FILL WORKS
(a) PFA AS A SEPARATE CONSTITUENT MAY BE USED ONLY WITH OPC AND TYPICAL DETAIL FOR COLUMN & WALL TYPICAL DETAIL FOR TYPE 2
SHOULD COMPLY WITH BS3892 : PART I : 1982, EXCEPT THAT THE STARTER BAR STARTER BAR TYPICAL DETAIL DETAILS
CRITERION FOR MAXIMUM WATER REQUIREMENT MAY NOT APPLY; DETAILS OF BENCHING UNDERLYING THE PILE CAP (FOR INFORMATION ONLY) (N.T.S) BETWEEN HANGER WALL
(b) BLENDED CEMENT CONTAINING PFA SHOULD COMPLY WITH BS6588:1985 (N.T.S)
(N.T.S) AND PILE CAP
AND HAVE A NOMINAL PFA CONTENT NOT EXCEEDING 25%; SYMBOL: (THE COUPLER FOR COLUMN
AND WALL STARTER SHALL BE (N.T.S)
(c) THE PFA CONTENT SHOULD NOT EXCEED 25% BY MASS OF THE
"BOSA" DUCTILITY COUPLER)
CEMENTITIOUS CONTENT (OPC PLUS PFA) OF THE CONCRETE.
BD REF :

BIM REF :
METHOD STATEMENT FOR DEMOLITION WORK: DEMOLITION OF CANTILEVER STRUCTURE: 7. MAINTENANCE AND INSPECTION NOTES ON UBW:
7.1 THE DEMOLITION WORKS SHALL BE SUPERVISED BY AUTHORIZED PERSON, REGISTERED
1. GENERAL STRUCTURAL ENGINEER, REGISTERED SPECIALIST CONTRACTOR AND THEIR TECHNICALLY 1. UBW SHALL BE REMOVED UNDER MINOR WORKS CONTROL SYSTEM OR UNDER AP/RSE
1. PROPPINGS SHALL BE INSTALLED FOR ALL CANTILEVERED STRUCTURES PRIOR TO COMPETENT PERSON IN ACCORDANCE WITH THE SITE SAFETY SUPERVISION PLAN LODGED FOR REFERENCE ONLY
1.1 DEMOLITION WORKS SHALL COMPLY WITH BUILDING (DEMOLITION WORKS) REGULATIONS, SUPERVISION UPON ISSUANCE OF THE DEMOLITION CONSENT AS INDICATED ON PLANS.
BS6187:82, CONSTRUCTION SITE (SAFETY) REGULATIONS, THE GUIDELINES AND COMMENCEMENT OF DEMOLITION WORKS. WITH BUILDING AUTHORITY.
REQUIREMENTS SET OUT IN PNAP71 AND CODE OF PRACTICE FOR DEMOLITION OF 2. NO STRUCTURAL MEMBER WITHIN THE BUILDING ON ABOVE THAT FLOOR CAN BE DEMOLISHED 7.2 ALL THE PRECAUTIONARY MEASURES AND TEMPORARY SUPPORTS SHALL BE INSPECTED BY
FOR REFERENCE ONLY THE CONTRACTOR ON A DAILY BASIS. ANY ACCUMULATION OF BUILDING DEBRIS ON THE
BUILDINGS 2004. PRIOR TO THE DEMOLITION OF THE CANTILEVER STRUCTURE AT THAT FLOOR.
3. THE EXTERIOR WALL CONNECTED SHALL BE DEMOLISHED FIRST WITH THE CANTILEVER SLAB. CATCH FANS AND CATCH PLATFORMS SHALL BE REMOVED. ANY DEFICIENCY SHALL BE NOTES ON DEBRIS MANAGEMENT SYSTEM:
1.2 ALL STRUCTURES TO BE DEMOLISHED BY ORDINARY HAND-HELD TOOLS.
1.3 POWERED MECHANICAL PLANTS MAY BE EMPLOYED AND RESTED AT SOLID GROUND TO 4. ANY STRUCTURE OR DEAD LOAD SUPPORTED BY THE CANTILEVERED SYSTEM SHALL BE REMOVED REPAIRED WHEN FOUND NECESSARY. THE INSPECTION AND REPAIR RECORDS SHALL BE
HELP REMOVAL OF DEBRIS AT G/F. PRIOR TO DEMOLISHING THE CANTILEVER SLAB. PROVIDED TO THE AP AND RSE.
1. DEBRIS MUST BE DISPOSED OF PROMPTLY. A DEBRIS DISPOSAL AND MANAGEMENT SYSTEM SHALL
1.4 DEMOLITION SHALL BEGIN ON THE ROOF AND PROCEED DOWN FLOOR BY FLOOR TO THE 5. THE CONCRETE SHALL BE BROKEN DOWN GRADUALLY STARTING FROM THE EXTERIOR EDGE OF 7.3 BEFORE LEAVING THE JOB SITE EACH DAY, THE CONTRACTOR SHALL IDENTIFY AND RECTIFY
BE PREPARED AND IMPLEMENTED BY THE RSC TO THE SATISFACTION OF AP / RSE. THE DEBRIS
GROUND FLOOR. THE CONCRETE OF EACH STRUCTURAL ELEMENT SHALL BE BROKEN THE CANTILEVER FLOOR, WORKING INWARD AND TOWARD ITS SUPPORTING BEAMS. ANY UNSAFE CONDITIONS SUCH AS PARTIALLY DEMOLISHED STRUCTURAL ELEMENTS AND
DISPOSAL AND MANAGEMENT SYSTEM SHOULD LAY DOWN THE FOLLOWING DETAILS:
DOWN GRADUALLY. THE REINFORCEMENT SHALL BE LEFT IN PLACE UNTIL THE CONCRETE IS DAMAGED TEMPORARY SUPPORTS.
1.1 METHOD OF HANDLING DEMOLISHED BUILDING DEBRIS;
BROKEN AWAY AND WHEN ITS SUPPORT IS NO LONGER NEEDED. 7.4 THE BAMBOO SCAFFOLDING SHALL BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH
1.2 THE ROUTING AND MOVEMENT OF DEBRIS FROM EACH FLOOR TO ON GRADE HOLDING AREA
1.5 THE DEMOLITION OF EACH STRUCTURAL ELEMENT SHALL BE PERFORMED ACCORDING TO
DEMOLITION OF BRICK IN-FILL WALL: WITH THE CODE OF PRACTICE FOR BAMBOO SAFETY AND THE CONSTRUCTION SITE
PRIOR TO LEAVING THE SITE;
THE DETAILS AS SHOWN ON DEMOLITION PLANS. (SAFETY) REGULATIONS BY THE CONTRACTOR.
1.3 MEANS OF TRANSPORTATION OF DEBRIS OFF THE SITE;
1.6 BEFORE DEMOLITION WORKS, THE PROPPING UNDERNEATH CANTILEVER BEAMS IF ANY 8. EMERGENCY PLAN
TO AVOID ANY POTENTIAL HAZARD OF BRICKS FALLING OUT OF THE BUILDING, ALL THE BRICK IN-FILL
8.1 EMERGENCY TELEPHONE NUMBERS SHALL BE CLEARLY DISPLAYED IN A CONSPICUOUS
1.4 TIME AND FREQUENCY OF FOR REFERENCE
DEBRIS ONLY
DISPOSAL OFF SITE;
SHALL BE INSTALLED. SHALL BE REMOVED BY PUSHING INWARD, BEFORE DISMANTLING THE REINFORCED CONCRETE FRAMING. 1.5 RECORD SCHEME ON THE TONNAGE OF EACH TRUCK LOAD, TRUCK LICENSE PLATE,
1.7 BEFORE DEMOLITION WORKS, ALL UNAUTHORIZED STRUCTURES SHALL BE REMOVED. LOCATION. IN THE EVENT OF ANY EMERGENCY OR ACCIDENT, THE CONTRACTOR SHALL
WORKING PLATFORMS OUTSIDE THE BUILDING SHALL BE USED FOR REMOVAL OF THE BRICK IN-FILL DRIVER'S NAME, TRIP TICKETS AND LOCATION OF DUMP SITE; AND
1.8 THE CONTRACTOR SHOULD VERIFY THE STRUCTURE WITH THE LATEST STRUCTURE
FOR REFERENCE ONLY NOTIFY THE POLICE AND FIRE SERVICES DEPARTMENTS FOR ASSISTANCE. THE
WALLS. BRICK REMOVAL SHALL BEGIN FROM THE TOP LAYER DOWNWARDS. THE WORKS SHALL BE 1.6 THE SITE SUPERVISORY PERSONNEL RESPONSIBLE FOR THE DEBRIS MANAGEMENT
APPROVED PLANS (INCLUDING A&A WORKS) BEFORE COMMENCEMENT OF THE DEMOLITION CONTRACTOR SHALL ALSO NOTIFY THE AP AND RSE IMMEDIATELY.
CARRIED OUT LAYER BY LAYER WITH EACH LAYER NOT LARGER THAN 300mm. SYSTEM.
WORKS. WHERE CONDITIONS ON SITE REVEALED SITUATION AND ARRANGEMENT 8.2 AT THE INITIAL WARNING OF A TYPHOON OR A MAJOR STORM EVENT, THE FOLLOWING SHALL
2. DETAILS OF THE DEBRIS DISPOSAL AND MANAGEMENT SYSTEM SHALL BE SUBMITTED TO THE
DIFFERENT FROM THE AVAILABLE INFORMATION, OR HAVING ANY POTENTIAL INSTABILITY, BE PERFORMED:
BUILDINGS DEPARTMENT TOGETHER WITH THE SITE SAFETY SUPERVISION PLAN PRIOR TO OR AT
THE CONTRACTORS SHOULD SEEK OPINION AND ADVICE FROM AP/RSE BEFORE PROCEED.
PRECAUTIONARY MEASURES: 8.2.1 CONTRACTOR SHALL SECUREFOR REFERENCE
ALL ONLY AND LOOSE
TEMPORARY SUPPORTS
THE TIME OF CONSENT APPLICATION.
1.9 GROUND FLOOR SLAB TO BEFOR REFERENCE ONLY
RETAINED. ELEMENTS ON SITE.
1.10 ALL SCAFFOLDING WORKS SHOULD STRICTLY FOLLOW THE GUIDANCE NOTES OF CODE OF 8.2.2 ALL FLAMMABLE MATERIALS, OXYGEN AND ACETYLENE BOTTLES SHALL BE
PRACTICE FOR BAMBOO SCAFFOLDING SAFETY AND GUIDANCE NOTES TO RENOVATION 1. HOARDING (SUBMITTED SEPARATELY) REMOVED OR SECURED IN A SAFE LOCATION.
SAFETY ISSUED BY LABOUR DEPARTMENT. THE HOARDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE HOARDING PLANS UNDER 8.2.3 NO UNSTABLE AND/OR PARTIALLY DEMOLISHED STRUCTURAL ELEMENTS NOTES ON SITE VIDEO CAMERA:
SEPARATE SUBMISSION. SHALL BE BRACED AND SECURED.
2. DEMOLITION SEQUENCE (TOP DOWN - BY MANUAL METHOD) 2. TEMPORARY SUPPORT 9. POST DEMOLITION
2.1 DEMOLITION SEQUENCE SHALL BE DETERMINED ACCORDING TO THE ACTUAL SITE STEEL PROPPING SHALL HAVE A WORKING CAPACITY OF 25kN PER PROP. THE PROPS SHALL BE 9.1 UPON COMPLETION OF THE DEMOLITION, THE SITE SHALL BE LEVELLED AND CLEARED OF 1. VIDEO CAMERA TO RECORD THE ENTIRE DEMOLITION PROCESS SHALL BE PROVIDED. THE VIDEO
CONDITIONS, RESTRAINTS, ORIGINAL BUILDING LAYOUT AND ITS CONSTRUCTION. IN BRACED WITH LATERAL RESTRAINTS IN AT LEAST TWO DIRECTIONS. DEBRIS. CAMERA SHALL BE SECURELY PROTECTED FROM BEING TEMPERED WITH SO THAT THE ENTIRE
GENERAL, THE FOLLOWING SEQUENCE SHALL APPLY: 3. EXISTING UTILITIES 9.2 IN THE CASE OF NO IMMEDIATE REDEVELOPMENT, THE SITE BOUNDARY SHALL BE DEMOLITION PROCESS INCLUDING THE MOVEMENT OF DEBRIS AND THE OVERALL SEQUENCE OF
ALL EXISTING UTILITIES SHALL BE TERMINATED. SEWER SERVICE AND DRAINAGE CONNECTIONS COMPLETELY ENCLOSED TO PREVENT PUBLIC ACCESS. DEMOLITION CAN BE RECORDED FORFORREFERENCE
REFERENCEANDONLY
REVIEW PURPOSES. THE LOCATION OF THE
(i) ALL CANTILEVERED STRUCTURE CANOPIES, AND VERANDAHS SHALL FIRST BE
DEMOLISHED PRIOR TO THE DEMOLITION OF MAIN BUILDING AND ITS INTERNAL SHALL BE PROPERLY DISCONNECTED AND SEALED OFF AT LAST MANHOLE. CONTRACTOR SHALL 9.3 DAMAGE TO PAVEMENT, FOOTPATH AND OTHER ELEMENTS WITHIN THE RIGHT OF WAY VIDEO CAMERA REFERS TO DEMOLITION PLAN. THE VIDEO CAMERA RECORDS SHALL BE KEPT BY
STRUCTURES ON EACH FLOOR; ASSIST THE CLIENT TO COORDINATE WITH UTILITY COMPANIES FOR ALL SERVICE TERMINATION. SHALL BE REPAIRED TO ITS ORIGINAL CONDITION PRIOR TO THE COMPLETION OF THE THE RSE FOR AT LEAST 14 DAYS.
(ii) THE STRUCTURAL ELEMENTS, IN GENERAL, SHALL BE DEMOLISHED IN THE 4. NOTIFICATION TO AP/RSE FOR ANOMALIES OR IRREGULARITIES OBSERVED DEMOLITION PROJECT.
FOLLOWING SEQUENCE: 4.1 THE FRAMING PLANS ARE RECORDED ON SITE. PRIOR TO THE DEMOLITION WORK, THE 10. SITE SUPERVISION
- SLAB CONTRACTOR SHOULD CARRY OUT A DETAILED INSPECTION TO VERIFY THE ACCURACY OF 10.1 SITE STAFF RESPONSIBLE FOR SUPERVISION AND CONTROL OF DEMOLITION SHALL BE
THE INFORMATION AS SHOWN. WHERE CONDITIONS ON SITE REVEALED SITUATION AND EXPERIENCED IN THE DEMOLITION OF BUILDINGS SIMILAR TO THOSE TO BE DEMOLISHED. NOTES ON BEAM PLUS:
- SECONDARY BEAMS, THEN
- INTERNAL PRIMARY BEAMS ARRANGEMENT DIFFERENT FROM NORMAL OR HAVING ANY POTENTIAL HAZARDS. THE 10.2 THE CONTRACTOR SHALL PROVIDE THE FOLLOWING MINIMUM SITE SUPERVISION
(iii) ALL DEMOLITION WORKS TO BE CARRIED OUT FLOOR BY FLOOR. CONTRACTOR SHOULD SEEK OPINION AND ADVICE OF AP/RSE BEFORE PROCEEDING REQUIREMENTS: 1. FORADMINISTRATIVE
DEMOLITION WORKS AND RELEVANT REFERENCE PROCEDURES
ONLY WILL COMPLY WITH THE
(iv) THE PERIPHERAL ELEMENT OF THE BUILDING SHALL BE DEMOLISHED IN FURTHER. (i) A FULL-TIME SITE ENGINEER WHO SHALL BE REGISTERED PROFESSIONAL BUILDING ENVIRONMENTAL ASSESSMENT METHOD (BEAM) PLUS V1.2 REQUIREMENT.
ACCORDANCE WITH THE DEMOLITION SEQUENCE OF PERIPHERAL ELEMENTS. 4.2 THE CONTRACTOR SHOULD EXAMINE AND IDENTIFY FOR THEMSELVES OF THE NATURE OR ENGINEER, IN THE STRUCTURAL, CIVIL OR BUILDING DISCIPLINE AND SHALL BE DIRECTLY
(v) THE INTERNAL ELEMENT, INCLUDING BEAMS AND COLUMNS SHALL BE DEMOLISHED BY TAIL-LOADING OF ANY CANTILEVER CONSTRUCTION SUCH AS BALCONIES, HEAVY CORNICES RESPONSIBLE TO THE CONTRACTOR DURING DEMOLITION OF CANTILEVER STRUCTURES.
GRADUALLY BREAKING DOWN THE CONCRETE OR BY PULLING THEM DOWN IN A OR STAIRCASES. IF UNCERTAIN, AP/RSE ADVICE SHOULD BE SOUGHT. GENERALLY, ALL (ii) EXPERIENCED FOREMAN WHO SHALL BE FULL-TIME ON SITE. EACH FOREMAN SHALL BE
CONTROLLED MANNER. CANTILEVER CONSTRUCTION SHOULD BE PROPPED PRIOR TO THE ACTUAL DEMOLITION. RESPONSIBLE AND SUPERVISE THE DEMOLITION WORKS FOR EACH ZONE OF THE
(vi) THE ABOVE PROCEDURES SHALL BE REPEATED (IF NECESSARY) FOR DEMOLITION DOWN 4.3 THE CONTRACTOR SHOULD NOTIFY THE AP/RSE DURING THE COURSE OF DEMOLITION DEMOLITION WORKS. REV DATE AMENDMENT
WORKS, THE FOLLOWING DEFECTS, IF ANY (iii) SITE SUPERVISION REQUIREMENTS AS STIPULATED IN THE LATEST VERSION OF THE
TO THE LOWEST FLOOR AT GROUND LEVEL. PROJECT
(i) STRUCTURAL DEFORMATION; DEMOLITION CODE AND BUILDING (DEMOLITION WORKS) REGULATION.
3. PRIOR TO COMMENCEMENT OF THE DEMOLITION WORK AN ASBESTOS INVESTIGATION SURVEY (ii) CRACK; AND CIC SAMPLE PROJECT
SHALL BE CARRIED OUT BY A SPECIALIST ASBESTOS CONSULTANT FIRM TO DETERMINE ANY (iii) CORROSION OF REINFORCEMENT
ASBESTOS BASED PRODUCTS WHICH MAY EXIST. 5. DEBRIS HANDLING
5.1 ANY EXISTING FURNITURE, WOOD FLOORS, DOOR FRAMES, WINDOWS, PIPING SHALL BE
SORTED AND REMOVED SEPARATELY.
5.2 DEMOLITION DEBRIS SHALL BE PICKED UP ON GROUND FLOOR AND CARRIED AWAY BY DUMP
DEMOLITION SEQUENCE: TRUCKS. DEBRIS CLEARING AND TRANSPORTATION SHALL BE SCHEDULED TO MAINTAIN THE DRAWING TITLE
FOLLOWING CONDITIONS: GENERAL NOTES FOR DEMOLITION
(i) DEBRIS ACCUMULATION ON THE COCKLOFT OR FIRST FLOOR OR ABOVE SHALL
1. REMOVE THE UBW WORKS UNDER MINOR WORKS IF APPLICABLE.
NOT BE HIGHER THAN 100mm.
2. PRIOR TO THE DEMOLITION WORKS, THE HOARDING SHALL BE CONSTRUCTED IN
(ii) DEBRIS ACCUMULATION ON THE GROUND FLOOR SHALL NOT EXCEED 1m.
ACCORDANCE WITH THE HOARDING PLANS UNDER SEPARATE SUBMISSION.
(iii) NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON THE CANTILEVER

N
3. THE TWO-STORIES PROPPING SHOULD BE PROVIDED PRIOR TO START OF DEMOLITION WORK. N 819792760.292
STRUCTURES.
4. REMOVE ALL UBW STRUCTURES. N 819789844.87 4.1
E 835350861.425 SCALE
6. SPECIAL SITE SAFETY FOR REFERENCE ONLY
5. DEMOLITION SEQUENCE OF ROOF FLOOR: E 835335928.356
6.1 EMERGENCY EXIT

9615
a. PARAPETS, STAIRHOOD AND OTHER STRUCTURES ABOVE ROOF FLOOR LEVEL; DRAWING NO. REV. NO.
THE EXISTING STAIRCASE SHALL BE USED AS EMERGENCY ROUTE. THE EMERGENCY ROUTE YYY
b. EXTERIOR WALLS LINKING THE CANTILEVERED STRUCTURE AT ROOF FLOOR; STRE
SHALL BE MAINTAINED THROUGHOUT THE DEMOLITION PROCESS. THE ROUTE SHALL BE
c. CANTILEVER SLABS OR CANOPY AT ROOF FLOOR;
CLEARED OF OBSTRUCTION AT ALL TIME. SIGNS OR MARKINGS SHALL BE INSTALLED TO 4.0
ET D001

2427
d. REMAINING SLAB AT ROOF FLOOR;
CLEARLY IDENTIFY THE ROUTE.
e. NON-LOAD BEARING WALLS BETWEEN ROOF AND FLOOR BELOW ROOF FLOOR;
FOR REFERENCE ONLY 6.2 PROTECTION OF OPENINGS SOURCE ---
f. SECONDARY BEAMS AT ROOF FLOOR;
THE CONTRACTOR SHOULD ENSURE THAT EVERY WORK PLACE AND APPROACH AND ALL

NO.98
B LO C
g. MAIN BEAMS AT ROOF FLOOR;
OPENINGS DANGEROUS TO PERSONS EMPLOYED AND OTHERS BE PROPERLY ILLUMINATED
h. COLUMNS AND LOAD BEARING WALLS BETWEEN ROOF AND FLOOR BELOW ROOF.
AND PROTECTED. SATISFACTORY MEASURES SHALL BE PROVIDED TO AVOID PERSONS

2
K A
6. DEMOLITION OF SUBSEQUENT FLOORS BELOW ROOF FLOOR:
FALLING FROM HEIGHT.
a. PARAPETS, STAIRHOOD AND OTHER STRUCTURES ABOVE FLOOR LEVEL IF APPLICABLE; 90mm (W) x 40mm (H) space
b. EXTERIOR WALLS LINKING THE CANTILEVERED STRUCTURES IF APPLICABLE; 6.3 FIRE PREVENTION for COMPANY LOGO
c. CANTILEVERED SLABS OR CANOPY; (i) FIRE EXTINGUISHER OR FIRE FIGHTING EQUIPMENT SHALL BE PLACED IN VISIBLE
d. REMAINING SLABS; LOCATIONS, ADJACENT TO THE STAIRCASE, ON EACH FLOOR. ALL FLAMMABLE
e. NON-LOAD BEARING WALLS BETWEEN THE FLOOR AND THE FLOOR BELOW; MATERIALS SHALL BE STORED IN A SAFE LOCATION IN ACCORDANCE WITH THE
19.3
f. SECONDARY BEAMS; FACTORIES AND INDUSTRIAL UNDERTAKING REGULATIONS.
g. MAIN BEAMS; 6.4 DUST AND NOISE

XXX
h. COLUMNS AND LOAD BEARING WALLS BETWEEN THE FLOOR AND THE FLOOR BELOW. (i) WATER SPRAYING SHALL BE APPLIED TO SUPPRESS THE DUST GENERATED DURING
78
THE DEMOLITION OPERATION AND DEBRIS HAULING. NO.9
12.7
(ii) SUPER SILENCED TYPE AIR COMPRESSOR SHALL BE USED. DEMOLITION WORKS SHALL

STRE
NOT BE PERFORMED WITHIN THE RESTRICTED HOURS FROM 1900 HRS TO 0700 HRS ON NO.9
76
ALL DAY AND FROM 0700 HRS TO 1900 HRS ON GENERAL HOLIDAYS INCLUDING SUNDAY,
OR AS PER EPD'S REQUIREMENT. NO.9
74 90mm (W) x 60mm (H) space
6.5 TRAINING for AP/RSE/RGE's

ET
SITE

ZZZ
ALL SITE PERSONNEL SHALL GO THROUGH A TRAINING PROGRAM TO UNDERSTAND THE 72 signature/ and stamp chop
NO.9
PROJECT AND SITE SAFETY REQUIREMENTS. THE TRAINING PROGRAM SHALL BE
CONDUCTED BY A COMPETENT TRAINER. THE TRAINING PROGRAM SHALL INCLUDE THE
NO.9
70 K.I.L 201
FOLLOWING:

ROAD
(i) AN INDUCTION TRAINING COURSE AT THE BEGINNING OF THE JOB TO
CIRCULATE INFORMATION ON THE PROPOSED METHOD AND REQUIRED SAFETY 68
NO.9
MEASURES TO PERFORM THE WORK. 3032
12200
(ii) DAILY SAFETY MEETINGS TO MAINTAIN AND REINFORCE THE SAFETY CONCEPT. NO.9
66 3235
BD's OFFICAL USE
6.6 TYPHOON
IN THE CASE WHEN TYPHOON SIGNAL NO. 3 IS HOISTED, THE CONTRACTOR SHALL INSPECT NO.9
64
ALL EXTERNALLY EXPOSED TEMPORARY WORK AND STRENGTHEN ANY LOOSE 2625
CONNECTIONS. AFTER THE TYPHOON, ALL EXTERNALLY EXPOSED TEMPORARY WORKS

SITTIN
SHALL BE INSPECTED AND CONFIRMED TO BE SAFE BY THE COMPETENT AND EXPERIENCED
PERSON.

G-OUT
AR EA
NO.95
B LCO

0-95
K B
3.8 90mm (W) x 150mm (H) space

4
N 819703101.028 for BD's approval stamp /

2700
WWW E 835368365.835 certification of copies of
STRE approved plans
ET (PNAP ADM-10 APP A)

10063
3.7
N 819700185.607
E 835353432.766

2467
BLOCK PLAN
1 : 500
BD REF :

BIM REF :

LEGEND:

TEMPORARY STEEL PROP AT 1200mm c/c UNDER

PROPOSED DEBRIS CHUTE

CANTILEVER STRUCTURE
J H G F E D C B A SITE BOUNDARY
1452 10045 12500 12500 10590 10400 10400 11200 11015 1250
CONCRETE FOOTING

VIDEO CAMERA
(1000 x 900) (1000 x 900) (1000 x 900) (1000 x 900) (800 x 750) (800 x 750) (1000 x 900) (1000 x 900)
1250

4 C3 C7 C11 C15 C17 C19 C21 C23 C27

(1000 x 1000)

(1000 x 1000)

(1000 x 1000)
(1000 x 1000)

(1000 x 1000)

(1000 x 1000)
(1000 x 900)

(1000 x 900)

(1000 x 900)
4795

C2 (1400 x 1300) C6 (1400 x 1300) C10 (1400 x 1300) C14 (1400 x 1300) C16 (1400 x 1300) C18 (1400 x 1300) C20 (1400 x 1300) C22 (1400 x 1300) C26
3
2545

(1000 x 1000)

(1000 x 1000)

(1000 x 1000)

(1000 x 1000)
(600 x 900)

(600 x 900)
(1000 x 900)

(600 x 900)
(800 x 900) (800 x 900) (800 x 900)

(600 x 900)
(800 x 900)

(400 x 700)
2498

C1 C5 C9 C13 (400 x 700) (400 x 700) (400 x 700)

(400 x 700)
(400 x 700)
(800 x 900) (800 x 900) (800 x 900) (800 x 900)

(400 x 700)

(400 x 700)

(400 x 700)

(400 x 700)

(400 x 700)
1 (400 x 700) C25

(400 x 700)
(400 x 700)
(800 x 900)

(800 x 900)
(1000 x 1000)

(800 x 900)

(800 x 900)
(400 x 700)
4127

C4 C8 C12
(500 x 900) (500 x 900) (500 x 900) (400 x 700) (400 x 700) (400 x 700) (500 x 900) C24

1 Date 1 Revision 1
REV DATE AMENDMENT

DEMOLITION PLAN - EXISTING G/F FRAMING PLAN


1
PROJECT
1 : 200 CIC SAMPLE PROJECT

DRAWING TITLE
DEMOLITION PLAN - EXISTING G/F, 1/F
FRAMING PLAN
J H G F E D C B A
1452 10045 12500 12500 10590 10400 10400 11200 11015 1250
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

(1000 x 900) (1000 x 900) (1000 x 900) (1000 x 900) (800 x 750) (800 x 750) (1000 x 900) (1000 x 900)
D002 1
1250

4 SOURCE ---
(1000 x 1000)

(1000 x 1000)
(1000 x 900)

C17 C19 C21 C23 C27


(1000 x 900)

(1000 x 1000)
(1000 x 1000)

(1000 x 1000)

(1000 x 1000)
(1000 x 900)
4795

C2 (1400 x 1300) C6 (1400 x 1300) C10 (1400 x 1300) C14 (1400 x 1300) C16 (1400 x 1300) C18 (1400 x 1300) C20 (1400 x 1300) C22 (1400 x 1300) C26 90mm (W) x 40mm (H) space
3 for COMPANY LOGO
(800 x 900) (800 x 900) (800 x 900)
(600 x 900)
2545

(1000 x 1000)

(1000 x 1000)

(1000 x 1000)

(1000 x 1000)
(1000 x 900)

(600 x 900)

(600 x 900)

(600 x 900)
(800 x 900)

(400 x 700)
(400 x 700) (400 x 700)
2498

C1 C5 (800 x 900) C9 (800 x 900) C13 (800 x 900) (800 x 900) C25
(400 x 700)

(400 x 700)
(400 x 700)

(400 x 700)

(400 x 700)

(400 x 700)
(400 x 700)
1 (400 x 700) (400 x 700)

(400 x 700)
(800 x 900)

(800 x 900)
(400 x 700)
(400 x 700)
(800 x 900)

(800 x 900)

(1000 x 1000)
4127

C4 (500 x 900) C8 (500 x 900) C12 (500 x 900) (400 x 700) (400 x 700) (500 x 900) C24
(400 x 700) 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop

DEMOLITION PLAN - EXISTING 1/F AND TYPICAL FLOOR FRAMING PLAN


2 1 : 200 BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

TYPICAL SEQUENCE OF TOP DOWN METHOD


WITH HAND HELD TOOLS

SCREEN 4
1
SCAFFOLDING

SCREEN
SCAFFOLDING
CATCHFAN AT
INTERVALS
NO MORE THAN 10m
CATCHFAN AT
INTERVALS NO
MORE THAN 10m

1. DEMOLITION OF SLABS AND BEAMS.

SCREEN
2 SCAFFOLDING
4. DEMOLITION OF EXTERNAL WALL CUTTING SHOULD BE CAREFUL TO MINIMIZE DEBRIS FALLING OUTSIDE.
5. CUTTING THE EXTERIOR WALL IN SECTIONS AND COLUMNS. CUTTING SHOULD BE CAREFUL TO MINIMIZE
DEBRIS FALLING OUTSIDE.
CATCHFAN AT
INTERVALS
NO MORE THAN 10m
5

SCREEN
SCAFFOLDING REV DATE AMENDMENT

PROJECT
CIC SAMPLE PROJECT
2. CONTINUE DEMOLITION OF SLABS AND BEAMS.
CATCHFAN AT
INTERVALS NO
3 MORE THAN 10m DRAWING TITLE
DEMOLITION DETAILS (BY HAND HELD
SCREEN
TOOLS)
SCAFFOLDING

SCALE

CATCHFAN AT DRAWING NO. REV. NO.


INTERVALS NO D003
MORE THAN 10m
6. WHILE CUTTING THE REINFORCEMENT BARS CONNECTING THE WALL SECTION. THE WALL SHOULD SOURCE ---
BE TIED TO INTERIOR COLUMN OR BEAM. THE WALL SECTION / COLUMN SHALL BE PULLED DOWN
IN A CONTROLLED MOTION.
7. DEMOLITION OF SLABS AND BEAMS OF THE REMAINING BLOCK. 90mm (W) x 40mm (H) space
for COMPANY LOGO
8. DEMOLISH COLUMN AND WALLS OF THE REMAINING BLOCK.

3. DEMOLITION OF INTERIOR COLUMN MAY BE NEEDED TO CREATE ACCESS AND WORKING ROOM
FOR EXTERIOR WALL DEMOLITION. DEMOLISH COLUMN BY FIRST PRE-WEAKENING THE BOTTOM.
THEN THE FRAME SHALL BE PULLED DOWN AND CONTROLLED MOTION IMMEDIATELY AFTER THE
REINFORCING STEEL IS CUT AT THE DISCONNECTING POSITIONS. 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

NOTES : BIM REF :


1. SECURE THE COLUMN BY WIRE & WINCH TO EXISTING STRUCTURE
DEMOLITION OF R.C. SLAB (MANUAL METHOD) PRE-WEAKENING AND DISMANTLING OF R.C. COLUMN 2. PRE-WEAKENING AT THE BOTTOM OF COLUMN BY HAND HELD TOOLS.
I) BREAK AWAY THE CONCRETE TO EXPOSE THE REINFORCING BARS.
(MANUAL METHOD) II) CUT THE REINFORCING BARS AT THE EXTERIOR HALF OF THE COLUMN.
CUTTING SHALL BE PERFORMED IMMEDIATELY PRIOR TO PULLING.

1. ENSURE ALL LOADS OTHER THAN SELF-WEIGHT, ARE REMOVED FROM SLABS. FOR CANTILEVER SLAB, 3. PULLING DOWN THE COLUMN IN A CONTROLLED MOTION.

THE EXTERIOR WALL OR PARAPET SHALL BE DEMOLISHED FIRST.


CL OF BEAM
2. THE SLAB SHALL BE DEMOLISHED BY GRADUALLY BREAKING AWAY THE CONCRETE. BEAMS TO BE
REMAIN
3. THE REINFORCEMENT SHALL REMAIN AND BE CUT OFF AFTER THE CONCRETE IS BROKEN AWAY. COLUMN
EXTERIOR
DIRECTION
OF FALL
CL OF COLUMN
TEMPORARY SUPPORTS AND/OR TEMPORARY SUPPORTS AND/OR INTERIOR
PLATFORMS SHALL BE PROVIDED PLATFORMS SHALL BE PROVIDED
UNDERNEATH UNDERNEATH LINES OF SUPPORT ATTACHED TO TIE WIRE
REINFORCING BARS TO BE CUT AFTER UNDER THE FLOOR AND WINCH SYSTEM OR
BREAKING AWAY THE CONCRETE EXCAVATOR ARM

REINFORCING BARS TO BE CUT


AFTER REMOVAL OF CONCRETE STRIPS NOT TO EXCEED 500mm
SECTION C1-C1
CANTILEVER BEAM LEGEND :
REINFORCING BARS
DEMOLISHED WITH REINFORCING BAR TO BE REMAIN
TO BE CUT AFTER EXISTING COLUMN TO BE DEMOLISHED
THE SLAB REMOVAL OF REINFORCING BARS
DIRECTIONS OF REINFORCING BAR TO BE CUT AWAY
CONCRETE DEMOLITION CONCRETE
DIRECTION OF
CONCRETE DEMOLITION
CANTILEVER TIE WIRE TO EXISTING STRUCTURE
CANTILEVER
BEAM TO BE FOR ADDITION SAFETY
BEAM TO BE
REMAIN (EXTERIOR COLUMNS ONLY)
REMAIN

DIRECTIONS OF EXISTING COLUMN REINFORCEMENT

TL = 46D.
CONCRETE DEMOLITION TO BE REMAINED EXISTING
EXTERIOR INTERIOR
(REMAINING TENSION LAP LENGTH GROUND
DIRECTION OF SPAN AND = 46 BAR DIA.)
MAIN REINFORCEMENT

BEAM TO BE EXISTING FOOTING


REGULAR BEAM REMAIN REINFORCING BARS
TO BE REMAINED
TO REMAIN
C1 C1

REGULAR BEAM
TO BE REMAIN
PLAN PLAN PLAN
PLAN
CANTILEVER SLAB CANTILEVER SLAB AND BEAM TWO WAY SLAB ONE WAY SLAB
TYPICAL DETAIL OF DEMOLITION COLUMN
1. TEMPORARY SUPPORTING STRUCTURES AND/OR CATCH PLATFORM SHALL BE PLACE DIRECTLY THE CANTILEVER BEAM SHALL BE DEMOLISHED AFTER THE DEMOLITION OF THE DEMOLITION OF SLAB SHALL BEGIN IN THE MIDDLE OF THE SLAB AND
1. THE BREAKING OF CONCRETE SHALL BEGIN AT UNSUPPORTED END DEMOLITION OF R.C. COLUMN
UNDERMEATH THE CANTILEVER STRUCTURE AS PRECAUTION MEASURES, (SEE SECTION REFER TO SEPARATE DRG.) CONNECTING FLOOR SLAB, DEMOLITION OF THE CANTILEVER BEAM SHALL NOT ADVANCE TOWARDS THE SIDES IN 4 DIRECTIONS. AND PROCEED IN STRIPS NOT EXCEEDING 500mm PERPENDICULAR
TO THE LINKS OF SUPPORT.
ABOVE GROUND
THE CONCRETE SHALL BE BRAKEN DOWN GRADUALLY STARTING FROM THE EXTERIOR
ADVANCE FURTHER THAN THE SLAB SO THAT THE SUPPORT FOR THE SLAB IS ALL COLUMN, EITHER EXTERIOR OR INTERIOR MAY BE PRE-WEAKENED AT THE BOTTOM
2. ALWAYS MAINTAINED.
EDGE OF THE CANTILEVER FLOOR, WORKING INWARDS AND TOWARDS ITS SUPPORTING BEAM.
2. THE STRIPS SHALL BE DEMOLISHED FROM THEIR CENTRE TOWARDS OF COLUMN, PULLED DOWN ONTO BUILDING FLOOR FOR FURTHER BREAKEN.
IN BOTH DIRECTION.

DEMOLITION OF R.C. BEAM (MANUAL METHOD)


1. BEAMS MAY BE DEMOLISHED BY GRADUALLY BREAKING AWAY THE CONCRETE.
THE REINFORCEMENT SHALL REMAIN AND CUT OFF AFTER THE CONCRETE IS BROKEN AWAY.
2. ALTERNATIVELY, THE ENTIRE BEAM SECTION MAY BE DISMANTLED AND LOWER ONTO
THE FLOOR LEVEL FOR FURTHER BREAKDOWN.
CUT CUT COLUMN REINFORCING PRE-DRILLED
ANCHORED AT WINCH OR REV DATE AMENDMENT
1&2 3&4 BARS HOLE
INTERNAL BEAM / COLUMN
WITH PULLEY
ANCHORED AT WINCH OR BEAM SECTION TO
BE DISMANTLED
PROJECT
INTERNAL BEAM / COLUMN MAIN BEAM REINFORCING
WITH PULLEY BARS CIC SAMPLE PROJECT
CUT 1 & CUT 3 &
CUT 2 CUT 4
CANTILEVER CROSS BRACING TO BE
ADJUSTABLE PROVIDED IN TO DIRECTIONS
B1 B1 PORTION
STEEL JACKET
WIRE CONNECTS TO
WINCH AND ANCHORS WIRE CONNECTS TO
TO STABLE STRUCTURE REINFORCING WINCH AND ANCHORS
BARS TO STABLE STRUCTURE CANTILEVERED BEAM
HORIZONTAL HOLE PLAN REINFORCING
DRAWING TITLE
AT BEAM
ANCHORED AT WINCH OR
BARS ADJUSTABLE
STEEL JACKET
STEEL PROPPINGS
DETAIL FOR DEMOLITION WORKS (1 OF 2)
ALTERNATE CONNECTION TO BEAM AT 1200c/c MAX.

1200 MAX.
INTERNAL BEAM / COLUMN SPAN TO BE DEMOLISHED (CAPACITY = 25kN
WITH PULLEY BEAM
(6M MAX.) SECTION
ALTERNATE CONNECTION TO BEAM
ANCHORED AT WINCH OR
INTERNAL BEAM / COLUMN
CUT 2 CUT 3
PLAN CA
-
CA
-
WITH PULLEY

PLAN CUT 1

1200 MAX.
CUT 4
PRE-DRILLED HOLE FOR
WIRE TO PASS THROUGH
COLUMN REINFORCING SCALE
BARS
CUT 1 CUT 3 EDGE BEAM

EXTERNAL MAIN BEAM BEAM SECTION


DRAWING NO. REV. NO.

1200 MAX.
BEAM
CUT 2
CUT 4

ADJUSTABLE
D004
ANCHORED AT WINCH OR
WIRE ANCHORED AT WIRE STEEL JACKET
INTERNAL BEAM / COLUMN
WITH PULLEY WIRE ANCHORED AT ADDITIONAL EXTERNAL BEAM EXTERNAL BEAM TIED TO
RUBBER TIRES
(OPTIONAL)
WINCH OR INTERNAL
COLUMN/BEAM WITH WIRE CONNECTS TO
COLUMN
PRE-DRILLED HOLE
LOCATION OF HOLE TO BE SOURCE ---

1200 MAX.
WINCH OR INTERNAL TIED TO EXISTING BEAM/ EXISTING BEAM /COLUMN WINCH AND ANCHORS DETERMINED BY ENGINEER
WINCH
COLUMN/BEAM WITH COLUMN MAY BE REQUIRED TO STABLE STRUCTURE
PULLEY FOR CORNER SECTION ADJUSTABLE
STEEL JACKET
REINFORCING
RUBBER TIRES ELEVATION BARS PRE-DRILLED HOLE
REINFORCING
(OPTIONAL) FOR WIRE TO PASS
1. PROP ALL SPAN OF EXTERNAL BEAM . REINFORCING THROUGH LOCATION BARS
WINCH AND PULLEY
SECTION B1 2. TIE THE SPAN OF BEAM TO DEMOLISHED. (REFER TO DETAILS AS SHOWN)
BARS
WIRE CONNECTS
OF HOLE SHALL BE
DETERMINED BY
90mm (W) x 40mm (H) space
WIRE TO WINCH AND ENGINEER
ALTERNATE CONNECTION TO BEAM for COMPANY LOGO
1. ENSURE NO LOAD ON THE BEAM. 3. REMOVE PROPS AT SPAN TO BE DEMOLISHED. ANCHORS TO
SECTION CA
2. TIE THE BEAM TO BE DEMOLISHED (TO DETAILS AS SHOWN) 4. EXPOSE ALL REINFORCEMENT AT CUT 1 TO CUT 4. ALTERNATE CONNECTION TO BEAM STABLE STRUCTURE
ELEVATION
3. EXPOSE REINFORCEMENTS AT BOTH ENDS OF THE BEAM. 5. CUT REINFORCEMENT AT CUT 1, CUT 2, AND CUT 3.
ELEVATION TYPICAL PLAN AT CANTILEVER TYPICAL SECTION AT CANTILEVER
4. CUT REINFORCEMENTS AT POSITIONS CUT 1, CUT 2, AND CUT 3. 6. LOWER THE END AT CUT 1 & CUT 2 ONTO BLDG. FLOOR IN A CONTROLLED MANNER.
(MIN. SUPPORT CAPACITY = 25 kN/LEG)
5. LOWER THE BEAM AT EXTERNAL END. ONTO BUILDING FLOOR IN A CONTROLLED MANNER. 7. CUT REINFORCEMENT AT CUT 4.
NOTES : NOTES :
6. CUT REINFORCEMENTS AT CUT 4 AND LOWER THE BEAM COMPLETELY. 8. LOWER THE OTHER END OF BEAM IN A CONTROLLED MANNER. THE TIE WIRE ARRANGEMENT IS ILLUSTRATION PURPOSE. IT MAY BE THE TIE WIRE ARRANGEMENT IS ILLUSTRATION PURPOSE. IT MAY BE
NOTE : THE TIE WIRE ARE INDICATIVE. IF THERE ARE PERMANENT ANCHORS OR LIFTING NOTE : THE TIE WIRE ARE INDICATIVE. IF THERE ARE PERMANENT ANCHORS OR LIFTING SIMPLIFIED TO SUIT DEPENDING ON THE AVAILABILITY OF STRUCTURAL ANHOR. SIMPLIFIED TO SUIT DEPENDING ON THE AVAILABILITY OF STRUCTURAL ANHOR.
MACHINES AVAILABLE, TIE WIRE ARRANGEMENTS MAY BE SIMPLIFIED TO SUIT. MACHINES AVAILABLE TIE WIRE ARRANGEMENTS MAY BE SIMPLIFIED TO SUIT.

DETAILS FOR SECURING EXTERNAL BEAMS DETAILS FOR SECURING SECONDARY BEAMS
DEMOLITION OF SECONDARY BEAM DEMOLITION OF MAIN BEAM BEFORE DISMANTLING BEFORE DISMANTLING
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop

EXISTING BEAM
A RING SEATS FOR
BAMBOO POSTS
1200 1200 1200 1200 1200
MAX. MAX. MAX. MAX. MAX.

50
NET 3.5mm DIAMETER HEAVY DUTY NET

200
TARPAULIN
BD's OFFICAL USE

SCREEN TIE AT EVERY 2m


HORIZONTALLY AND VERTICALLY
WALL TIE
MAX.
1200

OVER LAPPING WIDTH NOT


LESS THAN 300mm

700
BRACING SCREEN
TIE AT CATCHFAN STEEL WIRE WITH ANCHOR BOLT 80x80x6mm
MAXIMUM SPACING 3m EQUAL ANGLE
(S275. JO)
MAX.
1200

TEMPORARY SINGLE PROPPING


@1200 C/C MAX. BOTH DIRECTION METAL SHEET
A

100
(0.5mm)
NET STEEL WIRE WITH ANCHOR BOLT
MAXIMUM SPACING 3m

A
TARPAULIN AT WALL WITHOUT OPENING
WINDOW OR WALL
A-A
MAX.
1200

BAMBOO WITH EFFECTIVE 600


DIAMETER NOT LESS THAN 40mm OPENINGS EXISTING R.C. STRICTURE
- (MIN. 150mm THK.)
100 MIN.

BAMBOO MAX. SPACING 1000 MAX.


200mm c/c
90mm (W) x 150mm (H) space
for BD's approval stamp /
STEEL WIRE WITH ANCHOR BOLT
MAXIMUM SPACING 3m TYPICAL DETAIL FOR STEEL BRACKET certification of copies of
1.5m (Mim.) AT WALL WITHOUT OPENING
WALL TIE
* ALL JOINTS TO BE 5mm F.W. ALL ROUND approved plans
(PNAP ADM-10 APP A)
TYPICAL DETAIL FOR BAMBOO CATCHFAN & SCREEN COVER NOTES ON ANCHOR BLOTS: TYPE
MIN.
EMBEDMENT MIN.
MIN.
EDGE
RECOMMENDED
LOAD TEST LOAD
CROSS BRACING (FORMED BY 25x25x3mm THICK STEEL ANGLES) EXISTING BEAM TO SOUND
CONCEITS
SPACING
(mm)
DISTANCE TENSION SHEAR
TENSION
(KN)
TYPICAL DETAILS OF PROPPING NOTES : 1. BAMBOO FOR THE CONSTRUCTION OF SCAFFOLD, AND CATCHFAN SHALL HAVE 1. ANCHOR BLOTS SHALL BE INSTALLED STRICTLY IN
(mm) (mm) (KN) (KN)
AN EFFECTIVE DIAMETER NOT LESS THAN 40mm. ACCORDANCE WITH MANUFACTURER'S SPECIFICATION
TYPICAL PLAN FOR PROPPING N.T.S.
ALL PROPS SHALL HAVE CAPACITY OF 25kN PER LEG WITH BRACING AT 2. METAL SHEET, NET AND TARPAULIN SHALL BE FASTENED TO THE BAMBOO DECK
HST
M12
70 60 75 4.0 11.7 6.0
REQUIRED SPACING TO MANUFACTURER'S RECOMMENDATION AT 4 CORNERS OF THE SHEET OR AT SPACING NO LESS THAN 1.5m APART WHICHEVER
N.T.S. IS LESS.
BD REF :

BIM REF :

FELLING OF R.C. WALL (MANUAL METHOD) 1


SS
1. REINFORCEMENT CONCRETE WALLS MAY BE DEMOLISHED BY CUTTING DOWN THE WALL INTO
MANAGEABLE SECTIONS, PRE-WEAKED AT THE WALL BASE AND PULLED DOWN ONTO
BUILDING FLOOR FOR FURTHER BREAKDOWN.
REINFORCING BARS IN THE BEAM
W1 LS2
- CONNECTING TO EXTERIOR COLUMN
TO REMAIN FOR ADDITIONAL
1M~2M 1M~2M 1M~2M SUPPORT
SS
1

BEING WITH SECTION AT MID SPAN.


BREAK AWAY A VERTICAL GROOVE
WITH SOME REINFORCING BARS
SEQUENCE FOR DEMOLITION OF STAIRCASE:
REMAIN TO SUPPORT THE LS1
STRUCTURE 1. ERECT THE STEEL PROPS AT 1.2m c/c MAX. IN BOTH DIRECTION
FB12 FB14 UNDERNEATH THE STAIRCASE BEFORE DEMOLITION.
2. DEMOLITION OF STAIR FLIGHT SS1 OF STAIRCASE.

3. DEMOLITION OF UPPER LANDING LS2


ADDITIONAL TIE WIRE FOR 1
EXTERNAL WALLS ONLY SIZE SS 4. DEMOLITION OF LOWER LANDING LS1
AND NO. OF TIE WIRE SHALL BE
DETERMINED BY THE RES. AND WALL TIE ANCHORED TO INTERIOR 5. DEMOLITION THE SUPPORTING BEAM FB9&FB12
SHALL BE SPECIFIED ON THE COLUMN OR BEAM
DEMOLITION PLANS 6. THE MAIN BEAM FB7 AND FB14 SHALL BE DEMOLISHED UNTIL
DEMOLISHED ALL THE SUPPORTING MEMBER.

FB7 LS2 FB9


EXTERNAL R.C. WALL (VIEW FROM INSIDE) SS
1
REINFORCING BARS TO REMAIN
FOR ADDITIONAL SUPPORT
600 MAX.

TIE WIRE TO PULL


THE WALL DOWN
TIE WIRE FOR ADDITION LS1
SAFETY (EXTERNAL WALLS ONLY)
SIZE AND NO. OF TIE WIRE SHALL FB12 FB14
BE DETERMINED BY THE RSE AND
PULLEY SHALL BE SPECIFIED ON THE
DEMOLITION PLANS

BREAK OUT THE CONCRETE S S1


ON THE INTERIOR FACE. CUT
DEMOLITION SEQUENCE OF STAIRCASE
REINFORCING BARS TO
REMAIN
PULLEY

SECTION W1
PRIOR TO PULLING
FB7 LS2 FB9
SS
1
CUTTING AWAY THE
REINFORCING BARS
CONNECTING THE WALL
SECTION.
REINFORCING BAR AT
THE BOTTOM TO REMAIN.
PULLING DOWN THE WALL
SECTION BY WIRE AND LS1
WINCH IN A CONTROLLED REV DATE AMENDMENT
MOTION. FB12 FB14
PROJECT
RUBBER TIRES
(OPTIONAL) CIC SAMPLE PROJECT
SECTION W1
NOTES :
THIS METHOD MAY APPLY TO BOTH HAND-FELLING OF INTERIOR AND
EXTERNAL WALLS.

FELLING OF REINFORCED CONCRETE WALL DRAWING TITLE


DETAIL FOR DEMOLITION WORKS (2 OF 2)

SCALE

DRAWING NO. REV. NO.

D005
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

N N 819792760.292
4.1

9615
YYY E 835350861.425
LEGEND:
STRE
ET

2427
4.0
N 819789844.87
E 835335928.356
PROPOSED COVERED WALKWAY STREET LIGHT

NO.98
B LO C
PROPOSED GANTRY TRAFFIC LIGHT

2
K A
CONCRETE FOOTING PILLAR BOX

SITE BOUNDARY FIRE HYDRANT


19.3

MANHOLE PEDESTRIAN RAILING

XXX
78
NO.9
12.7

STRE
76
NO.9

SCHEDULE SHOWING WIDTH OF THE WALKWAY 74


NO.9

ET
ROAD/STREET PAVEMENT CLEAR WIDTH

ZZZ
STREET/LINE REMARKS
WIDTH WIDTH OF WALKWAY NO.9
72

XXX STREET 18.5 m 2.5 m 2.0 m -


70
NO.9 SITE

ROAD
SERVICE LANE N.A. 2.6 m 1.8 m -
68
YYY STREET 15.0 m 2.4 m 1.5 m - NO.9
K.I.L
C1B1 201 +3.915
A1
WWW STREET 15.2 m 2.5 m 1.65 m - 66
NO.9 C2B2
A2
64
NO.9 C3B3
A3
3020
C4B4 12200

SITTIN
A4 3235
C5B5

G- O U
2625 A5

T AR
+3.800
+3.830

EA
NO.95
B LCO
1 Date 1 Revision 1
REV DATE AMENDMENT

0-95
K B
N 819703101.028 PROJECT
3.8 E 835368365.835

4
CIC SAMPLE PROJECT

2700
N 819700185.607 WWW
E 835353432.766
STRE
ET

10063
3.7

DRAWING TITLE

2467
HOARDING LAYOUT PLAN

BLOCK PLAN SCALE AS SHOWN@A1


1 : 500 DRAWING NO. REV. NO.

H001 1
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

XXX STREET
TYPE C TYPE C (GANTRY) TYPE C
1280 1450 625 1515 885
2665 880 200 1933 200 1987 200 2030 200 3035 200 2100 200 2030 200 1985 200 1975 200 2020 200 2300 200 2100 200 2280 200 2000 200 2000 200 2000 200 1450 200 2020 200 2300 200 2060 200 2000 200 2065 200 2000 200 2005 200 2000 200 2040 200 2000 200 2020 200 2000 200 200 2150 200 6000 200 850 1900 200 200 2000 200 1000 1450 1450 750 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
1150 1000 1000 280 2000

1600 1600 200 1500


1000

3000
1650
4165

1000 1850 1000


100

WWW STREET
YYY STREET

1400
BD's OFFICAL USE
150 2000 200 2300 200 2000 200 200 2000 200

280 1600 1550

1600 200 2400 200 1600


TYPE A

COUNTER WEIGHT FOOTING COUNTER WEIGHT FOOTING

TYPE B
1000Wx1000Lx1200H 1000Wx1400Lx1300H
1400

2300
1500
200 1200 800 200 200 1600 200 200 250
400 200

200 1615 200 1600


502 2100 200 2800 200 2850 200 2000 1600 200 1200 200 2750 200 1950 1950 200 4400 200 2200 200 200 2000 200 3500 200 2400 2400 200 4400 200 2000 1250 2000 200 2200 200 2000 200 200 2000 200 2050 200 2000 200 2050 200 2000 200 1800 200 2000 200 2000 200 2000 1120 1200 200 2480 1600 3420 200 2000 200 1650
200

200
300

1800
2100

1800

90mm (W) x 150mm (H) space


for BD's approval stamp /
400 400 certification of copies of
800 TYPE A approved plans
(PNAP ADM-10 APP A)

HOARDING LAYOUT PLAN


1 1 : 200
BD REF :

BIM REF :
MEMBER SIZE:
CONCRETE FOORING
(TYPE 1 TO V) T10 @ 250 BW
REBAR SIZE, SPACING
C1 152 x 152 x 23 kg/m UC SP2 CH1
C2 203 x 203 x 46 kg/m UC FULL PENETRATION FULL PENETRATION
BUTT WELD BUTT WELD
B1 152 x 89 x 16 kg/m UB
B2 203 x 133 x 25 kg/m UB C1
B3 254 x 146 x 31 kg/m UB X
B1
-
B4 457 x 191 x 74 kg/m UB
B5 178 x 102 x 19 kg/m UB
SB1,MB1 305 x 165 x 54 kg/m UB 4mm FILLET WELD ALL B1
ROUND
CH1 127 x 64 x 12.9 kg/m CHANNEL @ 300c/c
CH2 76 x 38 x 6.7 kg/m CHANNEL @ 600c/c
SECTION X 100X100X6mm THK. M.S.
SP1 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT
SCALE 1:10 STIFFENER
SP2 3mm STEEL PLATE IF GRADE S275 OR EQUIVALENT
STIFFENER PLATE 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT

CONNECTION DETAIL
DETAIL 2 DETAIL 3
OF STEEL POST 1 : 10 1 : 10
SCALE 1:10
CH1

225mm(H) B.L. SP1


SP2

1105
SP1 CONTINUOUS
CH1 CH1 1:50
C1
CONCRETE
C1 BLOCK
C1 CH1
CH1
B2 B1
B1 4mm FILLET WELD SP1 SP2 B4
B1 ALL ROUND

B.L.
B1 CH1 CH1
100X100X6mm THK. CH2
4mm FILLET WELD ALL B1 100mm(H)
ROUND M.S. STIFFENER 6mm FILLET WELD
M6 S.S SELF TAPPING SCREW WITH ALL ROUND CONTINUOUS 100mm(H) CH1
CORRUGATED METAL 2mm THK. NEOPRENG WASHER OF 1:50
SP1 CONTINUOUS
SHEET 0.4mm THK.
CONCRETE
100X100X6mm THK. M.S. BOLTING AS SPECIFIED BY CONCRETE 1:50
B1 BLOCK DETAIL 1
STIFFENER CORRUGATED STEEL SHEET CLADDING B1 CH1 DETAIL 4 BLOCK
MANUFACTURER @ 300c/c
CH1 SP2

450
REV DATE AMENDMENT
B1 1:50 SP2
1:50

5500
DETAIL 3 PROJECT
DETAIL 4 DETAIL 6 WATERPROOF
B1
B1
CIC SAMPLE PROJECT
1 : 10 1 : 10 FLUORESCENT DETAIL 6 CH1
LAMP
C1
DETAIL 1 CORRUGATED
SLIDING GATE C1
METAL SHEET CH2 DRAWING TITLE
1 : 10 CH2

2200
WITH MESH
DOOR PANELS
HOARDING TYPICAL DETAILS

1100
DETAIL 7 DETAIL 5
C1 500 (MIN.)
CORRUGATED

800
C1 CONCRETE FOOTING 500 (MIN.)
CONCRETE FOOTING
METAL SHEET
2800L. x 250W. x 1100H. 2800L. x 250W. x 800H. SCALE AS SHOWEN@A1
250 1500 (MIN.) 250 250 1500 (MIN.) 250
R.C. FOOTING R.C. FOOTING
DRAWING NO. REV. NO.
CH2 (AT 500 c/c)
H002
4mm FILLET WELD TYPICAL SECTION OF HOARDING TYPE C TYPICAL SECTION OF GANTRY TYPE C SOURCE ---
T10-250 E.F. ALL ROUND M6 S.S SELF TAPPING SCREW
WITH 2mm THK. NEOPRENG
1 1 : 50 2 1 : 50
WASHER OF BOLTING AS
800

SPECIFIED BY CORRUGATED
800

STEEL SHEET CLADDING 90mm (W) x 40mm (H) space


T10-250 c/c for COMPANY LOGO
MANUFACTURER @ 300c/c

CORRUGATED
2
200x200x6mm THK. METAL SHEET
H002
STEEL PLATE CH1
200x200x6mm THK.
0

250/300/450/500 STEEL PLATE


0

90mm (W) x 60mm (H) space


DETAIL 5 DETAIL 7 for AP/RSE/RGE's
B1 signature/ and stamp chop
1 : 10 1 : 10 B2
1
H002

CH1
CH1 BD's OFFICAL USE
5500 (CLEAR)

DETAIL 2

600mm TUBE LIGHT AT


3000mm c/c
90mm (W) x 150mm (H) space
CORRUGATED
for BD's approval stamp /
METAL SHEET certification of copies of
1100

1100
approved plans
2800L. x 250W. x 1100H.
800

800

(PNAP ADM-10 APP A)


CH2 CH2
R.C. FOOTING
100

STEEL CASTOR 2800L. x 250W. x 800H.


METAL GATE R.C. FOOTING
200 2400 200 2000 200 2400 200 2000 200 2400 200 6000 Max. 200 2400 200 2000 200 2400 200 2000 200 2400 200

SECTION OF
HOARDING TYPE C

ELEVATION OF COVERED WALKWAY & GANTRY


A 1 : 50
BD REF :

BIM REF :
SCHEDULE OF WALING SCHEDULE OF SECONDARY STRUT AND CORNER STRUT
GENERAL NOTES: STANDARD FOR FILLING WORK NOTES ON PRE-BORING FOR INSTALLATION OF SHEET PILES
SCHEDULE OF WAILING SCHEDULE OF SECONDARY STRUT AND CORNER STRUT
1. ALL DIMENSIONS ARE IN mm AND LEVELS IN mPD. 1. FILL MATERIAL SHALL BE GRADED, CONTAINING NO PARTICLES COARSER THAN 200mm 1. THE PRE-BORED HOLES SHALL BE SUNK ALONG THE ALIGNMENT OF THE SHEET PILE
2. ALL DESIGN SHALL COMPLY WITH HONG KONG BUILDING (CONSTRUCTION) REGULATION 1990 AND THE PERCENTAGE BY MASS PASSING 75mm BS TEST SIEVE SHALL BE 75% TO WALL USING SYMMETRIX DRILLING METHOD. THE PRE-BORED HOLES SHALL BE COMPRESSION STRUT LEVEL
SHEAR (kN) MOMENT (kNm) PILE TYPE LAYER STRUT MEMBER SIZE
PILE (kN) (mPD)
EDITION AND STRUCTURAL DESIGN OF STEEL IS IN ACCORDANCE WITH THE CODE OF 100%. SUPPORTED BY TEMPORARY STEEL CASING ALONG THE FULL DEPTH OF THE EXCAVATION. LAYER WALING MEMBER SIZE
TYPE =1.4*Fh* =1.4*Fh* =1.4*Fh* A 1 203X203X46 kg/m UC +3.1
PRACTICE FOR THE STRUCTURAL USE OF STEEL 2011. 2. THE IN SITU FIELD DRY DENSITIES OF COMPACTED MATERIALS FORMING THE 2. THE PRE-BORED HOLES SHALL BE DRILLED IN ACCORDANCE WITH THE FOLLOWING (1.414*3.15) (0.6*3.15) (3.15^2/9) A 2 356X368X202 kg/m UC +1.6
3. THIS SET OF DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOUNDATION PLAN. EARTH FILL SLOPE SHALL BE NOT LESS THAN 95% OF THE MAXIMUM DRY REQUIREMENTS: - A 3 356X368X202 kg/m UC +0.1
A 1 533X210X92 kg/m UB 531 228 100
4. THE CONTRACTOR SHALL CHECK ALL RELEVANT DRAWINGS AND VERIFY LEVELS AND DENSITY DESCRIBED IN ITEM (2) BELOW. a) DEVIATION FROM THE CORRECT LINE FOR THE LOCATION NOT A 2 533X210X92 kg/m UB 803 344 151 A 4 356X368X202 kg/m UC -1.4
DIMENSIONS IN ADVANCE OF THE WORK AND WORK AND REPORT ANY DISCREPANCY TO 3. THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENTS SHALL BE GREATER THAN 20mm. A 3 610X305X179 kg/m UB 1550 665 291 A 5 356X406X235 kg/m UC -2.9
THE ENGINEER IMMEDIATELY. DETERMINED IN ACCORDANCE WITH THE STANDARD GIVEN IN GEO SPEC 3 b) DEVIATION FROM VERTICALITY OF INDIVIDUAL PRE-BORED HOLES IN A 4 610X305X179 kg/m UB 2791 1196 524 A 6 356X406X235 kg/m UC -4.4
5. ALL EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED GROUND LEVEL AFTER CLAUSE 10.1 & 10.2. EACH SOIL TYPE SHALL BE TESTED WHEN FIRST USED ANY DIRECTION SHALL BE LESS THAN 1:100. A 5 610X305X238 kg/m UB 3952 1694 741 A 7 356X406X235 kg/m UC -5.9
COMPLETION OF FOUNDATION CONSTRUCTION. THEREAFTER AT THE SAME TIME AS EVERY SET OF FIELD DENSITY TESTS c) DRILL 250mm MINIMUM DIAMETER HOLES FROM EXISTING GROUND A 6 610X305X238 kg/m UB 5088 2181 954 A 8 356X406X235 kg/m UC -7.4
6. THE CONSTRUCTION SEQUENCE FOR EXCAVATION AND LATERAL SUPPORT, REFER TO ARE OBTAINED. RECORDS SHALL BE KEPT, IDENTIFYING ON DRAWINGS THE LEVEL TO THE REQUIRED LEVEL BY SYMMETRIX DRILLING METHOD. A 7 610X305X238 kg/m UB 4971 2131 932 AA 1 203X203X46 kg/m UC +3.1
DRG. NO. S-ELS-006 TO 007. SOIL TYPE, PLAN LOCATION AND ELEVATION REFERENCE TO PRINCIPAL DATUM 3. AFTER DRILLING THROUGH TO THE REQUIRED DEPTH OF OBSTRUCTIONS THE A 8 914X305X289 kg/m UB 5934 2543 1113 AA 2 356X368X202 kg/m UC +1.6
7. THE INSTALLATION OF SHEET PILE SHALL BE WALL CARRIED OUT TO ACCORDING TO OF EACH TEST TOGETHER WITH THE MAXIMUM DRY DENSITY AND OPTIMUM INTERIOR OF EACH CASING SHALL BE FILLED WITH APPROVED GRANULAR BACKFILL AA 1 533X210X92 kg/m UB 464 199 87 AA 3 356X368X202 kg/m UC +0.1
APPROVAL DRAWINGS PRIOR TO THE COMMENCEMENT OF EXCAVATION AND MOISTURE CONTENTS. GRAPHS OF DRY DENSITY VS MOISTURE CONTENTS, MATERIAL SHALL BE TOPPED UP IMMEDIATELY. AA 2 533X210X92 kg/m UB 1186 509 223 AA 4 356X368X202 kg/m UC -1.4
LATERAL SUPPORT WORKS. LABORATORY TEST RECORD SHEETS AND A COMPLETE SOIL DESCRIPTION ARE 4. UPON COMPLETION SHEET PILE WALL SHALL BE INSTALLED TO THE REQUIRED TOE AA 3 610X305X179 kg/m UB 1760 755 330 AA 5 356X406X235 kg/m UC -2.9
AA 4 610X305X238 kg/m UB 3020 1294 567 AA 6 356X406X235 kg/m UC -4.4
TO BE KEPT IN A COMPANION FOLDER. LEVEL BY THE METHOD APPROVED BY THE RSE. THROUGH A GUIDE FRAME AT
AA 5 610X305X238 kg/m UB 3662 1570 687 AA 7 356X406X235 kg/m UC -5.9
4. THE IN SITU FIELD DENSITY AND MOISTURE CONTENTS SHALL BE DETERMINED GROUND LEVEL TO ENSURE PROPER PITCHING, VERTICALITY AND ALIGNMENT OF
NOTES ON CONSTRUCTION MATERIAL AA 6 610X305X238 kg/m UB 3705 1588 695 B 1 203X203X46 kg/m UC +3.1
IN ACCORDANCE WITH THE STANDARD GIVEN IN GEO SPEC 3 CLAUSE 11.1 SHEET PILE WALL
AA 7 610X305X238 kg/m UB 3884 1665 729 B 2 356X368X202 kg/m UC +0.1
1. STRUCTURAL STEEL MEMBERS & PNAP 55 TO DETERMINE THE RELATIVE COMPACTION ACHIEVED. THE 5. NO WITHSTANDING THE ABOVE-MENTIONED MINIMUM PRE-BORING REQUIREMENTS, B 1 533X210X92 kg/m UB 964 413 181 B 3 356X368X202 kg/m UC -2.9
a. ALL STRUCTURAL STEEL MEMBERS SHALL BE GRADE S355 (CLASS 1) WELDABLE NUMBER OF DETERMINATIONS FOR EACH BATCH OF FILL MATERIAL SHALL BE IT IS THE CONTRACOTR'S RESPONSIBILITY TO PROVIDE ANY ADDITIONAL B 4 356X406X235 kg/m UC -4.4
B 2 610X305X179 kg/m UB 2532 1085 475
STRUCTURAL STEEL AND COMPLY WITH TO BS EN 10025:2004. AS STATED IN TABLE 1 BELOW. RECORDS SHALL BE KEPT, IDENTIFYING ON PRE-BORING OR ALTERNATIVE MEASURES TO ENSURE THAT ALL SHEET PILE WALLS B 3 610X305X179 kg/m UB 2538 1088 476 B 5 356X406X235 kg/m UC -5.9
b. ALL WELDING SHALL COMPLY WITH THE CODE OF PRACTICE FOR STRUCTURAL USE OF DRAWINGS THE SOIL TYPE, PLAN LOCATION AND ELEVATION REFERENCE TO ARE TO BE PRESSED IN FREE OF OBSTRUCTIONS TO ACHIEVE THE REQUIRED TOE B 4 610X305X238 kg/m UB 3705 1588 695 B 6 356X406X235 kg/m UC -7.4
STEEL 2005, BS EN 1011-1:2009, BS EN 1011-2:2001 & BS EN 499:1995. PRINCIPAL DATUM OF EACH TEST TOGETHER WITH DRY DENSITY OF SOIL TESTED, LEVELS SPECIFIED. B 5 610X305X238 kg/m UB 3847 1649 722 C 1 203X203X46 kg/m UC +3.1
c. ALL CONNECTIONS SHALL BE 10mm FILLET WELDS ALL ROUNDED UNLESS OTHERWISE MOISTURE CONTENTS AND RELATIVE COMPACTION ACHIEVED (%). THE FIELD 6. THE CONTRACTOR SHALL SUBMIT A DETAILED METHOD STATEMENT TOGETHER WITH B 6 610X305X238 kg/m UB 3260 1398 612 C 2 356X368X177 kg/m UC +0.1
SPECIFIED. SHEETS, CALCULATION SHEETS AND A COMPLETE SOIL DESCRIPTION ARE TO BE THE PLANT AND EQUIPMENT FOR PRE-BORING to AP, RSE & RGE FOR APPROVAL C 1 533X210X92 kg/m UB 803 344 151 C 3 356X368X177 kg/m UC -2.9
d. SAMPLES OF WELDING MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE KEPT IN A COMPANION FOLDER. BEFORE COMMENCEMENT OF WORKS. THE PROPOSED METHOD AND SEQUENCE OF C 2 610X305X179 kg/m UB 2594 1112 487 C 4 356X368X202 kg/m UC -5.9
SUBMITTED TO RSE FOR APPROVAL. ALL WORKS, MATERIALS AND TESTING 5. ALL TESTS SHALL BE CARRIED OUT BY OR UNDER THE SUPERVISION OF THE PRE-BORING SHALL BE ARRANGED SO AS TO MINIMIZE THE CONSTRUCTION NOISE C 3 610X305X238 kg/m UB 4156 1781 780
SUCH AS TESTING OF STEEL BAR SHALL COMPLY WITH GENERAL SPECIFICATION FOR GEOTECHNICAL ENGINEER, OR BY AN INDEPENDENT TESTING AGENCY. DURING PRE-BORING. C 4 914X305X289 kg/m UB 6372 2731 1195
CIVIL ENGINEER WORKS 1992 EDITION AND HONG KONG BUILDING(CONSTRUCTION) 7. SHALL ANY UNDUE SETTLEMENT OCCUR DUE TO PRE-BORING, THE CONTRACTOR
REGULATION 1990 EDITION UNLESS OTHERWISE STATED IN THE DRAWING. SHALL SUBMIT A REMEDIAL PROPOSAL FOR THE APPROVAL OF THE RSE TO PREVENT
NOTES ON PROTECTION OF EARTHWORKS AGAINST HEAVY RAINFALL FURTHER UNDUE SETTLEMENT PRIOR TO THE RE-COMMENCEMENT OF THE
1. SURFACE WATER FLOWING INTO AND OUT OF THE SITE SHALL BE PRE-BORING WORKS. SECTION PROPERTIES OF WAILING
NOTES FOR EXCAVATION AND LATERAL SUPPORT (ELS) WORKS (TEMPORARY) INTERCEPTED AND CONDUCTED FROM THE SITE TO AN INDICATED SAFE 8. THE CONTRACTOR SHALL KEEP RECORD OF EACH PRE-BORED HOLES FOR
DISCHARGE POINT. AT EACH INTERSECTION AND ABRUPT CHANGE IN ENGINEER INSPECTION. SECTION PROPERTIES OF WAILING
1. THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR THE ERECTION, MAINTENANCE AND
DIRECTION OF SURFACE DRAINAGE, CHANNELS AND ACCESSIBLE CATCH MOMENT OF SECTION WEB FLANGE
REMOVAL OF ALL TEMPORARY WORKS DURING CONSTRUCTION.
PIT SHALL BE PROVIDED. ALL DRAINAGE WORKS SHALL BE KEPT CLEAR SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
2. NECESSARY PRECAUTIONS SHALL BE TAKEN TO PREVENT DAMAGE TO EXISTING FOUNDATIONS,
OF DEBRIS. SOIL PARAMETER ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
DRAINS, PAVEMENTS, FEATURES, SERVICES ETC. SHOULD ANY DAMAGE OCCUR, NOTIFY THE
2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WORKS DISCHARGE WITHIN
ARCHITECT AND RELEVANT AUTHORITIES CONCERNED IMMEDIATELY AND MAKE GOOD BY THE
THE SITE, A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE DISCHARGE POINT. SOIL PARAMETER 533X210X92 kg/m UB S355 117 55200 92 2070 533.1 209.3 10.1 15.6
CONTRACTOR AT NO EXTRA COST AND NO EXTENSION OF TIME. Ø' (DEGREE) C' (kpa) 610X305X179 kg/m UB S355 228 153000 179 4930 620.2 307.1 14.1 23.6
3. DURING EXCAVATION, A METHOD OF WORKING SHALL BE ADOPTED IN WHICH
3. ALL TEMPORARY WORKS SHALL BE WITHIN THE SITE BOUNDARY.
THE MINIMUM AMOUNT OF BARE SOIL IS EXPOSED AT ANY TIME. EXCAVATION FILL 33 1 610X305X238 kg/m UB S355 303 209000 238 6590 635.8 311.4 18.4 31.4
4. DURING SUBSTRUCTURE CONSTRUCTION, THE GROUNDWATER LEVEL SHALL BE KEPT BELOW THE
TO FORM THE FINAL FACE SHALL BE FOLLOWED UP IMMEDIATELY WITH MD 33 1
FINAL FORMATION LEVEL. 914X305X289 kg/m UB S355 368 504000 289 10900 926.6 307.7 19.5 32.0
SURFACE PROTECTION AND DRAINAGE WORKS AND THE FACE PANEL SIZE
5. THE CONTRACTOR SHALL INCREASE THE FREQUENCY OF MONITORING AS INSTRUCTED BY THE ALL. 32 2
SHALL BE SMALL ENOUGH TO PERMIT THIS.
ENGINEER SHOULD ANY UNDUE GROUND MOVEMENT BE OBSERVED. CDG 34 5 REV DATE AMENDMENT
4. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE, THEY
6. MAX. ANGLE FOR TEMPORARY SOIL CUT SLOPE SHALL BE REFERRED TO PLANS AND SECTION PROPERTIES OF STRUTS
SHALL BE PROTECTED WITH HEAVY DUTY SHEETING ADEQUATELY SECURED PROJECT
SECTIONS. BUT IN NO CIRCUMSTANCE BE GREATER THAN 20?IN MD LAYER.
AT THE EDGES, SEALED AT THE CREST, AND LAPPED AT JOINTS. WHERE CIC SAMPLE PROJECT
SLOPE FACES ARE TO BE TEMPORARILY EXPOSED FOR MORE THAN TWO SECTION PROPERTIES OF STRUTS
WEEKS, TEMPORARY DRAINS SHALL BE INSTALLED IN ADDITION TO SURFACING. SCHEDULE OF VERTICAL TIE
NOTES ON STRUCTURAL STEELWORK MOMENT OF SECTION WEB FLANGE
5. TRENCHES ON/OR ADJACENT TO SLOPES SHALL BE EXCAVATED WITH SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
1. ALL STRUCTURAL STEELWORK SHALL BE COMPLED WITH CODE OF PRACTICE FOR THE STRUCTURAL SCHEDULE OF VERTICAL TIE
EXTREME CARE IN SHORT SECTIONS AT A TIME. PRECAUTIONS SHALL ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
USE OF STEEL 2011. ALWAYS BE TAKEN TO PREVENT WATER ENTERING AND CONNECTING ITEM MEMBER MARK GRADE MEMBER SIZE
2. ALL LEVEL SHOWN ARE IN METERS AND OTHER DIMENSIONS SHOWN ARE IN MILLIMETERS UNLESS IN THE TRENCHES.
203X203X46 kg/m UC S355 58.7 4570 46 450 203.2 203.6 7.2 11.0
VERTICAL TIE D4 S355 UBP356x368x174 DRAWING TITLE
OTHERWISE STATED. 305X305X97 kg/m UC S355 123 22200 97 1450 307.9 305.3 9.9 15.4
3. ALL STRUCTURAL STEEL SECTION SHALL BE WELDABLE STRUCTURAL STEEL TO BS EN 10025:2004 FOR REFERENCE ONLY EXCAVATION & LATERAL SUPPORT
UNLESS OTHERWISE NOTED. NOTES ON SHEET PILING SCHEDULE OF HORIZONTAL TIE 356X368X177 kg/m UC S355 226 57100 177 3100 368.2 372.6 14.4 23.8 GENERAL NOTES
4. DESIGN SURCHARGE: 1. STEEL SHEET PILES TO COMPLY WITH BS EN 1993-5 2007 GRADE S355. 356X368X202 kg/m UC S355 257 66300 202 3540 374.6 374.7 16.5 27.0
a) BACK SERVICE LANE (2.0m WIDE) : 10kPa SCHEDULE OF HORIZONTAL TIE
2. UPON COMPLETION OF INSTALLING SHEET PILE WALLS, A RECORD PLAN FOR SHEET 356X406X235 kg/m UC S355 299 79100 235 4150 381.0 394.8 18.4 30.2
b) RECLAMATION STREET (9.0m WIDE) : 20kPa PILES SHALL BE SUBMITTED TO THE BUILDING AUTHORITY VIA THE R.S.E. FOR CONSENT ITEM MEMBER MARK GRADE MEMBER SIZE
c) FOOTPATH ALONG RECLAMATION STREET (2.0m WIDE) : 5kPa APPLICATION.
356X406X287 kg/m UC S355 366 99900 287 5070 393.6 399.0 22.6 36.5
d) BEARING PRESSURE AT HOARDING FOOTPATH (0.45m WIDE) : 20kPa TIE T1 S355 UC203x203x46 SCALE 1 : 100@A1
3. IN CASE ROCK OR OBSTRUCTION DUE TO BOULDER OR CORESTONE IS ENCOUNTERED,
e) D.L. & L.L. OF EXISTING BUILDING VIA PILING SYSTEM : PREBORING SHOULD BE CARRIED OUT.
(REFER TO RECORD PLAN) DATUM FOR SURCHARGE AT DRAWING NO. REV. NO.
4. TOLERANCE - THE MAXIMUM PERMISSIBLE DEVIATION FROM THE VERTICAL AT ANY LEVEL SECTION PROPERTIES OF SHORT STRUT / SPACER
SCHEDULE OF MAIN STRUT
2/3 OF THE LENGTH OF PILE MEASURED FROM GROUND LEVEL
f) LIVE LOAD FOR EACH LAYER OF WALING/ STRUT : 2kPa
OF A FINISHED PILE IS 1 IN 75. E001
5. THE SHEET PILE WALLS SHALL BE INSTALLED BY PRESS-IN, NO VIBRO DRAWING IS ALLOWED SECTION PROPERTIES OF SHORT STRUT / SPACER
SCHEDULE OF MAIN STRUT
DURING INSTALLATION.
PILE STRUT LEVEL HORIZONTAL DESIGN LOAD
MOMENT OF SECTION WEB FLANGE SOURCE ---
NOTES ON WELDING LAYER WALING MEMBER SIZE SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
TYPE (mPD) LOAD (kN/m) FOR STRUT (kN)
A 1 203X203X46 kg/m UC +3.1 86 569 ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
1. THE CONTRACTOR SHALL SUBMIT TO AP/ RSE HIS PROPOSED PROCEDURE NOTES ON EXISTING SERVICES, UTILITIES AND STRUCTURES
FOR WELDING. WELDING PROCEDURE WILL BE TESTED IN ACCORDANCE WITH A 2 305X305X97 kg/m UC +1.6 130 860 152x89x24 kg/m CH S355 30.4 1168 23.87 153 152.4 88.9 7.1 11.6
BS EN ISO 15614-1:2004+A1:2008. 1. BEFORE CONSTRUCTION COMMENCES, THE CONTRACTOR SHALL CONSULT THE VARIOUS A 3 356X368X177 kg/m UC +0.1 251 1661
90mm (W) x 40mm (H) space
SERVICES AND UTILITY AUTHORITIES FOR THE EXTENT OF WORKS TO BE CARRIED OUT. A 4 356X368X177 kg/m UC -1.4 452 2990
2. THE CONTRACTOR SHALL ONLY USE QUALIFIED WELDERS WHO HAVE DEMONSTRATED A 5 356X368X202 kg/m UC -2.9 640 4234
for COMPANY LOGO
THEIR COMPETENCE IN WELDING TO THE AGREED PROCEDURE. EACH WELDER 2. THE CONTRACTOR SHALL EXERCISE DUE CARE DURING THE WORKS ON SITE TO AVOID
A 6 356X406X235 kg/m UC -4.4 824 5451 SECTION PROPERTIES OF TIE
WILL BE TESTED AS DESCRIBED IN BS EN 287-1:2004. CAUSING DAMAGE TO ADJACENT STRUCTURES PAVETMENT, UTILITIES/SERVICES, PRIVATE
A 7 356X406X287 kg/m UC -5.9 805 5326
3. ALL WELDS SHALL MEET THE ACCEPTANCE CRITERIA LAID DOWN IN BS EN 1011-1:2009 AND GOVERNMENT PROPERTIES.
A 8 356X406X287 kg/m UC -7.4 961 6358 SECTION PROPERTIES OF HORIZONTAL TIE
& BS EN 1011-2:2001. 3. SHOULD ANY DAMAGE OCCUR TO THE ADJACENT STRUCTURES, PAVEMENT,
B 1 203X203X46 kg/m UC +3.1 156 1032
UTILITIES/SERVICES, MOMENT OF SECTION WEB FLANGE
4. UPON REQUESTED BY THE ARCHITECT WELDS WILL BE TESTED BY RADIOGRAPHIC B 2 356X368X177 kg/m UC +0.1 410 2713
PRIVATE AND GOVERNMENT PROPERTIES DUE TO THE CONTRACTOR'S WORKS, THE SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
EXAMINATION TO BS EN 1435:1997 OR ULTRASONIC EXAMINATION TO BS EN 1714:1998 B 3 356X368X177 kg/m UC -2.9 411 2719
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COST INCURRED FROM THE DAMAGE. THE ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
5. UNLESS OTHERWISE APPROVED, ALL SPLICES TO BE CONTINUOUS FULL-STRENGTH B 4 356X368X202 kg/m UC -4.4 600 3969
FULL PENETRATION BUTT WELDS. CONTRACTOR SHALL REPAIR, REINSTATE AND MAKE GOOD ANY DAMAGE DUE TO THE B 5 356X368X202 kg/m UC -5.9 623 4122 203X203X46 kg/m UC S355 58.7 4570 46 450 203.2 203.6 7.2 11.0
6. UNLESS OTHERWISE STATED, ALL FILLET WELDS SHALL BE 8mm ALL ROUND. CONTRACTOR'S WORKS TO THEIR ORIGINAL CONDITIONS OR TO THE SATISFACTION OF THE CM, B 6 356X406X235 kg/m UC -7.4 528 3493
7. ALL IMPROPER MATERIALS (e.g. SLAG, DIRT, IRREGULARITIES, OIL etc.) TO BE UNLESS OTHERWISE SPECIFIED. C 1 203X203X46 kg/m UC +3.1 130 860
REMOVED FROM JOINTS PRIOR TO WELDING. C 2 356X368X177 kg/m UC +0.1 420 2779 SECTION PROPERTIES OF VERTICAL TIE 90mm (W) x 60mm (H) space
C 3 356X368X202 kg/m UC -2.9 673 4452 for AP/RSE/RGE's
8. ALL WELDING SHALL COMPLY WITH BS EN 1011, P.T. 1:2009, P.T. 2:2001. PRECAUTIONARY MEASURES TO PREVENT THE SECTION WEB FLANGE
C 4 356X406X287 kg/m UC -5.9 1032 6827 signature/ and stamp chop
9. SAMPLES OF ALL MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE SUBMITTED TO OCCURRENCE OF OVER BREAK DURING PREBORING SECTION AREA MOMENT OF WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
RSE FOR APPROVAL. ALL WORKS, MATERIALS AND TESTING SUCH AS TESTING OF STEEL 1. A PROCEDURE SHALL BE CARRIED OUT TO MONITOR THE CONDITION OF OVER ITEM GRADE (cm²) INERTIA (kg/m) (cm³) (mm) (mm) (mm) (mm)
BAR SHALL COMPLY WITH GENERAL SPECIFICATION FOR CIVIL ENGINEER WORKS 1992 EDITION AND BREAK. IF THE DRILL BIT IS FOUND NOT TO PROPAGATE AFTER A CONSIDERABLE 356X368X174 kg/m UBP S355 221 51000 173.9 2820 361.4 378.5 20.3 20.4
HONG KONG BUILDING (CONSTRUCTION) REGULATION UNLESS OTHERWISE STATED IN AMOUNT OF DRILLING, THE OPERATOR OF THE DRILLING RIG SHALL STOP THE
THE DRAWING. DRILLING PROCESS AND INFORM THE ENGINEER IMMEDIATELY. THE RGE/RSE SHALL
REVIEW THE GEOLOGY OF THE SPECIFIC LOCATION. PROPOSAL TO LIMIT ANY OVER
BREAK OF SOIL SHALL BE SUBMITTED TO AND AGREED BY THE RSE/RGE PRIOR TO
NOTES ON SITE SUPERVISION ANY FURTHER DRILLING WORKS MAY COMMENCE. BD's OFFICAL USE
THE TCP T5 SITE SUPERVISION PERSONNEL UNDER THE RGE'S STREAM SHALL SUBMIT 2. SHOULD ANY UNDUE OVER BREAK OF SOIL OBSERVED DURING THE DRILLING
REGULAR REPORTS OF HER/HIS/THEIR FINDINGS AND RECOMMENDATIONS TO THE RGE. THE OPERATIONS, THE DRILLING AT THAT LOCATION SHOULD BE STOPPED AND THE RSE
RGE SHALL FORMALLY SUBMIT THESE REPORTS TO THE BD AND PROVIDE A COPY TO THE SHALL BE INFORM IMMEDIATELY. THE MONITORING DATA AND METHOD OF
GEO AT MONTHLY INTERVALS OR MORE FREQUENTLY AS NECESSARY PREBORING SHALL BE REVIEWED. PROPOSAL TO LIMIT ANY FURTHER OVER BREAK
TYPICAL CONTENTS OF THE REGULAR REPORTS PREPARED BY THE TCP T5 SITE OF SOIL SHALL BE SUBMITTED AND AGREED WITH RSE PRIOR TO ANY FURTHER
SUPERVISION PERSONNEL INCLUDE THE FOLLOWING: DRILLING WORKS MAY COMMENCE.

(1) PROGRESS OF THE WORKS PRECAUTIONARY MEASURES FOR PREBORING METHOD


(2) RESULTS OF MONITORING DURING CONSTRUCTION DRILL PIPE B
(3) SITE OBSERVATIONS 1. (a) THE AMOUNT OF AIR SUPPLY TO LIMIT THE PRESSURE OF DRILLINGS SHOULD BE y T
(4) INSPECTION RECORDS MONITORED. AIR AND

t
(5) REVIEW (b) THE ADVANCEMENT RATE OF DRILL BIT SHOULD BE MONITORED DURING THE BORING. CUTTINGS FLOW
2. THE OVERBREAK SHOULD NOT BE ALLOWED.

°
95
TEMPORARY CASING
3. THE DRILL BIT SHOULD BE ADVANCED SIMUTANOUSLY WITH THE STEEL CASING. t t
WITH INDEPENDENT T

h
x 90mm (W) x 150mm (H) space

D
ROTARY ACTION
for BD's approval stamp /
DEPROPPING SEQUENCE OF STRUTS RETRACTABLE certification of copies of
DRILL BIT t approved plans
ALL STRUT SHALL NOT BE REMOVED UNTIL CONSTRUCTION UP TO THE GROUND FLOOR

D
B w (PNAP ADM-10 APP A)
OF THE SUPERSTRUCTURE HAS BEEN COMPLETED AND THE REQUIRED 28-DAY CONCRETE x
STRENGTH HAS BEEN ACHIEVED. RING BIT UBP & UC
STAGE 1 : CAST PILE CAPS, STRAP/ GROUND BEAM (UNDER SEPARATE SUBMISSION)
STAGE 2 : CAST BASEMENT WALL, COLUMN, WALL, BEAM & SLAB OF B1/F & G/F FSP IV/VIL SHEET PILE

T
(UNDER SEPARATE SUBMISSION)
b
STAGE 3 : REMOVE ALL STRUTS WHEN G/F SLAB AND BASEMENT WALL ACHIEVE
28 DAYS OF STREMGTH
SCHEMATIC DETAILS OF RING BIT CHANNEL
DRILLING SYSTEM FOR OVERCOMING
UNDERGROUND OBSTRUCTIONS

N.T.S.
BD REF :

BIM REF :

LEGEND:
SHEET PILE SCHEDULE
N 4.1

N 819792760
POINT
BOUNDARY COORDINATES
E (m) N (m)
SITE BOUNDARY YYY E 835350861 A 835335.928 819789.845
STRE
FINAL MIN ET B B 835350.861 819792.76
BH1, BH1(P) EXISTING BOREHOLE SHEET PILE TOE LEVEL MAX RETAINING 4.0
MEMBER SIZE EXCAVATION EMBEDMENT GRADE A
TYPE (mPD) HEIGHT (m) N 819789845 C 835368.366 819703.101
LEVEL (mPD) LENGTH (m)
PROPOSED SHEET PILE E 835335928
A FSP-VIL (BOX TYPE) -23.000 12.675 -10.325 14.225 S275 D 835353.433 819700.186

NO.9
BLO C
PROPOSED SHORT STRUT AA FSP-VIL -18.900 11.275 -7.375 11.525 S275

82
K A
4.5 EXISTING LEVEL B FSP-VIL -18.900 12.175 -8.075 10.825 S275
C FSP-IV -18.900 12.175 -8.075 10.825 S275
PROPOSED MAX. 30° D CHS508.0*16.0 -18.900 11.275 -7.375 11.525 S275
OPEN CUT SLOPE
19.3
KA1 KA1

XXX
PROPOSED STRUT
SA1 SA1 78
NO.9
SHEET PILE SECTION PROPERTIES 12.7

STRE
76
+2.90 PROPOSED EXCAVATION LEVEL DIMENSIONS (mm) MOMENT OF SECTION SECTION AREA MOMENT OF SECTION NO.9
SECTION AREA WEIGHT (PER WEIGHT (PER 1m
MEMBER SIZE INERTIA (PER MODULUS (PER (PER 1m PILE) INERTIA (PER 1m MODULUS (PER
w h t (PER PILE) (cm²) PILE) (kg/m) PILE) (kg/m) NO.9
74
PILE) (cm4) PILE) (cm³) (cm²) PILE) (cm4) 1m PILE) (cm³)
PROPOSED BASEMENT WALL

ET
ZZZ
(UNDER SEPARATE SUBMISSION) FSP IV 400 170 15.5 97 4670 76.1 362 242.5 38600 153 2270 72
NO.9
T1 PROPOSED TIE FSP VIL 500 225 27.6 153 11400 120 680 306 86000 300 3820 SITE
70
FSP VIL (BOX) 500 207 27.6 306 22800 240 1360 306 172000 600 7640 NO.9

ROAD
GAS GAS PIPE K.I.L 201
68
S WAT SALT WATER PIPE NO.9

ELEC ELECTRIC CABLE NO.9


66

FOUL FOUL WATER PIPE 64


NO.9
F WAT FRESH WATER PIPE

SITTIN
G-OUT
AR EA
NO.9
BLCO

50-95
K B
REV DATE AMENDMENT

3.8 PROJECT

4
N 819703101
C E 835368366 CIC SAMPLE PROJECT
D WWW
STRE
ET
3.7
N 819700186
E 835353433
DRAWING TITLE
BLOCK PLAN EXCAVATION & LATERAL SUPPORT
1 : 500 LAYOUT PLAN

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

E002
SOURCE ---
4.1

XXX STREET 90mm (W) x 40mm (H) space


for COMPANY LOGO

WWW STREET
P-A P-B P-C P-D P-E P-F P-G P-H P-J

3.8
TYPE C SHEET PILE (TOE LEVEL -18.9 mPD) TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)
91352
39627 22150 23509 6066
3152 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150
-42.0 B BH4 BH6(P) BH10(P)
C
BH2(P) 12602 9450
BH8 90mm (W) x 60mm (H) space
0
for AP/RSE/RGE's
3043

3043
-8.075 -8.075
P-4 -8.075 signature/ and stamp chop

TYPE D SHEET PILE(TOE LEVEL -18.9mPD)


W1 W1 W1

T1
T1

CS

2579
-44.0 6 KC KC KA
CS 6 6 6 6 6 CS 6
KC

KB

KB

KB

KA
6

6 6 6
KC KB KB KB KA
6

6
6
KC

KC

KA
CS 6
6

6
6
3043

3043
FINAL
(TOE LEVEL -18.9 mPD)

EXCAVATION
TYPE C SHEET PILE

-46.0 0
6. LEVEL

2956
FINAL
-3 FINAL
-38.0

EXCAVATION -8.075 EXCAVATION


-40.0

LEVEL
15215

15215
15215
LEVEL
-42.0
3043

3043
P-3 FINAL
SC6

SC6

SC6

SC6

SC6

SC6

SB6

SB6

SB6

SB6

SB6

SB6

SA6

SA6

SA6

SA6

W1
W1

-48.0 C -6.975 EXCAVATION -7.375


-44.0

BD's OFFICAL USE


E004 LEVEL
-10.325
P-2
.0

2234 941
3043

3043
- 46

CS -8.075 6
6 KC 6 KC 6 KB 6 6 KA 6 CS
KC KB KB KA KA
6

6
KC

KB

KB

KA
-8.075 6 6 6 6
T1

T1
KC

KC

KB

-8.075
CS -8.075
6

6
6

0
-48.0
P-1
8.
6 W1 6
-4
CS
3043

3043
BH3 BH7
BH1(P) BH5(P)
3152 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 BH9(P)
3150
-46.0 A D
91352
39639 22178 23569 5966
YYY STREET

TYPE C SHEET PILE (TOE LEVEL -18.9 mPD) TYPE B SHEET PILE (TOE LEVEL -18.9 mPD) TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)
NO.982
19.3

SITTING-OUT AREA NO.950-954 90mm (W) x 150mm (H) space


for BD's approval stamp /
B A
BLOCK A E003 E003
certification of copies of
approved plans
BLCOK B (PNAP ADM-10 APP A)
NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964

ELS LAYOUT PLAN


C 1 : 200
BD REF :

BIM REF :

B.L. B.L. B.L. B.L. LEGEND AND NOTES:


mPD mPD
+5.0
XXX STREET +5.0
XXX STREET
EXISTING GROUND EXISTING GROUND
BH7 BH8 BH5(P) BH6(P)
+3.84 +3.92 BOUNDARY LINE
(OFFSET 2.18 m) (OFFSET 2.15 m) (OFFSET 1.32 m) (OFFSET 1.37 m)
W1 SA6 +3.10 W1 (1st EXCAVATION LEVEL) +2.90 W1 SB6 +3.10 W1 (1st EXCAVATION LEVEL) +2.90
3528 3528 FILL FILL
W2 SA6 +1.60 W2 (2nd EXCAVATION LEVEL) +1.40
NO.968-970 NO.968-970 N=11
BLOCK C BLOCK C N=9 CDG COMPLETELY DECOMPOSED GRANITE
N=11 FILL N=16 FILL
DESIGN W3 SA6 +0.10 FILL
W3 (3rd EXCAVATION LEVEL) -0.10 DESIGN W2 FILL SB6 +0.10 W2 (2nd EXCAVATION LEVEL) -0.10
+0.0 +0.0
G.W.T. G.W.T. IV HIGHLY DECOMPOSED GRANITE
-1.20 N=20 -1.40 W4 -1.20 N=22
N=11 W4 SA6 (4th EXCAVATION LEVEL) -1.60
N=13
III MODERATELY DECOMPOSED GRANITE
W5 SA6 -2.90 W5 (5th EXCAVATION LEVEL) -3.10 W3 SB6 -2.90 W3 (3rd EXCAVATION LEVEL) -3.10
N=12 N=4 II SLIGHTLY DECOMPOSED GRANITE
W6 SA6 -4.40 W6 (6th EXCAVATION LEVEL) -4.60 N=9 W4 SB6 -4.40 W4 MD(4th EXCAVATION LEVEL) -4.60
-5.0 -5.0 N=5 N=28 SPT N VALUE
N=14
W7 SA6 N=6 -5.90 W7 (7th EXCAVATION LEVEL) -6.10 W5 SB6 -5.90 W5 (5th EXCAVATION LEVEL) -6.10
MD
N=17
PROPOSED SHEET PILE
N=16 W8 SA6 N=13 -7.40 W8 (8th EXCAVATION LEVEL) -7.60 W6 -7.40 N=12 W6 (6th EXCAVATION LEVEL) -7.60
MD
-8.075 -8.075 PROPOSED WALING
MD
N=24 N=18 N=13

30°
N=24 PROPOSED FINAL PROPOSED SHORT STRUT
-10.0 -10.325 -10.0 EXCAVATION PROFILE
ALLU PROPOSED STRUT
N=30 N=13 ALLU N=14
N=13
PROPOSED FINAL PROPOSED EXCAVATION PROFILE
EXCAVATION PROFILE
N=8 N=20
N=15
N=18

ALLU
-15.0 N=33 -15.0 N=26
N=53 N=49

N=62 N=27
N=27 MIN TOE LEVEL
MIN TOE LEVEL PROPOSED
N=41 -18.90 COMBINED -18.90
N=64 N=32
SHEETPILE WALL
N=38 (TYPE B)
-20.0 -20.0
N=60 N=38
N=70
-22.09 N=48 PROPOSED COMBINED REV DATE AMENDMENT
MIN TOE LEVEL MIN TOE LEVEL CDG SHEETPILE WALL (TYPE B)
-23.00N=62 -23.00 CDG PROJECT
-23.16 CDG N=39
N=75
N=51 CIC SAMPLE PROJECT
PROPOSED PROPOSED
(INDICATIVE ONLY) N=73 (INDICATIVE ONLY)
-25.0 BOX TYPE N=85 BOX TYPE -25.0 N=57
SHEETPILE SHEETPILE N=64
WALL (TYPE A) CDG WALL (TYPE A)
N=77 N=27 DRAWING TITLE
N=108
N=78 EXCAVATION & LATERAL SUPPORT
N=85 N=31 SECTIONS (1 OF 2)
N=115
-30.0 -30.0
N=102 N=92
N=200/70 N=59
SCALE AS SHOWN@A1
IV
N=120 N=129 DRAWING NO. REV. NO.
N=200/70
IV II
E003
-35.0 N=109 -35.0
N=200/70 IV SOURCE ---
N=200/30
III
N=200/170
N=200/50
II
IV N=200/20
N=168 CDG 90mm (W) x 40mm (H) space
IV for COMPANY LOGO
N=200/50
IV
-40.0 III -40.0

IV III III N=200/20


III
III
IV
IV II
III III
IV
IV III IV
-45.0 N=200/50 -45.0
III 90mm (W) x 60mm (H) space
II III for AP/RSE/RGE's
signature/ and stamp chop

N=200/110 IV III
III II
-50.0 -50.0
III
BD's OFFICAL USE

II

III
-55.0 -55.0

-60.0 -60.0

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

ELS SECTION A ELS SECTION B


A 1 : 150 B 1 : 150
BD REF :

BIM REF :
B.L. B.L.
mPD
BH2(P) BH4 BH6(P) BH8
+5.0 (OFFSET 6.94 m) (OFFSET 7.47 m) (OFFSET 7.18 m) (OFFSET 6.22 m) EXISTING GROUND BH10(P)
(OFFSET 6.97 m)
+3.80
(1st EXCAVATION LEVEL) +2.90 W1 +3.10 +3.10 W1 (1st EXCAVATION LEVEL) +2.90
SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
+1.60 W2 (2nd EXCAVATION LEVEL) +1.40
N=9 N=9 SA6 SA6 SA6 SA6
N=16 N=10
FILL FILL FILL
(2nd EXCAVATION LEVEL) -0.10
+0.0 W2 +0.10 DESIGN FILL +0.10 W3 FILL (3rd EXCAVATION LEVEL) -0.10
G.W.T. SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
N=11 -1.20 N=22 N=20 N=14 -1.40 W4 (4th EXCAVATION LEVEL) -1.60
N=22 SA6 SA6 SA6 SA6
(3rd EXCAVATION LEVEL) -3.10 W3 -2.90 -2.90 W5 (5th EXCAVATION LEVEL) -3.10
SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SB6 N=4 SA6 SA6 SA6 SA6 N=4
MD
N=11 N=24 -4.40 W6
MD MD (6th EXCAVATION LEVEL) -4.60
N=10 SB6 SB6 N=5 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
-5.0 N=5
(4th EXCAVATION LEVEL) -6.10 W4 -5.90 N=23
N=6 -5.90 W7 (7th EXCAVATION LEVEL) -6.10
SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
-6.975
N=11 N=12 N=13 N=9 -7.375

°
MAX. 25
N=30 SB6 SB6 -8.075 SB6 SB6 SA6 SA6 SA6 SA6
MD MD
N=17 N=13 N=24 N=18

25°
CDG

MA X
-10.0 N=37 -10.325

.
MAX
ALLU

. 25 °
N=22 N=14 PROPOSED FINAL N=30 N=20
EXCAVATION PROFILE
N=45
N=32 N=20 N=8 N=21
N=53 CDG
ALLU ALLU
-15.0 N=200/10 N=26 N=33 N=22
II
N=62
II N=27 N=62 N=54
N=200/10 IV N=61
-18.90 PROPOSED SHEETPILE -18.90
N=32 N=64
N=29 WALL (TYPE D) N=52
-20.0 CDG N=65
N=38 N=70 N=65
PROPOSED N=200/30 III
SHEETPILE WALL N=200/70 CDG
II
(TYPE C) N=55 N=39 REV DATE AMENDMENT
N=75 N=68
II PROJECT
N=78 CDG
CIC SAMPLE PROJECT
-25.0 N=57 N=85 N=81
N=200/20 CDG
II
N=95 CDG N=200/70 N=27 N=108 N=111
N=200/60 CDG
CDG DRAWING TITLE
N=200/20 N=200/40 II N=31 N=115 N=200/70 EXCAVATION & LATERAL SUPPORT
-30.0 II SECTIONS (2 OF 2)
N=168
N=59 N=200/70 N=200/70
CDG
III
N=200/190 SCALE
N=129 N=200/70 N=200/60
AS SHOWN@A1
N=131 CDG
DRAWING NO. REV. NO.

-35.0 IV N=200/70 N=200/60 E004


N=200/20
N=200/30
III
SOURCE ---
IV N=200/50 N=200/50
N=200/20 IV

N=200/50 N=200/40 90mm (W) x 40mm (H) space


-40.0 for COMPANY LOGO

III N=200/20 III


III
IV IV IV
III
III III
IV IV IV
-45.0 N=200/50
III
III
IV 90mm (W) x 60mm (H) space
III for AP/RSE/RGE's
signature/ and stamp chop
III
II
III
-50.0 II
III

N=200/20
IV LEGEND AND NOTES: BD's OFFICAL USE

BOUNDARY LINE
-55.0
FILL FILL

III CDG COMPLETELY DECOMPOSED GRANITE

IV HIGHLY DECOMPOSED GRANITE


-60.0
III MODERATELY DECOMPOSED GRANITE

II SLIGHTLY DECOMPOSED GRANITE 90mm (W) x 150mm (H) space


for BD's approval stamp /
II N=28 SPT N VALUE certification of copies of
approved plans
PROPOSED SHEET PILE (PNAP ADM-10 APP A)
ELS SECTION C
C 1 : 150 PROPOSED WALING

PROPOSED SHORT STRUT

PROPOSED STRUT
PROPOSED EXCAVATION PROFILE
BD REF :

BIM REF :
B.L. B.L. B.L. B.L. B.L. B.L.
mPD mPD mPD
XXX STREET XXX STREET XXX STREET
+5.0 EXISTING GROUND +5.0 EXISTING GROUND +5.0 EXISTING GROUND
BH7 +3.84 BH8 BH7 +3.84 BH8 BH7 +3.84 BH8
W1 SA6 W1 (1st EXCAVATION LEVEL) +2.90 W1 SA6 W1

W2 SA6 W2 (2nd EXCAVATION LEVEL) +1.40


FILL N=16 FILL N=16
N=11 N=11 N=11 FILL N=16
DESIGN FILL DESIGN FILL DESIGN FILL
+0.0 G.W.T. +0.0 G.W.T. +0.0 G.W.T.
-1.20 -1.20 -1.20
N=11 N=11 N=11

N=12 N=12 N=12

-5.0 N=14 -5.0 N=14 -5.0 N=14


N=6 N=6 N=6

N=16 N=13 N=16 N=13 N=16 N=13


MD MD MD
MD MD MD

N=24 N=24 N=24 N=24 N=24 N=24


-10.0 -10.0 -10.0

N=13 N=30 N=13 N=30 N=13 N=30

N=15 N=8 N=15 N=8 N=15 N=8

ALLU ALLU ALLU


-15.0 N=33 -15.0 N=33 -15.0 N=33
N=53 N=53 N=53

PROPOSED BOX N=62 PROPOSED PROPOSED BOX N=62 PROPOSED PROPOSED BOX N=62 PROPOSED
TYPE SHEETPILE BOX TYPE TYPE SHEETPILE BOX TYPE TYPE SHEETPILE BOX TYPE
WALL (TYPE A) SHEETPILE WALL (TYPE A) SHEETPILE WALL (TYPE A) SHEETPILE
N=41 N=41 N=41
N=64 WALL (TYPE A) N=64 WALL (TYPE A) N=64 WALL (TYPE A)
-20.0 -20.0 -20.0
N=60 N=60 N=60
N=70 N=70 N=70
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
REV DATE AMENDMENT
-23.00 N=62 CDG -23.00 -23.00 N=62 CDG -23.00 -23.00 N=62 CDG -23.00
N=75 N=75 N=75 PROJECT
CIC SAMPLE PROJECT
N=73 N=73 N=73
-25.0 N=85 -25.0 N=85 -25.0 N=85

STAGE 0 STAGE 1 STAGE 2 DRAWING TITLE

1. INSTALL MONITORING CHECKPOINTS AS SHOWN ON DRAWING NO. E008 AND TAKE INITIAL READING 1. DEWATER AND EXCAVATE TO +2.90mPD. 1. DEWATER AND EXCAVATE TO +1.4mPD. EXCAVATION & LATERAL SUPPORT
2. CARRY OUT INSTALLATION OF SHEET PILES AS SHOWN ON PLAN TO REQUIRED LEVEL. 2. INSTALLATION OF THE 1st LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 2nd LAYER WAILINGS, STRUTS & TIES CONSTRUCTION SEQUENCE (1 OF 2)
3. CARRY OUT PUMPING TEST AS SHOWN ON DWG NO.: E009. 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & AA (REFER TO STRUT PRELOAD SCHEDULE IN
DWG. NO.: E001.) DWG. NO.: E001)

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
B.L. B.L. B.L. B.L.
mPD
XXX STREET
mPD
XXX STREET E005
+5.0 EXISTING GROUND +5.0 EXISTING GROUND
BH7 +3.84 BH8 BH7 +3.84 BH8
SOURCE ---
W1 SA6 W1 W1 SA6 W1

W2 SA6 W2 W2 SA6 W2
90mm (W) x 40mm (H) space
N=11 FILL N=16 N=11 FILL N=16 LEGEND AND NOTES: for COMPANY LOGO
DESIGN W3 SA6 +0.10 W3
FILL (3rd EXCAVATION LEVEL) -0.10 DESIGN W3 SA6 FILL
W3
+0.0 G.W.T. +0.0 G.W.T.
-1.20 -1.20 -1.40 W4
N=11 W4
N=11 SA6 (4th EXCAVATION LEVEL) -1.60 BOUNDARY LINE

FILL FILL
N=12 N=12
CDG COMPLETELY DECOMPOSED GRANITE
-5.0 N=14 -5.0 N=14
N=6 N=6 IV HIGHLY DECOMPOSED GRANITE 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
N=16 N=13 N=16 N=13 III MODERATELY DECOMPOSED GRANITE signature/ and stamp chop
MD MD
MD MD
II SLIGHTLY DECOMPOSED GRANITE
N=24 N=24 N=24 N=24
-10.0 -10.0 N=28 SPT N VALUE
N=13 N=30 N=13 N=30
PROPOSED SHEET PILE BD's OFFICAL USE

N=15 N=8 N=15 N=8 PROPOSED WALING

ALLU ALLU PROPOSED SHORT STRUT


-15.0 N=33 -15.0 N=33
N=53 N=53 PROPOSED STRUT
PROPOSED BOX N=62 PROPOSED PROPOSED BOX N=62 PROPOSED PROPOSED EXCAVATION PROFILE
TYPE SHEETPILE BOX TYPE TYPE SHEETPILE BOX TYPE
WALL (TYPE A) SHEETPILE WALL (TYPE A) SHEETPILE
N=41 N=41
N=64 WALL (TYPE A) N=64 WALL (TYPE A)
-20.0 -20.0
N=60 N=60 MIN TOE LEVEL
N=70 N=70
90mm (W) x 150mm (H) space
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
for BD's approval stamp /
-23.00 N=62 CDG -23.00 -23.00 N=62 CDG -23.00 certification of copies of
N=75 N=75
approved plans
(PNAP ADM-10 APP A)
N=73 N=73
-25.0 N=85 -25.0 N=85

STAGE 3 STAGE 4

1. DEWATER AND EXCAVATE TO -0.10mPD. 1. DEWATER AND EXCAVATE TO -1.60mPD.


2. INSTALLATION OF THE 3rd LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 4th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & AA (REFER TO STRUT PRELOAD SCHEDULE IN DWG.
DWG. NO.: E001) NO.: E001)
BD REF :

BIM REF :
B.L. B.L. B.L. B.L. B.L. B.L.
mPD mPD mPD
XXX STREET XXX STREET XXX STREET
+5.0 EXISTING GROUND +5.0 EXISTING GROUND +5.0 EXISTING GROUND
BH7 +3.84 BH8 BH7 +3.84 BH8 BH7 +3.84 BH8
W1 SA6 W1 W1 SA6 W1 W1 SA6 W1

W2 SA6 W2 W2 SA6 W2 W2 SA6 W2


N=11 FILL N=16 N=11 FILL N=16 N=11 FILL N=16
DESIGN W3 SA6 FILL
W3 DESIGN W3 SA6 FILL
W3 DESIGN W3 SA6 FILL
W3
+0.0 G.W.T. +0.0 G.W.T. +0.0 G.W.T.
-1.20 -1.20 -1.20
W4
N=11 SA6 W4 W4
N=11 SA6 W4 W4
N=11 SA6 W4

W5 -2.90 W5 (5th EXCAVATION LEVEL) -3.10 W5 SA6 W5 W5 W5


SA6 SA6
N=12 N=12 N=12
W6 SA6 -4.40 W6 (6th EXCAVATION LEVEL) -4.60 W6 W6
SA6
-5.0 N=14 -5.0 N=14 -5.0 N=14
N=6 N=6 W7 N=6-5.90 W7 (7th EXCAVATION LEVEL) -6.10
SA6

N=16 N=13 N=16 N=13 N=16 N=13


MD MD MD
MD MD MD

N=24 N=24 N=24 N=24 N=24 N=24


-10.0 -10.0 -10.0

N=13 N=30 N=13 N=30 N=13 N=30

N=15 N=8 N=15 N=8 N=15 N=8

ALLU ALLU ALLU


-15.0 N=33 -15.0 N=33 -15.0 N=33
N=53 N=53 N=53

PROPOSED BOX N=62 PROPOSED PROPOSED BOX N=62 PROPOSED PROPOSED BOX N=62 PROPOSED
TYPE SHEETPILE BOX TYPE TYPE SHEETPILE BOX TYPE TYPE SHEETPILE BOX TYPE
WALL (TYPE A) SHEETPILE WALL (TYPE A) SHEETPILE WALL (TYPE A) SHEETPILE
N=41 N=41 N=41
N=64 WALL (TYPE A) N=64 WALL (TYPE A) N=64 WALL (TYPE A)
-20.0 -20.0 -20.0
N=60 N=60 N=60
N=70 N=70 N=70
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
-23.00 N=62 CDG -23.00 -23.00 N=62 CDG -23.00 -23.00 N=62 CDG -23.00 REV DATE AMENDMENT
N=75 N=75 N=75
PROJECT
CIC SAMPLE PROJECT
N=73 N=73 N=73
-25.0 N=85 -25.0 N=85 -25.0 N=85

STAGE 5 STAGE 6 STAGE 7


1. DEWATER AND EXCAVATE TO -3.10mPD. 1. DEWATER AND EXCAVATE TO -4.60mPD. 1. DEWATER AND EXCAVATE TO -6.10mPD. DRAWING TITLE
2. INSTALLATION OF THE 5th LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 6th LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 7th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A & B (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD EXCAVATION & LATERAL SUPPORT
DWG. NO.: E001) DWG. NO.: E001) SCHEDULE IN DWG. NO.: E001) CONSTRUCTION SEQUENCE (2 OF 2)

B.L. B.L. SCALE


mPD AS SHOWN@A1
XXX STREET
+5.0 EXISTING GROUND DRAWING NO. REV. NO.
BH7 +3.84 BH8
E006
W1 SA6 W1
SOURCE ---
W2 SA6 W2 LEGEND AND NOTES:
N=11 FILL N=16 FILL
DESIGN W3 SA6 W3
+0.0 G.W.T. BOUNDARY LINE 90mm (W) x 40mm (H) space
-1.20
N=11 SA6 W4 for COMPANY LOGO

W4
FILL FILL
W5 SA6 W5
N=12 CDG COMPLETELY DECOMPOSED GRANITE
W6 SA6 W6
-5.0 IV HIGHLY DECOMPOSED GRANITE
N=14
W7 N=6 W7
SA6
III MODERATELY DECOMPOSED GRANITE
N=16 N=13-7.40W8 (8th EXCAVATION LEVEL) -7.60
SA6
MD -8.075 90mm (W) x 60mm (H) space
MD II SLIGHTLY DECOMPOSED GRANITE
W8 for AP/RSE/RGE's
30°

N=24 N=24 signature/ and stamp chop


N=28 SPT N VALUE
-10.0 -10.325

N=13 N=30 PROPOSED SHEET PILE


PROPOSED FINAL
EXCAVATION PROFILE PROPOSED WALING
N=15 N=8
PROPOSED SHORT STRUT BD's OFFICAL USE
ALLU
-15.0 N=33 PROPOSED STRUT
N=53
PROPOSED EXCAVATION PROFILE
PROPOSED BOX N=62 PROPOSED
TYPE SHEETPILE BOX TYPE
WALL (TYPE A) SHEETPILE
N=41
N=64 WALL (TYPE A)
-20.0
N=60
N=70
MIN TOE LEVEL MIN TOE LEVEL
-23.00 N=62 CDG -23.00
N=75
90mm (W) x 150mm (H) space
for BD's approval stamp /
N=73 certification of copies of
-25.0 N=85
approved plans
(PNAP ADM-10 APP A)

STAGE 8
1. DEWATER AND EXCAVATE TO -7.60mPD.
2. INSTALLATION OF THE 8th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & B (REFER TO STRUT PRELOAD SCHEDULE IN DWG. NO.: E001)
4. DEWATER AND EXCAVATE TO FINAL EXCAVATE PROFILE (i.e.: -8.075/-10.325mPD) WITH TEMPORARY CUT SLOPE(25° MAX). (REFER TO
ELS LAYOUT PLAN IN DWG. NO.: E002).
5. CARRY OUT REMAINING PILE CAP CONSTRUCTION (UNDER SEPARATE SUBMISSION) AND BACKFILL TO PILE CAP TOP
6. CARRY OUT BASEMENT CONSTRUCTION (UNDER SEPARATE SUBMISSION)
7. ALL STRUT SHALL NOT BE REMOVED UNTIL CONSTRUCTION UP TO G/F.
BD REF :

BIM REF :
A B
E003 E003 C
D
A E004 B
90°
90° 90°
TYPE AA SHEET PILE TYPE A SHEET PILE (FSP VIL BOX-TYPE) TYPE B SHEET PILE (FSP VIL) TYPE C SHEET PILE (FSP IV) TYPE C SHEET PILE (FSP IV)
(FSP VIL) 23569 22178 39639 15215
mPD
+5.0 VERTICAL TIE P4 FOR WAILING VERTICAL TIE P4 FOR WAILING VERTICAL TIE P4 FOR WAILING
BH9(P) BH5(P) BH1(P)
(1st EXCAVATION LEVEL) +2.90 (1st EXCAVATION LEVEL) +2.90

(2nd EXCAVATION LEVEL) +1.40 D4 D4


D4 D4 N=11 D4 D4
(3rd EXCAVATION LEVEL) -0.10 +0.0 FILL D4 D4 (2nd EXCAVATION LEVEL) -0.10
FILL N=9
(4th EXCAVATION LEVEL) -1.60 FILL
N=19 D4 D4
D4 D4 N=13 DAGONAL D4 D4
DAGONAL WAILING N=10
(5th EXCAVATION LEVEL) -3.10 D4 D4 WAILING (3rd EXCAVATION LEVEL) -3.10
N=4
(6th EXCAVATION LEVEL) -4.60 D4 D4 D4 D4 N=9
-5.0 N=4 D4 D4
(7th EXCAVATION LEVEL) -6.10 D4 D4 D4 D4 (4th EXCAVATION LEVEL) -6.10 N=15 CDG
N=17 MD
MD
-6.975 -6.975 -6.975 -6.975 -6.975
(8th EXCAVATION LEVEL) -7.60 -7.375 N=6 D4 D4 D4 D4
-8.075 D4-7.980 D4 -8.075 -8.075 -8.075 II -8.075 -8.075

22°
D4
D4 DAGONAL WAILING
N=13 D4 N=18 N=15

21°
-10.0 -10.325
N=20 N=13 ALLU N=19

N=8 ALLU
N=18 N=24
-15.0 N=25
N=49 N=26

N=65 MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
N=27 N=72
-18.90 -18.90 CDG -18.90
N=59
N=38 N=76
-20.0
N=82
MIN TOE LEVEL N=48 N=97
-23.00 CDG
N=87
N=51 N=100
CDG
-25.0 N=80
N=64 N=97
REV DATE AMENDMENT
N=88
N=78 N=105 PROJECT
IV CIC SAMPLE PROJECT
N=200/60
N=200/60
-30.0
N=92
N=200/70

DRAWING TITLE
ELS ELEVATION D-A-B EXCAVATION & LATERAL SUPPORT
1 1 : 200 ELEVATION

SCALE 1 : 200@A1
C
B A
B C E004 D DRAWING NO. REV. NO.
E003 E003
90° 90° 90°
E007
TYPE C SHEET PILE (FSP IV) TYPE B SHEET PILE (FSP VIL) TYPE A SHEET PILE (FSP VIL BOX-TYPE) TYPE AA SHEET PILE TYPE AA SHEET PILE (FSP VIL)
SOURCE ---
mPD 39696 22108 23541 (FSP VIL) 15215
+5.000 VERTICAL TIE P4
+5.0 VERTICAL TIE P4 VERTICAL TIE P4
BH2(P) BH4 FOR WAILING BH6(P) BH8 BH10
FOR WAILING FOR WAILING
(1st EXCAVATION LEVEL) +2.90 (1st EXCAVATION LEVEL) +2.90
90mm (W) x 40mm (H) space
D4 D4 D4 for COMPANY LOGO
N=9 D4 D4 N=9 D4
(2nd EXCAVATION LEVEL) -0.10 +0.0 FILL FILL FILL (2nd EXCAVATION LEVEL) -0.10 D4 N=16 FILL D4 D4
N=10
FILL
N=11 N=22 D4 N=20 D4 D4 N=14
N=22 D4 D4 DAGONAL DAGONAL WAILING
D4 D4
(3rd EXCAVATION LEVEL) -3.10 WAILING (3rd EXCAVATION LEVEL) -3.10 D4 D4
N=4 N=4
MD
N=11 N=24 (4th EXCAVATION LEVEL) -4.60 D4 D4 D4 D4
-5.0 N=10 MD D4 MD
D4 N=5 N=5
(4th EXCAVATION LEVEL) -6.10 (5th EXCAVATION LEVEL) -6.10 D4 D4 N=6 D4 D4
N=23
-6.975 -6.975 -6.975 -6.975
N=11 N=12 (6th EXCAVATION LEVEL) -7.60 D4 D4 N=13 N=9 -7.375 90mm (W) x 60mm (H) space
-8.075 -8.075 -8.075 D4 -8.075 D4 -8.075 -8.075 D4 D4
for AP/RSE/RGE's
27°

23°

N=30 D4 D4 MD MD
N=17 N=13 DAGONAL WAILING signature/ and stamp chop
N=24 N=18
-10.0 CDG
N=37
ALLU
N=22 N=14 N=30 N=20
N=45
N=32 N=20 N=8 N=21
N=53 CDG
ALLU ALLU
-15.0
N=200/10 N=26 N=33 N=22 BD's OFFICAL USE
II
N=62
II N=27 N=62 N=54
MIN TOE LEVEL
N=200/10 IV N=61
-18.90 -18.900
N=32 N=64 N=52
N=29
-20.0 CDG N=65 MIN TOE LEVEL
N=38 N=70 N=65
N=200/30 III
N=200/70 II CDG
-23.00
N=55 N=39 N=75 N=68
II
N=78 CDG MIN TOE LEVEL
-25.0 N=57 N=85 N=81
N=200/20 CDG
II
N=95 CDG N=200/70 N=27 N=108 N=111
N=200/60 CDG 90mm (W) x 150mm (H) space
CDG
N=200/20 N=200/40 II N=31 for BD's approval stamp /
N=115 N=200/70
-30.0 II certification of copies of
N=168 approved plans
N=59 (PNAP ADM-10 APP A)

ELS ELEVATION B-C-D


3 1 : 200
BD REF :

BIM REF :

T9 T10 T11

S9 S10

4.1
XXX STREET

WWW STREET
3.8
TYPE C SHEET PILE (TOE LEVEL -18.9 mPD) TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
U10
(TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)
U8 U1 U11
SP1(P) SP2(P)
RW1 OW2 V10 RW2 OW4 RW3 OW6
B C
S4 V1 S6 S7 V11 S8
S1
U12
P1 OW1 P2 OW3 P3 OW5
BH4 BH6(P)
BH2(P) BH10(P)
BH8
(TOE LEVEL -18.9 mPD)

(TOE LEVEL -18.9mPD)


TYPE AA SHEET PILE
TYPE C SHEET PILE

U7
OW7 OW8

V8
V7 U6

T8
T7

P4 RW4

BH1(P) BH5(P)
BH9(P)

P7 OW13 BH3 P6 OW11 BH7 P5 OW9


U3 U5

SP3(P) SP4(P) SP5(P)


A T1 RW7 OW14 T2 T3 RW6 OW12 T5 RW5 OW10 D
U2 S3
V6
YYY STREET

S1 U1 V1 BS2 V2 BS4 V3 BS6 V4 T4 BS8 V5 BS10 S2 U4 TYPE A SHEET PILE BS12 T6 TYPE AA SHEET PILE
TYPE C SHEET PILE (TOE LEVEL -18.9 mPD)
NO.982 TYPE B SHEET PILE (TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)

19.3
REV DATE AMENDMENT
SITTING-OUT AREA NO.950-954 PROJECT
BLOCK A CIC SAMPLE PROJECT
BLCOK B

NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964
DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
WORKS MONITORING PLAN
BS1 BS3 BS5 BS7 BS9 BS11

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

ELS MONITORING PLAN E008


NOTES ON EXISTING UTILITIES e. RSE/RGE TO REVIEW THE INCIDENT AND AGREE WITH RC ON FURTHER REMEDIAL AND
PREVENTIVE MEASURES TO ENABLE RESUMPTION OF THE SUSPENDED WORKS.
1 1 : 200
INSTRUMENT SCHEDULE
SOURCE ---
SYMBOL TYPE NUMBER
1. THE POSITION OF EXISTING UTILITIES SHOWN ON THIS DRAWING IS 5. EXISTING PIEZOMETERS/STANDPIPES INSTALLED ON SITE PREVIOUSLY SHOULD BE f. CONSTRUCTION ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE NECESSARY
APPROXIMATE ONLY.EXACT LOCATION AND DEPTH OF THE UTILITIES MONITORED ON DAILY BASIS CONTINUOUSLY THROUGHOUT THE CONSTRUCTION. THE REMEDIAL AND PREVENTIVE MEASURES HAVE BEEN COMPLETED TO THE BUILDING SETTLEMENT MARKER 12
BS1
MUST BE ASCERTAINED BY TRIAL PITS ON SITE. EXTREME CARE MUST READINGS SHOULD BE SUBMITTED TO RSE / RGE / BA ON BIWEEKLY BASIS. INITIAL SATISFACTION OF THE BD. (BS1-BS12)
LEGEND AND NOTES:
BE TAKEN DURING EXCAVATIONS IN THE PROXIMITY OF THE UTILITIES. READING SHOULD ALSO BE SUBMITTED BEFORE THE COMMENCEMENT OF WORKS. g. IF THE TRIGGER VALUES AND RESPONSE ACTION ARE REVISED, THE AMENDED PLANS BUILDING TILTING CHECK POINT WITH 11
PRECAUTIONS SHALL BE TAKEN TO PREVENT DAMAGE TO ANY OF THE 6. CHECK POINT READINGS TO BE KEPT ON SITE FOR INSPECTION. SHOULD BE SUBMITTED TO THE BD FOR APPROVAL. THE SUSPENDED CONSTRUCTION T1 90mm (W) x 40mm (H) space
UTILITIES. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLICATION OF EXCAVATION
BOUNDARY LINE VERTICAL DISPLACEMENT (T1-T11) for COMPANY LOGO
ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE AMENDED PLANS ARE APPROVED BY
2. THE INFORMATION INDICATED IS GIVEN IN GOOD FAITH AND NO PERMIT FOR INSTALLATION OF MONITORING CHECK POINTS OUTSIDE SITE BOUNDARY. INSTRUMENT CRITERION ALERT ALARM ACTION
GROUND SETTLEMENT CHECK POINT 10
BH2(P) BORED HOLE (WITH PIEZOMETER) S1
GUARANTEE IS GIVEN AS TO ITS ACCURACY OR COMPLETENESS. THE THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR SEEKING CONSENT FROM THE (S1-S10)
USE OF THIS INFORMATION BY THE CONTRACTOR OR ANY OTHER ADJACENT LOT OWNERS FOR INSTALLATION OF MONITORING CHECK POINT AT GROUND SETTLEMENT (BH1 (P), BH2 (P) AND BH5 (P)
TOTAL SETTLEMENT 12mm 18mm 25mm OW1 OBSERVATION WELL (OW1-OW14) 14
PARTY SHALL NOT RELIEVE HIM OF ANY OF HIS OBLIGATIONS OR ADJACENT LOTS / BUILDINGS. CHECK POINT BH6 (P), BH9 (P) AND BH10 (P) 6NOS.)
RESPONSIBILITY UNDER THE CONTRACT. UTILITY SETTLEMENT
TOTAL SETTLEMENT 12mm 18mm 25mm BH2 P1 PUMP WELL (P1 TO P7) 7
CHECK POINT
3. THE CONTRACTOR SHALL ARRANGE FOR ANY REALIGNMENT OF THE BORED HOLE RW1 RECHARGE WELL (RW1-RW7) 7
EXISTING UTILITIES AT THE WORKING LOCATION PRIOR TO THE ALERT LEVEL TILTING CHECK POINT ANGULAR DISTORTION 1:1000 1:750 1:500 (BH3, BH4, BH7 AND BH8 4 NOS.)
CONSTRUCTION OF WORKS, IF REQUIRED. STANDPIPE (WITH PIEZOMETER) (SP1(P) 5
RESPONSE ACTION: SP1(P)
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT TO THE VIBRATION CHECK PEAK PARTICLE
7.5mm/s 10mm/s 15mm/s 4.15 TO SP5(P))
a. RC TO NOTIFY AND SUBMIT WRITTEN REPORT TO AP/RSE/RGE. POINT (VB1 TO VB3) VELOCITY EXISTING GROUND LEVEL
EXISTING UTILITIES DURING THE CONSTRUCTION WORKS, IF REQUIRED. UTILITY SETTLEMENT MONITORING POINT 12
b. AP/RSE/RGE TO ASSESS EFFECT OF MOVEMENTS AND PREDICT FUTURE MOVEMENTS. BUILDING SETTLEMENT U1 90mm (W) x 60mm (H) space
5. THE CONTRACTOR'S PARTICULAR ATTENTION IS DRAWN TO THE TOTAL SETTLEMENT 12mm 18mm 25mm ON GROUND (U1-U12)
c. AP/RSE/RGE TO AGREE WITH RC ON THE SUITABLE ACTION PLAN WHICH MAY INCLUDE CHECK POINT for AP/RSE/RGE's
EXISTENCE OF UNDERGROUND SERVICE WITHIN AND AROUND THE SITE. GAS GAS PIPE
THE INSTALLATION OF ADDITIONAL CHECK POINTS AND/OR INCREASING MONITORING STANDPIPE RISE OF GROUND +2.00mPD +2.50mPD +3.10mPD V1 VIBRATION CHECK POINT (V1-V11) 11 signature/ and stamp chop
HE SHALL PROTECT AND MAINTAIN ALL THOSE WORKS DURING THE
ENTIRE CONTRACT PERIOD. NECESSARY PRECAUTIONS AND FREQUENCY, AND THE REMEDIAL/MITIGATING MEASURES TO BE TAKEN UPON PIEZOMETER WATER LEVEL +3.00mPD +3.50mPD +4.10mPD
REACHING THE "ALARM LEVEL". STANDPIPE -0.35mPD -0.40mPD -0.47mPD S WAT SALT WATER PIPE
MONITORING SHALL BE TAKEN TO PREVENT DAMAGE TO THE EXISTING DRAIN OF GROUND
PIEZOMETER WATER LEVEL -0.40mPD -0. 45mPD -0. 52mPD CONC.PAVEMENT 100
100 100
UPPER GROUND SERVICE. 100 OPENABLE STEEL COVER

50
ELECTRIC CABLE OR GRD. COVERING
6. THE CONTRACTOR SHALL IDENTIFY AND ESTABLISH HIMSELF THE ELEC
THE "ACTION LEVEL" RESPONSE ACTION SHOULD BE TAKEN IF ANY OF THE FOLLOWING BACKFILLED WITH CONC.
TYPES AND EXACT LAYOUT/LOCATION OF THE EXISTING SERVICES SITUATION OCCURS: GRD. LEV.
BEFORE CARRYING OUT ANY CONSTRUCTION WORKS ON SITE. HE ALARM LEVEL FOR REFERENCE ONLY 1. ANY MONITORING STATION HAS A READING REACHING THE SERVICEABILITY LIMIT. FOUL FOUL WATER PIPE
SHALL ALSO PLAN AND ARRANGE HIS WORKS TAKING INTO ACCOUNT BD's OFFICAL USE
2. UNDUE SETTLEMENT AS INDICATED IN ANY CHECK POINTS (E.G. AN INCREASE OF 5mm
THE EXISTENCE OF ALL SUCH WORKS THAT MAY AFFECT THE RESPONSE ACTION: 75MM DIA. PVC PIPE WELL COMPACTED
BETWEEN TWO CONSECUTIVE DAILY READINGS). F WAT FRESH WATER PIPE GRD. LEV.
CONSTRUCTION SEQUENCE OF HIS WORKS. SHALL ANY SERVICES FALL a. RC TO NOTIFY AND SUBMIT UPDATED REPORT TO AP/RSE/RGE AND NOTIFY THE SOFT BACKFILL
3. SIGN OF DISTRESS OR DAMAGES OBSERVED IN ANY ADJACENT STRUCTURES AND/OR
WITHIN THE SITE, THE CONTRACTOR SHALL PROPOSE AND SUBMIT A BD IMMEDIATELY. 10MM DIA. MILD STEEL ROD STEEL PLATE OF
UTILITIES.
METHOD STATEMENT ON PROTECTING OR DIVERTING THE EXISTING b. AP/RSE/RGE AND RC TO CONDUCT JOINT SITE INSPECTION TO DETERMINE IF ANY WELDED TO STEEL PLATE 150 x 150 x 10MM
UTILITIES FOR ARCHITECT'S APPROVAL AT NO EXTRA COST. IF CONSTRUCTION ACTIVITIES SHOULD BE TEMPORARILY SUSPENDED.
MASTER CONSTRUCTION SEQUENCE

1000
C SURFACE BOX
NECESSARY, THE CONTRACTOR SHALL MODIFY THE DESIGN OF ELS c. RC TO IMPLEMENT THE NECESSARY REMEDIAL/MITIGATING MEASURES IN BACKFILLED WITH 75mm
WORKS AND/OR PROVIDE TEMPORARY SUPPORTS FOR THE SERVICES ACCORDANCE WITH THE AGREED ACTION PLAN. 1. INSTALL MONITORING CHECK POINTS AND TAKE INITIAL READINGS. LEVEL TO BE LEAN CONCRETE
PERFORATED 20mm∅
AND SUBMIT THE METHOD STATEMENT FOR THE SERVICES AND SUBMIT d. AP/RSE/RGE AND RC TO DISCUSS THE INSTRUMENT RESPONSE AND REVIEW THE 2. CONSTRUCT BORED PILES FOUNDATION. DETERMINED PVC PIPE OR EQUIVALENT
EFFECTIVENESS OF THE RESPONSE ACTION. 3. CARRY OUT EXCAVATION AND LATERAL SUPPORT WORKS. (UNDER BY THE ENGINEER WRAPPED WITH 2 LAYERS
THE METHOD STATEMENT FOR ARCHITECT'S APPROVAL. SHOULD ANY B
ON SITE
DAMAGE OCCUR, NOTIFY THE ARCHITECT'S AND RELEVANT e. AP/RSE/RGE TO AGREE WITH RC ON THE EMERGENCY PLAN DETAILING THE SEPARATE SUBMISSION) OF NYLON MESH EXISTING UTILITIES
AUTHORITIES CONCERNED IMMEDIATELY AND MAKE GOOD BY THE MEASURES TO BE TAKEN UPON REACHING "ACTION LEVEL". 4. CARRY OUT THE CONSTRUCTION OF PILE CAP AND FOOTING. (UNDER PIEZOMETER TUBE
DETAILS OF UTILITY SETTLEMENT CHECK POINT

1500
CONTRACTOR AT NO EXTRA COST. f. ANY CONSTRUCTION ACTIVITIES MAY BE SUSPENDED IF THE RESPONSE ACTION SEPARATE SUBMISSION) A
HAS BEEN IMPLEMENTED AND ON THE ADVICE OF THE AP/RSE/RGE AS 5. CONSTRUCTION OF SUPERSTRUCTURE. (UNDER SEPARATE SUBMISSION) (N.T.S.)
NECESSARY. NOTE : ITEM 2, 3, 4, 5 CAN BE CARRIED OUT CONCURRENTLY AND A = BENTONITE SEAL OPENABLE STEEL COVER

VARIES

50mm
g. AP/RSE/RGE TO REVIEW THE METHOD STATEMENTS OF PILING/ELS WORKS TO INDEPENDENTLY. 20 64 6 B = SAND FILTER
DETERMINE WHETHER MODIFICATION TO THE CONSTRUCTION METHODS IS GROUT D C = 1:1 CEMENT-BENTONITE GROUT 19mm I.D. PVC PIPE 90mm (W) x 150mm (H) space

MIN.
NOTES ON MONITORING REQUIRED TO PREVENT ACTION LEVEL FROM BEING REACHED. D = BACKFILL GRD. LEV. for BD's approval stamp /
THREADED STEEL certification of copies of

150
1500
1. INSTALL ALL CHECK POINTS AS SHOWN ON PLAN. VIBRATION MONITORING DEVICE LEVELING MARKER CONC.PAVEMENT
A approved plans
2. INITIAL READINGS OF CHECK POINTS AND BENCH MARKS SHALL BE PIEZOMETER OR GRD. COVERING
2000

LEVEL TO BE (PNAP ADM-10 APP A)


SUBMITTED TO BUILDINGS DEPT. BEFORE COMMENCEMENT OF THE

100
TIP
ACTION LEVEL GRD. LEV.

1500 MIN.
DETERMINED

500
WORK. BACKFILLED WITH CONC.

450
RESPONSE ACTION: BY THE ENGINEER
3. ALL CHECK POINTS SHALL BE PROPERLY MAINTAINED AND FREE DRAINING COMPACTED GRANULAR
300

ON SITE B
MONITORED ON DAILY INTERVAL AND THE READINGS SHALL BE a. ALL WORKS THAT WILL CAUSE GROUND MOVEMENT ARE TO BE CEASED. COLUMN/WALL GRANULAR MATERIAL
CONCRETE PLINTH 19mm∅ BACKFILL
SUBMITTED TO THE AP/RSE/RGE AND BUILDING AUTHORITY BI- b. RC TO NOTIFY AND CARRY OUT A JOINT SITE INSPECTION WITH THE RSE/RGE (500mm X 500mm) 500
5 ANCHOR SOCKET 100mm DIA. PVC PIPE STEEL PLATE OF
WEEKLY. ANY DEFECTIVE MONITORING DEVICES SHALL BE IMMEDIATELY. THE BD AND THE RELEVANT PARTIES SHOULD BE NOTIFIED
DETAIL A 25x250x12mm
IMMEDIATELY. 30mm DRILLHOLE
REPLACED ASAP. DETAILS OF VIBRATION DETAIL A A
BOTTOM OF
4. THE LEVEL SHALL BE REPORTED IN mPD AND THE CHECK POINTS c. RC TO IMPLEMENT THE NECESSARY EMERGENCY MEASURES IN ACCORDANCE 25mmDIA. MILD STEEL ROD 500
WITH WITH THE AGREED EMERGENCY PLAN. CHECK POINTS ON GROUND DETAILS OF TILTING CHECKPOINT BOREHOLE WELDED TO STEEL PLATE
SHALL BE SURVEYED ACCORDING TO HONG KONG METRIC GRID.
d. RC TO SUBMIT AN INCIDENT REPORT TO RSE/RGE AND THE BD DETAILING THE (N.T.S.) (N.T.S.) DETAILS OF SETTLEMENT CHECK POINTS ON GROUND
STANDPIPE DETAILS
FULL HISTORY OF THE MOVEMENTS AND REMEDIAL/EMERGENCY MEASURES (ALSO FUNCTION AS BUILDING SETTLEMENT CHECKPOINT) (N.T.S.) (N.T.S.)
IMPLEMENTED.
BD REF :

BIM REF :

T9 T10 T11

S9 S10

4.1
XXX STREET

WWW STREET
3.8
TYPE C SHEET PILE (TOE LEVEL -18.9 mPD) TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
0 U10
1200 (TOE LEVEL -18.9 mPD)
1200 (TOE LEVEL -23.0 mPD) 1200 (TOE LEVEL -18.9 mPD)
U8 U1 U11
SP1(P) SP2(P)
RW1 OW2 V10 RW2 OW4 RW3 OW6

1200 1200

1200 1200

1200

1200 1200

1200 1200

1200 1200
B C
S8

0
V11

1200
S4 V1 S1 S6 S7
U12
P1 OW1 P2 OW3 P3 OW5
1200 BH4 BH6(P) 1200
BH2(P) BH10(P)
BH8
(TOE LEVEL -18.9 mPD)

(TOE LEVEL -18.9mPD)


TYPE AA SHEET PILE
1200 1200
TYPE C SHEET PILE

U7
OW7 OW8

1200

1200
V8
V7 U6

T8
T7

P4 RW4
1200 1200
BH1(P) BH5(P)
BH9(P)
1200 1200
BH7

1200 1200
1200 1200

1200 1200

1200 1200

1200 1200
P7 OW13 P6 OW11 P5 OW9

1200 1200
A BH3 D U5
0 U3
SP3(P) SP4(P) SP5(P)
T1 RW7 OW14 T2 T3 RW6 OW12 T5 RW5 OW10
U2 0 S3
1200 1200 1200V6
YYY STREET

S1 U1 V1 BS2 V2 BS4 V3 BS6 V4 T4 BS8 V5 BS10 S2 U4 TYPE A SHEET PILE BS12 T6 TYPE AA SHEET PILE
TYPE C SHEET PILE (TOE LEVEL -18.9 mPD)
NO.982 TYPE B SHEET PILE (TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)

19.3
SITTING-OUT AREA NO.950-954 REV

PROJECT
DATE AMENDMENT

BLOCK A CIC SAMPLE PROJECT


BLCOK B

NO.978

NO.976

NO.974

NO.972

NO.970

NO.968

NO.966

NO.964
DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
WORKS PUMPING TEST SETTING OUT
BS1 BS3 BS5 BS7 BS9 BS11 PLAN

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

E009
(I) PUMPING TEST PROCEDURES ELS PUMPING TEST SETTING OUT PLAN
1. INSTALL THE DEWATERING WELLS (P1-P7), STANDPIPES AND OBSERVATION WELLS (OW1-OW15) AS SHOWN IN DWG. NO.
NOTES FOR PARTIAL PUMPING TEST 1 1 : 200
SOURCE ---
(IV) PUMP TEST CRITERIA
ELS-13. 1. PARTIAL PUMPING TEST SHALL BE CARRIED OUT AFTER INSTALLATION OF PILES AND BEFORE
2. THE PROPOSED TOE LEVEL OF THE DEWATERING WELL AND OBSERVATION WELLS ARE AS FOLLOWS: THE PUMPING TEST SHALL BE CONSIDERED ACCEPTABLE IF THE FOLLOWING CRITERIA ARE MET WHEN THE COMMENCEMENT OF BULK EXCAVATION.
DESIGNATED WATER LEVEL IS ACHIEVED INSIDE THE SITE: 2. INSTALL PUMP WELL, OBSERVATION WELL, RECHARGING WELL AND PIEZOMETER.
PROPOSED PROPOSED LEVEL OF WATER LEVEL CONTROL ELECTRODES a. NO UNDUE SETTLEMENT OR MOVEMENT OF ANY SETTLEMENT CHECKPOINTS OR TILTING 3. THE PUMPING TEST PROPOSAL TO BE SUBMITTED SEPARATELY. 90mm (W) x 40mm (H) space
HOLE 4. THE CRITERIA OF PUMPING TEST REFERS TO THE DWG. NO. ELS-13.
INSTRUMENT SCHEDULE for COMPANY LOGO
TOE LEVEL (mPD) CUT-ON LEVEL (mPD) CUT-OUT LEVEL (mPD) CHECKPOINTS AS STATED IN APPROVED EXCAVATION AND LATERAL SUPPORT WORKS PLAN OR NO
DEFECT/DAMAGE TO ADJACENT GROUND/ STRUCTURES/ UTILITIES. 5. AFTER COMPLETION OF THE PARTIAL PUMPING TEST, AN ASSESSMENT REPORT SHALL BE PREPARED
-12.50 -13.50 BY CONTRACTOR. THIS REPORT SHOULD BE SUBMITTED TO BUILDING AUTHORITY.
SYMBOL TYPE NUMBER
DEWATERING WELL (P1-P7) -15.00 b. THE GROUND SETTLEMENT DURING DEWATERING SHOULD NOT EXCEED 5.0mm.
BUILDING SETTLEMENT MARKER 12
OBSERVATION WELL (OW1-OW15) -15.00 N/A N/A BS1
(V) ASSESSMENT REPORT (BS1-BS12)
3. BEFORE INSERTION OF THE SUBMERSIBLE PUMP, THE DEWATERING WELLS SHALL BE CLEANED, FLUSHED AND THE 1. AFTER COMPLETION OF THE PUMPING TEST, THE CONTRACTOR SHALL PREPARE AN ASSESSMENT MEASURED GROUNDWATER DRAWDOWN BUILDING TILTING CHECK POINT WITH 11
DEPTH OF THE WELL SHALL BE ACCURATELY MEASURED T1
REPORT BASED ON THE TEST RESULTS DISCUSSING THE ASSUMED AND ACTUAL CONDITIONS ON SITE. VERTICAL DISPLACEMENT (T1-T11)
4. THE DEWATERING WELLS INCLUDING DISCHARGE PIPES SHALL THEN BE COMPLETED AND TESTED TO BE FUNCTIONAL INTERPERT THE RESULTS AND ASSESS THE EFFECTS TO THE SURROUNDING STRUCTURES AND ALERT ALARM ACTION
5. THE PROPOSED DEWATERING PUMP TO BE INSTALLED IS 'MASTRA' MODEL R95-S-08 WITH A MINIMUM DISCHARGE LEVEL LEVEL LEVEL GROUND SETTLEMENT CHECK POINT 10
UTILITIES. THIS REPORT SHALL BE SUBMITTED TO THE AP/RSE/RGE FOR VERIFICATION OF THE WATER S1
CAPACITY OF 10CU.M/HR/WELL UNDER A DELIVERY HEAD OF 46M AND BE ABLE TO LOWER WATER LEVEL WITHIN 1M CUT-OFF EFFECTIVENESS OF THE SHEET PILE WALL. THIS REPORT SHALL BE SUBMITTED TO BD'S 0.75m BELOW THE 0.80m BELOW THE 0.87m BELOW THE (S1-S10)
ABOVE THE PUMP. OBSERVATION WELLS
SATISFACTION AFTER REVIEWED AND APPROVED BY AP/RSE/RGE. LOWEST MEASURED LOWEST MEASURED LOWEST MEASURED OW1 OBSERVATION WELL (OW1-OW14) 14
(OW2, OW4, OW6, 90mm (W) x 60mm (H) space
6. FLOW METER AND GATE VALVE TO CONTROL FLOW SHALL BE INCOPORATED INTO EACH DEWATERING WELL. GROUND WATER TABLE GROUND WATER TABLE GROUND WATER TABLE
OW6, OW8, OW10, P1 PUMP WELL (P1 TO P7) 7 for AP/RSE/RGE's
7. BEFORE COMMENCEMENT OF PUMP TEST, WATER LEVELS IN ALL DEWATERING WELLS, STANDPIPES, OBSERVATION (VI) CONTINGENCY MEASURES (RECORDS WITHIN 72 (RECORDS WITHIN 72 (RECORDS WITHIN 72
OW12, OW14) signature/ and stamp chop
WELLS SHALL BE MEASURED AT 4 HOURS INTERVALS FOR A PERIOD OF 72 HOURS. THE LOWEST MEASURED LEVELS IN HOURS PRIOR TO THE HOURS PRIOR TO THE HOURS PRIOR TO THE RW1 RECHARGE WELL (RW1-RW7) 7
THE PUMP WELL AND STANDPIPES SHALL BE USED AS INITIAL READINGS FOR THE PUMPING TEST. 1. 2 NUMBERS OF RECHARGE WELL WOULD BE PROVIDED AS CONTINGENCY MEASURES IF
CARRYING OUT OF CARRYING OUT OF CARRYING OUT OF
8. ALL DEWATERING PUMPS SHALL BE SWITCHED ON SIMULTANEOUSLY. GROUNDWATER DRAWDOWN EXCEEDING THE LIMIT AND UNSATISFACTORY PERFORMANCE DURING
PUMPING TEST) PUMPING TEST) PUMPING TEST)
STANDPIPE (WITH PIEZOMETER) (SP1(P) 5
RECOVERY PHASE WERE FOUND. THE LOCATION OF RECHARGE WELL ARE SHOWN AT DWG. NO. ELS-13 SP1(P)
9. STEADY STATE SHALL BE DEFINED AS SUCH THAT THE RATE OF GROUNDWATER DRAW DOWN BOTH INSIDE AND TO SP5(P))
OUTSIDE THE SITE IS LESS THEN 0.1M OVER AN HOUR. UTILITY SETTLEMENT MONITORING POINT 12
10. THE WATER LEVEL IN THE PUMP WELL SHALL BE MAINTAINED AT THE SPECIFIED LEVEL FOR AT LEAST 72 HOURS. FOR REFERENCE ONLY
GENERAL NOTES ON PUMPING TEST U1
ON GROUND (U1-U12)
11. SHOULD THE SPECIFIED STEADY STATE IN GROUNDWATER DRAWDOWN NOT BE REACHED, PUMPING SHALL BE
CONTINUED UNTIL SUCH A STATE IS REACHED OR AS DIRECTED BY THE ENGINEER.THE MINIMUM TEST PERIOD IS 7 1. THE PUMPING WELLS SHOWN ARE MINIMUM REQUIREMENT ONLY. NOTWITHSTANDING THESE FLOW METER V1 VIBRATION CHECK POINT (V1-V11) 11 BD's OFFICAL USE
MINIMUM REQUIREMENTS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE WHATEVER POWER SUPPLY
DAYS. TO DISCHARGE SYSTEM
& SWITCH SYSTEM
12. DURING THE TEST THE WATER LEVELS IN ALL DEWATERING WELL, OBSERVATION WELLS AS SHOWN ON DWG. NO. ADDITIONAL MEASURES THAT ARE NECESSARY TO ENSURE THE WATER LEVEL INSIDE THE SITE CAN
ELS-13 SHALL BE REACHED AT REGULAR INTERVALS WHICH SHOWN BELOW (II) WATER LEVEL MEASURMENT. BE LOWERED TO THE TO THE DESIGNATED LEVEL WITHOUT EXCEEDING THE DRAWDOWN AND
EXISTING GROUND LEVEL
13. ALL MONITORING DATA SHALL BE PRODUCED IN BOTH TABULAR AND GRAPHICAL FORM DURING THE COURSE OF THE SETTLEMENT CRITERIA STATED IN THIS DRAWING.
PUMPING TEST AND SUBMIT TO ENGINEER FOR BUILDINGS DEPARTMENT'S APPROVAL. 2. INSTALLATION RECORDS AND RESPONSE TEST RESULTS OF THE PIEZOMETERS, STANDPIPES, VALVE TO HEADER
BENTONITE BALL STEEL PLATE COVER LEGEND AND NOTES:
14. WATER LEVELS SHALL BE MONITORIED AFTER CESSATION OF PUMPING UNTIL RECOVERY TO INITIAL LEVELS IS PUMPING WELLS AND OBSERVATION WELLS SHALL BE SUBMITTED PRIOR TO THE COMMENCEMENT EXISTING 150mm DIA. G.I. TO CONTRACTOR'S DESIGN
COMPLETED OF THE PUMPING TEST. GROUND LEVEL HEADER PIPE GROUND LEVEL BOUNDARY LINE
3. THE PUMPING WELLS AND OBSERVATION WELLS FORM PART OF THE DEWATERING SYSTEM FOR BOREHOLE CASING
THE FURTURE EXCAVATION. OF SOIL DURING
WELL INSTALLATION PLAIN PIPE 1:1 CEMENT BH2(P) BORED HOLE (WITH PIEZOMETER)
(II) WATER LEVEL MEASUREMENT 4. THE TARGET GROUNDWATER TABLES TO BE LOWERED WITHIN THE SITE, AS RECORD BY ∅19mm PERFORATED PIPE 50mm PVC BLANK
BENTONITE (BH1 (P), BH2 (P) AND BH5 (P)
OBSERVATION WELLS GROUT 50mm NO-FINES RISER PIPE
DURING THE PUMPING AND RECOVERY TESTS, THE WATER LEVELS IN THE DEWATERING WELLS, OBSERVATION WELLS CONCRETE CEMENT BH6 (P), BH9 (P) AND BH10 (P) 6NOS.)
AND STANDPIPES SHALL BE MEASURED AT THE FOLLOWING INTERVALS: BENTONITE BALL BEDDING BENTONITE GROUT
TARGET
500 BELOW TOP BH2
8-12mm LEVEL OF CEMENT BORED HOLE
TIME FROM COMMENCEMENT INTERVAL BETWEEN AGGREGATE FILTER 50mm DIA. G.I. BENTONITE GROUT
OBSERVATION WELL P1 P2 P3 P4 P5 P6 P7 (BH3, BH4, BH7 AND BH8 4 NOS.)
OF PUMPING TEST (mins) READINGS (mins) MATERIAL BACKFILL PIPE WITH 90mm (W) x 150mm (H) space
IN STAGE AS CASING ∅19mm FITTINSG TO for BD's approval stamp /
0-30 5 DRAWDOWN LEVEL (mPD) -8.075 -8.075 -8.075 -7.375 -10.325 -8.075 -8.075 BEING WITHDRAWN 4.15
PERFORATED REINFORCED
CLEAN 10mm EXISTING GROUND LEVEL certification of copies of
SWITCH PVC PIPE WITH FLEXIBLE HOSE
30-60 10 ON-SWITCH GRAVEL FILTER approved plans
TWO LAYERS 10mm SINGLE AND COUPLERS
5. THE PUMPING TEST SHALL BE STOPPED IN CASE THE GROUNDWATER DRAWDOWN OUTSIDE THE SITE OF NYLON MESH SIZE AGGREGATE 50mm PVC PERFORATED GAS GAS PIPE (PNAP ADM-10 APP A)
60-120 15 RISER PIPE 6% OPEN AREA
EXCEEDS 2.0m. THE CONTRACTOR SHALL INVESTIGATE THE CAUSE OF THE DRAWDOWN AND OFF-SWITCH RATID FORMED BY 5mm
120-360 30 IMPROVEMENT MEASURES SHALL BE PROPOSED AND IMPLEMENTED. CONTINGENCY MEASURES SUCH DIA. HOLES MAPPED WITH 2 S WAT SALT WATER PIPE
360-END OF TEST 60 AS INSTALLATION OF RECHARGE WELLS BEHIND SHEET PILE WALLS MAY BE REQUIRED. LAYERS OF NYLON NESH OF
SUMBERSIBLE 2mm OPENINGS
6. COMPLETE PUMPING TESTS RESULT SHALL BE SUBMITTED TO BD AFTER THE SUCCESSFUL PUMP OF ELECTRIC CABLE
200

DURING THE RECOVERY PHASE, THE READINGS SHALL BE TAKEN CONTINUOUSLY UNTIL THE WATER LEVEL IN ALL COMPLETION. SUFFICIENT
TO BE EQUIVALENT TO ELEC
165 CUT-OFF LEVEL OF
OBSERVATION WELLS AND STANDPIPES HAVE RECOVERED TO THEIR PRE-TEST LEVELS OR FOR A PERIOD OF TWO 7. PUMP WELLS AND OBSERVATION WELLS SHALL BE PROTECTED FROM DAMAGE. WORKS SHALL BE CAPACITY ADJACENT PUMP WELL
DAYS, WHICHEVER IS THE SOONER. PRIOR TO TERMINATING READINGS, THE ARCHITECT SHALL BE NOTIFIED. CARRIED OUT WITH DUE CARE IN PROXIMITY OF THOSE WELLS. 250 FOUL WATER PIPE
FOUL
8. IN CASE THE PUMP/OBSERVATION WELL HAS BEEN DAMAGED DURING ANY TIME OF THE TYPICAL DETAILS OF
(III) MONITORING OF CHECKPOINTS CONSTRUCTION WORKS, THE CONTRACTOR SHALL INFORM AP/RSE/RGE IMMEDIATELY AND TYPICAL DETAILS OF PUMP WELL TYPICAL DETAILS OF RECHARGE WELL
OBSERVATION WELL F WAT FRESH WATER PIPE
REINSTATEMENT SHALL BE CARRIED OUT WITHOUT DELAY. (N.T.S.)
(N.T.S.) (N.T.S.)
1. DURING THIS TEST AND UNTIL ALL STANDPIPES/ OBSERVATION WELLS HAVE RECOVERED TO THEIR PRE-TEST LEVELS,
ALL SETTLEMENT CHECKPOINTS TILTING CHECK POINTS AND UTILITY CHECK POINTS AS SHOWN ON THE DRAWING NO.
ELS-01 SHALL BE MONITORIED ONCE PER DAY. THE RESULTS SHALL BE PRODUCED IN ACCORDANCE WITH NOTE (I) 13.
BD REF :

BIM REF :
XXX ROAD

XXX ROAD

T
75

15
S

4.0

Basketball Court
R

Building 2
Building 1

15
7.6
GIU REPORT 04934

SITE BH2280
15
3.4

75

T
GIU REPORT 04934
TS

BH2281

15
15

3.9
3.4

TS
SH

15
R

S
P

4.0
154 DH4(P/S)
Q

Basketball Court
150

15
DH2(P/S)

R
4.9

Building 2
GIU REPORT 04934
14

Building 1
6.5

BH2283

15
3.4

15
14

7.6
7.2
14
5.6

14
5.2

14
7.3
BLOCK PLAN
REV DATE AMENDMENT
1 : 500 DH3(P/S)

TS
PROJECT

DH1(P/S) CIC SAMPLE PROJECT


SURFACE BOX

15
15
CAP GIU REPORT 04934 GIU REPORT 04934
NOTES FOR GI PLAN WITH COVER BH2278 BH2279

3.9
3.4
1. LEVEL SHALL REFER TO METERS ABOVE PRINCIPAL DATUM, HONG KONG. 20mm PVC PIPE GROUND LEVEL

TS
DRAWING TITLE

SH
2. THE CONTRACTOR SHALL SET OUT THE LOCATIONS OF Gl STATIONS PRIOR TO
COMMENCEMENT OF THE WORKS. EXACT LOCATIONS ARE TO BE CONFIRMED BY PROPOSED GROUND INVESTIGATION

R
1500 MIN.

OF WORKS. PLAN
DRAIN CONDUIT

P
3. THE CONTRACTOR SHALL EXERCISE EXTREME CARE SO AS NOT TO DISTURB OR BENTONITE BALL
DAMAGE ANY UTILITIES PRIOR TO THE COMMENCEMENT OF ROTARY DRILLING. A 154

Q
HAND EXCAVATED INSPECTION PIT SHALL BE CARRIED OUT AT EACH DRILLHOLE
10mm SINGLE SIZE AGGREATE SCALE
TO LOCATE ANY UNDERGROUND UTILITIES BEFORE DRILLING. As indicated@A1
4. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE
∅19mm PERFORATED PVC PIPE DRAWING NO. REV. NO.
WITH 2 LAYERS OF NYLON
RECOMMENDATIONS OF
GEOGUIDE 2, CEOGUIDE 3, APP49 AS WELL AS APP24.
MESH 150 G001
---

15
SOURCE
5. INSPECTION PIT (APPROXIMATELY 1.2m x 1.2m x 1.5m DEEP) SHALL BE HANG DUG PLASTIC TUBE

4.9
AND
ARE CARRIED OUT TO ENSURE THAT THE PROPOSED DRILLING LOCATION WILL

14
NOT INTERECEPT THE EXISTING UNDERGROUND UTILITIES AND FOUNDATION.

6.5
SHOULD EXISTING UTILITIES AND FOUNDATIONS BE ENCOUNTERED THE CEMENT BENTONITE GROUT 90mm (W) x 40mm (H) space
DRILLHOLE WILL BE RELOCATED IN THE VICINITY OF THE CONCERNED LOCATION (1 : 1 BY WEIGHT)

15
for COMPANY LOGO
BY THE INSTRUCTION OF THE ENGINEER.

3.4
FOR REFERENCE ONLY
6. PROPOSED BOREHOLES SHALL BE H SIZE IN SOIL AND ROCK AND SHALL BE SUNK

14
BY

N
7.2
ROTARY DRILLING METHOD USING WATER AS FLUSHING MEDIUM.
APPROX 1500

14

7. MAZIER SAMPLES SHALL BE TAKEN AT 20m INTERNALS COMMENCING AT 0.5m BENTONITE BALL
BELOW
5.6

INSPECTION PIT OF DRILLHOLES.


SAND FILTER
1500 MIN.

8. STANDARD PENETRATION TEST (SPT) WITH LINER SAMPLES SHALL BE CARRIED 90mm (W) x 60mm (H) space

14
OUT AT for AP/RSE/RGE's
APPROX. 500

5.2
PIEZOMETER
2.0m INTERNALS. IF SPT ARE CARRIED OUT AT LEVEL SAME AS THE LEVEL FOR signature/ and stamp chop
MAZIER SAMPLING. THE SPT SHOULD BE CARRIED OUT AFTER MAZIER SAMPLING.
APPROX. 1500

9. ROCKHEAD SHAL BE DEFINED AS THE SURFACE OF CAT I(C) OR BETTER ROCK BENTONITE BALL

14
WITH TOTAL CORE RECOVERY (TCR OF THE DESIGNATED GRADE) GREATER THAN

7.3
85%. THE
DEFINITION OF TOTAL CORE RECOVERY IS IN ACCORDANCE WITH CODE OF CEMENT BENTONITE GROUT PROPOSED GROUND INVESTIGATION PLAN
1500 MIN.

PRACTICE FOR (1 : 1 BY WEIGHT)


FOUNDATIONS, 2017. 1 : 250 BD's OFFICAL USE
BOTTOM OF HOLE SITE BOUNDARY

PROPOSED VERTICAL DRILLHOLE


DETAILS OF PIEZOMETER WITH STANDPIPE / PIEZOMETER
N.T.S
AVAILABLE EXISTING DRILLHOLES
NEARBY THE PROJECT SITE

PROPOSED DRILLHOLE SCHEDULE EXISTING DRILLHOLE SCHEDULE


90mm (W) x 150mm (H) space
Mark Easting Northing Mark Easting Northing for BD's approval stamp /
DH1(P/S) 832043740 813811230 GIU REPORT 04934 BH2278 832057170 813825680 certification of copies of
approved plans
DH2(P/S) 832029510 813821270 GIU REPORT 04934 BH2279 832071240 813845210 (PNAP ADM-10 APP A)
DH3(P/S) 832062200 813841590 GIU REPORT 04934 BH2280 832035150 813853290
DH4(P/S) 832046550 813852060 GIU REPORT 04934 BH2281 832024940 813832730
GIU REPORT 04934 BH2283 832062290 813862720

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

N
SITE
OVERVIEW IN 3D (FOR INFORMATION ONLY)
SURFACE BOX CAP
WITH COVER
20mm PVC PIPE GROUND LEVEL

1500 MIN.
DRAIN CONDUIT
BENTONITE BALL

10mm SINGLE SIZE AGGREATE REV DATE AMENDMENT

∅19mm PERFORATED PVC PIPE PROJECT


WITH 2 LAYERS OF NYLON CIC SAMPLE PROJECT
MESH
SITE FORMATION BLOCK PLAN
1 : 500 PLASTIC TUBE

DRAWING TITLE
CEMENT BENTONITE GROUT SITE FORMATION BLOCK PLAN
(1 : 1 BY WEIGHT)

NOTES UTILITIES SCALE As indicated@A1

APPROX 1500
1. THE CONTRACTOR SHALL MAINTAIN AND PROTECT ALL EXISTING FACILITIES AND DRAINAGE 1. PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL CONFIRM DRAWING NO. REV. NO.
BENTONITE BALL
SYSTEM WITHIN AND NEARBY THE SITE UNLESS OTHERWISE INSTRUCTED BY THE
SUPERVISOR.
THE EXACT LOCATIONS OF THE EXISTING UTILITIES AFFECTING OR TO BE AFFECTED
BY THE WORKS USING INSPECTION PITS OR OTHER MEANS AS RECOMMENDED BY
T001
THE RELEVANT UTILITY / SERVICES COMPANIES OR PARTIES CONCERNED.
SAND FILTER SOURCE ---

1500 MIN.
2. ANY UTILITIES SHOWN ON THIS PLAN ARE INDICATIVE ONLY.THE CONTRACTOR IS
RESPONSIBLE FOR CONFIRMING THE EXACT LOCATIONS AND ALIGNMENT ON SITE. 2. THE CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ANY EXISTING

APPROX. 500
PIEZOMETER
UTLITIES OR SERVICES WITHIN OR IN THE VICINITY OF THE WORKS SITE AND WORKS
3. IF THE CUT SLOPE TO BE LAST FOR MORE THAN A YEAR, SHOTCRETE OR SIMILAR SLOPE AREA AND SHALL PROVIDE NECESSARY PROTECTION AND SUPPORT TO THE

APPROX. 1500
SURFACE PROTECTIVE MEASURE SHALL BE APPLIED. EXISTING UTLITIES OR SERVICES ACCORDANCE WITH THE REQUIREMENTS OF THE 90mm (W) x 40mm (H) space
RELEVANT OF UTILITY / SERVICES COMPANIES OR PARTIES CONCERNED DURING BENTONITE BALL for COMPANY LOGO
4. TEMPORARY DRAINAGE REFER TO TEMPORARY DRAINAGE MANAGEMENT PLAN. THE EXECUTION WORKS. SHOULD ANY DAMAGE OCCUR TO THE UTILITIES /
SERVICES DUE TO THE THE WORKS. SHOULD ANY DAMAGE OCCUR TO THE
5. IF THE LOADING OR GROUNDWATER CONDITIONS ARE DEVIATED FROM THE DESIGN UTILITIES / SERVICES DUE TO THE CONTRACTOR'S WORKS, THE CONTRACTOR CEMENT BENTONITE GROUT

1500 MIN.
ASSUMPTIONS, FURTHER DESIGN OR CHECKING SHALL BE REQUIRED TO CONFIRM THE SHALL BE RESPONSIBLE FOR ANY COST INCURRED FROM THE DAMAGE. (1 : 1 BY WEIGHT)
MAXIMUM CUT SLOPE ANGLE.
BOTTOM OF HOLE
6. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATIONS AND THE
PARTICULAR REQUIREMENTS WHICH ARE SHOWN ON INDIVIDUAL DRAWINGS. THE PROTECTION OF EARTHWORKS AGAINST HEAVY RAINFALL
7. UNLESS OTHERWISE SPECIFIED, THESE GENERAL NOTES ARE APPLICABLE TO ALL
For Reference Only
1. SURFACE WATER FLOWING INTO THE SITE FROM UPHILL SHALL BE INTERCEPTED
GEOTECHNICAL WORKS OF SITE FORMATION. AND CONDUCTED FROM THE SITE TO SAFE DISCHARGE POINT. AT EACH 90mm (W) x 60mm (H) space

8. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE GENERAL SPECIFICATION
INTERSECTION AND ABRUPT CHANGE IN DIRECTION OF SURFACE DRAINAGE STANDPIPE / PIEZOMETER for AP/RSE/RGE's
signature/ and stamp chop
CHANNELS AN ACCESSIBLE CATCHPIT SHALL BE PROVIDED, ALL DRAINAGE N.T.S.
FOR CIVIL ENGINEERING WORKS 2006 OR OTHERWISE SPECIFIED. WORKS SHALL BE KEPT CLEAR OF DEBRIS.
9. THE BOTTOM OF THE EXCAVATION SHALL BE KEPT DRY. WATERFLOW INTO THE EXCAVATION 2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WITHIN THE SITE,
SHALL BE PUMPED TO SAFE DISCHARGE POINT TO AVOID PONDING AT BASE OF EXCAVATION. A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE DISCHARGE POINT.
See detail "X"
10. ALL EXCAVATION WORK SHALL NOT REDUCE THE REQUIRED STABILITY OF THE SLOPE. Grating
3. ALL EARTHWORKS SHALL BE GRADED AND SEALED TO ENSURE RUN-OFF AND TO
AVOID PONDING. BD's OFFICAL USE
11. IF DURING EXECUTION OF THE WORKS, THE GROUND CONDITIONS ARE FOUND TO BE SECTION B_B
SUBSTANTIALLY DIFFERENT FROM THE DESIGN, THE ENGINEER MAY CHANGE THE DESIGN 4. A METHOD OF WORKING SHALL BE ADOPTED IN WHICH THE MINIMUM OF BARE
SECTION A_A
AND THE EXTENT OF THE WORKS IN ORDER TO ADDRESS THE ACTUAL GROUND CONDITIONS. SOIL IS EXPOSED AT ANY TIME. EARTHWORK TO FORM THE FINAL FACE SHALL BE Contract Manufacturer's
Manufacturer's
FOLLOWED UP IMMEDIATELY WITH SURFACE PROTECTION AND DRAINAGE number name name
12. DURING THE EXECUTION OF WORKS, RECORDS SHALL BE SUBMITTED TO THE ENGINEER OF WORKS AND THE FACE PANEL SIZE SHALL BE ENOUGH TO PERMIT THIS.
THE GROUND ENCOUNTERED. THESE RECORDS SHALL INCLUDE THE LEVELS OF SOIL AND
ROCK ACROSS THE SLOPE FACE, THE OCCURRENCE OF GROUNDWATER AND THE 5. EXCAVATION SHALL NOT BE LEFT OPEN ON OR ADJACENT TO SLOPES.
LOCATIONS OF ANY VOIDS OR WEAK OR WET GROUND.
6. IF TRENCHES ON OR ADJACENT TO SLOPE HAVE TO BE EXCAVATED DURING THE
13. REGULAR CLEAN-UP OF DIESEL AND OIL SPILLS SHALL BE CARRIED OUT TO PREVENT WET SEASON, THIS SHALL BE DONE WITH EXTREME CARE IN SHORT SECTIONS
CONTAMINATION OF SURFACE DRAINAGE WATER. AT A TIME. PRECAUTIONS SHALL ALWAYS BE TAKEN TO PREVENT WATER FROM
ENTERING AND COLLECTING IN THE TRENCH.
Contract
7. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE, THEY SHALL
number
DIMENSIONS, LEVELS & SETTING-OUT
BE PROTECTED WITH IMPERMEABLE SHEETING WELL-SECURED AGAINST THE TYPICAL CROSS SECTION
WIND. WHERE SLOPE FACES ARE TO BE TEMPORARILY EXPOSED FOR MORE 90mm (W) x 150mm (H) space
THAN TWO WEEKS TEMPORARY HARD SURFACING SHALL BE PROVIDED AND
OF CHANNEL for BD's approval stamp /
1. COORDINATES ARE BASED ON HONG KONG METRIC GRID (1980) UNLESS TEMPORARY DRAINS SHALL BE INSTALLED. certification of copies of
OTHERWISE SPECIFIED. GRATING - OBLIQUE approved plans
25 x 25 x3 tk. hot dip
galvanised angle BARS PATTERN GRATING - SQUARE HOLES (PNAP ADM-10 APP A)
2. LEVELS ARE IN METRES RELATIVE TO HONG KONG PRINCIPAL DATUM (mPD)
UNLES OTHERWISE SPECIFIED. 4 dia. stainaless steel stud ( All slots and ribs are 18 in width. PATTERN
bolts at 300 spacing Exact no. of slots and ribs to be ( All hole are 25 x 25 in size and all ribs are
3. DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. adjusted to suit channel width ) of equal width. Exact no. of holes and ribs to
be adjusteed to suit channel width )
4. SETTING OUT DIMENSIONS, LEVELS, COORDINATES ARE TO BE CALCULATED BY
THE CONTRACTOR. NO INFORMATION SHOULD BE SCALED PHYSICALLY OR
DETAIL "X"
ELECTRONICALLY FROM THE DRAWINGS OR FILES. (Scale 1:5)

5. SETTING OUT OF ALL SLOPES SHALL BE VERIFIED BY THE CONTRACTOR AND


AGREED WITH THE ENGINEER ON SITE.
BD REF :
LEGEND:
BIM REF :

SITE BOUNDARY 99
N 813850 E 832000

+5.0 SLOPE BERM / PLATFORM LEVEL

N
97.6
98
225UC 98.6 95.6
U-CHANNEL

RETAINING WALL 99.8 97


N 813826335.275
E 831989314.834 1 N 813855097.074
CATCHPIT WITHOUT COVER E 832010173.18
T003 GIU REPORT 04934
96.7
96 BH2283
SOIL NAIL

SOIL CUT SLOPE 225 UC 95


98 97.4
94.8 92.3
SOIL FILL SLOPE 94

.
S.C
39.81°

300

UC
ROCK CUT SLOPE 94.1 UP 93
97 225 UC +92.0

300
ROCK FILL SLOPE 55
.81

.
92

S.C
59.49°
° SN1 SN2 SN3
2

C
61

300
5U
150 EXISTING GROUND PROFILE T003 .9
5° SN4 SN5
91
96 93.1

°
SN6

22
300 UC

.55
151 UP
+92.0 90

50
N 813800
150 FINAL SITE FORMATION LEVEL 89

30
89.5
151

0
95 92

UC

UC
88

5
22
1i
DH1 91.7
PROPOSED VERTICAL DRILLHOLE

87
91

FALL
WITH STANDPIPE PIEZOMETER 30

UC

FA
0U

86
94

LL
90 C

0
1i

30
DH2
AVAILABLE EXISTING DRILLHOLES 89

85
53 89.6
93 .5

225
NEARBY THE PROJECT SITE
86.6 92
0° 88 N 813859160.029
92.0 E 832043026.248

UC
87
89.8 FA
LL 86
GIU REPORT 04934 85

91

DF OR

300 UC
FAL
L BH2281 DH3

I LL
LAN ILL
5° +85.0 84

ED OIL F
53.1 83
DH2(P)
82
REV DATE AMENDMENT

MP TED S
E 832000 81 E 832050 PROJECT

OS
89.1 DH4

DE MPAC
90 80 CIC SAMPLE PROJECT

CO
STANDPIPE

CO
89 DH2 (P)
Dia 100
83.6 6535mm dp
88 FAL
L FA
LL

53.1

300
DRAWING TITLE
87
SITE FORMATION LAYOUT PLAN

UC
80.6

C
0U
86

UC

30
85 SOIL FILL OR

0
COMPACTED

30
D LANDFILL 75.5
GIU REPORT 04934 DECOMPOSE GIU REPORT 04934
84 83.4
81.4 BH2280 BH2279 SCALE As indicated@A1

LL

FALL
FA
83
DRAWING NO. REV. NO.
82 77.6 T002
CATCHPIT SCHEDULE N 813850
81 SAND TRAP
TO GOVERNMENT MANHOLE
SOURCE ---
Catchpit Base Slab Catchpit Catchpit Catchpit Catchpit 78.5
Depth Depth Length Width Material Count 300 UC FMH4012623
80
CL +78.90
150 655 800 800 Concrete Grade 16 A1 -0.12-150
20/20 76.6 79 A3 400 90mm (W) x 40mm (H) space
150 655 989.18 800 Concrete Grade 1 300 UC DRAIN PIPE TO X1 -0.12-400 for COMPANY LOGO
N 813829468.92
20/20 71.1 78 DH1 LAST CATCH PIT E 832054991.388
77.1 GIU REPORT 04934
Grand total: 17 77 BH2278
N 813794051.903
E 832033830.725 76
LAST CATCH PIT

73.7
SOIL NAIL SCHEDULE
69.8
Soil Nail Soil Nail Soil Nail Total 70.4 90mm (W) x 60mm (H) space
N 813800 E 832050 for AP/RSE/RGE's
Mark Type Dia Northing Easting Inclination Length signature/ and stamp chop
SN1 Nail Head_400x400 50 813835.295 832007.543 20.00° 4000
SN2 Nail Head_400x400 50 813836.607 832008.495 20.00° 5000
SITE FORMATION LAYOUT PLAN
1 : 200
SN3 Nail Head_400x400 50 813837.956 832009.604 20.00° 4000
SN4 Nail Head_400x400 50 813834.333 832008.869 20.00° 4000
SN5 Nail Head_400x400 50 813835.564 832009.933 20.00° 5000 BD's OFFICAL USE
SN6 Nail Head_400x400 50 813836.811 832011.183 20.00° 4000

GI Schedule
Mark Northing Easting
DH1 813810690.2 832044484.336
DH2(P) 813823615.425 832023778.222
DH3 813845788.059 832037467.269
DH4 813852049.716 832046564.18 +85.0 +85.400 +85.0
+85.907
+85.700 +85.907
+85.500 +85.457
+85.457
+85.300 90mm (W) x 150mm (H) space
+85.491 for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)

3D View from South For Information Only 3D View from East For Information Only
BD REF :

BIM REF :
ELEVATION
(mPD)
SITE BOUNDARY
SITE BOUNDARY

+96.0

50.
CONCRETE
+95.0 STAIR

45°
EXISTING GROUND PROFILE
+94.0

60
+93.0

.61
°
+92.000
+92.0

+91.0 +90.760 SN1

20°
+90.0
PROPOSED SURFACE CHANNEL
DH2(P)

62
+89.0

°
+88.0 +87.721 SN4

+87.0
COMPACTED SOIL FILL OR DECOMPOSED LANDFILL PROPOSED FORMATION LEVEL

20°
+86.0 DESIGN
+85.500
G.W.T.
+85.000 +84.86
+85.0

Fill
+84.0 MEASURED
HIGHEST G.W.T.
+82.86
+83.0 RC RETAINING WALL

+82.0

+81.0

+80.0
VI
REV DATE AMENDMENT
+79.0
+78.500 PROJECT

+78.0 CIC SAMPLE PROJECT


+77.200
+77.0

+76.0
DRAWING TITLE

+75.0
SITE FORMATION SECTIONS
Section 1
+74.0
1 1 : 100
+73.0
ELEVATION SCALE 1 : 100@A1
(mPD)
DRAWING NO. REV. NO.
SITE BOUNDARY SITE BOUNDARY
T003
+96.0 SOURCE ---

+95.0

+94.0 EXISTING GROUND PROFILE 90mm (W) x 40mm (H) space


for COMPANY LOGO

58
.67
+93.0

°
+92.000
+92.0

+91.0

53
.46
+90.0

°
GIU REPORT 04934 BH2281 90mm (W) x 60mm (H) space
+89.0
for AP/RSE/RGE's
signature/ and stamp chop
+88.0 PROPOSED FORMATION LEVEL

N=9
+87.0
COMPACTED SOIL FILL OR DECOMPOSED LANDFILL Fill

+86.0

+85.000 DESIGN BD's OFFICAL USE


+85.0 G.W.T.
+84.29
+84.0
DESIGN
G.W.T.
+83.0 RC RETAINING WALL +82.61

+82.0
COLLU
N=15
+81.0

+80.0

N=33
+79.0
90mm (W) x 150mm (H) space
for BD's approval stamp /
+78.0 certification of copies of
VI approved plans
N=38
+77.0 (PNAP ADM-10 APP A)
+76.400

+76.0

+75.100 N=200
+75.0
III
+74.0

+73.0
Section 2
2 1 : 100
BD REF :

BIM REF :
GENERAL NOTES 20. ALL INVERT LEVELS SHOWN ON MANHOLES ARE THE INVERT LEVEL OF THE MAIN
1. THE WHOLE DRAINAGE INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF THE CHANNELS IN THE CENTRE OF MANHOLES.
21. ALL UNDERGROUND DRAINS SHALL BE DULY TESTED AND COMPLIED WITH THE LEGENDS
BUILDINGS ORDINANCE AND BUILDING REGULATIONS AND THE CURRENT REGULATIONS OF
HONG KONG ENVIRONMENTAL PROTECTION DEPARTMENT. REQUIREMENT STATED ON PNRC 11 & PNAP APP-58 PRIOR TO THE BACKFILLING OF
2. ALL DIMENSIONS AND PIPE SIZES SHOWN ON THE DRAWINGS ARE IN mm UNLESS TRENCHES. F.A.I. FRESH AIR INLET
22. WHETHER SHOWN ON THE DRAWING OR NOT, SUFFICIENT PROTECTIVE GUARD SHALL DIRECTION OF FLOW
OTHERWISE STATED.
3. WHERE THE WASTE PIPE FROM A WASTE FITMENT IS CONNECTED TO A SOIL PIPE, THE TRAP BE SUPPLIED AND INSTALLED BY MAIN CONTRACTOR.
WASTE PIPE WIRE MESH BALLOON (VENT COWL)
PROVIDED FOR EACH FITMENT SHALL HAVE A WATER SEAL NOT LESS THAN 80mm AND BE 23. POSITION OF MANHOLES SHALL BE CO-ORDINATE WITH OTHER TRADES/SERVICES.
VENTED BY MEANS OF ANTISYPHONAGE PIPE OR ANTISYPHONAGE TRAP. EXACT POSITION AND SET-OUT TO BE DETERMINED ON SITE.
4. HORIZONTAL VENT PIPE SHALL BE INSTALLED IN A MANNER THAT THERE IS A CONTINUOUS 24. CAST IRON AIRTIGHT BOLTED COVER SHALL BE USED TO BACK INLET TRAPPED SOIL & WASTE PIPE / SOIL PIPE VRWO VERTICAL RAIN WATER OUTLET
FALL BACK AT A GRADIENT OF NOT LESS THAN 1 IN 300 INTO THE DISCHARGE PIPE SYSTEM. GULLIES WHICH ARE SITUATED INSIDE BUILDING AND THE AIR TIGHT TRAPPED GULLIES
5. UNLESS OTHERWISE STATED GRADIENT OF DRAIN PIPES SHALL BE AS FOLLOWS:- SHALL BE VENTILATED. RAIN WATER PIPE
25. EVERY STORM WATER PIPE WHICH DISCHARGE TO A CHANNEL OR A TRAP SHALL RWO RAIN WATER OUTLET
∅100 FALL 1 : 40 DISCHARGE AT A POINT NOT MORE THAN 150MM ABOVE THE TOP OF THE CHANNEL OR VENTILATING PIPE/
∅150 FALL 1 : 70 DISCHARGE INTO A TRAPPED AND VENTED INSPECTION CHAMBER. ANTI-SYPHONAGE PIPE TFD
∅225 FALL 1 : 100 26. SIZE OF TRAPS FOR FITMENTS SHALL BE THE SAME AS THE PIPE SIZE NOTED FOR TOP ACCESS FLOOR DRAIN
∅300 OR ABOVE FALL 1 : 150 FITMENTS. A/C CONDENSATION DRAIN PIPE
TSD
6. ALL UNDERGROUND PIPES SHALL BE PROVIDED WITH PIPE HAUNCHING OR SURROUNDED BY 27. FACES OF EVERY MANHOLE WITHIN SITE SHALL BE RENDERED WITH CEMENT MORTAR TOP ACCESS SHOWER DRAIN
CONCRETE AS SHOWN ON DETAILS DRAWINGS. THE DRAINAGE SUB-CONTRACTOR SHALL SO AS TO PROVIDE A SMOOTH AND IMPERVIOUS SURFACE.
SMH STORMWATER MANHOLE
CHECK THE SITE BEFORE CONSTRUCTION AND RECTIFY THE PROPOSED PIPE ROUTING. 28. UPON THE COMPLETEION OF DRAINAGE CONNECTION WORKS BY THE SUB- FD
CONTRACTOR. A JOINT INSPECTION WITH D.S.D SHALL BE CARRIED OUT AND THE AS FLOOR DRAIN
7. INSPECTION PANELS OF ADEQUATE SIZE SHALL BE PROVIDED AT PIPE DUCTS AND SHAFTS WMH SOIL & WASTE MANHOLE
FOR INSPECTION AND MAINTENANCE OF PIPES. BUILT SEWER AND STORMWATER DRAINS RECORDS WILL BE FURNISHED TO D.S.D.
8. ALL BACK INLET TRAPPED GULLIES SHALL BE VENTILATED BY MEANS OF 80mm DIA. VENT PIPE. 29. ALL BENDING RADIUS OF THE UNDERGROUND PIPE SHOULD BE GREATER THAN 6 VFD VERTICAL FLOOR DRAIN
9. ALL SOIL WASTE AND VENT STACKS SHALL BE CARRIED UP TO THE ROOF AND TERMINATED TIMES OF THE PIPE DIA.. STMH
TERMINAL STORMWATER
AT NOT LESS THAN 1000mm ABOVE THE ROOF OR AS SHOWN IN DRAWINGS. 30. ALL CONDENSATE DRAIN PIPES SHALL BE CONNECTED TO THE STORM WATER PIPE IS MANHOLE
10. EVERY ANTI-SYPHONAGE PIPE SHALL BE CONNECTED WITH BRANCH SOIL PIPE OR BRANCH NOT REQUIRED TO CONNECT WITH ANTI SYPHONIC TRAP. BITG
31. UNLESS OTHERWISE SPECIFIED, ALL FINISHED FLOOR GRADIENT SHALL BE 1 IN 100 FTMH TERMINAL FOUL WATER
WASTE PIPE AT A POINT NOT MORE THAN 300mm FROM TRAP OUTLET. BACK INLET TRAPPED GULLY
FALL. MANHOLE BITG
11. WHETHER SHOWN ON THE DRAWINGS OR NOT, SUFFICIENT ACCESS SHALL BE PROVIDED BY C/W VENT PIPE
MEANS OF CLEANING EYES OR OTHER APPROVED METHOD TO ENABLE ALL DRAINAGE PIPES 32. UNDERGROUND DRAIN SHALL HAVE AN INTERNAL DIAMETER OF NOT LESS THAN
TO BE CLEARED OF ANY OBSTRUCTION. SUCH ACCESS POINTS SHALL BE SO SITED AT TO 100mm DIA. WATER CLOSET OTG
ALLOW CLEARANCE FOR THE EASY ENTRY OF CLEANING ROD. 33. BEFORE CONSTRUCTION OF THE DRAINAGE WORKS, THE SUB-CONTRACTOR SHOULD
CHECK THE EXACT LOCATION AND INVERT LEVELS OF THE EXISITNG GOVERNMENT OTG OPEN TRAPPED GULLY
12. ALL BENDS IN SOIL PIPES AND WASTE PIPES SHALL HAVE AN OBTUSE ANGLE AND HAVE THE
LARGEST PRACTICABLE RADIUS OF CURVATURE. THE BENDS SHALL NOT CHANGE IN ANY WAY PIPELINES AND MANHOLES. WASH BASIN
OF THE SECTION OF THE PIPE AND A CLEANING EYE SHALL BE PROVIDED AT OR NEAR THE 34. ALL PIPES SHALL BE SURROUNDED WITH 150mm CONCRETE WHEN COVER DEPTH IS
BEND. LESS THAN 900mm UNDER ROAD AND 450mm UNDER FOOTWAY. SINK CLEANSING EYE
13. ALL FLOOR DRAINS ARE TO BE COMPLETED WITH FLAT GRATING. THEIR SIZE ARE NOTED AS 35. NO PIPE JOINTS SHALL BE PERMITTED WITHIN THE THICKNESS OF WALLS OR FLOORS.
FOLLOW: 36. FRESH AIR INLETS SHALL BE STRONG CAST IRON APPROX. 50MM(W)x115MM(H) x140(D)
WITH CURVED BACK FIXING EATS CASTED ON FOR CONNECTION PIPE 100MM URINAL
OUTLET SIZE GRATING SIZE DIAMETER WITH POLISHED STAINLESS STEEL SKILLED FRONT SCREWED ON AND SUMP PIT WITH SUBMERSIBLE PUMPS
∅50 ∅100 FOR REFERENCE ONLY FITTED WITH THIN ALUMINIUM-FLAP VALVE FIXED AT MINIMUM 2.5M ABOVE GROUND
∅80 ∅150 LEVEL OR SHOWN ON THE DRAWINGS. SHOWER
∅100 ∅225 37. TRAPPED GULLIES SHALL BE WITH HINGED CAST IRON GRATING OR COVER WITH
∅150 ∅300
FRAME. CAST IRON GULLY TRAP OF APPROPRIATE SIZE SHALL MATCH WITH THE DRAIN
PIPES AND PROVIDE A MIN. 75MM DEEP-WATER SEAL AND WITH MIN. 50MM DIAMETER BATH-TUB GREASE TRAP
14. THE SUB-CONTRACTOR SHOULD CHECK AND ALLOW ADEQUATE FALL FOR THE VENT PIPE FOR SEALED COVER GULLY.
SOIL/WASTE PIPE RUNNING ON FLOOR LEVEL. 38. FLOOR DRAINS OR VERTICAL GRATINGS SHALL BE SET IN POSITIONS AND SEAL THE HALF ROUND / FLAT CHANNEL
15. ALL PIPES PASSING THROUGH EXIT STAIRCASES, FIRE PROTECTED LOBBIES SHALL BE CLEARANCE BETWEEN THE FLOOR DRAINS AND THE FLOOR SLABS AFTER S.T. SEPTIC TANK
ENCLOSED IN FRR -/60/60 MATERIAL & BASEMENT IN FRR -/120/120 MATERIAL BY MAIN INSTALLATION. REV DATE AMENDMENT
COVERED CHANNEL
CONTRACTOR. 39. DRAINAGE WORKS OUTSIDE LOT BOUNDARY ARE FOR BD REFERENCE ONLY.
16. EXPANSION JOINTS SHALL BE PROVIDED FOR PIPEWORK PASSING THROUGH BUILDING PROJECT
40. CCTV AND MANHOLE SURVEY SHALL BE CARRIED OUT AT THE EARLY STAGE OF THE SOAKAWAY PIT
EXPANSION JOINTS. CONSTRUCTION AND THE COMPLETION OF THE WHOLE DRAINAGE SERVICES SYSTEM. 200 DEPTH SUNKEN SLAB CIC SAMPLE PROJECT
17. UNLESS OTHERWISE STATED, BRANCH PIPE SIZE SHALL BE AS FOLLOWS: THE EXTENT OF CCTV SURVEY SHALL SUBJECT TO ARCHITECT/ ENGINEER'S
WASTE BRANCH FOR EACH WASH BASIN 32mm APPROVAL. 400 DEPTH SUNKEN SLAB
40mm PETROL INTERCEPTOR
WASTE BRANCH FOR EACH KITCHEN SINK
WASTE BRANCH FOR EACH FLOOR DRAIN IN TOILET 50mm
DISCONNECTING TRAP
WASTE BRANCH FOR EACH SHOWER DRAIN IN TOILET 50mm
WASTE BRANCH FOR EACH BATH IN TOILET 40mm
A A CONNECTION FROM A TO A DRAWING TITLE
WASTE BRANCH FOR EACH FLOOR DRAIN IN PLANT RM. 100mm ANIT-SYPHONAGE BOTTOM TRAP GENERAL NOTES FOR DRAINAGE
SOIL BRANCH FOR EACH URINAL 40mm EARLY STAGE - FROM GOVERNMENT MANHOLE FMH4055942 TO FMH4055943 B B CONNECTION FROM B TO B
SOIL BRANCH FOR EACH WATER CLOSET 100mm - FROM GOVERNMENT MANHOLE SMH4074523 TO SMH4074524
VENT BRANCH FOR EACH WATER CLOSET 50mm - FROM GOVERNMENT MANHOLE SMH4074527 TO SMH4074529 4.3
VENT BRANCH FOR EACH URINAL 32mm
18. ALL MANHOLE AND BITG FRAMES AND COVERS (INCLUDING CAST IRON COVER AND COMPLETION - FROM FOUL WATER TERMINAL MANHOLE T.FMH-B01 TO FMH4055942
MATCHING COVER) SHALL BE OF AN APPROVED DESIGN CONFORMING TO THE OF SYSTEM - FROM GOVERNMENT MANHOLE FMH4055942 TO FMH4055943 SCALE
FOLLOWING REQUIREMENTS, UNLESS OTHERWISE INDICATED:
a. INDOOR CARPARK AREA/DRIVE WAY - HEAVY DUTY TYPE DOUBLE SEAL
- FROM STORM WATER TERMINAL MANHOLE T.SMH-101 TO SMH4074523
- FROM GOVERNMENT MANHOLE SMH4074523 TO SMH4074524
- FROM STORM WATER TERMINAL MANHOLE T.SMH-B01 TO SMH-B13
N 4.1 DRAWING NO. REV. NO.
b. OUTDOOR CARPARK AREA/DRIVE WAY - HEAVY DUTY TYPE SINGLE SEAL
c.INSIDE BUILDING - MEDIUM DUTY TYPE DOUBLE SEAL - FROM GOVERNMENT MANHOLE SMH-B13 TO SMH4074527
YYY ST M001
- FROM GOVERNMENT MANHOLE SMH4074527 TO SMH4074529
REET
19. ALL UNDERGROUND DRAINS ARE TO BE LAID ON A CONCRETE BED NOT LESS THAN 4.0 B SOURCE ---
41. SUNKEN TRENCH SHALL BE BACKFILL WITH LIGHT WEIGHT CONCRETE. A
100mm THICK AND AT LEAST 150mm WIDER THAN THE PIPE BORE AND AUNCHED UP CLEANSING EYE SHALL BE PROVIDED FOR PIPEWORKS INSIDE SUNKEN TRENCH.
BOTH SIDES WITH CONCRETE TO MEET THE PIPE BARREL TANGENTIALLY.

NO.98
BLOC

ø300
SMH40
90mm (W) x 40mm (H) space

A1 300
X1 300

72709
2
KA
for COMPANY LOGO

ø150
PIPEWORK MATERIAL SCHEDULE
GALVANIZED STEEL TUBE TO BS EN 10255 ‘MEDIUM’

ø300
ABOVEGROUND: ABBREVIATION
∅32 - ∅40 GRADE WITH SCREW JOINT FOR INSIDE PIPE DUCT &
19.3
(INSIDE PIPE DUCT / PODIUM AREA) PODIUM AREA OR UPVC PIPE TO BS EN 465*-1 / BS 4514 T/A TO ABOVE STG SEAL TRAPPED GULLY P.D. PLANTER DRAIN
FOR INTERNAL AREA.

SMH405
CL 3.7
ABOVEGROUND SOIL / WASTE /

A1 2.35-30
A2 2.5
X1 2.35-30

XXX ST
T/B TO BELOW OTG OPEN TRAPPED GULLY S.S. STAINLESS STEEL

72708
4-1500
∅50 - ∅300

0
SOIL & WASTE / RAIN WATER
8
VENT PIPE (INSIDE PIPE DUCT / PODIUM AREA / CAST IRON TO BS 416 / BS 437 F/A FROM ABOVE WP WASTE PIPE S.W.P. SOIL & WASTE PIPE NO.97
WITHIN 2m FROM TRANSFER PLATE) 12.7
F/B FROM BELOW SP SOIL PIPE R.W.P. RAINWATER PIPE

ø300
6 90mm (W) x 60mm (H) space
ALL SIZES (INSIDE SUNKEN SLAB /
UPVC PIPE TO BS 4514 / BS EN 1329-1 U/S UNDERSLAB RW RAIN WATER G.S.P. GALVANIZED STEEL PIPE NO.97
for AP's signature/ and stamp chop

REET
WITHIN SAME COMPARTMENT AREA) VP VENT PIPE D.I.P. DUCTILE IRON PIPE

SMH40
CL 3.744-300
A1 2.4
A2 2.5
X1 2.44-30
4

72707
6-1500
∅32 TO ∅65 UPVC PIPE TO BS 5255 & BS EN 1329 NO.97

ø150
ø300
ZZZ RO
∅80 - ∅150 U/G UNDERGROUND

SMH40
CL 3.743-300
A1 2.4
A2 2.9
X1 2.43-30
F/L FLOOR LEVEL F.D. FLOOR DRAIN 2
NO.97
SITE

72706
4-1500
(EXTERNAL & ABOVE 2m ABOVE UPVC PIPE TO BS 4514 / BS EN 1329-1

ø300
H/L HIGH LEVEL AFFL ABOVE FINISHED
TRANSFER PLATE)) V.G. VERTICAL GRATING

SMH40
CL 3.764-300
A1 2.4
FLOOR LEVEL

X1 2.44-30
0

13018
M/L MID LEVEL C.L. COVER LEVEL NO.97 K.I.L 201

AI
0
∅350 AND ABOVE DUCTILE IRON TO BS EN 598 WITH INTERNAL HIGH C/W COMPLETE WITH

FMH401
CL 3.9
A1 150
X1 2.84-15
ALUMINA CEMENT COATING L/L LOW LEVEL

12025

H
I.L. INVERT LEVEL

ø300

T
0
P.I. PETROL INTERCEPTOR

AD
8
NO.96

STREE
G
SMH 407
A/G ABOVE GROUND

CL 3.8
G.I. PIPES TO BS EN 10255 MEDIUM GRADE FOR

A1 2.4
X1 2.44-30
ø150
F.M.H. FOUL WATER MANHOLE A/C AIR CONDITIONING BD's OFFICAL USE

4 0
4-30 0
PUMPED DRAINAGE PIPE UP TO ∅65

2712

N
FOR REFERENCE ONLY ABOVEGROUND, HEAVY GRADE FOR UNDERGROUND C.E. CLEANING EYE

FMH40
X1 150
X2 150
S.M.H. STORM WATER MANHOLE 6
NO.96

A
12024
DUCTILE IRON TO BS EN 598 WITH INTERNAL HIGH

FMH40
X1 150
X2 150
∅80 AND ABOVE A1 DRAIN INLET PIPE 1 TFD TOP ACCESS FLOOR DRAIN

SH
12028

ø300
ALUMINA CEMENT LINING
A2 DRAIN INLET PIPE 2 TSD TOP ACCESS SHOWER DRAIN NO.96
4
A/C CONDENSATE DRAIN SYSTEM
EXTERNAL AND ALL SIZES UPVC PIPES AND FITTINGS TO BS EN 1329-1 / BS 4514 A3 DRAIN INLET PIPE 3 VERTICAL RAIN WATER

SMH 407
CL 3.7
A1 2.6
A2 2.95-22
X1 2.68-30
VRWO

8 0
8-30 5
2711
SITTIN
OUTLET

0
INSIDE PIPE DUCT / PODIUM AREA G.I. PIPE TO BS EN 10255 MEDIUM GRADE C/W 9mm X1 DRAIN OUTLET PIPE 1
/ TRANSFER PLATE AND ALL SIZES ELASTOMERIC THERMAL INSULATION CLASS O

G-OUT

ø150
∅100 - ∅225 CAST IRON TO BS 437
UNDERGROUND SOIL / WASTE / DN DIAMETER(MM) UNPLASTICIZED POLYVINYL

SMH 407
CL 3.8
A1 2.70-30
A2 2.7
X1 2.69-30
∅250 - ∅375 CAST IRON TO BS 1211 / BS 4622 UPVC.P.

1 0
7-2250

2710
SOIL & WASTE / RAIN WATER GOVT. GOVERNMENT CHLORIDE PIPE

AREA
VENT PIPE ∅400 AND ABOVE DUCTILE IRON TO BS EN 598 R.W.O. RAIN WATER OULET BITG BACK INLET TRAPPED GULLY
C.I.P. CAST IRON PIPE STMH-01 FTMH-01
UNDERGROUND SOIL AND WASTER ALL SIZE M.H. MANHOLE
HIGH DENSITY POLYETHYLENE PIPES TO C.D.P. CONDENSATE DRAIN PIPE C.L.: 3.95
C.L.: 3.43

NO.95

FMH40
A1 150

ø300
PIPE CONNECT TO PUBLIC

X1 150
BLCO
BS EN 12201-2:2011, PE 100. D.T.I.L. DISCONNECTING TRAP

12621
DRAINAGE SYSTEM CON. PIPE CONCRETE PIPE I.L.: 2.43 I.L.: 2.42
INVERT LEVEL D.T.I.L.: 2.27 90mm (W) x 150mm (H) space
AP ACCESS PANEL D.T.I.L: 2.28

0-954

SMH40
KB

CL 3.53
X1 300
UNDERGROUND RAIN WATER ALL SIZE 4.0 for BD's approval stamp /

13017
ø150
CONCRETE PIPE TO BS EN 5911 PART 100 CLASS H

ø3
PIPE CONNECT TO PUBLIC 3.8 certification of copies of

00
DRAINAGE SYSTEM approved plans

FMH405
CL 3.7
A1 1.92-15
X1 1.92-15
50 C

12622
ø2

0
(PNAP ADM-10 APP A)

0
D
WWWS

ø150
FMH402
CL 3.4
A1 -0.12-250
A2 0.2
TREET

A3 400
X1 -0.1

12623
2-150
2-400
ø400
ø400
3.7

BLOCK PLAN
1 : 500
KITCHEN TOILET
BD REF :

1100 AFFL
ø50 TR/F BIM REF :
+109.500

ø32 FRESH WATER PUMP


ROOM

ø32
ø50

ø100
ø50 TSD
TFD UR2/F ø100
+106.300 VFD

ø50 ø50
ø50 ø50
ø100 SUNKEN FLUSHING WATER PUMP
ø50

ø100
ROOM
2500 AFFL

2500 AFFL

2500 AFFL

2500 AFFL

2500 AFFL
2500 AFFl
VFD
R/F
DETAIL E ø100
ø100

ø100

ø100

ø100

ø100

ø100
+100.000 1 : 100 VFD

ø100
ø100 ø100 ø100

ø100
ø100

ø100

ø100

ø100

ø100
ø100

ø100
FLAT B FLAT D FLAT C FLAT A FLAT E FLAT F FLAT G FLAT H W.M.C. W.M.C. W.M.C. M.R.R. FLAT I FLAT J FLAT K FLAT L FLAT M

27-29/F
+96.350 DETAIL B DETAIL D DETAIL E DETAIL A DETAIL C DETAIL C DETAIL C DETAIL C ø50 ø50 ø50 ø50 DETAIL C DETAIL C DETAIL A DETAIL B ø100 DETAIL D
FD FD FD FD
A

ø50

ø50

ø50

ø50
A

ø100
ø100
ø100

ø100
ø100

ø100
ø100

ø100

ø100

ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100

ø100
ø100
ø100

ø100
FLAT B FLAT D FLAT C FLAT A FLAT E FLAT F FLAT G FLAT H W.M.C. W.M.C. W.M.C. M.R.R. FLAT I FLAT J FLAT K FLAT L FLAT N FLAT M

ø100
ø100

ø100

ø100
4/F-26/F
+29.850 DETAIL B DETAIL D DETAIL E DETAIL A DETAIL C DETAIL C DETAIL C DETAIL C ø50 ø50 ø50 ø50 DETAIL C DETAIL C DETAIL A DETAIL B1 DETAIL D1 DETAIL E
ø100

ø50

ø50

ø50

ø50
FLAT B FLAT D FLAT C FLAT A FLAT E FLAT F FLAT G FLAT H W.M.C. W.M.C. W.M.C. M.R.R. FLAT I FLAT J FLAT K FLAT L FLAT N FLAT M
ø100
ø100

3/F
ø100

ø50
ø100

+23.200 DETAIL B1 DETAIL D1 DETAIL E1 DETAIL A1 DETAIL C1 DETAIL C1 DETAIL C1 DETAIL C1 ø50 ø50 VFD ø50 DETAIL C1 DETAIL C1 DETAIL A1 DETAIL B1 DETAIL D1 DETAIL E1
FD FD FD

ø50
ø100
ø100
ø100

ø100
ø100
ø100

ø50
ø100
ø100

ø100
ø100
ø100

ø100

ø50

ø100
ø100
ø100
REV DATE AMENDMENT

ø100
ø50
ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
ø100

ø100
ø100
ø100

ø100
ø100
ø100

ø100
PROJECT
CIC SAMPLE PROJECT

ø100
ø100 ø100 ø100
ø150

ø100
ø100 ø150
ø100 ø100 ø100
ø100
ø100 ø100 ø150
ø150 ø150 ø150 ø150 ø100
ø150 ø150 ø150
ø150 DRAWING TITLE

UNI-SEX F. LAV M. LAV CARETAKER LAV CARETAKER PANTRY


SCHEMATIC DIAGRAM OF DRAINAGE
SYSTEM
ø50 ø50
ø50

SCALE 1 : 100@A1
ø32 ø32 ø32 ø32 ø32 ø32
2/F ø40 ø32 ø40 ø32 ø40 DRAWING NO. REV. NO.
+14.100 ø50 ø50 ø50 ø50 ø50
FD FD FD FD FD M002

ø100

ø100
---

ø50

ø50
SOURCE

ø150
ø150
ø100
ø100 ø100 ø50 SUNKEN ø100 ø50 ø50
UNI-SEX M. LAV F. LAV
SHOP 1-8

90mm (W) x 40mm (H) space


for COMPANY LOGO

ø100
ø100
1/F ø100 ø32 ø32 ø32 ø32 ø32 ø32
+9.100 ø50 ø50 ø40 ø32 ø40 ø32
FD FD ø50 FD ø50 FD ø50

ø50

ø50
ø100

ø100

ø100
ø50

ø100

ø100
B.L.
ø100
ø100 ø100 ø100
ø150 ø150
ø150 ø150
ø100 ø100
FAI SHOP G-5
90mm (W) x 60mm (H) space
2500mm AFFL

for AP's signature/ and stamp chop


2500mm AFFL

2500mm AFFL

2500mm AFFL

R.C. & M.R.C. LOADING / UNLOADING

G/F ø40
+3.950 ø100 ø100ø100 ø100ø100ø100 ø100 ø100 ø50
BITG

ø40
FD FD
FD FD FD FD FD FD

ø50 FRESHING & FLUSHING


WATER PUMP ROOM
ø150 ø100 ø100 BD's OFFICAL USE
ø100

CONNECT TO ø150 BABYCARE ROOM F. LAV UNI-SEX F. LAV F&B-B2 W.M.C.


GOVERNMENT ø100
MANHOLE PUMPED ø100 ø100 ø100 ø100 F.S. WATER TANK & PUMP
(FMH4012623) PUMPED ø80 PUMPED ø80 PUMPED ø80 ø100 ø100 ROOM
CL 3.42 ø200 PUMPED ø80 PUMPED ø80 PUMPED ø80 ø50
F&B-B1 LOADING / UNLOADING
ø50

A1 -0.12-150
A2 -0.12-200
FTMH-01
B1/F A3 400 C.L. 3.95 m ø32 ø32 ø32 ø32
X1 -0.12-400 I.L. 2.42 m ø32 ø32 ø32
-1.000 ø50 ø40 ø50 ø50 ø50 ø100 ø100 ø100 ø100 ø100
ø100ø100 D.T.I.L. 2.27 m ø100 ø100

ø50

ø100
FD FD FD FD FD FD FD

ø100
FD FD FD FD FD FD
ø100

ø100

ø50
ø100

ø100

ø100
ø100
ø100

ø100

ø100
ø100

ø50
ø50
PUMPED ø80
PUMPED ø80

ø50
ø50

ø50 ø100 ø100


ø100 ø100 ø100
PUMPED ø80 PUMPED ø80 PUMPED ø80 ø100
PUMPED ø80 PUMPED ø80
PUMPED ø80 PUMPED ø80 PUMPED ø80
ø100 SPRINKER WATER TANK &
ø100 W.M.C. PUMP ROOM 90mm (W) x 150mm (H) space
ø100
ø100

PUMPED ø80

CARPARK EXHUAST FAN for BD's approval stamp /

ø100
ø100

certification of copies of

PUMPED ø80
ROOM
PUMPED ø80
ø100

PUMPED ø80

B2/F
ø100

-5.900 ø100 ø100 ø100 ø100 ø100 ø100 ø100 approved plans
OTG OTG ø100 OTG OTG FD OTG OTG (PNAP ADM-10 APP A)
FD
ø100 ø100 ø100
ø150 ø150 ø100 ø100
ø100 ø100 ø100
ø100 B
GREASE TRAP ø100 GREASE TRAP
ø100 ø100 ø100 ø100
ø150 ø100 B ø100 ø100 GT-02
GT-01
FLOW: 4.4 L/s FLOW: 1.0 L/s
INTERNAL DIMENSION: WMH-02 WMH-01 INTERNAL DIMENSION:
UNDERGROUND SUMP PIT UNDERGROUND SUMP PIT UNDERGROUND SUMP PIT UNDERGROUND SUMP PIT
2050(L) x 1000(W) x 1300(D) PETROL INTERCEPTOR C.L. -6.10 m C.L. -6.10 m 1650(L) x 900(W) x 1000(D)
RWPP-01 SWPP-03 SWPP-02 SWPP-04
PI-01 I.L. -7.85 m I.L. -7.85 m
FLOW: 30.0 L/s FLOW: 3.0 L/s FLOW: 6.0 L/s FLOW: 3.0 L/s
HEAD: 20.0 m HEAD: 20.0 m FLOW: 2.0 L/s HEAD: 20.0 m HEAD: 20.0 m
EFFECTIVE VOLUME: EFFECTIVE VOLUME: INTERNAL DIMENSION: EFFECTIVE VOLUME: EFFECTIVE VOLUME:
2000(L) x 1500(W) x 1000(D) 2000(L) x 1500(W) x 600(D) 2650(L)x750(W)x2500(D) 2000(L) x 1500(W) x 600(D) 2000(L) x 1450(W) x 600(D)
BD REF :

BIM REF :

L TO R ø100 RWP F/A T/B


ø100 RWP F/A T/B
ø100 SWP F/A T/B ø100 RWP F/A T/B
ø100 RWP F/A T/B ø100 WP F/A T/B L TO R
ø100 SWP F/A T/B ø100 RWP F/A T/B

L TO R A B ø100 WP F/A T/B


ø100 VP F/B T/A
ø50 CDP F/A T/B
C D E F G H J K ø100 SWP F/A T/B
ø100 WP F/A T/B
ø100 SWP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø100 WP F/A T/B
ø100 SWP F/A T/B ø100 VP F/B T/A
ø100 WP F/A T/B ø50 CDP F/A T/B
ø100 VP F/B T/A
ø50 CDP F/A T/B ø100 RWP F/A T/B
ø100 RWP F/A T/B T TO B
T TO B
ø100 SWP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø100 WP F/A T/B
ø100 VP F/B T/A VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 ø100 VP F/B T/A
L TO R
ø50 CDP F/A T/B
ø100 WP F/A T/B VFD ø50 IN SUNKEN
ø100 SWP F/A T/B 5 TSD ø50 TSD ø50 L TO R
T TO B VFD ø50 IN SUNKEN ø100 SWP F/A T/B
ø150 SWP F/A T/B VRWO ø80 ø100 WP F/A T/B
ø100 WP F/A T/B ø50 WP ø50 CDP F/A T/B
ø100 WP F/A T/B ø50 WP
ø100 VP F/B T/A TFD ø50
F G H I J K TFD ø50
VRWO ø80 D E TSD ø50
ø100 RWP F/A T/B TSD ø50 TSD ø50
TFD ø50 TSD ø50
TFD ø50 TSD ø50 TFD ø50 TFD ø50 TSD ø50 TFD ø50
T TO B VRWO ø80 TSD ø50 TFD ø50 ø100 RWP F/A T/B
ø100 SWP F/A T/B ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP TSD ø50
ø50 CDP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP
T TO B
ø50 WP ø50 CDP F/A T/B
4 TFD ø50
ø50 WP
VFD ø50
VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN
ø50 WP VRWO ø80
ø100 WP F/A T/B

VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN TFD ø50
ø100 RWP F/A T/B VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN VFD ø50
VFD ø50 IN SUNKEN
ø100 RWP F/A T/B C TSD ø50 FD ø50 FD ø50 TSD ø50
FD ø50 FD ø50 L
ø50 WP ø50 WP
ø50 WP RWO ø100 ø50 WP
VRWO ø40 TFD ø50 VRWO ø40 ø100 RWP F/A T/B
ø50 WP TFD ø50 ø50 WP
RWO ø100
T TO B
3 VRWO ø40 VRWO ø80 VRWO ø40 T TO B
ø150 SWP F/A T/B
B ø100 WP F/A T/B
RWO ø100 ø100 WP F/A T/B
ø100 WP H/L T/B
ø100 VP F/B T/A ø100 WP F/A T/B ø100 WP F/A T/B
ø100 WP F/A T/B VRWO ø80 M ø100 WP F/A T/B
N ø100 VP F/B T/A REV DATE AMENDMENT
ø100 SWP F/A T/B
L TO R
L TO R ø50 WP A ø50 WP L TO R PROJECT
ø100 RWP F/A T/B
ø100 SWP F/A T/B
ø100 WP F/A T/B 2 TFD ø50
ø50 WP ø100 RWP
L TO R TFD ø50
ø50 WP ø50 CDP F/A T/B
ø100 VP F/B T/A
ø100 SWP F/A T/B
CIC SAMPLE PROJECT
ø100 WP F/A T/B ø100 WP F/A T/B
ø100 RWP F/A T/B L TO R
ø100 SWP F/A T/B
1 TSD ø50 ø100 SWP F/A T/B TSD ø50
L TO R ø100 WP F/A T/B
VRWO ø80 VFD ø50 IN SUNKEN ø100 WP F/A T/B VFD ø50 IN SUNKEN VRWO ø80
VRWO ø40 ø100 SWP F/A T/B VRWO ø40
ø100 VP F/B T/A ø100 RWP F/A T/B ø100 RWP F/A T/B DRAWING TITLE
ø50 CDP F/A T/B A2 A1 L TO R
DRAINAGE LAYOUT PLAN FOR
TYPICAL FLOOR (NEW APPROACH)
ø100 WP F/A T/B
ø100 SWP F/A T/B
T TO B
ø100 VP F/B T/A
ø100 WP F/A T/B
ø100 SWP F/A T/B

SCALE 1 : 100@A1
DRAWING NO. REV. NO.
6/F FLOOR PLAN (New Approach) M003
1 1 : 100
ø100 VP ø100 VP
SOURCE ---
(2D plan generated from 3D model on proposed new approach
ø100 WP
with supplementary elevation/ 3D views) ø100 WP
ø100 SWP
ø100 SWP

90mm (W) x 40mm (H) space


for COMPANY LOGO
VFD ø50 IN
TSD ø50 SUNKEN

VFD ø50 IN SUNKEN

3D View-Right (for reference only) 3D View-Left (for reference only) 90mm (W) x 60mm (H) space
A1 (Not to scale) A2 (Not to scale)
for AP's signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BD REF :

BIM REF :

L TO R ø100 RWP F/A T/B


ø100 RWP F/A T/B
ø100 SWP F/A T/B ø100 RWP F/A T/B
ø100 RWP F/A T/B ø100 WP F/A T/B L TO R
ø100 SWP F/A T/B ø100 RWP F/A T/B

L TO R A B ø100 WP F/A T/B


ø100 VP F/B T/A
ø50 CDP F/A T/B
C D E F G H J K ø100 SWP F/A T/B
ø100 WP F/A T/B
ø100 SWP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø100 WP F/A T/B
ø100 SWP F/A T/B ø100
ø100 VPVP
F/BF/B
T/AT/A
ø100 WP F/A T/B ø50 CDP F/A T/B
ø100 VP F/B T/A
ø50 CDP F/A T/B ø100 RWP F/A T/B
ø100 RWP F/A T/B T TO B
T TO B
ø100 SWP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø100 WP F/A T/B
ø100 VP F/B T/A VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 VRWO ø80 VRWO ø80 VRWO ø40 VRWO ø40 ø100 VP F/B T/A
L TO R
ø50 CDP F/A T/B
ø100 WP F/A T/B VFD ø50 IN SUNKEN
ø100 SWP F/A T/B 5 TSD ø50 TSD ø50 L TO R
T TO B VFD ø50 IN SUNKEN ø100 SWP F/A T/B
ø150 SWP F/A T/B VRWO ø80 ø100 WP F/A T/B
ø100 WP F/A T/B ø50 WP ø50 CDP F/A T/B
ø100 WP F/A T/B
ø100 VP F/B T/A TFD ø50
F G H I J K TFD ø50
VRWO ø80 D E TSD ø50
ø100 RWP F/A T/B TSD ø50 TSD ø50
TFD ø50 TSD ø50
TFD ø50 TSD ø50 TFD ø50 TFD ø50 TSD ø50 TFD ø50
T TO B VRWO ø80 TSD ø50 TFD ø50 ø100 RWP F/A T/B
ø100 SWP F/A T/B ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP TSD ø50
ø50 CDP F/A T/B ø100 SWP F/A T/B
ø100 WP F/A T/B ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP ø50 WP
T TO B
ø50 ø50 ø50 ø50 ø50 ø50
ø50 WP ø50 CDP F/A T/B
4 TFD ø50 VFD ø50
VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN
ø50 ø50 WP VRWO ø80
ø100 WP F/A T/B

VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN TFD ø50
ø100 RWP F/A T/B VFD ø50 IN SUNKEN VFD ø50 IN SUNKEN VFD ø50
VFD ø50 IN SUNKEN
ø100 RWP F/A T/B C TSD ø50 FD ø50 FD ø50 TSD ø50
ø50

FD ø50 FD ø50 L

ø50
ø50 WP ø50 WP

ø50
ø50 WP RWO ø100 ø50 WP
VRWO ø40 TFD ø50 VRWO ø40 ø100 RWP F/A T/B REV DATE AMENDMENT
ø50 WP TFD ø50 ø50 WP
RWO ø100 PROJECT
T TO B
3 VRWO ø40 VRWO ø80 VRWO ø40 T TO B
ø150 SWP F/A T/B CIC SAMPLE PROJECT
B ø100 WP F/A T/B ø100 WP F/A T/B RWO ø100 ø100 WP F/A T/B ø100 WP F/A T/B
ø100 WP H/L T/B
ø100 VP F/B T/A VRWO ø80 ø100 WP F/A T/B
ø100 WP F/A T/B M
N ø100 VP F/B T/A
ø100 SWP F/A T/B
L TO R ø50 WP
L TO R ø50 WP A L TO R
ø100 RWP F/A T/B
ø100 SWP F/A T/B
ø100 WP F/A T/B 2 TFD ø50
ø50 WP ø100 RWP
L TO R TFD ø50
ø50 WP ø50 CDP F/A T/B
ø100 VP F/A T/B
ø100 SWP F/A T/B
ø100 WP F/A T/B
DRAWING TITLE
ø100 WP F/A T/B
L TO R
ø100 RWP F/A T/B ø100 SWP F/A T/B DRAINAGE LAYOUT PLAN FOR
1 TSD ø50 ø100 SWP F/A T/B TSD ø50 TYPICAL FLOOR (TRADITIONAL STYLE)
L TO R ø100 WP F/A T/B
VRWO ø80 VFD ø50 IN SUNKEN ø100 WP F/A T/B VFD ø50 IN SUNKEN VRWO ø80
VRWO ø40 ø100 SWP F/A T/B VRWO ø40
ø100 VP F/B T/A ø100 RWP F/A T/B ø100 RWP F/A T/B
ø50 CDP F/A T/B L TO R
ø100 WP F/A T/B SCALE
ø100 SWP F/A T/B 1 : 100@A1
T TO B
ø100 VP F/B T/A DRAWING NO. REV. NO.
ø100 WP F/A T/B
ø100 SWP F/A T/B
M003a
6/F FLOOR PLAN (TRADITIONAL PRESENTATION STYLE) SOURCE ---
1 1 : 100
(2D plan generated from 3D model based on traditional presentation style with manual updating)
90mm (W) x 40mm (H) space
for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP's signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
75 DIA. VENT PIPE 200 675mm 400 BD REF :
mm mm C.I. MANHOLE COVER
AND FRAME. BIM REF :

MANHOLE COVER (HEAVY DUTY


"A" "A" FOR CARPARK, LOADING/UNLOADING
150 DIA. MIN.

300mm
150 DIA. MIN.

600mm
AREA, TRAFFIC AREA, ETC.)
15mm
INLET OUTLET 1:3 CEMENT 200 675 DOUBLE SEAL CAST IRON
1150
750 75mm

MAX. 1500mm
RENDERING GROUND LEVEL

300mm
60°

OPENING FOR F.A.I.


CLEAR OPENINGS
750 750 750 200 ∅100 C.I. VENT
550x550 MIN. STAINLESS STEEL CHAIN
FALL PIPE FOR F.A.I.

FALL
3050

1:12
WITH COVERS

225mm
MIN.
STEP IRONS
PLAN C C AT 300 C/C

2500MAX
C.L. STAGGERED

1000
STANFORD (CLAY)

D
SECTION A-A RUBBER RINGS.

MIN. 450
BENCHING
TO STORMWATER /
INLET 20mm C.I. STEP IRONS.

FALL
SEWER DRAIN.

1:12
I.L. OUTLET TO FALL 1 IN 2 ∅150 RODDING ARM.
15mm 1:3 CEMENT INLET
200 250

FALL
RENDERING PIPE
75

150 DIA. MIN. A I.L. FALL


MAX. 2800

A 35°

1000
1:2

200

200
600

D+300mm/

150
750 MIN.

DIA(mm)
D.T.I.L.

150-600
D=DIA. OF TRAP.

PLAN CONCRETE FILLING 75 DEEP WATER SEAL

FALL
1:2
600
C.I. OR GLAZED FIRECLAY
B.L. STEP IRONS TRAP AND RODDING ARM
200 NOT EXCEEDING 300mm.

200
200
200 750mm 200 1000
mm mm
PLAN
SECTION A-A SECTION C-C

TYPICAL DETAILS OF PETROL INTERCEPTOR STANDARD DETAILS OF MANHOLE TYPE D1 TERMINAL MANHOLE (TYPE T1_1)

20MM THICK
WATERPROOF
FLEXIBLE FLOOR
RENDERING
C I COVER (SEE SEPARATE DETAIL) CONNECTOR LEVEL
C.L.
S 15 15 S

200
S S ANGLE FRAME
15 15 M S FISH BOLT ∅100 V.P.
7 50 W 50 7 GROUND FLOOR LEVEL INLET PIPE D REV DATE AMENDMENT
CEMENT RENDERING FINISHED WITH SMOOTH SURFACE CHANNEL 600 400 600
d

(IF APPLICABLE)
GATE I.L. SEE LAYOUT PLAN PROJECT
FALL FALL WATER PROOF MEMBRANCE VALVE D SUBMERSIBLE
S1 W1 S1 200
D

DOME GRATING CHECK GATE D.I. PUMPED DISCHARGE PIPE PUMP CIC SAMPLE PROJECT
HIGH POINT GROUND FLOOR LEVEL A A VALVE HIGH WATER LEVEL ALARM
VALVE W.L.
D1

HIGH POINT FLOOR

800
25mm LOW POINT STRUCTURAL FINISH CHECK 1ST PUMP RUNNING,
FALL FALL FINISHED 2ND PUMP START 200

A
VALVE 1ST PUMP
LOW POINT START 200
SMOOTH CEMENT
SUBMERSIBLE DRAWING TITLE
B

RENDERING 400
PUMP 100 THICK TWO PUMPS
DRAINAGE INSTALLATION DETAILS

600
CEMENT STOP INLET
FLOOR

(TYP.)
T.A.L.
WIRE MESH CONC. 200
DETAIL OF COVERED SURFACE CHANNEL DISC CHANNEL SLAB
REINFORCEMENT A252 PLAN-DOME GRATING SECTION 'A-A' B.L. 100

200
PLACED CENTRALLY.
W S D B
200 100 100 100 D1
225 100 115 100 W1 S1 MIN. MAX. LEVEL CONTROLLERS ∅100 G.I. CONDUIT
CHANNEL SCALE
250 100 125 100 200 100 25
(IF APPLICABLE) WATER PROOF MEMBRANCE B AS SHOWN@A1
300 100 150 100 225 100 25 DUCTILE IRON FLANGE
350 100 170 100 FLAT SECTION D-D DRAWING NO. REV. NO.
400 100 200 100 250 100 25 FLOOR JOINT PUMP DISCHARGE PIPE
B B GRATING
450 100 225 100 300 100 25 FALL FALL FINISHED M004
350 100 25 NOTES: SECTIONAL PLAN
SURFACE CHANNEL SCHEDULE
400 100 25 1. THE SUMP PUMPS SHALL BE AUTOMATIC START AND STOP WHEN WATER LEVEL REACH SOURCE ---
NOTES : 450 100 25 SMOOTH THE PUMPS START LEVEL AND THE PUMP CUT-OFF LEVEL
1. ALL SURFACE CHANNELS SHALL BE FINISHED SMOOTH WITH 1 : 2 CEMENT CEMENT 2. START/STOP CONTROL OF THE SUMP PUMPS SHALL BE PROVIDED ON THE CONTROL PANEL.
AND SAND RENDERING RENDERING FLOOR 3. SUMP PUMPS CONTROL CIRCUIT DIAGRAM SHALL BE FRAMED AND DISPLAYED NEXT TO THE
CHANNEL SCHEDULE
2. GRADIENT OF CHANNEL SHALL BE NOT LESS THAN 1 IN 100 SLAB SUMP PUMPS CONTROL PANEL.
(NOTE: MAX., DEPEND ON FALL) 90mm (W) x 40mm (H) space
3. DEPTH OF LOW POINT DEPEND ON THE LENGTH OF CHANNELS PLAN-FLAT GRATING SECTION 'B-B'
4. ALL CHANNEL SHALL BE CONSTRUCTED IN GRADE 30D/20 CONCRETE for COMPANY LOGO

DETAIL OF SURFACE CHANNEL DETAIL OF DISC CHANNEL VERTICAL GRATING DETAIL DETAILS OF SUMP PIT

SQ. J SQ. J 90mm (W) x 60mm (H) space


SQ. N for AP's signature/ and stamp chop
E GRADE INDICATION
I
H

H
H

F G KEY HOLE

A A B B B B
D

A
KEY HOLE
B
GRADE INDICATION BD's OFFICAL USE
C
O
SECTION A - A

S
T
H
H

Q
R
SQ. 1005

SQ. 745 PLAN OF COVER PLAN OF COVER PLAN OF COVER

P
( FOR SEWER MANHOLE ) SQ. 679 K
( FOR FOUL WATER MANHOLE ) ( FOR STORM WATER MANHOLE )
SQ. 657
SQ. 875 M
SQ. N
PLAN OF FRAME SECTION B - B
90mm (W) x 150mm (H) space
H

for BD's approval stamp /


A A DIMENSION LETTER A B C D E F G H I J certification of copies of
MAXIMUM 3mm DIMENSION LETTER K M N O P Q R S T approved plans
H 675 815 1005 16 22 134 150 5 32 811 KEYHOLE (PNAP ADM-10 APP A)
DIMENSIONS H 679 875 675 22 16 134 150 5 32
M 675 720 1005 16 22 109 125 5 22 811 DIMENSIONS
GRADE INDICATION M 679 875 675 22 16 109 125 5 22
NOTES
H

H NOTES
INDICATES HEAVY DUTY
H INDICATES HEAVY DUTY
M INDICATES MEDIUM DUTY PLAN OF COVER
( FOR STORM WATER MANHOLE ) M INDICATES MEDIUM DUTY
PLAN OF FRAME

DETAIL OF MANHOLE COVER AND FRAME ( DOUBLE SEAL ) DETAIL OF MANHOLE COVER AND FRAME (DOUBLE TRIANGULAR)
( N. T. S. ) ( N. T. S. )
BD REF :

BIM REF :

STORM WATER MANHOLE SCHEDULE


DRAIN DIAMETER
MANHOLE NO. (mm) C.L. I.L. DEPTH (mm) TYPE
SMH-01 150 -6.15 -7.9 1750 D1
Grand total: 1

FOUL WATER MANHOLE SCHEDULE


DRAIN DIAMETER
MANHOLE NO. (mm) C.L. I.L. DEPTH (mm) TYPE
WMH-01 150 -6.1 -7.85 1750 D1
WMH-02 150 -6.1 -7.85 1750 D1
Grand total: 2

FOUL WATER TERMINAL MANHOLE SCHEDULE


DRAIN DIAMETER
MANHOLE NO. (mm) C.L. I.L. D.T.I.L. DEPTH (mm) TYPE
FTMH-01 225 +3.95 +2.42 +2.27 1680 T1_1
Grand total: 1

STORM WATER TERMINAL MANHOLE SCHEDULE


DRAIN DIAMETER
MANHOLE NO. (mm) C.L. I.L. D.T.I.L. DEPTH (mm) TYPE
STMH-01 225 +3.43 +2.43 +2.28 1150 T1_1 REV DATE AMENDMENT

Grand total: 1 PROJECT


CIC SAMPLE PROJECT

PETROL INTERCEPTOR SCHEDULE


DRAWING TITLE
PETROL DRAINAGE SCHEDULES
INTERCEPTOR NO. C.L. I.L. B.L. DEPTH (mm)
PI-01 -5.9 -6.9 -8.4 2500
Grand total: 1
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.

M005
SUMP PIT SCHEDULE
SOURCE ---
PUMP DUTY (EACH)
SUMP PIT NO. SUMP PIT SIZE (LxWxD) C.L. I.L. B.L. PUMP NO. FLOW (l/s) HEAD (m)
RWPP-01 2000(L) x 1500(W) x 1000(D) -5.85 -6.5 -8 RSP01-01,02 30.0 20
SWPP-02 2000(L) x 1500(W) x 600(D) -5.85 -6.5 -7.5 SSP02-01,02 6.0 20 90mm (W) x 40mm (H) space
for COMPANY LOGO
SWPP-03 2000(L) x 1500(W) x 600(D) -5.85 -6.5 -7.5 SSP03-01,02 3.0 20
SWPP-04 2000(L) x 1450(W) x 600(D) -5.85 -6.5 -7.5 SSP04-01,02 3.0 20
Grand total: 4

GREASE TRAP SCHEDULE 90mm (W) x 60mm (H) space


for AP's signature/ and stamp chop
GREASE TRAP NO. C.L. B.L. DEPTH (mm)
GT-01 -5.9 -7.2 1300
GT-02 -5.9 -6.9 1000
Grand total: 2

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Software 2
BD REF :

12. CONSTRUCTION JOINTS TO BE POSITIONED AS FOLLOWS :- BIM REF :


GENERAL NOTES FOR REINFORCED CONCRETE STRUCTURE: a. THE JOINT IN A BEAM TO BE VERTICAL AND AT ONE-THIRD OF THE SPAN.
b. THE JOINT IN A SLAB TO BE VERTICAL, AT ONE-THIRD OF THE PANEL AND PARALLEL TO THE REINFORCEMENT.
c. THE JOINT IN COLUMNS TO BE AT THE UNDERSIDE OF THE LOWEST BEAM OVER THE COLUMNS OR AT 75mm
1. DESIGN TO COMPLY WITH : ABOVE FLOOR LEVEL.

a. HONG KONG BUILDING (CONSTRUCTION) REGULATION, 1990 13. CONSTRUCTION JOINTS WHERE NOT SHOWN SHOULD BE LOCATED TO THE APPROVAL OF THE ENGINEER.
b. THE STRUCTURAL USE OF CONCRETE, 2013
c. CODE OF PRACTICE ON WIND EFFECTS, HONG KONG, 2004 14. DURING CONSTRUCTION THE STRUCTURE SHOULD BE MAINTAINED IN A STABLE CONDITION AND NO PART
d. CODE OF PRACTICE FOR FIRE SAFETY IN BUILDINGS, 2011 SHALL BE OVERSTRESSED.
e. CODE OF PRACTICE FOR DEAD AND IMPOSED LOADS, 2011
15. SIZE OF CONCRETE ELEMENTS DOES NOT INCLUDE THICKNESS OF APPLIED FINISHES.
2. ALL STRUCTURAL DRAWINGS MUST BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS AND
OTHER RELEVANT DRAWINGS. 16. NO HOLES OR CHASES OTHER THAN THOSE SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE MADE.

3. STEEL REINFORCEMENTS FOR CONCRETE SHALL COMPLY WITH THE CONSTRUCTION STANDARD CS2 : 17. PIPES OR CONDUITS SHALL NOT BE PLACED WITHIN THE CONCRETE COVER TO REINFORCEMENT WITHOUT
2012 MINIMUM CHARACTERISTIC STRENGTH OF : 500MPa FOR HIGH YIELD STEEL BAR GRADE 500B/
C, THE APPROVAL OF THE ENGINEER. THE CONCRETE COVER TO EMBEDDED PIPES OR CONDUITS SHALL BE A
250MPa FOR MILD STEEL BAR GRADE 250. MINIMUM OF 20mm. FOR REFERENCE ONLY
4. MINIMUM BOND LAP
/ LENGTH OF REINFORCEMENT FOR ALL STRUCTURAL ELEMENTS SHALL BE AS 18. WATER BORNE PIPES SHALL NOT BE PLACED WITHIN R.C. CONCRETE WITHOUT THE APPROVAL OF THE
SPECIFIED IN THE FOLLOWING SCHEDULE: BUILDINGS DEPARTMENT, AP AND RSE.

SCHEDULE OF LAP & ANCHORAGE LENGTH FOR DESIGN TO COP 2013 19. SPACER BARS SHALL BE OF DIAMETER = 25mm OR DIAMETER OF MAIN BAR WHICHEVER IS GREATER
@1.5m c/c.
20. ALL ROOF SCREEDING TO BE LIGHT WEIGHT CONCRETE OF DENSITY BETWEEN 1600 TO 1700kg/
m3 AND
N
MINIMUM CUBE STRENGTH Uw=21N/ mm2 AT 28 DAYS.
FOR HIGH
YIELD BARS 21. ALL BEAM SIZE TO BE READ AS BREADTH x DEPTH

GRADE 45D 22. ALL LEVELS SHOWN IN FRAMING PLANS TO BE STRUCTURAL FLOOR LEVEL.
DIAMETER OF BAR (LEGEND : 108.7 SFL STRUCTURAL FLOOR LEVEL AT 108.7 mPD.)
ANCHORAGE 23. ALL DIMENSION ARE IN MILLIMETRE & LEVEL IN mPD EXCEPT OTHERWISE STATED.
24. ALL EARTH BACKFILLING TO BE COMPACTED TO 95% OF MAX. DRY DENSITY TO BS 1377-TEST 12.
TL CL
33 x Dia. 26 x Dia. 25. ALL BENT TO STEEL REINFORCEMENT SHALL COMPLY WITH BS 8666:2000
10 330 260
12 400 320 NOTES FOR ANNOTATION OF BARS :
16 530 420
20 660 520 1. ALL DIMENSIONS SHOWN ARE IN mm.

25 830 650 2. ANY DISCREPANCY FOUND BETWEEN THE DETAILS SHOWN IN THIS DRAWING AND THAT SHOWN IN
DETAILED DRAWINGS SHALL BE REPORTED TO THE ENGINEER FOR DIRECTION.
32 1060 840
3. BAR REFERENCING :
40 1320 1040 FOR REFERENCE ONLY
EXAMPLE : 16T32-200
NUMBER OF BARS: 16
LEGEND : TYPE OF STEEL: T (HIGH YIELD STEEL BAR GRADE 500B/
C)
DIAMETER OF BARS: 32mm
PITCH OF BARS (IF APPLICABLE): 200 mm
1. TL = LAP OR ANCHORAGE LENGTH UNDER TENSION OR LAP LENGTH UNDER COMPRESSION
2. CL = ANCHORAGE LENGTH UNDER COMPRESSION
NOTES FOR ANNOTATION OF BARS :
3. NO SPLICING OF REINFORCEMENT OTHER THAN THOSE SHOWN ON THE DRAWING IS ALLOWED UNLESS
OTHERWISE APPROVED BY THE ENGINEER AND TL SHALL BE PR0VIDED.
1. ALL DIMENSIONS SHOWN ARE IN mm.
4. NOMINAL LAP AND ANCHORAGE FOR DISTRIBUTION BARS TO BE 300 OR NL WHICHEVER THE GREATER.
LAP LENGTH FOR UNEQUAL SIZE BARS SHALL BE BASED UPON THE SMALLER BAR. FOR THE FOLLOWING 2. ANY DISCREPANCY FOUND BETWEEN THE DETAILS SHOWN IN THIS DRAWING AND THAT SHOWN IN
DETAILED DRAWINGS SHALL BE REPORTED TO THE ENGINEER FOR DIRECTION.
PROVISIONS a) OR b) APPLY, THE LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 1.4.
SITE
a) WHERE A LAP OCCURS AT THE TOP OF A SECTION AS CAST AND THE MINIMUM COVER IS LESS THAN 3. BAR REFERENCING :
TWICE THE SIZE OF THE LAPPED REINFORCEMENT.
EXAMPLE : 16T32-200
FOR REFERENCE ONLY
b) WHERE A LAP OCCURS AT THE CORNER OF A SECTION AND THE MINIMUM COVER TO EITHER FACE IS
LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT, OR WHERE THE CLEAR DISTANCE NUMBER OF BARS: 16
BETWEEN ADJACENT LAPS IS LESS THAN 75mm OR SIX TIMES THE SIZE OF THE LAPPED TYPE OF STEEL: T (HIGH YIELD STEEL BAR GRADE 500B/
C)
REINFORCEMENT, WHICHEVER IS THE GREATER. DIAMETER OF BARS: 32mm
PITCH OF BARS (IF APPLICABLE): 200 mm
IF BOTH PART a) & b) CONDITION APPLY, THE LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 2.0. REV DATE AMENDMENT

5. ALL NOMINAL LAPS OF DISTRIBUTION BAR FOR SLABS AND WALLS SHALL BE 300 MINIMUM UNLESS
NOTES FOR CONSTRUCTION OF CANTILEVERED BEAM & SLAB : PROJECT
OTHERWISE SPECIFIED.
6. FOR DETAILS OF STRUCTURAL FALLS, SEE APPROPRIATE STRUCTURAL AND ARCHITECTURAL
DRAWINGS. FOR REFERENCE ONLY
1. ALL CANTILEVERED PROJECTIONS SHOULD BE CAST MONOLITHICALLY WITH AND AT THE SAME TIME AS
THE DIRECTLY SUPPORTING MEMBERS. CONSTRUCTION JOINTS MUST NOT BE LOCATED ALONG THE
EXTERNAL EDGE OF THE SUPPORTING MEMBERS.
CIC SAMPLE PROJECT
7. CONCRETE TO BE DESIGNED MIX CONCRETE AS SPECIFIED IN THE FOLLOWING SCHEDULE TO 2. ADEQUATE BAR SPACERS SHOULD BE PROVIDED TO MAINTAIN THE POSITION AND ALIGNMENT OF THE
CS1:2010 AND THE GRADE DESIGNATIONS GIVEN ARE THE CHARACTERISTIC CUBE STRENGTH AT 28
DAYS AND THE MAXIMUM AGGREGATE SIZE 20mm. UNLESS OTHERWISE STARTED ON THE DRAWINGS.
STEEL REINFORCEMENT. FOR REFERENCE ONLY
3. DURING CONCRETING, ADEQUATE COMPACTION SHOULD BE GIVEN TO ENSURE GOOD QUALITY
CONCRETE. EVERY ENDEAVOUR SHOULD ALSO BE MADE TO AVOID STEEL REINFORCEMENT FROM BEING
MEMBER GRADE DISPLACED OR DEPRESSED. DRAWING TITLE
BEAM, SLABS AND WALLS C45/20 4. ALL PROPPING TO THE SOFFIT OF THE FORMWORK FOR THE CANTILEVERED PROJECTIONS SHOULD BE GENERAL NOTES FOR SUPERSTRUCTURE
MAINTAINED FOR AT LEAST 14 DAYS.
COLUMNS C45/20
WATER TANKS C45/20
NOTES FOR WATERPROOFING CONSTRUCTION :
8. THE EQUIVALENT SODIUM OXIDE IN CONCRETE MIX SHALL NOT EXCEED 3.0 KG PER CUBIC METER OF 1. WATERSTOP :
CONCRETE. CORRESPONDING TEST CERTIFICATES ON ALKALI CONTENT IN CEMENT, ADMIXTURES,
AGGREGATE ETC., ISSUED BY A HOKLAS LABORATORY AND CALCULATION OF THE EQUIVALENT SODIUM a) FOR LOCATIONS AND DETAILS OF WATERSTOP AT EXPANSION JOINTS, CONSTRUCTION JOINTS ETC. SCALE
OXIDE SHOULD BE SUBMITTED TO THE RSE QUARTERLY. REFER TO ALL RELEVANT DRAWINGS. JOINT NOT SPECIFIED SHALL RECEIVE THE PRIOR APPROVAL BY THE
ENGINEER.
9. CONCRETE CUBES SHALL BE MADE AND TESTED WITH TEST REPORT IN ACCORDANCE WITH THE DRAWING NO. REV. NO.
PROVISIONS OF THE HONG KONG BUILDING (CONSTRUCTION) REGULATIONS : 1990 AND THE b) TYPE OF WATERSTOPS SHALL BE AS SPECIFIED IN THE CONTRACT OR TO THE APPROVAL OF THE
CONSTRUCTION STANDARD CS1 : 2010, EXCEPT SECTION 7.1 . ENGINEER.
10. UNLESS OTHERWISE STATED, CONCRETE COVER TO ALL REINFORCEMENT SHALL BE AS SPECIFIED
S001
c) DETAIL OF FIXING OF WATERSTOPS SHALL BE IN ACCORDANCE WITH THE RECOMMENDATION OF THE
IN THE FOLLOWING SCHEDULE OR EQUAL TO THE DIAMETER OF THAT REINFORCEMENT, WHICHEVER IS
THE GREATER :
MANUFACTURER. FOR REFERENCE ONLY SOURCE ---
d) PRIOR TO CONCRETING, THE WATERSTOP SHALL BE NAILED, CLIPPED OR TIED WITH WIRE TO ITS
CORRECT POSITION SECURELY AND ADEQUATELY. DETAIL AND SPACING OF SUCH NAILING, CLIPS AND
IN CONTACT WITH EARTH SLAB STAIR BEAM COLUMN WALL TIES SHALL BE IN ACCORDANCE WITH THE RECOMMENDATION OF THE MANUFACTURER AND TO THE
APPROVAL OF THE ENGINEER.
1.1 CAST ON BLINDING 50 50 50 50 50
e) CARE SHALL BE TAKEN TO AVOID ANY AIR VOIDS BEING TRAPPED BETWEEN THE WATERSTOP AND THE
1.2 CAST AGAINST SOIL 75 75 75 75 75 SURROUNDING CONCRETE.
90mm (W) x 40mm (H) space
f) SURROUNDING STEEL REINFORCEMENT SHALL NOT BE PLACED IN CONTACT WITH THE WATERSTOP, for COMPANY LOGO
11. CONCRETE COVER SHALL ALSO FULFIL THE REQUIREMENT FOR APPROPRIATE FIRE RESISTANCE
RATING AS SPECIFIED IN THE CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION OR NOMINAL
MINIMUM SPACING TO BE 40mm.
BLOCK PLAN
COVER FOR DURABILITY WHICHEVER IS GREATER.
2. ALL CONCRETE USED IN WATER RETAINING STRUCTURE SHALL BE WATERPROOFING CONCRETE AND
COMPLY WITH BS8007.
1:500

CONCRETE COVER TO
MAIN REINFORCEMENT NOMINAL
COVER FOR
DURABILITY
120 MINS. 60 MINS. 240 MINS.
F.R.P. F.R.P. F.R.P.

SLAB, SIMPLY SUPPORTED 35 25 55* 35


SLAB, CONTINUOUS 25 25 45* 35 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
STAIR 35 25 55* 35
signature/ and stamp chop
BEAM, SIMPLY SUPPORTED 50* 30 80* 40
BEAM CONTINUOUS 50 30 60* 40
COLUMN 35 25 35 35
WALL 25 25 25 35
WALL SLAB FOR WATER TANK 40 40 40 40

*REINFORCEMENT CONSISTING OF EXPANDED METAL LATH OR A WIRE FABRIC NOT LIGHTER THAN 0.5 BD's OFFICAL USE
kg/m2 WITH 2mm DIAMETER WIRE AT NOT MORE THAN 100mm CENTRES OR A CONTINUOUS
ARRANGEMENT OF LINKS AT NOT MORE THAN 200mm CENTRES SHALL BE INCORPORATED IN THE
CONCRETE COVER AT A DISTANCE NOT EXCEEDING 20mm FROM THE FACE OF THE STRUCTURAL
MEMBERS SURROUNDING THE PLANT/MACHINE ROOMS AND AT OTHER AREAS REQUIRING 120 MINS.
F.R.P. AS SPECIFIED IN THE GENERAL BUILDING PLANS.

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :
TA TB TC TD TE TF TG TH TI TJ

7010 4025 6225 2025 6650 1675 6225 4025 7210

CTB1 200x300

CTB1 200x300

CTB1 200x300

CTB1 200x300
CTB1 200x300

CTB1 200x300
CTB1 200x300
CTB1 200x300
CTB1 200x300

CTB1 200x300
CTB1 200x300

CTB1 200x300
CTB1 200x300

CTB1 200x300

CTB1 200x300
CTB1 200x300
CTB1 200x300
76 200 200 4400 400

CTB1 200x300

CTB1 200x300

CTB1 200x300
CTB1 200x300

CTB1 200x300

CTB1 200x300

CTB1 200x300
CTB1 200x300
CTB1 200x300
CTB1 ( 200x300 )
CTB1 200x300
300 1550 84
1240

CTB56 400x600
750
TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12 TS12
C1B TS12 TS12 TS12 750 C 3434

175

175

175

175

175

175

175

175

175

175

175

175

175

175
2B

225
T5
TB3 400x600 TB4 400x600 TB5 400x600 TB6 400x600
1160

1101 150 TB7 400x600 TB8 400x600 TB9 400x600 TB10 400x600 TB11 400x600 TB12 400x600

250CTB83 400x600
750 2650 25 99 151 1928

TB80 400x600
TB59 400x600
CTB1 200x300 3201 150 150 849
251 101 TS3 CTB1 200x300

4809
4810

4809
W5E
TS3
350 1405

TS1

W5D
W5A
5035

5034
TS12

TS2 TS1

TS12
TS1 TS2

W5C
W5B
175

W5F
175 TS1 TS1 TS1 250
4785

W5G
CTB1 200x300 C1A 184 592
450 1060 1000 1600 CTB1 200x300

1520 348
C2C CTB1 200x300
C1C 375 250 1500 100 1000 1060 375 TB14 250x600 C2A
CTB1 200x300

275

275
76 1600 250 1600
TS12

1795

TS12
175 1600 250 1600 174 250 450

745
175
1045
TB15 400x600 TB22 400x600
TB16 200x600

100 200
CTB1 200x300 W5E W5G
3030

W5A W5C

525
TB67 250x600
TB21 200x600

525

525

TS10 525
TB18 200x600 TB20 200x600

200

200

200
TB17 200x600 TB19 200x600 CTB1 200x300
TB55 400x600

T4 100

100

100
600
TB23 200x600 WC2D

TS10

TB72 200x600

TS10
TB75 200x600

TB82 400x600

1510
WC1D

TB65 200x600

550 1050

TB75 200x600
TS10

TB78 250x600
TS10

TS10

TS10

TB79 450x600
TB60 250x600

250x
TB25 200x600 TB27 200x600

TB71 200x600
TS4 TB24 200x600 TB28 200x600 TB29 200x600 TS4
TB58 450x600

TB69
CTB1 200x300 TB26 250x600

TS10
C10 CTB1 200x300

TS10
TB66A 200x600

TS10
TS2 TS2

TS10

W6 250x2900

TS10
3850

TS10
175
200 734 3041 200 1475 200

TB68 300x600
2055

2055
175 200 1475 202 2498 TB41 500x600

2700
TB31 500x600

TS12
TS12

BEAM 375x340 BEAM 375x340 4815 84

1150 450

1150 450
W6 300x1250

450
C5

W8
W6
W6 TB37 200x600

W3
136 W1 4815 W2 BEAM 375x301 C9 W10 W8

1450

1450
W10

200
TS13 W7

TB70 200x600
W4 TB34 200x600 TB35 200x600
600

TS11

TS11
W9TS13

100 1150
TS11

TS11
250

250

250
W2

W4 200x1424.7
CTB1 200x300
W4 211
495

495
TB62 250x600
CTB1 200x300
TB2 200x300

TB42 250x600

TB41 250x600
TB40 200x600 TB32 200x600

200
TB30 250x600 TB36 200x600 TB39 200x600

TB74 200x600
2500

TB2 200x300
175
T3 W6 200x3150
W6 W10

175

175
250

TB66 200x600
175

CTB1 200x300
TB32 200x600
1975

1977
TS6

W8
CTB1 200x300
175 175
TS12 TS12 TS12 TS6
TS7 TS8 464 6586 300 C8 TS12
C4

300

1134 301
2260

TS8 TS7

4095

TB81 400x600
TB57 400x600

3725

W2 300

1136
TB43 300x600
CTB1a 200x300 250 1691 675 300 986 675 1439 TB48 300x600

CTB65 200x600
C3 CTB1a 200x300

CTB73 200x600
250

285
809 189 200 C7
1990

1988
T2 TB45 250x600 TB47 250x600 1061 775
CTB61 250x600
1265

TS6

CTB76 250x600
TB49 250x600 TB50 250x600
W8 TS6
CTB1 200x300
295

295
CTB1 200x300

175
175

T1

CTB1 200x300
W2
580

580
860 1025

860 1025
W8

TS12
TS12

200 855

TS12 TS12 175


175
REV DATE AMENDMENT
1815

WC2 WC6
CTB1 200x300

CTB1 200x300

PROJECT

CTB1 200x300
CTB51 200x600 CTB53 200x150 CTB54 200x600 CTB1 200x300
CTB1 200x300 CTB52 200x150

1836 1475 CIC SAMPLE PROJECT


175

DRAWING TITLE
TYP Floor Framming

TYP FLOOR FRAMING PLAN


SCALE
NOTES
DRAWING NO. REV. NO.
WALL SCHEDULE 1. ALL BEAM SIZE TO BE 400(B)x600(D), UNLESS OTHERWISE STATED.
2. ALL SLAB SIZE TO BE 150mm THK, UNLESS OTHERWISE STATED. S002
MARK THICKNESS (mm)

W1 250
SOURCE ---
W2 200

W2 250
90mm (W) x 40mm (H) space
W2 875
TA TB TC TD TE TF TG TH TI TJ for COMPANY LOGO
W3 200

W4 150

W4 200

COLUMN SCHEDULE
W5A 200 T5
MARK SIZE (mm)
W5A 250

W5B 150 C1A 775x250


T4 90mm (W) x 60mm (H) space
C1B 750x200
W5C 200 for AP/RSE/RGE's
C1C 450x275 signature/ and stamp chop
W5C 250
T3
W5D 150 C2A 775x250
T2
W5E 200 C2B 750x200 T1
W5E 250 C2C 450x275

C3 675x250
W5F 150 BD's OFFICAL USE
TYP FLOOR FRAMING PLAN
W5G 200 C4 300x300 1:300

W5G 250 C5 200x450


LOADING KEY PLAN
W6 200 C7 675x250
USAGE LEGEND LL (kPa) FIN. (kPa) F.R.R. (Min)
W6 250 C8 300x300
STAIRCASE 3.0 1.25 60/60/60
W6 300 C9 200x450
LOBBY 3.0 1.25 60/60/60
W7 250 C10 250x550

DOMESTIC 2.0 0.5 60/60/60


W8 200
PLANT ROOM 7.5 1.25 60/60/60
W8 250

W8 875 FLAT ROOF 5.0 5.60 60/60/60


90mm (W) x 150mm (H) space
W9 200 for BD's approval stamp /
certification of copies of
W10 150 approved plans
(PNAP ADM-10 APP A)
W10 200

WC1D 200

WC2 250

WC2D 200

WC6 200
Tekla Structures
BD REF :

BIM REF :

R.C. BEAM SCHEDULE

REINFORCEMENT REINFORCEMENT DIMENSION


BEAM SIZE
BEAM MARK (DxB) ELEV. REFER
a a1 a2 b b1 c d e f g LINKS 1 LINKS 2 LINKS 3 A B C D

TB1 300x200 E9 2T20 - - - 2T16 - - - - - <---------------- T10-150(2 LEGS) ---------------> 2550 - - -

TB1a 300x200 E9 2T20 - - - 2T16 - - - - - <---------------- T10-150(2 LEGS) ---------------> 2550 - - -

TB2 300x200 E10 2T16 - - 2T16 - - - - - - <---------------- T10-200(2 LEGS) ---------------> 0 - - -

TB3 600x400 E5 4T25 - - 4T25 - 4T25 4T25 4T25 4T20 - <---------------- T10-200(4 LEGS) ---------------> 0 1300 1000 -
T10-200(2 LEGS)
TB4 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1000 1800 -
T10-200(2 LEGS)
TB5 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1000 1800 -
T10-200(2 LEGS)
TB6 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1800 -
T10-200(2 LEGS)
TB7 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1800 -
T10-200(2 LEGS)
TB8 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1800 -
T10-200(2 LEGS)
TB9 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1800 -
T10-200(2 LEGS)
TB10 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1800 -
T10-200(2 LEGS)
TB11 600x400 E4 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- TORSIONAL_LINKS+T10 ---------------> 0 1800 1000 -

TB12 600x400 E3 4T25 - - 4T25 - - 4T25 - 4T20 - <---------------- T10-200(4 LEGS) ---------------> 0 1000 1300 -

TB13 600x250 E10 2T25 - - 2T25 - - - - - - <---------------- T10-200(2 LEGS) 8T16-200(2 LEGS) 0 - - -

TB14 600x250 E10 2T25 - - 2T25 - - - - - - <---------------- T10-200(2 LEGS) 8T16-200(2 LEGS) 0 - - -

TB51 600x200 E9a 2T20 2T20 2T20 2T20 - - - - - T10-225 E.F. <---------------- T10-150(2 LEGS) ---------------> 1000 - - -

TB54 600x200 E9a 2T20 2T20 2T20 2T20 - - - - - T10-225 E.F. <---------------- T10-150(2 LEGS) ---------------> 1000 - - -

CL OF SUPPORT CL OF SUPPORT
CL OF SUPPORT
f g-225 DIM B a,a2 DIM A
a1 g-225 a3
500 b b1 300 500

REV DATE AMENDMENT


a2
e1 c1 LINKS 1 LINKS 2 LINKS 3 b1 PROJECT
LINKS 2 LINKS 1 b LINKS
CIC SAMPLE PROJECT
DIM D SPACERS a a1 a2 DIM D d b,b1 DIM B

E3 E9
DRAWING TITLE
BEAM R.C. SCHEDULE
2 LEGS
CL OF SUPPORT
CL OF SUPPORT CL OF SUPPORT a a1 g-225 a2
300 DIM A

f g-225 DIM B DIM C SCALE AS SHOWN@A1


500 b3 b1 b 500
LINKS DRAWING NO. REV. NO.
LINKS 2 LINKS 1 LINKS S003
e1 d2 b2
c1 LINKS 1 LINKS 2 LINKS 3

SPACERS b1 b SOURCE ---


d1
DIM D SPACERS a a1 a2 DIM D d
E9a
E4 6 LEGS 90mm (W) x 40mm (H) space
for COMPANY LOGO

CL OF SUPPORT CL OF SUPPORT
a a1 g-225
CL OF SUPPORT CL OF SUPPORT

DIM A f g-225 DIM B DIM C


e1 e 500 500 b b1 500
LINKS 3 LINKS 2 LINKS 3
90mm (W) x 60mm (H) space
b2 for AP/RSE/RGE's
LINKS 1 LINKS 2 LINKS 3 d2
SPACERS b1 b signature/ and stamp chop

c1 d1
c DIM D a a1 DIM D d
SPACERS

E10 BD's OFFICAL USE


E5

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :
250 2675 750 2950 400
1800

W5A 2350

A 400
A523 17 T 10 C1B
4 T 25
42 T 10 4T25
A511
A511

2 T 16 20T10

600
2T16
17 T 10
TB5
42 T 10

4T25 4 T 25
19T10-150 20T10-150 A - A ( 1:20 )
C1B

TB4 (600x400) TB3 (600x400)


A

400

3 T 25

450 375 1060 1000 399 1193


200
B 8T10-150
WC1D
3 T 25 W5A
2 T 20
15 T 10 A510
21 T 10

600
C
21 T 10 2 T 20
22T10 8T10
15 T 10

300
TB58 2 T 25 2 T 16 REV DATE AMENDMENT
2 T 16
2 T 25 PROJECT
WC1D
C - C ( 1:10 )
22T10-109 W5A C CIC SAMPLE PROJECT
CTB1 (300x200)
B

DRAWING TITLE
TB15 (600x400) B - B ( 1:10 ) BEAM RC DETAIL

2615 240 4910 250 SCALE AS SHOWN@A1


18T10-150 11T10-150 5T10-150 11T10-150
DRAWING NO. REV. NO.
400 400
S004
A1050
E 4T25
C1A 4T25
W1 4T25 SOURCE ---
D

CTB1 18T10 27T10

90mm (W) x 40mm (H) space

600
600
for COMPANY LOGO

4T25
4T25 4T25

C1A D - D ( 1:20 )
W1
D E
CTB56 (600x400) E - E ( 1:20 ) 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
TB55 (600x400) signature/ and stamp chop

394 3800 775 250 BD's OFFICAL USE

11T10-150 2T10-150 11T10-150 2T25

C1A
24T10
600

F
TB59 2T25
TB55

CTB1

2T25
90mm (W) x 150mm (H) space
for BD's approval stamp /
certification of copies of
approved plans
2T25 (PNAP ADM-10 APP A)

F - F ( 1:20 )
C1A

F
TB13 (600x250)
Tekla Structures
BD REF :

BIM REF :

539 236
T10 - 175 (TYP) / T10 - 125 (CRI) T10 - 175 (TYP) / T10 - 125 (CRI)
6T25 16T10
2T25
T10 - 175 (TYP) / T10 - 125 (CRI)
1T32
6T25 15T10
1T32
T5

25
1T32 15T10

15T10
1T32

275
1T32

200
16T10

15T10

15T10

15T10
1T32
250

16T10
1T32 1T32 1T32
1T32
1T32 1T32
2T25

6T25 6T25 16T10


763 450

C1A (775x250) C1C (450x275)


C1B (750x200)
TA

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
COLUMN R.C. DETAIL

SCALE

DRAWING NO. REV. NO.

S005

SOURCE ---

90mm (W) x 40mm (H) space


1 for COMPANY LOGO
IF H > hc
2
COLUMN BINDERS SHOULD BE
ACCORDING TO CRITICAL ZONE
h c = CLEAR HEIGHT OF STOREY
FOR EXAMPLE : PC11
B HORIZONTAL LINKS AT
BEAM-COLUMN JOINT =5T12-150 2 LEGS (X-DIR)
VERTICAL LINKS AT SHEAR REINFORCEMENT WITHIN
BEAM ALONG BEAM-COLUMN JOINT =5T20 (X-DIR)
Y DIRECTION COLUMN BEAM JOINT BEAM/COLUMN JOINT
COULUMN BEAM VETICAL LINKS
REINFORCEMENT (ALONG X) (i.e. 5T20) 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
SIZE OF BAR signature/ and stamp chop
NO. OF BAR TO BE
PROVIDED AT
BEAM-COLUMN
A A 5 NOS. OF T20 INTERFACE
HORIZONTAL
LINKS CRITICAL ZONE FROM
(i.e. 5T12-150 2 LEGS)
BEAM ALONG COULUMN H COLUMN TOP WITH
Y
X DIRECTION BINDERS ENHANCED TRANSVERSE
T16
NO. OF LAYERS OF HORIZONTAL REINFORCEMENT BD's OFFICAL USE
LINKS TO BE PROVIDED ALONG NO. OF LEGS
THE DEPTH OF JOINT (i.e. 2 LEGS)
SPACING OF THIS LINKS
X
SIZE OF BAR COLUMN (VERTICAL
B NO. OF BAR TO BE PROVIDED REINFORCEMENT
ALONG THE DEPTH OF JOINT IS NOT SHOWN) hc NORMAL TRANSVERSE
REINFORCEMENT
TYPICAL DETAIL FOR COLUMN-BEAM JOINT COLUMN BEAM JOINT DETAIL
(PLAN VIEW) (3D VIEW)

COLUMN COLUMN COLUMN CRITICAL ZONE FROM


COLUMN

COLUMN

COLUMN
BINDER

BINDER

BINDER
REINFORCEMENT REINFORCEMENT REINFORCEMENT
COLUMN BOTTOM
H WITH ENHANCED TRANSVERSE
T.L.L.

HORIZONTAL JOINT HORIZONTAL JOINT HORIZONTAL JOINT


SHEAR LINKS SHEAR LINKS SHEAR LINKS REINFORCEMENT

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
BEAM BEAM BEAM
T.L.L.

T.L.L.

REINFORCEMENT VERTICAL JOINT REINFORCEMENT VERTICAL JOINT REINFORCEMENT VERTICAL JOINT


SHEAR LINKS SHEAR LINKS SHEAR LINKS
COLUMN

COLUMN

COLUMN
BINDER

BINDER

BINDER

(U-BAR)

CASE 1 CASE 2 CASE 3


NOTES:
VERTICAL JOINT SHEAR REINFORCEMENT SHOULD CONSIST OF INTERMEDIATE CRITICAL ZONE IN COLUMN
SECTION A - A
COLUMN BARS ADEQUATELY ANCHORED IN THE COLUMN AND PLACED
BETWEEN THE CORNER BARS AND WITH IN THE EFFECTIVE JOINT AREA AS
DEFINED IN CLAUSE 6.8.1.3 OF THE CODE OF PRACTICE FOR STRUCTURAL
USE OF CONCRETE 2013.
Tekla Structures
BD REF :

BIM REF :
R.C. WALL SCHEDULE
WALL MARK CONCRETE THICKNESS HORIZONTAL BINDER STEEL RATIO
FLOOR GRADE (mm) VERTICAL BARS BARS (%)
HORIZONTAL VERTICAL
4/F W1 C60 250 T40-150 T10-150 T12-300 150 3.4
LEGEND:
A B
4/F W2 C60 250 T25-125 T12-125 1.3

4/F W3 C60 200 T20-125 T10-100 1.3


CONFINED AREA
4/F W4 C60 150 T20-150 T10-150 1.4

4/F W4 C60 200 T20-125 T10-100 1.3

4/F W5A C60 200 T20-125 T10-100 1.3

4/F W5A C60 250 T25-125 T12-125 1.6


BINDERS:
4/F W5B C60 150 T20-100 T10-150 T12-200 150 2.1
VERTICAL BAR
7010
4/F W5C C60 200 T20-125 T10-100 1.3
250 201 400 250 HORIZONTAL BAR HORIZONTAL SPACING
4/F W5C C60 250 T25-125 T12-125 1.6 T10-200
BINDER

200 450
4/F W5D C60 150 T20-125 T10-150 1.7
135 4815

200
4/F W5E C60 200 T20-125 T10-100 1.3

495 250
4/F W5E C60 250 T25-125 T12-125 1.6

4/F T20-100 2.1 TYPICAL DETAIL OF WALL


W5F C60 150 T10-150 T12-200 150 401 W1 399
(N.T.S.)
4/F

4/F
W5G

W5G
C60

C60
200

250
T20-125

T32-175
T10-100

T12-125
1.3

1.8
3
4/F W6 C60 200 T25-150 T10-100 1.6

4/F W6 C60 250 T20-125 T12-125 1.0

2260

W2
4095
4/F W6 C60 300 T32-100 T10-150 2.7

4/F W7 C60 250 T25-150 T12-125 1.3

4/F W8 C60 250 T32-175 T12-125 1.8

4/F W9 C60 200 T20-125 T10-100 1.3

4/F W10 C60 150 T20-150 T10-150 1.4 2


4/F W10 C60 200 T20-125 T10-100 1.3

1265
4/F WC1D C60 200 T20-125 T10-100 1.3

400
4/F WC2 C60 200 T20-125 T10-100 1.3
250 810

295
4/F WC2D C60 200 T20-125 T10-100 1.3 1
4/F WC6 C60 200 T20-125 T10-100 1.3

855
400 WC2 400

200
1475 1585 REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
WALL R.C. DETAIL (1 OF 2)

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
S006

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO
C D E F G H

6225 2025 6650 1675 6225


90mm (W) x 60mm (H) space
400

for AP/RSE/RGE's
signature/ and stamp chop

200 734
1900
2800
400

400
65 235
400

400
W6

200 400 250 400


525

525

W10
660

W4

1475

1475

1550
W3

W9
BD's OFFICAL USE

1150
W6

150 400
W4 W10
550

W6

500
75 490

200 400
150

3
125

75
100

100

125
400 400 200 600 1700 400
250 400 400 300
540 2500 200 2700 290 985 200
465 6885

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

TC TD TE
TB 6225 2025

T2 T2

400

400

400
T5 T5

1500
L2
HORIZONTAL BAR (H.B.) HORIZONTAL BAR (H.B.)

VERTICAL BAR (V.B.) VERTICAL BAR (V.B.)


4635

4635
4810

L1

2035
L2A

L2
W5A
L2
4785

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

1500
L2
400

400
100 600

WC1D

525
1090 T1
T1

T3

DRAWING TITLE
100

T3
T4 T4

100
WALL R.C. DETAIL (Schedule)
400 800 400 250 400 800 400
400 260 400 1000 650 800 400
L3
L1 L3

6225 2025
SCALE

DRAWING NO. REV. NO.

S007
THINKNESS (mm) THINKNESS (mm)
FL. MARK FL. MARK SOURCE ---
T1 T2 T3 L1 % L2 % L3 % T1 T2 T3 L1 % L2 % L2A % L3 %
V.B. (E.F.) T16-150 0.48 T16-200 0.45 T16-180 0.9 V.B. (E.F.)
27/F to 18/F 200 250 200 H.B. (CRI.) 27/F to 18/F 200 250 200 H.B. (CRI.)
90mm (W) x 40mm (H) space
H.B. (TYP.) H.B. (TYP.) for COMPANY LOGO
V.B. (E.F.) V.B. (E.F.)
18/F to 11/F 200 250 200 H.B. (CRI.) 18/F to 11/F 200 250 200 H.B. (CRI.)
H.B. (TYP.) H.B. (TYP.)
V.B. (E.F.) V.B. (E.F.)
11/F to 4/F 200 250 200 H.B. (CRI.) 11/F to 4/F 200 250 200 H.B. (CRI.)
H.B. (TYP.) H.B. (TYP.)
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

LEGEND :

CONFINED AREA

BINDERS
Vertical Bar
TA TB Horizontal Spacing
Horizontal Bar
T10-200
Binder

TYPICAL DETAIL OF WALL


(N.T.S.)
T3

2260
T2

1265
T1
7010

View_02 (3d) (1:50)

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
WALL RC DETAIL

TC TD TE TF TG TH TI TJ SCALE

DRAWING NO. REV. NO.


S008
250 6586 64

1650
236
214 SOURCE ---
1275
1442

1050
90mm (W) x 40mm (H) space

100
150

for COMPANY LOGO


175

175

T3

100
200 734 541 2500 200

2260
T2

1265
90mm (W) x 60mm (H) space
T1 for AP/RSE/RGE's
signature/ and stamp chop
6225 2025 6650 1675 6225 4025 7210

BD's OFFICAL USE


5/F plan (1:50)

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

T10- 250 (B2)


T10- 250 (T2)
TA TB TC TD TE TF TG TH TI TJ

T5

T10- 250 (B1)


T10- 250 (T1)
T10- 250 (T1)
T10- 250 (B1)

4785
TS1 TS1

TS4

T4

TS10
T10- 250 (T2)
T10- 250 (B2)

3850
TS10
T10- 250 (slab rebar)

TS10

TS10
T10- 250 (T1) T10- 250 (slab rebar)
T10- 250 (B1) TS4

TS11

TS11
T10- 250 (T1) T10- 250 (B1)
T3

T10- 250 (slab rebar)


T10- 250 (slab rebar)
TS6

T10- 250 (T2)


T10- 250 (B2)
T10- 200 (T1)
T10- 200 (B1)

2260
TS13 REV DATE AMENDMENT
T10- 200 (B1) TS8
T10- 200 (T1) TS7
TS8
PROJECT

T2
T10- 250 (T1) CIC SAMPLE PROJECT

1265
PANEL

T10- 250 (B2)


T10- 250 (T2)
TS6 T10- 250 (B2)
T1
T10- 200 (B2)
T10- 200 (T2)

DRAWING TITLE
SLAB R.C. DETAIL
T10- 200 (B1)
T10- 200 (T1)
T10- 300 (B2)
T10- 300 (T2)

PANEL

SCALE

DRAWING NO. REV. NO.

S009

SOURCE ---

7010 4025 6225 2025 6650 1675 6225 4025 7210 90mm (W) x 40mm (H) space
for COMPANY LOGO
5/F plan (1:100)

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

TC
TH

TB16 (200x600) TB17 (200x600)

T4

TS10
TS10

TS10
TS10

TS10

TS10
TB28 (200x600)

TS10
UP

TS10
TS10

UP
200 1475 200 2500

TS10
200 734 3041 200
ST-02

W9
TB31 (500x600)
ST-01 3

1300

1450
S010
3

TS11
S010
1450

TS13

1500
W3

150
W10

TS11
TS13

175
W4 T3
175
175

125
T3 TS12 986 200
200 1275 175

TS8 TS12

C4

TYPICAL FLOOR PART PLAN OF STAIRCASE ST-02


2 1:50

TYPICAL FLOOR PART PLAN OF STAIRCASE ST-01


1 1:50

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
STAIRCASE R.C. DETAIL
TH
TC

SCALE

DRAWING NO. REV. NO.


5/F 5/F
+26.525 +26.525 +26.525 +26.525 S010

SOURCE ---

T10-250 90mm (W) x 40mm (H) space


for COMPANY LOGO

T12-100
T10-250

W10
T12-100 W4 200mm THK.
200mm THK. STRUCTURAL
STRUCTURAL WALL
WALL

3325
3325

W3
W9
200mm THK. 90mm (W) x 60mm (H) space

2792.5
2792.5

STRUCTURAL 200mm THK.


WALL STRUCTURAL for AP/RSE/RGE's
WALL
signature/ and stamp chop

BD's OFFICAL USE

3/F 3/F
+23.200 +23.200 +23.200 +23.200

ST-02 (250)
3 1:25

90mm (W) x 150mm (H) space


for BD's approval stamp /
ST-01 (250)
3 1:25
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

W2TB6 (600x500) 250 2250 250 1375 1375

T10-150 (T1) T10-150 (T1) T10-150 (T2)

250
T10-150 (B1)
T10-150 (T2) +17.175 T10-150 (B2)

100
+17.175 T10-150 (T2) T10-150 (T1)

250
1300 268 500

965

575
+16.600
T10-150 (B1)

400
3 T10-150 (B2)
S011 T10-150 T10-150

600
T10-150 T10-150 T10-150 (B1)
T10-150

2175
T10-150

700
T10-150 (B2)
1139 2299 620 250 T10-150 T10-150
1450

685
T10-150 T10-150
T10-150 (T1)
T10-150 (T2) T10-150 (T2)

1000
250
T10-150 (EXTRA) T10-150 (T1) T10-150 (EXTRA) T10-150 (EXTRA) +14.750 T10-150 (EXTRA)

300 250
100
T10-150 (B1)

400
+14.100 +14.100
T10-150 (B1)
T10-150 (B2)

WATER TANK SECTION 1 WATER TANK SECTION 2


2 3 1:50
1:50
2
S011

6.6m3 FLUSHING WATER TANK AT 2/ F


1 1:50

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
WATER TANK R.C. DETAIL

SCALE

DRAWING NO. REV. NO.

S011

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

GENERAL NOTES FOR STRUCTURAL STEEL WORKS

1. UNLESS NOTED OTHERWISE, ALL STRUCTURAL STEEL WORKS SHALL BE GRADE S355 J0 COMPLYING WITH BS EN 10025:2004 (Py = 355
MPa) EXCEPT HOLLOW SECTION TO BS EN 20210 AND CLASS 1 COMPLYING WITH CODE OF PRACTICE FOR THE STRUCTURAL USE OF

N 2.
STEEL 2011.

ALL STEELWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CODE OF PRACTICE FOR THE STRUCTURAL USE OF
STEEL 2011. STRUCTURAL USE OF STEEL MATERIALS PROPERTIES SHALL COMPLY WITH BS EN 10025:2004, FOR PERMANENT
STRUCTURES. MINIMUM DESIGN STRENGTH ARE AS FOLLOWS:
THICKNESS LESS DESIGN STRENGTH
GRADE THAN OR EQUAL N/mm2
TO (mm)
S355 16 355

* THE STRUCTURAL STEEL ARE CLASSIFIED AS CLASS 1 IN ACCORDANCE WITH CODE OF PRACTICE FOR THE STRUCTURAL USE OF
STEEL 2011.

3. THE STEELWORK CONTRACTOR IS RESPONSIBLE FOR ENSURING THE STEEL HAS ADEQUATE THROUGH THICKNESS PROPERTIES TO
SATISFY THE REQUIREMENTS OF HIS WELDING PROCEDURES AND WELDING SEQUENCE AND THAT THE MATERIAL AT OR ADJACENT
TO WELDED LOCATIONS IS FREE OF LAMINATIONS, CENTRELINE SEGREGATION, OR OTHER CRACK LIKE INDICATIONS ON COMPLETION
OF WELDING. THE STEELWORK CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE QUALITY CLASS OF STEEL WITH ENHANCED
THROUGH THICKNESS PROPERTIES WHICH MAY BE REQUIRED TO BE COMPATIBLE WITH HIS CHOSEN METHOD OF WORKING.

4. ANY DAMAGED SURFACES OF GALVANISED STEEL SHALL BE COATED WITH ANTI-CORROSIVE COLD GALVANISED PRIMER PRIOR TO
PAINTING.

5. PRIOR TO ERECTION ALL STEELWORK SHALL BE SPRAY WASHED WITH WATER AND DETERGENT THEN SPRAY RINSED WITH CLEAN
WATER. THEY SHOULD BE FREE FROM RUST, GREASE AND LOOSING SCALES BEFORE APPLICATION OF SURFACE PROTECTION.

6. THE CONTRACTOR SHOULD EMPLOY QUALIFIED WELDERS WITH VALID WELDING CERTIFICATE.

7. ALL WELDING WORK SHALL BE CARRIED OUT BY CERTIFIED WELDERS TESTED BY A HOKLAS APPROVED LABORATORY TO BS EN
15614-8:2002 ALL WELDING WORK TO COMPLY WITH BS EN 1011 SITE WELDING SHALL ONLY BE CARRIED OUT WITH PRIOR WRITTEN
CONSENT OF THE ARCHITECT.

8. ALL WELD AND BLOT CONNECTIONS SHALL BE INSPECTED BY THE ENGINEER BEFORE BEING COVERED UP AND REPRESENTATIVELY
TESTED TO THE SATISFACTORY OF THE ENGINEER.

9. THE WELDING STANDARDS SHALL BE IN ACCORDANCE WITH BS EN 1011 PART 1:2009 AND PART 2:2001.

10. THE WELDING PROCEDURES SHALL BE IN ACCORDANCE WITH BS EN ISO 15614 PART 1: 2004 AND PART 8:2002.

11. THE WELDERS SHALL BE APPROVED IN ACCORDANCE WITH BS EN 287 PART 1:2004.

12. THE WELDING TESTS SHALL BE IN ACCORDANCE WITH BS EN 1714:1998 AND BS EN ISO 9934 PART 1:2001.
REV DATE AMENDMENT
13. UNLESS NOTED OTHERWISE, ALL WELDING SHALL BE 6mm CONTINUOUS FILLET WELD ALL ROUND.
PROJECT
14. ABBREVIATIONS FOR WELDING :-
FW -FILLET WELD
REFERENCE ONLY CIC SAMPLE PROJECT
FPBW -FULL PENETRATION BUTT FILLET WELD
SITE PPBW -PARTIAL PENETRATION BUTT FILLET WELD

15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROVISION OF ALL SHIMMING/PACKING REQUIRED TO ACHIEVE ADEQUATE
TOLERANCE AT THE CONNECTIONS.
DRAWING TITLE
16. THE CONTRACTOR SHOULD VERIFY THE SETTING OUT DIMENSIONS ON STRUCTURAL AND BUILDING PLANS ON SITE. ANY STEEL STRUCTURE BLOCK PLAN
DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT/ENGINEER BEFORE CONSTRUCTION WORK IS PROCEEDED.
AND GENERAL NOTES
17. THE CONTRACTOR SHOULD SUBMIT THE FABRICATION AND SHOP DRAWING TO THE ENGINEER FOR CHECKING.

18. ALL STEEL WORKS SHALL BE GALVANIZED TO BS EN ISO 1461:2009 WITH MIN. ZINC COATING THICKNESS OF 85 MICRONS AND WITH 2
COATS OF ZINC PRIMER. SCALE AS SHOWN@A1
19. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING TO STABILIZE THE STEEL WORKS DURING ERECTION. DRAWING NO. REV. NO.
R001
20. ALL EXISTING FINISHES SHALL BE REMOVED PRIOR TO FIXING END PLATES AND ANCHOR BARS.

21. ALL ORDINARY BOLTS SHALL BE ISO GRADE 8.8 BLACK BOLT TO BS 3692:1967, UNLESS NOTED OTHERWISE. SOURCE ---
BLOCK PLAN
1:500 22. ALL EXISTING REINFORCEMENT IN THE EXISTING CONCRETE STRUCTURES SHALL BE LOCATED WITH COVERMETER PRIOR TO
DRILLING FOR ANCHOR BAR INSTALLATION. NO STEEL BAR SHALL BE CUT FOR DRILLING.

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :
LEGEND BIM REF :

PINNED JOINT

MOMENT JOINT

CONCRETE GRADE OF ALL CONCRETE COLUMNS TO BE C40

S-F S-E S-D S-C S-B S-A


1
R004 150mm THK Concrete Slab

3 CC1
R003 SC2-01 CC3
SB6-01 ( T.L. + 4.330 )
S-5 4
R003
SB6-07 ( T.L. + 4.330 )
1000

1000
1500
SB2-01 ( T.L. + 4.330 ) SB2-11 ( T.L. + 4.330 )

2000
SB4-03 ( T.L. + 4.330 )
1000

1000
SB2-02 ( T.L. + 4.330 ) SB3-01 ( T.L. + 4.330 ) SB2-14 ( T.L. + 4.330 )

1000
SB2-15 ( T.L. + 4.330 )
1000

1000
1500
SB6-03 ( T.L. + 4.330 )

SB6-05 ( T.L. + 4.330 )


SB4-01 ( T.L. + 4.511 )

SB2-03 ( T.L. + 4.330 ) SB2-14 ( T.L. + 4.330 )


2
R004 + 4.480
SB3-02 ( T.L. + 4.330 )
1000

2000

1000

SB4-10 ( T.L. + 4.510 )


SB4-09 ( T.L. + 4.330 )
SB2-05 ( T.L. + 4.330 ) SB2-17 ( T.L. + 4.330 )

1000

500
SB4-05 ( T.L. + 4.330 )
S-4
1000

500
SB2-07 ( T.L. + 4.330 ) SB2-18 ( T.L. + 4.330 )

1000
1750

SB3-04 ( T.L. + 4.330 )


1000

1000
SB2-09 ( T.L. + 4.330 ) SB2-19 ( T.L. + 4.330 )
SB2-06 ( T.L. + 4.330 )

1500
805

1000
REV DATE AMENDMENT
2 SB2-10 ( T.L. + 4.330 ) PROJECT
R003 SB3-06 ( T.L. + 4.330 ) SB2-20 ( T.L. + 4.330 )
CIC SAMPLE PROJECT
1750
SB2-12 ( T.L. + 4.330 )

1000
1 SB2-13 ( T.L. + 4.330 )
2195

SB4-07 ( T.L. + 4.330 ) SB2-21 ( T.L. + 4.330 )

2000
R003
DRAWING TITLE
1000

1000
STEEL STRUCTURE FLOOR PLAN
SB5-01 ( T.L. + 4.330 ) SB5-03 ( T.L. + 4.331 )
S-3 6
SC2-04 R003 5 CC2 CC4
R003

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
R002

SOURCE ---

1 Level 2 Framing Plan


1:50

90mm (W) x 40mm (H) space


for COMPANY LOGO

STEEL COLUMN SCHEDULE STEEL BEAM SCHEDULE


MARK PROFILE
90mm (W) x 60mm (H) space
MARK PROFILE GRADE GRADE
for AP/RSE/RGE's
SC2-01 UB610*305*179 S355 SB2 UB152*89*16 S355
signature/ and stamp chop
SC2-04 UB610*305*179 S355 SB3 UB203*102*23 S355
SB4 UB356*171*57 S355
SB5 UB457*191*74 S355
SB6 UB533*210*101 S355
CONCRETE COLUMN SCHEDULE
MARK PROFILE
CC1 600x300 BD's OFFICAL USE
CC2 600x300
CC3 600x300
CC4 600x300

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

1B
R003
4NOS. GR.8.8
STEEL ANGLE BRACKET BOLT AND NUT
2NOS. M10-HSL-3
4NOS. GR.8.8 ANCHOR BOLTS
13 BOLT AND NUT 13
+4.330
12

25
12 +4.330
SB2

42 60 50

152
110
1A
13

152
R003

4NOS. GR.8.8
BOLT AND NUT 12
4NOS. GR.8.8 98 10 92
BOLT AND NUT

1 CONNECTION DETAIL FOR STEEL BEAM


1:10
1A SECTION
1:10
1A
1B SECTION
1:10
1B

S-F

S-F S-E

4
REV DATE AMENDMENT

8NOS M16 PROJECT


75 260 75 ANCHOR BOLT
2A
R003 09 4 260 CIC SAMPLE PROJECT
4

80 320 320 80
01

01
DRAWING TITLE
4
09
STEEL STRUCTURE DETAIL

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
R003
2 CONNECTION DETAIL FOR STEEL BEAM (WELDING) CONNECTION DETAIL FOR CONCRETE COLUMN AND STEEL BEAM
1:10 2A SECTION
1:10
2A 4 1:50
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

S-F
S-F
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
975 1050 975

SC2-04
MS BASE PLATE
8 SC2-01
8
T25 REBAR

975
6A 1050
RC SLAB R003 BD's OFFICAL USE
SHEAR STUD
MS STIFFENER MS BASE PLATE

1050
150

TAL

TAL
01

1500
4 T25 REBAR
457

PILE CAP

975
(UNDER SEPARATE SUBMISSION)
01 3000
4
REBAR REBAR

CONNECTION DETAIL FOR CONCRETE SLAB AND STEEL BEAM CONNECTION DETAIL FOR STEEL COLUMN AND PILE CAP 6A Section 6A 90mm (W) x 150mm (H) space
3 CONNECTION DETAIL FOR 1:50
STEEL COLUMN AND STEEL BEAM 5 1:25
6 1:50 1:50 for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

S-5 S-4 S-3


2
R004

+7.970
02 04 01 17 03 06 05 08 07 08 02

1500 500 500 1000 1000 1000 750 750 1000 1000
+4.480
03 01 15 02 05 04 06 06 07 01

CC1 CC2

REV DATE AMENDMENT


+0.250
+0.025 +0.025 PROJECT

CIC SAMPLE PROJECT


FOUNDATION OF STRUCTURE
(UNDER SEPARATE SUBMISSION)

DRAWING TITLE
STEEL STRUCTURE SECTIONS

1 Section
1:50
1
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
R004

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

S-F S-E S-D S-C


1
R004
10000 6000 4000

02 12
04 16
90mm (W) x 60mm (H) space
04 17 06 11 for AP/RSE/RGE's
signature/ and stamp chop

150mm THK Concrete Slab

BD's OFFICAL USE


150 5000 5000 5000 1000 4000 150

03 05 14
01 03 15 05 10
09

90mm (W) x 150mm (H) space


2 Section
1:50
2 for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

1. DESIGN REFERENCE
a. CODE OF PRACTICE FOR STRUCTURAL USE OF STEEL, 2011, B.D. H.K.
b. CODE OF PRACTICE FOR STRUCTURAL USE OF GLASS, 2018, B.D. H.K.
c. CODE OF PRACTICE ON WIND EFFECTS IN HONG KONG 2019, B.D. H.K.
d. CODE OF PRACTICE FOR STRUCTURAL USE OF CONCRETE 2013, B.D. H.K.
External wall of the building for the purpose of
measurement of GFA and site coverage
N
f. BRITISH STANDARD - STRUCTURAL USE OF ALUMINIUM BS8118:1991 Curtian wall system
g. BUILDING (CONSTRUCTION) REGULATIONS
h. STRUCTURAL DESIGN OF STAINLESS STEEL (SCI PUBLICATION 291)

MINIMUM 300mm from floor level


2. GLASS: Projection of the curtain wall
system not exceeding 200mm Internal finishes
a. TP10+12A+TP10mm SILVER GREY GLASS PANEL GLASS WITH LOW-E COATING ON
SURFACE (GL-01) (domestic building) /250mm (non- Raised floor
domestic building) from the outer INTERIOR
b. DEFLECTION LIMIT : SPAN/60 face of structural elements
PERMISSIBLE STRESS OF TEMPERED GLASS = 50 N/mm2
YOUNG'S MODULUS, E = 73 kN/mm2
DENSITY OF GLASS = 2600 kg/m3
c. GASKETS: DENSE : NEOPRENE - 60 : 5 DURO - FOR SOLD PROFILES
- 75 : 5 DURO - FOR HOLLOW PROFILES
Fire seal
d. SETTING BLOCKS : NEOPRENE ( DURO ) GMS bracket
150mm LONG AT QUARTER POINT OF GLASS Glass

e. 100% HEAT SOAK TESTING FOR ALL TEMPERED GLASS Insulation panel
THE QUALITY CONTROL ON THE FABRICATION OF INSULATED GLASS UNIT
SHOULD STRICTLY FOLLOW TAE RECOMMENDATION OF ASTM E773.
f. ALL GLASS PANEL COMPLY TO B.S. 952
Suspended ceiling

3. DESIGN CRITERIA
a. -WIND LOAD
THE BASIC DESIGN PRESSURE : 2.37 kPa
TOPOGRAPPY FACTOR, Sa = 1.3 Section of Curtain Wall System installed at New Building
2.37 x 1.0 x 1.3 = 3.08 kPa (COMPRESSION)
2.37 x 1.4 x 1.3 = 4.31 kPa (SUCTION) SITE
- IMPACT LOAD
- 3kN/m AT 1.1m ABOVE FFL.
- UDL LOAD = 1.5 kN/m2 K.I.L 201
- POINT LOAD = 1.5kN FOR REFERENCE ONLY
b. CONCRETE
MINIMUM COMPRESSIVE fc' = 60 MPa AT 28 DAYS
STRENGTH External wall of the building for the purpose of
FOR REFERENCE ONLY measurement of GFA and site coverage
4. STRUCTURAL STEEL
Curtian wall system
a. B.S. EN. 10210 FOR STEEL HOLLOW GRADE S275 J0 CLASS 1.
b. B.S. EN. 10025 FOR OTHER STRUCTURAL STEEL GRADE S275 J0 CLASS 1.
MINIMUM 300mm from floor level REV DATE AMENDMENT
c. ALL MILD STEEL BRACKETS TO BE SECURED BY External finishes
WELDING TO B.S. EN. 1011 Projection of the curtain wall PROJECT
ALL FILLET WELD TO BE 4mm THK, UNLESS OTHERWISE STATED. Internal finishes
system not exceeding 200mm
d. MAKE GOOD DAMAGE TO ZINC COATINGS AND GALVANISING, (domestic building) /250mm (non- Raised floor
CIC SAMPLE PROJECT
TREAT CUT ENDS OF GALVANISED SECTIONS WITH TWO COATS domestic building) from the outer INTERIOR
OF METALLIC ZINC-RICH PRIMING face of structural elements
e. ALL STRUCTURAL MILD STEEL WORKS AND BRACKETS, ETC,
FOR FIXING SHALL BE HOT-DlP GALVANIZING OF ZNC
PAINT TO B.S. 4652,1995 DRAWING TITLE
COMPLYING WITH B.S. E.N. ISO 1461 WITH 85 MICRONS THICKNESS.
Fire seal CURTAIN WALL GENERAL NOTES
GMS bracket
5. ANCHOR BOLT Glass
(N) 819700185.607
1) THE INSTALLATION OF ANCHOR BOLTS SHALL STRICTLY IN ACCORDANCE WITH THE Insulation panel (E) 835353432.766
MANUFACTURER'S SPECIFICATIONS
Suspended ceiling
2) THE MINIMUM EMBEDMENT, SPACING & EDGE DISTANCE FOR THE VARIOUS TYPES Existing window
SCALE AS SHOWN@A1
OF ANCHOR BOLTS USED ARE AS FOLLOWS:
DRAWING NO. REV. NO.

BD 'HILTI' MIN. MIN. EDGE EFFECTIVE BASE TENSILE SHEAR TEST LOAD C001
REFERENCE 'HST30R' SPACING DISTANCE EMBEDMENT MATERIAL (kN) (kN) (kN)
NO. LENGTH THICKNESS TENSILEx1.5
Section of Curtain Wall System installed at Existing Building
SOURCE ---

BLOCK PLAN
6. ALLOWABLE TOLERANCE: 1:500 90mm (W) x 40mm (H) space
for COMPANY LOGO
ALLOWABLE TOLERANCE OF THE POSITIONING OF WINDOW SUPPORTS
AND ARRANGEMENTS IS ±25mm

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

A UNDER SEPERATE SUBMISSION

W1
D5
TB30 (250x600) OUTSIDE INSIDE

499
GL-02
3
SLAB EDGE

TB57 (400x600)
+26.350

456
TB2 (200x300)

ALUM. MULLION (D6)


D5 GLASS PANEL (GL-02)
ALUM. MULLION (D4)
ALUM. WINDOW FIXED (D7)
200
STRUCTURAL SEALANT
860

B M6X16 S.S SCREW 2 NOS.

200

23
50

50
W2
TB1a (200x300) D2 150 GL-02

90

90
TB43 (300x600)
662

465

D21

50

50
23
90

D4 M8X28 S.S BACK ANCHOR


GL-02 M6X16 S.S. SCREW @300c/c MAX.
STONE PANEL (TYPE 2)
2
STRUCTURAL SEALANT ALUM. MULLION (D6)
740
830

2
ALUM. WINDOW FIXED (D7)
C002
D21 50 80 70
GLASS PANEL (GL-02)
90

D4 REV DATE AMENDMENT


GL-02
PROJECT
D21
CIC SAMPLE PROJECT
605
799

D2
TB1 (200x300)
1
A C11
C003 (775x875) DRAWING TITLE
+26.350 +26.525 CURTAIN WALL LAYOUT PART PLAN
735

D5
GL-01 TB51 (200x600)
S1
2 TYPICAL MULLION FIXING DETAIL
1:5
90

TB1 (200x300)
WC2 SCALE AS SHOWN@A1
245

DRAWING NO. REV. NO.


C002
1140 1179 1430 SPANDREL PANEL
SOURCE ---
D3 D21 D3 D21 D3 D21 D3

90mm (W) x 40mm (H) space


for COMPANY LOGO

1 5/F CURTAIN WALL LAYOUT PART PLAN (FLAT B)


1:25

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

A
UNDER SEPERATE SUBMISSION 1
INSIDE OUTSIDE

W1 955 100130 115

TB30 (250x600)

D21

6/F

395
3

350
+29.850

TB57 (400x600)
+26.350

150
TB2 (200x300)

645
175

450
SPANDREL PANEL

D24
B

GLASS PANE SASH

1100
W2
100

FOR APPROVAL IN LOCKED POSITION ONLY


TB43 (300x600)
560

D23
505

2725
2
830

GLASS PANE FIXED

1185
100 REV DATE AMENDMENT
+26.525
PROJECT

CIC SAMPLE PROJECT


700

D21

5/F

350

395
+26.525 E2
1 150.8890

C11
(775x875) DRAWING TITLE
A
+26.350
175 C003
CURTAIN WALL CAST-IN LAYOUT PLAN
TB51 (200x600)

WC2
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
1 C003
C004
A SECTION
1:25
A
SOURCE ---

Y
90mm (W) x 40mm (H) space
for COMPANY LOGO
E 5/F
1:25
CAST-IN LAYOUT PART PLAN (FLAT B)

6
6

7
80
4

6 6

35
X 90mm (W) x 60mm (H) space
ALUM. TRANSOM (D23) for AP/RSE/RGE's

70
GLASS PANEL (GL-01) signature/ and stamp chop
SMOKE SEAL 4
X

180
35
FIRE STOP

6
6
NON-STRUCTURAL RC CURB (NOT FOR APPROVAL)
ALUM. TRANSOM (D21)

6
ALUM. BRACKET (D46) 20.5 22.5

100
2NOS. #14X38 S.S. SCREW 6 6
35

M16X55 S.S HEX. BOLT 40 BD's OFFICAL USE


395

ALUM. BRACKET (D40)


M20X75 S.S HEX. BOLT
120

SFL ALUM. BRACKET (D41)


35

7
160
50 40
SPANDREL PANEL
90
645

350
EMBED TYPE E2 3mm THK. ALUM PANEL D1 ALUM. TRANSOM SECTION PROPERTY
ALUM. TRANSOM (D24) ALLOY 6063-T6 D3 ALUM. MULLION SECTION PROPERTY
Area (mm 2) : 922.5 ALLOY 6063-T6
Moments of inertia - X (mm 4) : 592951 Area (mm 2) : 2311.8
Moments of inertia - Y (mm 4) : 211886 Moments of inertia - X (mm 4) : 4509546
ALUM. WINDOW SASH (D30)
Radii of gyration - X (mm) : 25 Moments of inertia - Y (mm 4) : 629163
60 35

90mm (W) x 150mm (H) space


Radii of gyration - Y (mm) : 15 Radii of gyration - X (mm) : 44
STRUCTURAL SEALANT for BD's approval stamp /
22

elastic Modulus - Zx (mm 3) : I/y - max = 16941 Radii of gyration - Y (mm) : 16 certification of copies of
GLASS PANEL (GL-01)
elastic Modulus - Zy (mm 3) : J/ x- max = 9326 elastic Modulus - Zx (mm 3) : I/y - max = 63137 approved plans
elastic Modulus - Zy (mm 3) : J/ x- max = 25172 (PNAP ADM-10 APP A)

INSIDE OUTSIDE

3 TRANSOM DETAIL (D1) MULLION DETAIL (D3)


1:2 4 1:2
Tekla Structures

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

D
C004

75 150 150 75

UNFACTORED FORCES FOR CAST-IN EMBED TYPE E2


25 25
D.L. W.L.

Fx (kN) 0 0

Fy (kN) 0 39.5
Ø CLEAR HOLE

135
Fz (kN) -14 0 M20 BOLT (GR. 8.8)

Mx (kNm) 0.9 2 70x70x12 THK. G.M.S PLATE (GR.275)

12
25
My (kNm) 0 0
M20 NUT (GR. 8.8)
Mz (kNm) 0 0

*(W.L.) WIND LOAD ARE REVERSIBLE

1A PLAN
1:5
VIEW CAST-IN EMBED TYPE E2

450

75 150 150 75

Ø CLEAR HOLE
25

160
70x70x12 THK. G.M.S PLATE (GR.275)
M20 NUT (GR. 8.8)
160

Fz Fx REV DATE AMENDMENT


M20 NUT (GR. 8.8)

320
PROJECT
Mz Mx
M20 BOLT (GR. 8.8) CIC SAMPLE PROJECT
320

70

My
1A
160
C004
20mm THK. G.M.S PLATE (GR.275)
160

DRAWING TITLE
EMBED DETAIL
25

123 12 INSIDE
25
160
OUTSIDE
SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
C004
PLAN VIEW CAST-IN EMBED TYPE E2
D SIDE VIEW CAST-IN EMBED TYPE E2 1 1:5
1:5
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :

LEGEND:

TP10+12A=TP100mm SILVER GREY GLASS PANEL


GLASS W/LOW-E COATING ON SURFACE (GL-01)

K J H G F E D C B A A B C

ROOF ROOF SPANDREL PANEL


+100.000 +100.000
3650

3325
29/F 29/F
+96.350 +96.350 OPENABLE WINDOW
3325

3325
28/F 28/F
+93.025 +93.025
3325

3325
27/F 27/F
+89.700 +89.700

1B
3325

3325
26/F 26/F C003
+86.375 +86.375
A
1215 100 1237 1182 1580
260
3325

3325
25/F 25/F
+83.050 +83.050

D21
3325

3325
23/F 23/F
+79.725 +79.725 6/F
+29.850 D1

395
3325

3325
22/F 22/F

645
+76.400 +76.400 D24
3325

3325
21/F 21/F
+73.075 +73.075
D23

2285
3325

3325
20/F 20/F
+69.750 +69.750 D3 REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT


3325

3325
19/F 19/F
+66.425 +66.425 5/F
+26.525

395
3325

3325
18/F 18/F
+63.100 +63.100
DRAWING TITLE
CURTAIN WALL ELEVATIONS
3325

3325
17/F 17/F
+59.775 +59.775
AND SECTIONS

1 PARTIAL ELEVATION
3325

3325
16/F 16/F 1:50
+56.450 +56.450 SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
C005
3325

3325
15/F 15/F
+53.125 +53.125
SOURCE ---
3325

3325
12/F 12/F
+49.800 +49.800

90mm (W) x 40mm (H) space


3325

3325
11/F 11/F for COMPANY LOGO
+46.475 +46.475
3325

3325
10/F 10/F
+43.150 +43.150
3325

3325

9/F 9/F
+39.825 +39.825

90mm (W) x 60mm (H) space


3325

3325

8/F 8/F for AP/RSE/RGE's


+36.500 +36.500 signature/ and stamp chop
3325

3325

7/F 7/F
+33.175 +33.175
3325

3325

6/F 6/F
BD's OFFICAL USE
+29.850 +29.850

1
SAFETY TEST
3325

3325

5/F 5/F -
+26.525 +26.525
3225
3325

4/F 4/F
+23.200 +23.200

90mm (W) x 150mm (H) space


ELEVATION 1 2 ELEVATION 2 for BD's approval stamp /
1 1:200 1:200 certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures

This is an example of demonstrating the presentation of drawings generated from BIM according to the Standard and User Guides ONLY. It does
NOT represent the completeness of Submission Drawings under BD’s approval requirement of Statutory Plans. The BD approval requirements
should refer to other relevant references and remain unchanged no matter whether BIM is used or not used for the preparation of Statutory Plans.
BD REF :

BIM REF :
GENERAL NOTES NOTES ON PROOF TEST BY CORE-DRILLING
1. ALL DIMENSIONS ARE IN MILLIMETERS (mm) UNLESS OTHERWISE STATED. 1. CORE-DRILLING SHOULD BE TAKEN THROUGH THE FULL DEPTH OF THE PILE AND CARRIED DOWN TO A
DISTANCE OF AT LEAST HALF A DIAMETER OF THE BASE, OR 00mm, WHICHEVER IS LARGER, INTO THE
2. ALL LEVELS ARE IN METERS ABOVE PRINCIPAL DATUM(mPD) UNLESS OTHERWISE STATED. GROUND UPON WHICH THE PILE IS FOUNDED.
3. ALL PROPOSED CAP TOP LEVEL SHOULD BE -6.35mPD. THICKNESS OF CAP TO BE 2500mm2000mm.
/ 2. THE COMPLETED CORE TAKEN SHOULD BE PROPERLY MARKED AND ARRANGED IN ORDER FOR
INSPECTION.
4. CONCRETE GRADE OF PILE CAP IS C45/20(UNDER SEPARATE SUBMISSION)
3. THE CONCRETE CORES SHOULD NOT SHOW EVIDENCE OF HONEY COMBING OR SEGREGATION OF
5. ALL PILE CAP SHOULD BE UNDER SEPARATE SUBMISSION. FOR REFERENCE ONLY
INDIVIDUAL MATERIALS AND THE ASSESSMENT OF EXCESS VOIDAGE (%) IN THE CORES SHOULD NOT BE
MORE THAN FIGURE NO. "(16(b))" IN ACCORDANCE WITH THE CLASSIFICATION DEFINED IN TABLE 4 OF
6. ALL FOUNDING LEVELS OF BORED PILES AS SHOWN ARE TENTATIVE ONLY. CS1:2010.

FOR REFERENCE ONLY


7. HEIGHT OF BUILDING TO BE 100m. 4. ANY ROCK CORE OBTAINED SHALL BE VISUALLY EXAMINED TO CONFORM TO THE REQUIRED ROCK
MATERIAL SPECIFIED IN THE DESIGN.
8. THE DESIGN OF BORED PILING WORKS SHALL BE IN ACCORDANCE WITH HONG KONG BUILDING BORED PILE DIAMETER
(CONSTRUCTION) REGULATIONS 1990, THE STRUCTURAL USE OF CONCRETE 2013, CODE OF PRACTICE 5. THE CORES SHALL ALSO BE EXAMINED TO CONFIRM THE ADEQUACY OF THE INTERFACE BETWEEN THE
ON WIND EFFECTS IN HONG KONG 2004, CODE OF PRACTICE FOR FOUNDATION 2017 AND PRACTICE CONCRETE AND ROCK.
NOTES FROM THE BUILDINGS DEPARTMENT.
COLUMN / WALL BY OTHER
9. HIGHEST POSSIBLE GROUND WATER LEVEL TO BE +4.10mPD. EXISTING GROUND LEVEL IS +4.10mPD. NOTES ON MINOR IMPERFECTION OF PILE / ROCK INTERFACE (UNDER SEPARATE SUBMISSION)
10. FLEXIBLE CAP THEORY IS ADAPTED IN PILE DESIGN.
1. SHOULD ANY SEDIMENT AND/
OR SEGREGATION MORE THAN 50mm THICK BE FOUND AT THE CONCRETE /
11. ALL LATERAL LOADS ARE RESISTED BY BORED PILES & SOCKETED H-SHEET PILES. ROCK INTERFACE DURING THE INTERFACE PROOF DRILLING. REMEDIAL WORKS BY MEANS OF PRESSURE
GROUTING SHALL BE CARRIED OUT UNDER THE SUPERVISION OF RSE.
12. WIND LOAD SHALL BE REVERSIBLE. PILE CAP

46xREBAR DIA
2. THE PILE BASE SHOULD BE CLEANED BY HIGH WATER JETTING WITH MINIMUM JET PRESSURE OF 200 (UNDER SEPARATE
13. CONSIDERATION OF N.S.F. IS NOT REQUIRED. BARS PRIOR TO PRESSURE GROUT. SUBMISSION)
1000
3. THE GROUT SHOULD BE CEMENT GROUT AND THE GROUT STRENGTH SHOULD NOT BE LESS THAN THE CUT-OFF LEVEL
GENERAL NOTES FOR BORED PILE FOR REFERENCE ONLY
CONCRETE STRENGTH OF BORED PILES.
4. THE GROUT PRESSURE SHALL NOT BE LESS THAN 25 BAR AND SHALL BE MAINTAINED FOR AT LEAST 5

75
ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL MINUTES UNTIL NO SIGNIFICANT GROUT INTAKE IS NOTED.
AND BUILDING SERVICES DRAWINGS. SETTING OUT TO BE IN ACCORDANCE WITH RELEVANT
ARCHITECTURAL DRAWINGS. 5. DETAILED METHOD STATEMENT FOR THE GROUTING WORKS SHALL BE SUBMITTED BY CONTRACTOR TO
THE RSE FOR HIS ACCEPTANCE PRIOR TO CARRYING OUT THE GROUTING WORKS. THE GROUTING
1. CONCRETE USED IN BORED PILE SHALL HAVE PFA CONTENTS COMPLYING WITH PNAP APP-33 AND NOT WORKS SHALL BE SUPERVISED BY THE RSE AND ALL RELEVANT RECORDS SHALL BE KEPT ON SITE FOR
EXCEED 25% OF THE CEMENT CONTENT AND COMPLY WITH PNAP APP-74. THE REACTIVE ALKALI OF INSPECTION AT ALL TIMES. BINDERS :
CONCRETE EXPRESSED AS THE EQUIVALENT SODIUM OXIDE PER CUBIC METER OF CONCRETE SHOULD
6. FULL DETAILS OF THE REMEDIAL GROUTING WORKS INCLUDING IDENTIFICATION OF THE PILES FOR REFER BORED PILE
NOT EXCEED 3.0kg.
GROUTING, NATURE AND THICKNESS OF THE SEDIMENT/SEGREGATION DISCOVERED, EFFECTIVENESS LOADING SCHEDULE
2. ALL DESIGN IS IN ACCORDANCE WITH "HONG KONG(CONSTRUCTION) REGULATION 1990" WITH LOAD OF FLUSHING AND GROUTING WORKS, GROUTING RECORDS AND GROUT CUBE TEST REPORTS SHALL BE
INCORPORATED IN THE PILING REPORTS TO BE SUBMITTED TO THE BUILDING AUTHORITY UPON
1 1
COMBINATION IN ACCORDANCE WITH TABLE 2.1 OF "THE CODE OF PRACTICE FOR STRUCTURAL USE OF
CONCRETE 2013" FOR REINFORCED CONCRETE DESIGN. THE LOAD COMBINATIONS INCLUDE 1.4D+1.6L, COMPLETION OF THE PILING WORKS.

LAP LENGTH = 46D


1.4D+1.4W, 1.2D+1.2L+1.2W, 1.0D - 1.4W
3. THE CONTRACTOR SHALL ESTABLISH THE BASE SETTING OUT POINTS AND LINES FOR THE
ENGINEERS.
4. THE CONTRACTOR IS ADVISED TO INSPECT THE CONDITIONS ON SITE AND TO RECORD THE EXISTING
LANDSCAPING FEATURES AND UTILITIES WITHIN AND CLOSE TO THE EXCAVATION AREA. THE
CONTRACTOR SHALL CARRY OUT PRE-CONSTRUCTION DIVERSION OF THE EXISTING UNDERGROUND REINFORCEMENT REFERS
UTILITIES WITHIN THE WORK AREA. TO LOADING SCHEDULE
5. ALL REINFORCEMENTS ARE HIGH TENSILE DEFORMED STEEL BAR (Y) AND MILD STEEL ROUND BAR (R) METAL CASING TO
COMPLYING WITH CS2 : 2012 WITH MINIMUM YIELD STRESS AS FOLLOWS : BE REMOVED AFTER
HIGH TENSILE DEFORMED STEEL BAR = 500 N/sq mm CONCRETING
MILD STEEL ROUND BARS = 250 N/sq mm
6. CONCRETE MIX FOR ALL BORED PILES TO BE GRADE C45 COMPLYING WITH HONG KONG BUILDING COVER THE MAIN COVER THE MAIN
(CONSTRUCTION) REGULATION CONCRETING METHOD TO BE BY TREMIE. A REDUCTION FACTOR OF 0.8
SHALL BE APPLIED FOR CONCRETE STRENGTH. REINFORCEMENT = 75mm REINFORCEMENT = 75mm
7. ALL LAP LENGTHS OF REINFORCEMENT SHALL BE 46D WHERE D IS THE DIAMETER OF SHAFT SHAFT
REINFORCEMENT. FOR REFERENCE ONLY DIAMETER BINDERS DIAMETER BINDERS
8. CUT-OFF LEVEL AND TENTATIVE FOUNDING LEVEL FOR ALL PILES ARE SHOWN IN THE BORED PILE
SCHEDULES. LAYER 1
9. COVER TO MAIN REINFORCEMENT FOR BORED PILES TO BE 75mm. REV DATE AMENDMENT
GRADE BEDROCK

300mm MIN.
10. ALL DIMENSIONS ARE IN mm. BEDROCK OR BETTER PROJECT
VERTICAL VERTICAL
11. ALL LEVELS ARE IN mPD.
REINFORCEMENT REINFORCEMENT M.S. PIPE FOR
EFFECTIVE ROCK SOCKET LENGTH
12. ESTIMATED PILE LENGTHS GIVEN IN THE PILING SCHEDULE ARE MEASURED FROM THE CUT-OFF
LEVEL 1 OF INDIVIDUAL PILES.
INTERFACE CORING CIC SAMPLE PROJECT
LAYER 2/ SPACER OF T16 REFER TO LOADING SCHEDULE
13. ESTIMATED PILE LENGTHS GIVEN ARE TENTATIVE. ACTUAL PILE LENGTH FOR INDIVIDUAL PILES 135° LINK 135° LINK WITH MAX. SPACING OF 1000mm ROCK SOCKET DIAMETER
SHALL BE VERIFIED ON SITE.
1
LAP LENGTH=46D LAP LENGTH=46D 135° LINK
14. THE TENTATIVE FOUNDING LEVELS OF BORED-PILES ARE APPROXIMATE AS DETERMINED FROM THE
(D=DIAMETER OF REBAR) 2
BOREHOLE INFORMATION. (D=DIAMETER OF REBAR)
MAX.3 TENTATIVE
BELLOUT DEPTH 0° FOUNDING LEVEL DRAWING TITLE
15. CONCRETE SHALL BE COMPILED WITH CS1 : 2010, EXCEPT CLAUSE 7.1.
GENERAL NOTES FOR FOUNDATION

400
16. BORED PILE IS DESIGNED AS FIXED HEAD AND PILE CAP TO BE DESIGNED AS FLEXIBLE CAP. PILE CAP
SHALL BE PROVIDED AT B2/F (UNDER SEPARATE SUBMISSION) BORED PILE WITH BORED PILE WITH
600
17. NO NEGATIVE SKIN FRICTION TO BE CONSIDERED FOR PILE DESIGN DUE TO COMPLETION OF SINGLE LAYER REINF'T DOUBLE LAYER REINF'T BELL-OUT
CONSOLIDATION AND REDUCTION OF OVERBURDEN PRESSURE FROM THE BASEMENT CONSTRUCTION.
18. CORRESPONDING GBP SUBMISSION AND SUBSEQUENT AMENDMENT SHALL BE SUBMITTED TO TALLY
TYPE1 TYPE2 DIAMETER
WITH THE AS-BUILT SETTING OUT OF BORED PILES.
SECTION 1-1 TYPICAL BORED PILE DETAILS
SCALE
NOTES ON FOUNDING CRITERIA AND PREDRILLING N. T. S. (WITH BELL-OUT)
DRAWING NO. REV. NO.
ALL BORED PILES SHOULD BE FOUNDED AT THE PRESCRIBED LEVELS WHICH ARE DETERMINED BY THE N.T.S.
FOLLOWING CRITERIA: P001
1. THE FOUNDING STRATUM SHALL BE SLIGHTLY TO MODERATELY DECOMPOSED MODERATELY STRONG
ROCK OR MATERIAL WEATHERING CAT (1C) ROCK OF BETTER, WITH A TOTAL CORE RECOVERY OF
MORE THAN 85% OF THE GRADE AND MINIMUM UNIAXIAL COMPRESSION STRENGTH (UCS) NOT LESS SOURCE ---
THAN 25MPa OR EQUIVALENTLY POINT LOAD INDEX STRENGTH (PLI50) NOT LESS THAN 1MPa. THE
ALLOWABLE BEARING CAPACITY SHOULD BE 5000 kPa
2. PRE-DRILLING SHALL BE CARRIED OUT FOR EACH PILE TO ASCERTAIN THAT THE FOUNDING TO A
FOR REFERENCE ONLY
DEPTH 5m OR THE DESIGNED LENGTH OF THE ROCK SOCKET OF THE PILE INTO CONTINUOUS CAT (1C)
ROCK OR BETTER WITH TCR > 85% WHICHEVER IS DEEPER. 50 50 50
3. PRIOR TO THE COMMENCEMENT OF BORED PILE WORKS, PRE-DRILLING RECORDS SHALL BE
90mm (W) x 40mm (H) space
SUBMITTED TO THE SATISFACTION OF THE ENGINEER. IN CASE CHANGE IN FOUNDING LEVEL IS for COMPANY LOGO
REQUIRED, CORRESPONDING AMENDMENT SHALL BE SUBMITTED TO BD FOR APPROVAL. PNEUMATIC CONTROL 3 3
4. THE ALLOWABLE BOND BETWEEN ROCK AND CONCRETE SHOULD BE 700 kPA UNDER COMPRESSION 50% OF VERTICAL BAR OF PILE
OR TRANSIENT TENSION, AND 350kPA UNDER PERMANENT TENSION.

LAP LENGTH
RING STABILIZER CASING
METHOD STATEMENT OF BORED PILE CONSTRUCTION
50% OF VERTICAL BAR OF PILE
6 NOS
1. BEFORE THE COMMENCEMENT OF THE BORED PILE CONSTRUCTION, PREDRILLHOLES TO BE CARRIED
OUT AT PILE POSITION TO VERIFY THE FOUNDING LEVEL. M.S. PIPE FOR
TENTATIVE SONIC TEST
3 ARMS FOUNDING LEVEL
2. SET OUT THE BORED PILE LOCATION CORRECTLY ON SITE. (BOTTOM OF SLEEVE BORED-PILE

LAP LENGTH = 46D


3. THE HYDRAULIC OSCILLATOR OR ROTATOR SHALL BE SET UP IN CONJUNCTION WITH A CRANE AND THE TO BE SEALED)
TEMPORARY STEEL CASING OF THE REQUIRED DIAMETER SHALL BE INSTALLED INTO THE GROUND.
F.L. 90mm (W) x 60mm (H) space

100

100
4. EXCAVATION OF SOIL WITHIN THE TEMPORARY CASING SHALL BE CARRIED OUT BY A HAMMER GRAB. for AP/RSE/RGE's
EXCAVATION IN ROCK/BOULDER SHALL BE CARRIED OUT BY RCD.
signature/ and stamp chop
5. A CONSTANT HEAD EQUAL TO GROUND LEVEL OF DRILLING FLUID SHALL BE MAINTAINED SO AS TO
CREATE A"BALANCED HEAD CONDITION" TO PREVENT ANY INGRESS OF MATERIALS AT THE BOTTOM OF
CASING. BORED PILE DIAMETER
DIAMETER OF SHAFT
6. THE TEMPORARY STEEL CASING SHALL BE EXTENDED BY BOLTING OR WELDING ON ADDITIONAL CASING
AND BE OSCILLATED AND JACKED DOWN BY A OSCILLATOR OR BE ROTATED DOWN BY A ROTATOR. THE
TEMPORARY CASING SHALL MAINTAIN A MINIMUM OF 1.5m EMBEDMENT LENGTH FROM EXCAVATION LEVEL. DIAMETER OF BELLOUT TYPICAL TUBE INSTALLATION
7. VERTICALITY OF THE CASING SHALL BE MONITORED BY MEANS OF SPIRIT LEVEL FROM TIME TO TIME.
8. TOLERANCE FOR BORE PILES : THE MAX. DEVIATION OF THE CENTRE OF THE HEAD OF EACH PILE FROM RCD BELLOUT TOOL (FOR INFORMATION ONLY) (FOR BORED PILE) LAPPING DETAILS (STAGGERED LAP)
THE DESIGNED CENTRE POINT SHALL NOT BE MORE THAN 75mm IN ANY DIRECTION. THE MAX. DEVIATION BD's OFFICAL USE
FROM THE VERTICAL AXIS OF THE PILE THROUGH THE CENTROID OF THE FINISHED PILE SHALL NOT BE
MORE THAN 1 IN 100.
(N.T.S.) 1 : 100 FOR TENSION BORED PILE
9. CONTINUE PROCEDURES 4 TO 7 UNTIL THE FOUNDING LEVELS OF PILES HAVE BEEN REACHED. N. T. S.
10. FOR PILE ENLARGEMENT BELLOUT,
/ IT SHALL BE FORMED BY EMPLOYING A BELLING OUT TOOL.
11. THE CONTRACTOR SHALL CARRY OUT KODEN PILE MONITORING TESTS ON ALL (100%) BORED PILES OR EFFECTIVE SHAFT DIAMETER
SIMILAR ELECTRONIC CALIBRATION TEST METHOD APPROVED BY THE ENGINEER TO CHECK THE THICKNESS OF CASING
1000

DIMENSION, ALIGNMENT AND INTEGRITY OF THE PILE ROCK SOCKET AND BELLOUT. THE CONTRACTOR R10 @ 1000 C/C VERTICAL
SHALL SUBMIT THE PROPOSED METHOD FOR APPROVAL PRIOR TO COMMENCEMENT OF THE WORKS. A
COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE ENGINEER IMMEDIATELY AFTER TESTING AND 150 M.S. PIPE FOR INTERFACE CORING
SUBMITTED TO BD TOGETHER WITH FORM BA14.
STIFFENING LINK, T16 @ 3000 C/C CASING
12. STEEL REINFORCEMENT SHALL BE PRE-FABRICATED INTO CAGES AND LOWERED INTO THE TEMPORARY
STEEL CASING. FOR REFERENCE ONLY CASING BORED PILE
2 FULL STRENGTH V-BUTT 2 TAP WELD WITH 4mm REINFORCEMENT

MIN. 300
13. FINAL CLEANING SHALL BE ACHIEVED BY MEANS OF HAMMER GRAB/
RCD AND AIR LIFTING METHOD
USING HIGH PRESSURE AIR COMPRESSORS. WELD WITH LOW
45°

HYDROGEN ELECTRODE
45°

14. THE MUDDY WATER WITHIN THE STEEL CASING SHALL BE CLEANED AND DELIVERED INTO A DESILTING
TANK BEFORE DISCHARGED INTO DRAINS.

50 M.S. PIPE FOR SONIC TEST


3

15. THE PILE SHAFT SHALL THEN BE CONCRETED USING HIGH SLUMP TREMIE CONCRETE THROUGH TREMIE
PIPE DISPLACING FLUID UPWARDS. ROCK 90mm (W) x 150mm (H) space
16. DURING CONCRETING OPERATION, THE TEMPORARY STEEL CASING SHALL BE EXTRACTED SOCKET for BD's approval stamp /
F.L. certification of copies of
SIMULTANEOUSLY BY THE OSCILLATOR OR ROTATOR. A HEAD OF APPROX. 2m IS MAINTAINED BETWEEN DIAMETER
THE TOP OF THE CONCRETE AND THE BASE OF THE TEMPORARY STEEL CASING.
approved plans
17. THE BASE OF THE TREMIE PIPE SHALL BE KEPT AT A MINIMUM DEPTH OF APPROX. 2m BELOW THE (PNAP ADM-10 APP A)
SURFACE OF THE CONCRETE. BORED PILE DIAMETER
18. CONCRETING SHALL BE CARRIED OUT IN ONE CONTINUOUS OPERATION UNTIL 1.0m.ABOVE THE CUT-OFF DETAIL OF BORED PILE DIAMETER
LEVEL 2 . THE TREMIE PIPE WILL BE EXTRACTED.
19. CORING TEST OF PILES SHALL BE CONDUCTED IN ACCORDANCE WITH PNAP APP-18 AFTER THE TYPICAL DETAIL FOR SPLICES N. T. S.
CONCRETE IS MATURED. SECTION 3-3
20. THE CONTRACTOR SHALL CARRY OUT SONIC LOGGING TEST FOR 100% AT THE TOTAL NUMBER OF OF TEMPORARY STEEL CASING 1 : 50
LARGE DIAMETER BORED PILE BY AN INDEPENDENT APPROVED LABORATORY
N. T. S.
21. NO PILE EXCAVATION SHALL CARRIED OUT WITHIN DISTANCE NO LESS THAN 10m FORM AN ADJACENT
PILING BEING UNDER EXCAVATION OR AN ADJACENT PILE HAS BEEN CONCRETING LESS THAN 24 HRS
PREVIOUSLY.
Tekla Structures
BD REF :

BIM REF :

LEGEND AND NOTES: N


P4
P3
P1 P2

BOUNDARY LINE

COLUMN / WALL ABOVE (UNDER SEPARATE SUBMISSION) PA

BORED PILE
BASEMENT SCREEN WALL (UNDER SEPARATE SUBMISSION) PB

PILE CAP
3040

H-PILE PC
PILE CAP (2000mm THICK) (UNDER SEPARATE SUBMISSION)
1350

CP1 -PILE CAP MARK


F5 PILE CAP MARK
PD
BH1(P) BORED HOLE (WITH PIEZOMETER) SITE
PILE CAP
705
1630
705
(BH1 (P), BH2 (P) AND BH5 (P)
H-PILE BH6 (P), BH9 (P) AND BH10 (P) 6NOS.) PE
1375 1660

F8
BH2 BORED HOLE
PILE CAP MARK
(BH3, BH4, BH7 AND BH8 4 NOS.)

PF
4.15
EXISTING GROUND LEVEL
TIEBEAM (UNDER SEPARATE SUBMISSION) REV DATE AMENDMENT

TB1 PG PROJECT
(1000x800)
CIC SAMPLE PROJECT
PH
INFERED ROCK HEAD LEVEL
(500)
PJ DRAWING TITLE
(500) PILING LAYOUT PLAN

BASEMENT SLAB (UNDER SEPARATE SUBMISSION)

SCALE

DRAWING NO. REV. NO.

BLOCK PLAN P002


1:500
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

PA PB PC PD PE PF PG PH PJ
10740 12240 11055 9620 15355 12365 6500 9200
A 90mm (W) x 60mm (H) space
B for AP/RSE/RGE's
signature/ and stamp chop
( 1000x790 )
TB13

BH2 BH4 BH6


2005

1455

1455

1455

TB3 TB5 TB8


TB15
665

( 1000x800 ) ( 1000x800 )
365

365

( 1000x800 ) ( 1000x800 ) BH8 BH10


P4
685

BD's OFFICAL USE


1460

1460

1460

F2 1405 1635 1520 1520 BP2 BP6


1898 3040 1457 1583 -6.350
5535

5535
498
BP3 BP4
( 1000x800 )

502
( 1000x800 )

( 1000x800 )

(600) (600)
(600)
TB1

(600) (600)
( 1000x800 )
TB4

TB7

P3
TB10

3418
2150

2150
1520 1520
2915 525

P2
1898 3040 1457 1583
3175

3175
1880 1160
TB9
00 ) BP1 BP5
1115

1115

TB14 TB2 BH3 ( 1000x8 BH7 -8.850 90mm (W) x 150mm (H) space
325

( 1000x800 ) ( 1000x800 )
P1 for BD's approval stamp /
1025
710

710

C BH5 C
( 1000x800 )

certification of copies of
1800

1800

BH1
2350

TB6 BH9
TB11

F1 ( 1000x800 ) TB12 (600) approved plans


( 1000x775 )
(PNAP ADM-10 APP A)
860 480
B 140 520

A
Tekla Structures

Plan PCTL (1:150)


BD REF :

BIM REF :

Lot Boundary

P1 P2 P3 P4 P1 P2 P3 P4 COLUMN/ WALL
(UNDER SEPARATE SUBMISSION)

PILE CAP
(UNDER SEPARATE SUBMISSION)
BH1 BH2 +3.537 BH7 BH8 F3
Ground Water Table +3.819 EGL
+3.500
G/F EGL G/F PILE CAP MARK

SOCKET H-PILE

F3HP01 F3HP02
N=9 FILL N=16
SOCKET H-PILE MARK
FILL N=11
FILL FILL FILL
N=9
FILL -1mPD
N=11 Ground Water Table -1.200 N=20 Ground Water Table -1.200 TIE BEAM
B1/F N=11
B1/F (UNDER SEPARATE SUBMISSION)
N=10 TB1
(1000x800)
MD
N=12 N=4 PILE CAP (2000mm THICK)
MD CP1 CP1 -PILE CAP MARK
N=11 (UNDER SEPARATE SUBMISSION)

ALLU N=10 N=14


V N=15 -6mPD N=6

B2/F B2/F Basement Wall


PCTL N=11
PCTL N=13
N=16
II MD
MD
N=17 PCLL N=24 N=24
PCLL N=15 V
MD
N=22 N=13 N=30
N=19

N=32 N=15 N=8


N=24
ALLU
ALLU
N=200/10 N=33
N=26 II
N=53
CDG
II N=62
N=72
N=200/10 IV
V REV DATE AMENDMENT
N=41
N=64 PROJECT
N=76 N=29
V
N=60
N=70
CIC SAMPLE PROJECT
N=97 N=200/30

V N=62
N=75
N=100 II DRAWING TITLE
N=73 PILING SECTION A & SECTION B
N=85
N=97
N=200/20 V
N=77
N=95 V N=108
N=105 CDG
SCALE
N=85
N=200/60 N=200/20 N=115
IV DRAWING NO. REV. NO.
II
N=102 P003
N=200/70

III
SOURCE ---
III
N=120
N=200/70
N=131 V
IV
-34.525 -34.525
IV N=109 90mm (W) x 40mm (H) space
N=200/70
N=200/20 for COMPANY LOGO
III
N=200/170
IV N=200/50
-37.525 -37.525 II
IV
II N=168
V
IV N=200/50
III
III
II
III IV III
III
II III
IV 90mm (W) x 60mm (H) space
III IV for AP/RSE/RGE's
II III signature/ and stamp chop
III III IV
IV
II N=200/50
III III
III TENTATIVE ROCKHEAD

II IV
TENTATIVE ROCKHEAD
IV N=200/110 BD's OFFICAL USE
-48.800 III

-49.300
-49.300 III -48.950
III

-51.800
N=200/20 II
IV
-53.300 -53.300 SECTION A - A ( 1:150 )

III
90mm (W) x 150mm (H) space
for BD's approval stamp /
certification of copies of
-59.800 -59.800 approved plans
(PNAP ADM-10 APP A)

II

-65.300 -65.300

SECTION B - B ( 1:150 )
Tekla Structures
BD REF :

BIM REF :

PA PB PC PD PE PF PG PH PJ

EGL G/F

Proposed B1 Level
-1.000
B1/F

Proposed B2 Level

-6.000

PCTL B2/F
-6.350

-8.853
PCLL

-11.350

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
PILIING SECTION C

SCALE

DRAWING NO. REV. NO.


P004

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

-45.300

-46.300

-48.750 -48.800
90mm (W) x 60mm (H) space
-48.800
for AP/RSE/RGE's
signature/ and stamp chop
-50.550

BD's OFFICAL USE

-59.800

-65.300

SECTION C - C ( 1:200 )

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

PA PB PC PD PE PF PG PH PJ

TC10 ( CIRCULAR1600 )

475
475
BW11 BW10 BW9 BW8 BW7

615

980

980

980
1600
1000

980
615
1000

1000

1000
480
P4

615
PC4 PC8 TC7 ( CIRCULAR1600 )
TC2 ( CIRCULAR1600 ) TC4 TC8 ( CIRCULAR1600 )
PC2 PC6
2895 450 6935 162 11842 450 10490 225 9395 13855 1000 12365 6500 730 8470 2550

5435

5435

5535
288 225 500
298

10440
783 455 1100
288

9460

10210
8750
475 2895 450 6935 162 11367 450 10338 717 8292 545 6700 1000 6700 500 10915 350 6500 350 7645 1205 2550 475

10210
9935

10565
P3 135

2725 450 2250

2725 450 2250

2150
9935

BW12

P2

1300

3175
PW7

2500 300
TC1 TC3

150

1300
PC1 PC3 PC5 TC5

650
100
1000

1000

P1

1425

1325

1325
615

850

1000
615

BW6

1325
475
BW2
475

BW1 BW3 BW4 BW5


10740 12240 11055 9620 15355 12365 6500 9200 TC9 ( CIRCULAR1600 )

REV DATE AMENDMENT

PROJECT
Plan PCTL (1:150)
CIC SAMPLE PROJECT

DRAWING TITLE
COLUMN / WALL LOADING PLAN

SCALE

LOCAL AXIS DIRECTION OF WIND LOAD CASE UNLESS OTHERWISE STATED ALL
DRAWING NO. REV. NO.

P005
Y MOMENTS AND FORCES ACT ON
Y WIND ALONG X THE CENTROID OF EACH SOURCE ---
W0 ELEMENT WITH RESPECT TO ITS
X 0° LOCAL AXIS AND DISTRIBUTED
UNIFORMLY ON THE CROSS 90mm (W) x 40mm (H) space
SECTION OF EACH ELEMENT. for COMPANY LOGO
LOCAL AXIS SHOWN ABOVE

MOMENT (Y-Y)
W90

SHEAR (Y-Y)
APPLIES TO COLUMNS & WALLS

(+ve)
(+ve)
WITH ANGLE 0°. MOMENT (X-X)
90
WIND ALONG Y ° (+ve)
X
SHEAR (X-X)
WU (+ve) 90mm (W) x 60mm (H) space
Y for AP/RSE/RGE's
X signature/ and stamp chop

LOCAL AXIS SHOWN ABOVE APPLIES SIGN CONVENTION


TO WALL WITH ANGLE 90°. T
T

WIND ALONG AXIAL LOAD : + COMPRESSION (DOWNWARD)


(P) - TENSION (UPWARD)
BD's OFFICAL USE
Y

V X = SHEAR FORCE ALONG LOCAL X-AXIS


V Y = SHEAR FORCE ALONG LOCAL Y-AXIS
1° WV
X

M X = MOMENT ALONG LOCAL X-AXIS


M Y = MOMENT ALONG LOCAL Y-AXIS
LOCAL AXIS SHOWN ABOVE APPLIES
TO WALL WITH ANGLE 1°.
T
WIND ALONG a
Y

WMAX = ABSOLUTE MAXIMUM OF W0, W90, WU, WV


X

90mm (W) x 150mm (H) space


1° for BD's approval stamp /
certification of copies of
LOCAL AXIS SHOWN ABOVE APPLIES approved plans
(PNAP ADM-10 APP A)
TO WALL WITH ANGLE -1°.
Tekla Structures
BD REF :

BIM REF :

COLUMN LOADING SCHEDULE ABOVE PILE CAP (1 OF 2)

MIN DEAD LOAD (Dmin) SDL DEAD LOAD (DL) = Dmin + SDL LIVE LOAD (LL) DL + LL
COLUMN MARK ANGLE
P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm)
PC1 0 1600 0 0 800 0 0 2400 0 0 700 0 0 3100 0 0

PC2 0 2100 0 0 1400 0 0 3500 0 0 900 0 0 4400 0 0

PC3 0 2400 0 0 1700 0 0 4100 0 0 1000 0 0 5100 0 0

PC4 0 2300 0 0 2000 0 0 4300 0 0 1000 0 0 5300 0 0

PC5 0 2300 0 0 1400 0 0 3700 0 0 900 0 0 4600 0 0

PC6 0 2500 0 0 1400 0 0 3900 0 0 1000 0 0 4900 0 0

PC8 0 3200 0 0 1100 0 0 4300 0 0 1300 0 0 5600 0 0

PW7 0 4200 0 200 1600 0 300 5800 0 500 1800 0 100 7600 0 600

TC1 0 12700 0 0 5600 0 0 18300 0 0 4500 0 0 22800 0 0

TC2 0 19400 0 0 9300 0 0 28700 0 0 6400 0 0 35100 0 0

TC3 0 17200 0 0 7200 0 0 24400 0 0 7100 0 0 31500 0 0

TC4 0 18000 0 0 7400 0 0 25400 0 0 8100 0 0 33500 0 0

TC5 0 24200 0 0 10900 0 0 35100 0 0 9300 0 0 44400 0 0

TC7 0 16200 0 0 7300 0 0 23500 0 0 6100 0 0 29600 0 0

TC8 0 13400 0 0 6700 0 0 20100 0 0 4200 0 0 24300 0 0

TC9 0 13200 0 0 7200 0 0 20400 0 0 4700 0 0 25100 0 0

TC10 0 13000 0 0 7500 0 0 20500 0 0 4300 0 0 24800 0 0

COLUMN LOADING SCHEDULE ABOVE PILE CAP (2 OF 2)

W0 W90 WD1 WD2 WMAX


COLUMN MARK ANGLE
P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm)
PC1 0 -200 10 30 0 0 -1000 10 300 0 0 -400 10 80 0 0 -700 -10 230 0 0 1000 10 300 0 0

PC2 0 100 10 30 0 0 1000 -10 290 0 0 200 10 80 0 0 800 -10 230 0 0 1000 10 290 0 0

PC3 0 -200 10 30 0 0 -1600 -10 390 0 0 -500 10 90 0 0 -1200 -10 300 0 0 1600 10 390 0 0

PC4 0 200 10 30 0 0 1600 -10 370 0 0 400 10 90 0 0 1300 -10 290 0 0 1600 10 370 0 0

PC5 0 -200 10 30 0 0 -1800 10 380 0 0 -500 10 90 0 0 -1400 -10 300 0 0 1800 10 380 0 0

PC6 0 100 10 20 0 0 1500 10 350 0 0 300 10 80 0 0 1200 -10 280 0 0 1500 10 350 0 0

PC8 0 -200 10 10 0 0 1300 -10 200 0 0 -200 10 40 0 0 1300 -10 170 0 0 1300 10 200 0 0

PW7 0 -400 270 10 0 1200 -1100 -80 10 0 -400 -700 450 10 0 2000 -600 -330 10 0 -1400 1100 450 10 0 2000

TC1 0 -1300 10 20 0 0 -11400 -30 510 0 0 -3800 -10 90 0 0 -8300 -20 420 0 0 11400 30 510 0 0

TC2 0 -500 50 20 0 0 15200 -20 540 0 0 1400 80 90 0 0 13100 -60 450 0 0 15200 80 540 0 0

TC3 0 -500 -10 -10 0 0 -13100 -10 340 0 0 -2700 -10 40 0 0 -10400 10 290 0 0 13100 10 340 0 0

TC4 0 -1400 -10 -20 0 0 -13000 -50 350 0 0 -4100 -20 20 0 0 -9500 -40 310 0 0 13000 50 350 0 0 REV DATE AMENDMENT
TC5 0 -600 50 10 0 0 20600 -20 400 0 0 2100 80 60 0 0 17600 -60 330 0 0 20600 80 400 0 0
50 -10 90 0 17100 -30 -400 0 19000 90
PROJECT
TC7 0 -1500 0 0 19000 20 -490 0 0 300 -70 0 0 490 0 0

TC8 0 600 60 20 0 0 17000 30 -470 0 0 3400 90 -50 0 0 13500 -40 -410 0 0 17000 90 470 0 0

TC9 0 3100 -40 10 0 0 -17300 230 330 0 0 2700 -30 50 0 0 -17100 220 280 0 0 17300 230 330 0 0 CIC SAMPLE PROJECT
TC10 0 2100 40 -10 0 0 13300 60 360 0 0 5400 70 40 0 0 9100 10 310 0 0 13300 70 360 0 0

DRAWING TITLE
COLUMN / WALL LOADING SCHEDULE
WALL LOADING SCHEDULE ABOVE PILE CAP (1 OF 2)

MIN DEAD LOAD (Dmin) SDL DEAD LOAD (DL) = Dmin + SDL LIVE LOAD (LL) DL + LL
WALL MARK ANGLE
P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm) P (kN) M2 (kNm) M3 (kNm)
BW1 0 2300 0 -900 700 0 -500 3000 0 -1400 400 0 -200 3400 0 -1600

BW2 0 3200 0 -600 1100 0 -300 4300 0 -900 700 0 -100 5000 0 -1000

BW3 0 3200 0 -600 900 0 -300 4100 0 -900 600 0 -100 4700 0 -1000
SCALE
BW4 0 2600 0 -300 400 0 -100 3000 0 -400 400 0 -100 3400 0 -500

BW5 0 11300 0 -2500 2200 0 2600 13500 0 100 4000 0 -3300 17500 0 -3200 DRAWING NO. REV. NO.
BW6 90 4000 0 -2200 1000 0 -800 5000 0 -3000 1100 0 -600 6100 0 -3600

BW7 0 19600 0 -11400 5800 0 1800 25400 0 -9600 6000 0 -14700 31400 0 -24300
P006
BW8 0 3400 0 500 800 0 300 4200 0 800 600 0 100 4800 0 900

BW9 0 2000 0 -200 200 0 -100 2200 0 -300 200 0 -200 2400 0 -500
SOURCE ---
BW10 0 2000 0 -100 400 0 -100 2400 0 -200 100 0 -200 2500 0 -400

BW11 0 1700 0 -100 400 0 100 2100 0 0 200 0 -100 2300 0 -100

BW12 90 1600 0 -400 300 0 -200 1900 0 -600 200 0 -100 2100 0 -700

TW6A 90 4700 0 200 2000 0 200 6700 0 400 2100 0 -100 8800 0 300

TW6B 0 24200 0 1200 10400 0 200 34600 0 1400 9600 0 1000 44200 0 2400 90mm (W) x 40mm (H) space
TW6C 90 4600 0 300 2100 0 100 6700 0 400 1900 0 -100 8600 0 300 for COMPANY LOGO

WALL LOADING SCHEDULE ABOVE PILE CAP (2 OF 2)

W0 W90 WD1 WD2 WMAX


WALL MARK ANGLE
P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) P (kN) V2 (kN) V3 (kN) M2 (kNm) M3 (kNm) 90mm (W) x 60mm (H) space
-2600 -1100 9400 0 4880
for AP/RSE/RGE's
TW6A 90 -280 -10 0 25500 8300 4880 -10 0 -3300 200 -10 0 1800 4330 -10 2220 9400 10 0 25500

0 900 3170 10 0 -47600 -180 0 27700 0 46800 -40200 -3190 0 47600 5340 10
signature/ and stamp chop
TW6B 600 -10 -5300 5340 -10 -10 -26100 0 46800

TW6C 90 2400 120 -10 0 26700 9100 5150 10 0 300 5300 910 10 0 4100 5300 4160 10 0 21900 9100 5150 10 0 26700

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

LOADING INTENSITY PLAN AT B2


PA PB PC PD PE PF PG PH PJ
FINISHES IMPOSED LOAD
DESCRIPTION LEGEND (kPa) (kPa)

PC4 PC6 PC8 TC2 TC4 TC7 TC8 TC10


PC2
LOBBY 1.2 3.0
BW9 BW8 BW7
BW11 BW10
CAR PARK 1.2 3.0
P4
CAR LIFT PIT 1.2 7.5

5535
LIFT PIT 1.2 7.5
P3
PLANT ROOM 1.2 7.5

2150
P2
WATER TANK 1 14.7+1.2 30.0

3175
P1 WATER TANK 2 17.0+1.2 30.0
BW3 BW4 BW5
BW1 BW2
PW7 TC1 TC3 TC9
PC1 PC3 PC5 TC5
10740 12240 11055 9620 15355 12365 6500 9200

LOADING INTENSITY PLAN AT B2

PA PB PC PD PE PF PG PH PJ LOADING INTENSITY PLAN FOR UPTRUST AT B2

UPTRUST REV DATE AMENDMENT


PC2 PC4 PC8
LEGEND (kPa)
PC6 TC2 TC7 TC8 TC10 PROJECT
TC4

129.5 CIC SAMPLE PROJECT


P4 140.5
DRAWING TITLE

5535
154.5
LOADING INTENSITY PLAN

P3

2150
P2 SCALE

3175
10740 12240 11055 9620 15355 12365 6500 9200
DRAWING NO. REV. NO.
P1 P007

SOURCE ---
PC1 PC5 PW7 TC1 TC3 TC5 TC9
PC3

90mm (W) x 40mm (H) space


for COMPANY LOGO
LOADING INTENSITY PLAN FOR UPTRUST AT B2

PA PB PC PD PE PF PG PH PJ LOADING INTENSITY PLAN FOR FILL AT B2


90mm (W) x 60mm (H) space
FILL for AP/RSE/RGE's
PC2 PC4 PC6 PC8 TC2 TC4 TC7 TC8 TC10 LEGEND (kPa) signature/ and stamp chop

12.3
P4
NO FILL
BD's OFFICAL USE

5535
NO FILL

P3 25.8

2150
P2 10740 12240 11055 9620 15355 12365 6500 9200 61.3

3175
NO FILL
P1

PC1 PC3 PW7 TC1 TC5


PC5 TC3 TC9 90mm (W) x 150mm (H) space
for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
LOADING INTENSITY PLAN FOR FILL AT B2
Tekla Structures
BD REF :

BORED PILE LOADING SCHEDULE (1 OF 2) BIM REF :

(X) (AA) (W) Z=W-0.3-(X)-(Y) (AB)=(AA)-(Z) (Y) (a) (b) (c)=(a)+(b) (d) (b)+(d) (e) (f)=(b)+(d)+(e) (h) (i) (j) (k)
BORED PILE SELF-WEIGHT TOTAL UPLIFT ADDITIONAL LOAD DUE TO
BORED PILE CAP TENTATIVE TENTATIVE EFFECTIVE TOTAL DEAD
BORED PILE EFFECTIVE ROCK SOCKET PILE BASE TENTATIVE PILE OF BORED PILE LIVE LOAD (LL) FORCE DUE TO STEPPING EFFECT
BORED PILE THICKNESS (FOR BELLOUT DEPTH CUT-OFF LEVEL ROCKHEAD FOUNDING ROCK SOCKET Dmin (total) Dmin + SWP SDL(total) LOAD (DL) = Dmin DL + SDL + LL Wmax (total)
DIAMETER SHAFT DIAMETER DIAMETER LENGTH (SUBMERGED) (total) GROUND WATER
MARK REFERENCE ONLY) LEVEL LEVEL LENGTH + SDL WITHOUT WIND WITH WIND
DIAMETER (SWP) (U)
(m) (m) (m) (m) (m) (m) (mPD) (mPD) (mPD) (m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
BP1 2.50 3.00 2.80 2.80 4.50 1.50 -8.761 -47.00 -52.40 43.639 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

BP3 2.50 3.00 2.80 2.80 4.50 1.50 -8.761 -47.00 -52.40 43.639 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

BP4 2.50 3.00 2.80 2.80 4.50 1.50 -11.280 -47.00 -52.40 41.120 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

BP4 2.50 3.00 2.80 2.80 4.50 1.50 -8.761 -47.00 -52.40 43.639 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

BP5 2.50 3.00 2.80 2.80 4.50 1.50 -11.280 -47.00 -52.40 41.120 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

BP6 2.50 3.00 2.80 2.80 4.50 1.50 -8.780 -47.00 -52.40 43.620 3.60 3950 45600 49550 17500 63100 15200 78300 15800 -21400 0 0

(n)=(b)-1.5*(h)+1.5 (a1)=Min (u1)=Min (b)+0.9*(u1)-1.5


(f) (f)+(h) (f)+(a)+(j) (f)+(h)+(a)+(k) (l)=(b)+(i) (m)=(b)-(h)+(i) (o) (p)=(o)*1.25 (q) (r)=(q)*1.25 (r1) (p1) (u)=(o)+(q) (v)=(u)*1.25 (b)+(a1)-(h)+(i)>0
*(i) of(((r1),(p1)/3))+(a) of(((r1)*2,(p1))+(a) *(h) +1.5*(i)>0

PILE BARING CAPACITY BORED PILE BEARING CAPACITY


MAX. PILE LOAD MIN. PILE LOAD ROCK FRICTION (COMPRESSION) UPLIFT RESISTANCE STABILITY CHECK
(COMPRESSION) ROCK/SOIL (COMPRESSION)
ROCK FRICTION
BORED PILE DL + SDL + LL + VERTICAL BARS MASS REFERENCE
DL + SDL + LL + DL + SDL + LL + Dmin + SWP - Dmin + SWP - LINKS (TENSION)
(SUBMERGED) Dmin + 0.9*Ru Dmin + Ra -
MARK DL + SDL + LL Wmax + Stepping Dmin + SWP -U WITHOUT WIND WITH WIND WITHOUT WIND WITH WIND ALLOWABLE ULTIMATE WITHOUT WIND WITH WIND BORED HOLE
Wmax Stepping Load Wmax - U 1.5Wmax - 1.5U -1.5Wmax - 1.5U Wmax - U
Load

(kN) (kN) (kN) (kN) (kN) (kN) (kN) LAYER 1 LAYER 2 (kN) (kN) (kN) (kN) (kN) (kN) Ra (kN) Ru (kN) (kN) (kN) (kN) (kN)
BP1 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 798530 998162 17250 21562 11090 21899 11249 25849 815780 1019725 13064 19649 BP1

BP3 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 798530 998162 17250 21562 11090 21899 11249 25849 815780 1019725 13064 19649 BP3

BP4 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 798530 998162 17250 21562 11090 21899 11249 25849 815780 1019725 13064 19649 BP4

BP5 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 798530 998162 17250 21562 11090 21899 11249 25849 815780 1019725 13064 19649 BP5

BP6 78300 94100 82250 98050 28150 12350 -6250 54 T40 50 T40 T16 / 300 (2 rings) 798530 998162 17250 21562 11090 21899 11249 25849 815780 1019725 13064 19649 BP6

SOCKET H-PILE LOADING SCHEDULE (1 OF 2)

(A) (A) (AA) (w) (Z) (AB) (Y) (P1) (P2) (P3) = (P1) + (P2) (a) (P4) = (P3) + (a) (b) (d) (b) + (d) (e) (f) = (b) + (d) + (e) (h) (i) (j) (k) = (j) * 1.25

PILE CAP SOIL MASS ROCK/SOIL MASS ROCK / SOIL MASS UPLIFT FORCE ADDITIONAL LOAD DUE TO
PIPE EFFECTIVE TENTATIVE TENTATIVE TENTATIVE PILE EFFECTIVE SELF-WEIGHT TOTAL DEAD REV DATE AMENDMENT
THICKNESS (FOR ROCK SOCKET PILE CAP BASE TENTATIVE PILE ROCK MASS SURROUNDING (SUBMERGED W/O (SUBMERGED) W/ Min DEAD LOAD SDL PER PILE (AT STEPPING EFFECT
SHAFT CUT-OFF LEVEL ROCKHEAD FOUNDING LENGTH ABOVE ROCK SOCKET (SUBMERGED) LOAD (DL) = Dmin LIVE LOAD (LL) DL + SDL + LL Wmax PER PILE
PILE MARK REFERENCE PILE PILE SELF PER PILE
ONLY)
DIAMETER
DIAMETER LEVEL
LEVEL LEVEL
LENGTH
RH LENGTH
(SUBMEGED) PILE
(SUBMERGED) SELF-WEIGHT
(SWP) WEIGHT
PER PILE (Dmin)
+ SDL
THE BOTTOM OF
CAP) (U) WITHOUT WIND WITH WIND PROJECT
(m) (m) (mPD) (mPD) (mPD) (m) (m) (m) (m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
SP1A 2 0.55 0.55 -53.30 -28.275 -46.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0 CIC SAMPLE PROJECT
SP1B 2 0.55 0.55 -53.30 -28.275 -46.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP1C 2 0.55 0.55 -53.30 -28.275 -46.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP2A 2 0.55 0.55 -65.30 -28.275 -58.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP2B 2 0.55 0.55 -65.30 -28.275 -58.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP2C 2 0.55 0.55 -65.30 -28.275 -58.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0
DRAWING TITLE
SP3A 2 0.55 0.55 -49.30 -28.275 -42.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP3B 2 0.55 0.55 -49.30 -28.275 -42.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0
PILE LOAD SCHEDULE
SP3C 2 0.55 0.55 -49.30 -28.275 -42.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP4A 2 0.55 0.55 -59.80 -28.275 -52.80 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP4B 2 0.55 0.55 -59.80 -28.275 -52.80 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP4C 2 0.55 0.55 -59.80 -28.275 -52.80 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP5A 2 0.55 0.55 -46.30 -28.275 -39.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP5B 2 0.55 0.55 -46.30 -28.275 -39.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0 SCALE
SP6A 2 0.55 0.55 -45.30 -28.275 -38.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP6B 2 0.55 0.55 -45.30 -28.275 -38.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0 DRAWING NO. REV. NO.
SP7A 2 0.55 0.55 -47.30 -28.275 -40.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP7B 2 0.55 0.55 -47.30 -28.275 -40.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0 P008
SP7C 2 0.55 0.55 -47.30 -28.275 -40.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP8A 2 0.55 0.55 -46.30 -28.275 -39.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0 SOURCE ---
SP8B 2 0.55 0.55 -46.30 -28.275 -39.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

SP8C 2 0.55 0.55 -46.30 -28.275 -39.30 -8.275 7 190 8290 2900 11190 2100 13290 1300 -10000 0

90mm (W) x 40mm (H) space


for COMPANY LOGO

SOCKET H-PILE LOADING SCHEDULE (2 OF 2)

(n)=(b)-1.5*(h)+1.5 (a1)=Min (u1)=Min (b)+0.9*(u1)-1.5


(f) (f)+(h) (f)+(a)+(j) (f)+(h)+(a)+(k) (l)=(b)+(a)+(i) (m)=(b)-(h)+(i) (o) (p)=(o)*1.25 (r1) (p1) = (P3) (b)+(a1)-(h)+(i)>0
*(i) of(((r1),(p1)/3))+(a) of(((r1)*2,(p1))+(a) *(h) +1.5*(i)>0

PILE BARING CAPACITY


MAX. PILE LOAD MIN. PILE LOAD UPLIFT RESISTANCE STABILITY CHECK
(COMPRESSION) ROCK/SOIL
ROCK FRICTION
BORED PILE DL + SDL + LL + DL + SDL + LL + MASS REFERENCE
DL + SDL + LL + Dmin + SWP - Dmin + SWP - (TENSION) Dmin + 0.9*Ru Dmin + Ra -
MARK DL + SDL + LL SWP + Stepping Wmax + SWP + Dmin + SWP -U WITHOUT WIND WITH WIND (SUBMERGED) ALLOWABLE ULTIMATE BORED HOLE
Wmax Wmax - U 1.5Wmax - 1.5U -1.5Wmax - 1.5U Wmax - U
Load Stepping Load

(kN) (kN) (kN) (kN) (kN) (kN) (kN) (m) (kN) (kN) (kN) Ra (kN) Ru (kN) (kN) (kN) 90mm (W) x 60mm (H) space
SP1A 13290 for AP/RSE/RGE's
SP1B 13290 signature/ and stamp chop
SP1C 13290

SP2A 13290

SP2B 13290

SP2C 13290

SP3A 13290

SP3B 13290

SP3C 13290

SP4A 13290 BD's OFFICAL USE


SP4B 13290

SP4C 13290

SP5A 13290

SP5B 13290

SP6A 13290

SP6B 13290

SP7A 13290

SP7B 13290

SP7C 13290

SP8A 13290

SP8B 13290

SP8C 13290

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

T10 T11
T9

S1
S10

PA PB PC PD PE PF PG PH PJ

U8
V9
S4 U10
S8
S5 U9 U11 S7 V11
V10
S6
U9 U12

P4

5535
V8
V7 U6
P3 U7

2150
10740 12240 11055 9620 15355 12365 6500 9200
P2

3175
P1
U3

T1 S3
U1 BS2 V2
S1 U2 T4 U5
T2 V4 V5 V6
BS10 U4
BS8 T6
BS4 V3 T5 S2
V1 T3 BS6 BS12 REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
FOUNDATION MONITORING PLAN

SCALE

DRAWING NO. REV. NO.


BS1 BS3 BS5 BS7 BS9
P009

Foundation Monitoring Plan SOURCE ---

OPENABLE STEEL COVER


AAA TRIGGER LEVELS
CONC.PAVEMENT
12mm DIA. 90mm (W) x 40mm (H) space
OR GRD. COVERING BACKFILLED WITH CONC. STAINLESS STEEL
INSTRUMENT CRITERION ALERT ALARM ACTION 100 100 100 100 SCREW for COMPANY LOGO
GRD. LEV.
GROUND SETTLEMENT TOTAL SETTLEMENT 12mm 18mm 20mm
CHECK POINT (S1-S10)
75MM DIA. PVC PIPE WELL COMPACTED
UTILITY SETTLEMENT CHECK TOTAL SETTLEMENT 12mm 18mm 25mm SOFT BACKFILL
POINT (U1-U12) 10MM DIA. MILD STEEL ROD STEEL PLATE OF
TILTING CHECK POINT WELDED TO STEEL PLATE 150 x 150 x 10MM
ANGULAR DISTORTION 1:1000 1:750 1:500
(T1-T11) BACKFILLED WITH 75mm
LEAN CONCRETE
VIBRATION CHECK
POINT (V1 TO V11)
PEAK PARTICLE
VELOCITY
7.5mm/s 10mm/s 15mm/s S1
BUILDING SETTLEMENT DETAIL OF SETTLEMENT/ TILTING MARKER GROUND SETTLEMENT CHECK POINT (S1 TO S10)
TOTAL SETTLEMENT 12mm 18mm 25mm
CHECK POINT (BS1-BS12)
ON EXISTING BUILDING/ RETAINING WALL
STANDPIPE/ RISE OF GROUND
+2.0mPD +2.25mPD +2.5mPD N.T.S.
PIEZONEMETER WATER LEVEL
STANDPIPE/PIEZONEMETER DRAIN OF GROUND UTILITY SETTLEMENT MARKER (USM) 90mm (W) x 60mm (H) space
-0.4mPD -0.5mPD -0.6mPD
OUTSIDE COFFERDAM WATER LEVEL N.T.S. for AP/RSE/RGE's
OPENABLE STEEL
signature/ and stamp chop
COVER (150mm x 150mm)

GROUND LEVEL
BACKFILLED WITH
CONCRETE V1
EXISTING STRUCTURE WALL INSCRIBE CONCRETE CONCRETE VIBRATION CHECK POINT (V1 TO V11)
PIEZOMETER NUMBER PAVEMENT / PAVEMENT /
STANDARD LOCKABLE IN CONCRETE GROUND GROUND
LOCATION '1' C.I. HINGED COVER 19mm I.D. PVC PIPE
SURROUND

LOCATION '2' FREE DRAINING BD's OFFICAL USE


PVC CAP WITH VENT HOLE 75Ø PVC SLEEVE PIPE
GRANULAR MATERIAL
PVC TUBING

LOCATION OF TILTING CHECK COMPACTED


T1
POINT ON STRUCTURAL WALL 20mmØ PVC PIPE
CONCRETE BOX
GRADE 20/20
25Ø MILD SLEEVE ROD GRANULAR BACKFILL BUILDING TILTING CHECKPOINT WITH
LAID TO NOMINAL 1 WELDED TO STEEL
N.T.S. IN 50 FALL APPROVED FILLING PLATE VERTICAL DISPLACEMENT (T1 TO T11)
STEEL PLATE OF
150x150x10mm THICK
MASS CONCRETE
BENTONITE BALLS / PELLETS
DETAILS OF GROUND SETTLEMENT
OPENABLE STEEL COVER CHECK POINTS BS1
(BUILDING SETTLEMENT CHECK
BACKFILL WITH CONCRETE
POINTS SIMILAR)
BUILDING SETTLEMENT MARKER (BS1 TO BS12)
EXISTING CONCRETE PAVEMENT
SAND FILTER SURROUND N.T.S.

FREE DRAINAGE GRANULAR MATERIAL


COMPACTED GRANULAR FILL
Ø25mm MILD STEEL ROD
90mm (W) x 150mm (H) space
POROUS ELEMENT CAST IRON PAVEMENT
WELDED TO STEEL PLATE
HINGE
for BD's approval stamp /
Ø75mm PVC PIPE COVER certification of copies of
STEEL PLATE OF 250x250x12mm THICK
MASS CONCRETE
U1 approved plans
UTILITY SETTLEMENT MARKER (U1 TO U12) (PNAP ADM-10 APP A)
GAS PIPE TO BE MONITORED FOR BENTONITE BALLS / PELLETS STEEL CASING (3mm)
SETTLEMENT
CONNECTION WIRE
DETAILS OF MONITORING CONCRETE PLINTH
END OF HOLE
STATION ON UTILITY VIBRATION MONITORING DEVICE
N.T.S. DETAILS OF VIBRATION CHECK POINT
NOTES:
1. THE PRIOR AGREEMENT FOR THE UTILITY OWNERS SHOULD BE
DETAILS OF PIEZOMETER
N.T.S.
OBTAINED BEFORE THE INSTALLATION WORK COMMENCE. N.T.S.
Tekla Structures
BD REF :

BIM REF :

705 1630 705


705 1630 705 LEGEND:
B

1090
PROPOSED COLUMN /WALL

1540
1540
T32-200(T1) (UNDER SEPARATE SUBMISSION)
T32-200(B2)

2915

1000
2915

1375
1375

825
A A

LEGENDS FOR SHEAR LINKS DIAGRAM :

1295 450 1295


T40-200(B1)
T32-200(T2) 3040 PATTERN LINK ARRANGMENT
3040

B PILE CAP F1 (2000MM THK.)


(F2,F3,F4,F7&F8 SIMILAR)
1:50
PILE CAP F1 (2000MM THK.)
(F2,F3,F4,F7&F8 SIMILAR)
1:50
T16 SHEAR LINKS
AT 150mm C/C
REV DATE AMENDMENT
BOTH WAYS
PROJECT

CIC SAMPLE PROJECT

3040
DRAWING TITLE
PILE CAP REINFORCEMENT
T32-200(T2) C T16 SHEAR LINKS
AT 175mm C/C
LAYOUT PLAN (1 OF 2)
BOTH WAYS

1350
D D
SCALE

DRAWING NO. REV. NO.


PILE CAP F5 (2000mm THK.) P010
(F6 SIMILAR)
(SHEAR REINFORCEMENT)
C
1:50
SOURCE ---
PILE CAP F5 (2000mm THK.)
(F6 SIMILAR)
1:50
90mm (W) x 40mm (H) space
for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop
T32 (T1)

T16 (SIDE BAR) BD's OFFICAL USE


T16 (SIDE BAR)
T16 (SIDE BAR) T16 (SIDE BAR)

SECTION A - A ( 1:50 ) SECTION B - B ( 1:50 )

SECTION D - D ( 1:50 ) SECTION C - C ( 1:50 )

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :
PE PF PG PH PJ

T40-200 (B2,B4,B6)
T40-200 (B2,B4,B6)
T40-200 (T1,T3)
15355 12365 6500 9200

LEGENDS FOR SHEAR LINK DIAGRAME

PATTERN LINK ARRANGEMENT


P4

-6.350 S S S S
T10 SHEAR LINKS AT
5535

200 mm C/C BOTH WAYS

T40-200 (B1,B3,B5)
T40-200 (T1,T3) S
A A
P010A P010A S
P3 T16 SHEAR LINKS AT

2900
2500
100 mm C/C BOTH WAYS
S
2150

-6.350 400
-8.850 -9.250
S
T40-200 (B1,B3,B5)
P2

T16 SHEAR LINKS AT


T40-200 (B1,B3,B5) 125 mm C/C BOTH WAYS
3175

MAIN REINFORCEMENT
P1 T40-200 (T1,T3,T5)
T16 SHEAR LINKS AT
T40-200 (T1,T3,T5) 150 mm C/C BOTH WAYS
T40-200 (B1,B3,B5)
LEGEND

T40-200 (B2,B4,B6)
T40-200 (T2,T4,T6)

T40-200 (T2,T4,T6)
S = SPACING OF SHEAR LINKS
T16 SHEAR LINKS AT
200PROPOSED
mm C/C BOTH WAYS
COLUMN / WALL
(UNDER SEPARATE SUBMISSION)

1
PILE CAP PC5 (2500mm THK.)
1:100

PE PF PG PH PJ

15355 12365 6500 9200


LEGENDS FOR SHEAR LINK DIAGRAM:
REV DATE AMENDMENT

PROJECT

PATTERN LINK ARRANGEMENT CIC SAMPLE PROJECT


P4

DRAWING TITLE
PILE CAP REINFORCEMENT
5535

LAYOUT PLAN (2 OF 2)
T16 SHEAR LINKS
AT 150mm C/C
BOTH WAYS

P3
SCALE

2900
2500
2150

400
DRAWING NO. REV. NO.
P2
P010A
T16 SHEAR LINKS
3175

AT 175mm C/C MAIN REINFORCEMENT


SOURCE ---
BOTH WAYS
P1

90mm (W) x 40mm (H) space


for COMPANY LOGO

PILE CAP F5 (2000mm THK.)


3
(SHEAR REINFORCEMENT)
1:100

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop
PE PF PG PH PJ
15355 12365 6500 9200

T40-200 (T4) T40-200 (T1)


T40-200 (T1)
T40-200 (T1) T40-200 (T6) T40-200 (T3)
T40-200 (T2) -6.000 T40-200 (T3)
T40-200 (T5)
T40-200 (T3) T40-200 (T4) -6.350
T40-200 (T5)
B2/F T40-200 (T7)
PCTL
T20-250 (SIDE BAR)
T40-200 (T2)
T40-200 (T4) T20-250 (SIDE BAR)
T20-250 (SIDE BAR)
2500

T.

L.

T40-200 (T6)
A

BD's OFFICAL USE


A.
.L

T.
.

T40-200 (B5) T40-200 (B6)


-8.850 -8.850

PCLL -9.250
T40-200 (B4) T40-200 (B1) T40-200 (B5)
T40-200 (B3) T40-108 (REBAR)
T40-200 (B3) T40-200 (B2) T40-200 (B5) T40-200 (B6) T40-200 (B3)
T40-200 (B5)
T40-200 (B1) T40-200 (B3) T40-200 (B4) T40-200 (B1)
-11.350 T40-200 (B1) T40-200 (B2)
BP1
BP3

BP4 BP5

A - A ( 1:100 )

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

PC1 PC2 PC3 PC4 PC5 PC6 PW7 PC8

SECTIONS 450x1000 450x1000 450x1000 450x1000 450x1000 450x1000 300x1500 450x1000

VERTICAL BARS 14T40 ( 3.59% ) 14T40 ( 3.83% ) 14T40 ( 3.82% ) 14T40 ( 3.53% ) 14T40 ( 3.90% ) 14T40 ( 3.83% ) 14T40 ( 3.83% ) 14T40 ( 3.91% )

TC1 TC2 TC3 TC4 TC5 TC7, TC8, TC9, TC10

REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
COLUMN AND WALL STARTER DETAILS

SCALE
SECTIONS 1000x1300 CIRCULAR1600 1000x1300 1000x1600 1600x1000 CIRCULAR1600
DRAWING NO. REV. NO.
48T40 ( 3.67% ) 36T40 ( 4.00% ) 56T40 ( 3.97% ) 36T40 ( 4.00% )
VERTICAL BARS 48T40 ( 3.67% ) 56T40 ( 3.97% ) P011

SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

SFL 90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop
SFL

COLUMN SIZE,

0.3T.L.L
BINDER & REINFORCEMENT

REFER TO ARCHITECTURAL PLAN


DETAIL PLEASE REF. TO
SUPERSTRUCTURE DWG.
BD's OFFICAL USE

T.L.L

REFER TO ARCHITECTURAL PLAN


FLOOR HEIGHT H

T.L.L

T.L.L.
FLOOR HEIGHT H

T.L.L.
300

0.3
>3H/8

T.L.L.

T.L.L.
WATER STOP

>1/4 FLOOR
HEIGHT
STARTER BAR DETAILS

1000
PROPOSED PILE CAP OR
FOOTING TOP LEVEL FFL

PROPOSED PILE CAP OR

OR FOOTING THICKNESS
FFL FOOTING TOP LEVEL

PILE CAP OR TIE BEAM


TAL.+8D
90mm (W) x 150mm (H) space

FOOTING THICKNESS
for BD's approval stamp /
0.75T

3T16 BINDERS

PILE CAP OR
TAL.+8D
STARTER BARS

0.75T
T
certification of copies of

T
300
300 MIN. approved plans
MIN. (PNAP ADM-10 APP A)

300 75 BLINDING LAYER


300 75 BLINDING LAYER MIN.
MIN.

TYPICAL DETAIL FOR WALL STARTER BAR TYPICAL DETAIL FOR COLUMN STARTER BAR
(N.T.S.) (N.T.S.)
WHERE D = DIAMETER OF REBAR WHERE D = DIAMETER OF REBAR
Tekla Structures
BD REF :

BIM REF :

TIE BEAM R.C. DETAILS SCHEDULE

TIE BEAM BEAM SIZE LENGTH PILE CAP TOP LEVEL PILE CAP TOP LEVEL STEEL BAR SECTION ELEVATION
MARK (D x B) (m) (P1) (Lv1) (P2) (Lv2) T1 T2 B1 B2 SB Link REFERENCE REFERENCE
TB1 1000 x 800 10.935 F1 -6350 F2 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB2 1000 x 800 7.385 F1 -6350 F3 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB3 1000 x 800 7.400 F2 -6350 F4 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB4 1000 x 800 10.936 F3 -6350 F4 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB5 1000 x 800 12.293 F4 -6350 F6 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB6 1000 x 800 11.818 F3 -6350 F5 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB7 1000 x 800 11.220 F5 -6350 F6 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB8 1000 x 800 10.941 F6 -6350 F8 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB9 1000 x 800 11.530 F5 -6350 F7 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB10 1000 x 800 9.451 F7 -6350 F8 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
TB11 1000 x 800 3.075 BW4 -6350 F7 -6350 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB12 1000 x 800 1.450 BW3 -6350 F5 -6350 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB13 1000 x 800 1.455 BW9 -6350 F6 -6350 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2 REV DATE AMENDMENT

TB14 1000 x 800 3.595 BW13 -6350 F1 -6350 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2 PROJECT
TB15 1000 x 800 3.595 BW12 -6350 F2 -6350 10T32 - 10T32 - 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E2
TB16 1000 x 800 7.065 F8 -6350 PC1 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1
CIC SAMPLE PROJECT
TB17 1000 x 800 7.045 F7 -6350 PC1 -6350 10T40 6T40 10T40 6T40 5T12 E.F. T12-150 T.S. SECTION S1 ELEVATION E1

DRAWING TITLE
TIE BEAM DETAILS & SCHEDULE

SCALE

DRAWING NO. REV. NO.

LENGTH (L) P012


LENGTH (L)
SB LV2
TAL SB
SOURCE ---
LV1 1.0 TL T1
Tie Beam Top Level LV 2 T1
Tie Beam Top Level
T12 T12
T12 T12
TAL T12 T12
TAL T12 T12 90mm (W) x 40mm (H) space
TAL
1.0 TL B1 T12 T12 for COMPANY LOGO
2900 B1
T12
LINK
LINK
(D x B)
(D x B)
ELEVATION E1 ELEVATION E2 SECTION S1

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

LEGEND AND NOTES: N

BOUNDARY LINE

BORED PILE

PILE CAP
3040
1350

H-PILE
F5
PILE CAP MARK

705
1630
705
PILE CAP SITE
1375 1660

F8
H-PILE

PILE CAP MARK

COLUMN / WALL ABOVE (UNDER SEPARATE SUBMISSION)


REV DATE AMENDMENT

PROJECT

BASEMENT SCREEN WALL (UNDER SEPARATE SUBMISSION) CIC SAMPLE PROJECT

DRAWING TITLE
TIEBEAM (UNDER SEPARATE SUBMISSION) PILE CAP LAYOUT PLAN

SCALE

DRAWING NO. REV. NO.

BLOCK PLAN P013


1:500
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

PA PB PC PD PE PF PG PH PJ
10740 12240 11055 9620 15355 12365 6500 9200
A 90mm (W) x 60mm (H) space
B for AP/RSE/RGE's
signature/ and stamp chop

TB13

547
( 1000x790 )
1640

475
2005

SP2A
TB15 TB3 TB5 TB8
SP4A ( 1000x800 ) ( 1000x800 )
885 755

885 755

885 755

( 1000x800 ) ( 1000x800 ) SP8A


SP6B SP6A
P4 SP2B SP2C SP4B SP4C SP8B SP8C BD's OFFICAL USE
F6
2478 1890 F2 882 1008
F4 830 1060
F8
943 947
BP2 BP6
-6.350

5535
5535

BP3 BP4
( 1000x800 )

( 1000x800 )

( 1000x800 )

(600) (600)
(600) FOOTING
TB1

(600) (600)
( 1000x800 )
TB4

TB7

P3
TB10

TW6A

TW6B
3418

2150
2150

925 965
TW6C
P2
1100

FOOTING
F7
2478 1890

3175
3175

882 1008 F3 1890 SP7B SP7C


1640

TB9
( 1000x8
00 ) BP1 BP5
TB14 TB2 F5 -8.850 90mm (W) x 150mm (H) space
540

540

( 1000x800 ) ( 1000x800 )
P1 for BD's approval stamp /
350

SP1B SP1C SP3B SP3C SP7A


1100

1100

C C
( 1000x800 )

certification of copies of
TB6 SP5B SP5A TB12
2350

TB11

F1 ( 1000x800 ) ( 1000x775 )
(600) approved plans
SP1A SP3A (PNAP ADM-10 APP A)

B
18865

A
Tekla Structures

Plan PCTL (1:150)


BD REF :

GENERAL NOTES ON PILE CAP NOTES ON PROTECTION OF EARTHWORKS DETAILS OF MINIMUM TRANSVERSE REINFORCEMENT IN LAP ZONE BIM REF :
AGAINST HEAVY RAINFALL
1. ALL DESIGN SHALL COMPLY WITH HONG KONG BUILDING (CONSTRUCTION)
REGULATIONS AND THE CODE OF PRACTICE FOR STRUCTURAL USE OF
TALBE : TRANSVERSE REINFORCEMENT LAP ZONE
1. SURFACE WATER FLOWING INTO AND OUT OF THE SITE SHALL
CONCRETE 2013, CODE OF PRACTICE FOR FOUNDATIONS BE INTERCEPTED AND CONDUCTED FORM THE SITE TO A SAFE
TRANSVERSE REINFORCEMENT REQUIRED WITHIN LAP ZONE TRANSVERSE
2. ALL DIMENSIONS ARE IN mm AND ALL LEVEL ARE IN METERS ABOVE DISCHARGE POINT AT EACH INTERSECTION AND ABRUPT CHANGE MAIN REINFORCEMENT REINFORCEMENT
PRINCIPAL DATUM UNLESS OTHERWISE STATED. IN DIRECTION OF SURFACE CHANNEL, ACCESSIBLE CATCHPIT AT LAP (THE SMALLER WITHIN LAP ZONE
(WITHOUT STAGGERED LAP)
SHALL BE PROVIDED ALL DRAINAGE WORKS SHALL BE KEPT OF Ø1 OR Ø2) (WITH STAGGERED LAP)
3. 75mm THICK BLINDING LAYER OF GRADE 10/20 CONCRETE SHALL BE LAID CLEAR OF DEBRIS. 1.0TL 1.4TL 2.0TL TRANSVERSE
UNDERNEATH ALL PILE CAP
2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WITHIN REINFORCEMENT
< 20 NO EXTRA REQUIREMENT

Ø1
4. ALL REINFORCEMENT SHALL COMPLY WITH BS4449:1997 AND CONSTRUCTION THE SITE A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE OUTSIDE LAP ZONE
STANDARD, CS2, 1995 `T' INDICATES HIGH TENSILE STEEL, WITH MINIMUM TENSILE
STRESS EQUAL TO 500 MPa.
DISCHARGE POINT. FOR REFERENCE ONLY 20
4T10
2x3T10-100 2x3T10-125 2x4T10-125 TRANSVERSE
(BAR SIZE TO BE
SAME AS

Ø2
3. DURING EXCAVATION A METHOD OF WORKING SHALL BE ADOPTED 3T12
5. CONCRETE FOR ALL PILE CAP SHALL COMPLY WITH CS1:2010 (EXCEPT SECTION 7.1), REINFORCEMENT TRANSVERSE
IN WHICH THE MINIMIUM OF BARE SOIL IS EXPOSED AT ANY TIME. 7T10 REINFORCEMENT
THE CONCRETE DESIGN MIX SHALL BE GRADE 45D/20 AND MINIMUM CONCRETE 25 2x3T12-125 2x4T10-100 2x5T10-125 OUTSIDE LAP ZONE
EXCAVATION TO FORM THE FINAL FACE SHALL BE FOLLOWED UP 5T12
COVER SHALL BE 40mm. (BAR SIZE TO BE WITHIN LAP ZONE)
IMMEDIATELY WITH SURFACE PROTECTION AND DRAINAGE WORKS.
11T10 SAME AS TRANSVERSE
6. THE REACTIVE ALKALI OF CONCRETE EXPRESSED AS THE EQUIVALENT SODIUM OXIDE 4. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE. 32 2x4T12-150 2x5T12-125 2x6T12-150
8T12 REINFORCEMENT 4ØMAX. 4ØMAX.
PER CUBIC METER OF OF CONCRETE SHALL NOT EXCEED 3.0kg WHEN DETERMINED THEY SHALL BE PROTECTED WITH HEAVY DUTY SHEETING ADEQUATELY
IN ACCORDANCE WITH THE SPECIFIED ITEM GIVEN IN APPENDIX A OF PNAP APP-74. 16T10 WITHIN LAP ZONE)
SECURED AT THE EDGES, SEALED AT THE CREST, AND LAPPED AT 40 2x6T12-100 2x6T12-125 2x7T12-150
7. ANY ADDITIVE OR ADMIXTURE SHALL COMPLY WITH BS5075 AND SHALL NOT BE JOINTS WHERE SLOPE FACES ARE TO BE TEMPORARILY EXPOSED 12T12 LAP LENGTH/3 LAP LENGTH/3
USED WITHOUT PRIOR AGREEMENT OF THE ENGINEER. FOR MORE THAN TWO WEEKS, TEMPORARY DRAINS SHALL BE 25T10
INSTALLED IN ADDITION TO SURFACING. 50 2x5T16-125 2x5T16-150 2x9T12-200
8. SAMPLES OF ALL MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE 18T12 WITHOUT STAGGERED LAP
SUBMITTED TO THE ENGINEER FOR APPROVAL ALL WORKS, MATERIALS AND TESTING (N.T.S)
SUCH AS TESTING OF STEEL BAR &CONCRETE CUBES SHALL COMPLY WITH GENERAL
SPECIFICATION FOR CIVIL ENGINEERING WORKS 1992 EDITION AND HONG KONG BUILDING NOTES ON COMPACTED BACKFILL (FOR INFORMATION ONLY) 4ØMAX. 4ØMAX.
(CONSTRUCTION) REGULATION UNLESS OTHERWISE STATED IN THE DRAWING. TRANSVERSE LAP ZONE
CONCRETE SURFACE
9. DETAILS SETTING OUT OF THE BUILDING SHALL REFER TO BUILDING PLANS. 1. FILL MATERIAL SHALL BE GRADED, CONTAINING NO PARTICLES REINFORCEMENT
COARSER THAN 200mm AND THE PERCENTAGE BY MASS PASSING OUTSIDE LAP ZONE TRANSVERSE REINFORCEMENT
10. THE CONTRACTOR SHALL CHECK ALL RELEVANT DRAWINGS AND VERIFY LEVELS 75mm BS TEST SIEVE SHALL BE 75% TO 100%. WITHIN LAP ZONE
AND DIMENSIONS IN ADVANCE OF THE WORK AND REPORT ANY DISCREPANCY
TO THE ARCHITECT/ENGINEER IMMEDIATELY. 2. FILL MATERIAL SHALL BE PLACED IN LAYERS OF NOT MORE THAN
300mm THICK, AND EACH LAYER SHALL BE COMPACTED TO NOT LAP ZONE MAIN REINFORCEMENT TRANSVERSE
11. THE WIND LOAD OF BUILDING IS BASED ON CODE OF PRACTICE ON WIND

Ø1
LESS THAN 95% MAXIMUM DRY DENSITY. TRANSVERSE REINFORCEMENT
EFFECTS HONG KONG 2004. REINFORCEMENT OUTSIDE LAP ZONE
3. FILL MATERIALS SHALL BE AT OPTIMUM MOISTURE CONTENT DURING
(IN FORM OF LINKS/ (BAR SIZE TO BE
12. ALL STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT COMPACTION THE TOLERANCE ON THE OPTIMUM MOISTURE CONTENT
U-BAR IF WITHOUT
ARCHITECT'S AND SERVICES ENGINEER'S DRAWINGS THE CONTRACTOR SHALL CHECK PERCENTAGE SHALL BE 3%, PROVIDED THAT THE FILL MATERIAL IS TRANSVERSE SAME AS

Ø2
STAGGERED LAP)
ALL DRAWINGS AND VERIFY LEVELS AND DIMENSIONS IN ADVANCE OF THE WORK AND STILL CAPABLE OF BEING COMPACTED IN ACCORDANCE WITH REINFORCEMENT TRANSVERSE
FOR REFERENCE ONLYFOR REFERENCE ONLY THE SPECIFIED REQUIREMENTS.
ADDITIONAL TRANSVERSE
4ØMAX. OUTSIDE LAP ZONE REINFORCEMENT
13. HIGH TENSILE STEEL BARS (DENOTED BY T) SHALL BE HOT ROLLED TYPE 2 (BAR SIZE TO BE WITHIN LAP ZONE)
4. COMPACTION OF THE SOFT FILL SHALL BE PERFORMED IN REINFORCEMENT OUTSIDE 4ØMAX. CONCRETE SURFACE
DEFORMED BAR OF GRADE 500 TO CS2-2012. MILD STEEL BARS (DENOTED BY R) ACCORDANCE WITH THE REQUIREMENT STIPULATED IN SAME AS TRANSVERSE
LAP ZONE 4ØMAX. 4ØMAX.
SHALL BE PLAIN ROUND GRADE 250 TO CS2-2012. ALL REINFORCEMENT CLAUSE 6.46 - 6.48 OF GENERAL SPECIFICATION FOR REINFORCEMENT
TRANSVERSE REINFORCEMENT FOR SLAB
TO BE CUT AND BENT IN ACCORDANCE WITH BS4466. CIVIL ENGINEERING WORKS, PNAP APP-8 AND PNAP APP-64. WITHIN LAP ZONE)
14. ALLOW SUFFICIENT STEEL CHAIRS TO SUPPORT TOP REINFORCEMENTS IN PILE CAP 5. FILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER.
NOTES : WITH STAGGERED LAP
15.
AND TIE BEAM TO KEEP VERTICAL WALL REINFORCEMENTS IN THEIR CORRECT ALIGNMENTS.
UNLESS NOTED OTHERWISE, MINIMUM LAP LENGTHS AND MINIMUM ANCHORAGE LENGTHS
6. FOR REFERENCE ONLY
IF THE FRACTION OF FILL MATERIAL PASSING A 420 MICRO SIEVE IS (N.T.S)
PLASTIC, THE LIQUID LIMIT SHALL NOT EXCEED 45% AND THE PLASTIC 1. Ø IS THE SMALLER OF Ø1 AND Ø2
OF BEAM BARS AND COLUMN BARS SHALL COMPLY WITH CODE OF PRACTICE FOR LIMIT SHALL NOT EXCEED 20%.
STRUCTURAL USE OF CONCRETE 2013 OR BE AS FOLLOW, WHICHEVER IS THE GREATER. 2. TRANSVERSE REINFORCEMENT SHOULD BE PLACE PERPENEDICULAR TO REV DATE AMENDMENT
7. THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT SHALL SAst/2 SAst/2 SAst/2 SAst/2
THE DIRECTION OF THE LAPPED REINFORCEMENT AND BETWEEN THAT AND PROJECT
(A) MINIMUM TENSION ANCHORAGE LENGTH (T.A.L.) BE DETERMINED IN ACCORDANCE WITH GEO REPORT NO 36 TEST THE SURFACE OF THE CONCRETE Lo/3 Lo/3 Lo/3 Lo/3
HIGH YIELD DESIGNED MIX (CONC GRADE) NO 4.3.3 EACH SOIL TYPE SHALL BE TESTED WHEN FIRST USED AND
BAR DIA.
(mm.) 45D
THEREAFTER AT THE SAME TIME AS EVERY SET OF FIELD DENSITY TESTS 3. TRANSVERSE REINFORCEMENT SHALL INCLUDE HORIZONTAL BARS
BARS OF WALL, BINDERS OF COLUMN OR SHEAR LINKS OF BEAM
CIC SAMPLE PROJECT
RECORDS SHALL SHOW CLEARLY SOIL TYPE, TEST LOCATION AND <150mm <150mm
10 300
12 ELEVATION IN mPD FOR EACH TEST TOGETHER WITH THE MAXIMUM DRY
360
16 480 DENSITY AND OPTIMUM MOISTURE CONTENT RESULTS. Fs Fs
20 600 Fs Fs

Ø2
8. THE INSITU FIELD DENSITY AND MOISTURE CONTENT SHALL BE
25 750 DRAWING TITLE
DETERMINED IN ACCORDANCE WITH GEO REPORT NO 36 TEST NO 9.2.1

Ø1
32 960
40 1200 AND PNAP APP-8. GENERAL NOTES FOR PILE CAP
9 ONLY LABORATORIES ACCREDITED UNDER HOKLAS FOR THE RELEVANT Lo Lo
(B) MINIMUM TENSION LAP LENGTH (T.L.L.)
TESTS SHALL BE EMPLOYED IN ACCORDANCE WITH PNAP APP-64 AND <4 Ø <4 Ø
HIGH YIELD DESIGNED MIX (CONC GRADE) THE TEST RESULTS SHALL BE ISSUED ON HOKLAS-ENDORSED
BAR DIA.
45D TEST CERTIFICATES OR REPORTS. FOR BAR IN TENSION FOR BAR IN COMPRESSION
(mm.)
(L.L.) 300 TRANSVERSE REINFORCEMENT IN LAP ZONE (FOR OUTER MOST REBAR) SCALE
10 (1.4 L.L.) 420
2000
(2.0 L.L.) 600 (N.T.S)
(L.L.) 360 TAL DRAWING NO. REV. NO.
300 THK. T12-100
12 (1.4 L.L.) 510 +136.7 P014
(2.0 L.L.) 720 300 THK. HANGER WALL
(L.L.) 480 HANGER WALL CONNECTING COLUMN/ WALL COLUMN/ WALL
16 (1.4 L.L.) 680 CONNECTING PILE CAP PEDESTAL PEDESTAL SOURCE ---

2000
(2.0 L.L.) 960 PILE CAP TAL 250 250 (GRADE 60 250 (GRADE 60
(L.L.) 600 APPROX. 200 TOP OF CAP CONCRETE) TOP OF CAP CONCRETE)
20 (1.4 L.L.) 840 +136.3 T12-100

300

300
(2.0 L.L.) 1200

DEPTH OF CAP

DEPTH OF CAP
(L.L.) 750
90mm (W) x 40mm (H) space

2650
25 (1.4 L.L.) 1050
(2.0 L.L.) 1500 T16-125 T16-125 T12-100 for COMPANY LOGO
FOOTING/ PILE CAP FOOTING/ PILE CAP
(L.L.) 960 T10-175
32 (1.4 L.L.) 1350
(2.0 L.L.) 1920 T10-200 T10-200
(L.L.) 1200 T10-175
40 (1.4 L.L.) 1680 T10-175 DETAIL OF PEDESTAL FOR COLUMN/ WALL
(2.0 L.L.) 2400 T12-100 T10-175 +136.7 (N.T.S)
NOTES : TAL D

1650)
(MIN.
1. TENSION LAP LENGTH (T.L.) NORMALLY EQUAL TO LAP LENGTH (L.L.)
+136.3
2. LAP LENGTH FOR UNEQUAL SIZE BARS JULY BE BASED UPON THE SMALLER BAR.
3. (2.0 L.L.) APPEARS ON TOP MOST LAYERS OF STEEL BARS ONLY.
WALL THICK 90mm (W) x 60mm (H) space

B
TAL TAL
TAL for AP/RSE/RGE's
(C) SPECIAL CASE FOR TENSION LAP LENGTH
TAL TAL signature/ and stamp chop
(a) WHERE A LAP OCCURS AT THE TOP OF A SECTION AS CAST AND THE MINIMUM T12-100
TYPICAL DETAIL FOR LOCAL TYPICAL ARRANGEMENT OF
COVER IS LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT, THE TYPICAL DETAILS OF LIFT PIT SLAB (800)
LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 1.4. (N.T.S)
SUMP PIT AT LIFT PIT STARTER BAR DETAIL FOR COLUMN
(N.T.S) (N.T.S) STARTER
(b) WHERE A LAP OCCURS AT THE CORNER OF A SECTION AND THE MINMUM COVER
TO EITHER FACE IS LESS THAN TWICE THE SIZE OF THE LAPPED REINFORCEMENT * CONCRETE COVER FOR STARTER BAR TO BE 40mm. BAR
OR, WHERE THE CLEAR DISTANCE BETWEEN ADJACENT LAPS IS LESS THAN 75mm
OR SIX TIMES THE SIZE OF THE LAPPED REINFORCEMENT, WHICHEVER IS THE BD's OFFICAL USE
GREATER, THE LAP LENGTH SHOULD BE INCREASED BY A FACTOR OF 1.4. G/F G/F

(c) IN CASE WHERE BOTH CONDITIONS (a) & (b) APPLY, THE LAP LENGTH SHOULD
PROPOSED BOTTOM LEVEL OF PILE CAP

3/8H
COLUMN & WALL SIZE, BINDER COLUMN & WALL SIZE, BINDER
BE INCREASED BY A FACTOR OF 2.0. & REINFORCEMENT DETAIL REFER
TO SUPERSTRUCTURE DWG.
& REINFORCEMENT DETAIL REFER
TO SUPERSTRUCTURE DWG.
TYPICAL ARRANGEMENT
e.g TOP BARS AS CAST ( NOTES : Ø = BAR DIA ) (UNDER SEPARATE SUBMISSION) (UNDER SEPARATE SUBMISSION)
OF STARTER BAR

1/4H
H
TAL

CENTRE OF LAPPING AT DETAIL FOR WALL


20

20

20

20

20

MID-QUARTER OF STOREY HEIGHT


<

<

<

<

<

(N.T.S)

3/8H
20 <75mm >75mm >75mm >75mm 20
< <
OR 60 OR 60 25° - B/F B/F
FACTOR 2 2 1.4 1.0 1.4 40° FTA

300mm
PROPOSED TOP OF PILE CAP LEV. TO PROPOSED TOP OF PILE CAP LEV. TO CAP TOP

300mm
e.g. BOTTOM BARS AS CAST LEVEL
PROPOSED LIGHT BE AS SHOWN ON SEC. DETAIL BE AS SHOWN ON SEC. DETAIL
300 MAX

WEIGHT CONCRETE PILE REBAR


20 <75mm >75mm >75mm >20
< FILL UNDERLYING THE 1/2D OR 8 Ø 1/2D OR 8 Ø
OR 60 OR 60 OR 60 PROPOSED CONC. MIX. WHICHEVER PROPOSED CONC. MIX. WHICHEVER EXTRA T16 90mm (W) x 150mm (H) space
PROPOSED PILE CAP
FOR PILE CAP TO BE
AS SHOWN ON SEC.

IS LESSER
AS SHOWN ON SEC.

FOR PILE CAP TO BE IS LESSER for BD's approval stamp /


DEPTH OF CAP

DEPTH OF CAP

500 (MAX.) 45D/20 (DESIGNED MIX.) Ø=BAR 45D/20 (DESIGNED MIX.) Ø=BAR CAP certification of copies of
20

20

20

20

DIAMETER DIAMETER
DETAIL

DETAIL
<

<

<

<

* THE ANGLE WILL BE ADJUSTED approved plans


H

H
FACTOR 1.4 1.4 1.0 1.4 TO SUIT STEEPER CUTTING (PNAP ADM-10 APP A)
AS NECESSARY T10-200
60°

EXCAVATION LINE
16. THE PILE CAP DESIGN IS ADOPTED BY FLEXIBLE CAP ASSUMPTION. 46Ø 46Ø 46Ø 46Ø
T16-125
17. THE CONCRETE COVER TO REINFORCEMENT BAR OF PILE CAP SHALL BE 40mm.
BENCHES TO BE CUT IMMEDIATELY PRIOR
18. PULVERISED FUEL ASH (PFA) WILL BE USED AS A PARTIAL CEMENT REPLACEMENT
TO CARRY OUT LIGHT WEIGHT
300
IN CONCRETE OF PILE CAP:
MASS FILL WORKS
(a) PFA AS A SEPARATE CONSTITUENT MAY BE USED ONLY WITH OPC AND TYPICAL DETAIL FOR COLUMN & WALL TYPICAL DETAIL FOR TYPE 2
SHOULD COMPLY WITH BS3892 : PART I : 1982, EXCEPT THAT THE STARTER BAR STARTER BAR TYPICAL DETAIL DETAILS
CRITERION FOR MAXIMUM WATER REQUIREMENT MAY NOT APPLY; DETAILS OF BENCHING UNDERLYING THE PILE CAP
(FOR INFORMATION ONLY) (N.T.S) BETWEEN HANGER WALL
(b) BLENDED CEMENT CONTAINING PFA SHOULD COMPLY WITH BS6588:1985 (N.T.S)
(N.T.S) AND PILE CAP
AND HAVE A NOMINAL PFA CONTENT NOT EXCEEDING 25%; SYMBOL: (THE COUPLER FOR COLUMN
Tekla Structures

AND WALL STARTER SHALL BE (N.T.S)


(c) THE PFA CONTENT SHOULD NOT EXCEED 25% BY MASS OF THE
"BOSA " DUCTILITY COUPLER)
CEMENTITIOUS CONTENT (OPC PLUS PFA) OF THE CONCRETE.
BD REF :

BIM REF :
5. DEBRIS HANDLING
METHOD STATEMENT FOR DEMOLITION WORK:
5.1 ANY EXISTING FURNITURE, WOOD FLOORS, DOOR FRAMES, WINDOWS, PIPING SHALL BE SORTED AND
1. GENERAL REMOVED SEPARATELY.

1.1 DEMOLITION WORKS SHALL COMPLY WITH BUILDING (DEMOLITION WORKS) REGULATIONS, BS6187:82, 5.2 DEMOLITION DEBRIS SHALL BE PICKED UP ON GROUND FLOOR AND CARRIED AWAY BY DUMP TRUCKS.
CONSTRUCTION SITE (SAFETY) REGULATIONS, THE GUIDELINES AND REQUIREMENTS SET OUT IN PNAP71 AND DEBRIS CLEARING AND TRANSPORTATION SHALL BE SCHEDULED TO MAINTAIN THE FOLLOWING CONDITIONS:
CODE OF PRACTICE FOR DEMOLITION OF BUILDINGS 2004.
(i) DEBRIS ACCUMULATION ON THE COCKLOFT OR FIRST FLOOR OR ABOVE SHALL NOT BE HIGHER THAN
1.2 ALL STRUCTURES TO BE DEMOLISHED BY ORDINARY HAND-HELD TOOLS. 100mm.

1.3 POWERED MECHANICAL PLANTS MAY BE EMPLOYED AND RESTED AT SOLID GROUND TO HELP REMOVAL OF (ii) DEBRIS ACCUMULATION ON THE GROUND FLOOR SHALL NOT EXCEED 1m.
DEBRIS AT G/F.
(iii) NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON THE CANTILEVER STRUCTURES.
1.4 DEMOLITION SHALL BEGIN ON THE ROOF AND PROCEED DOWN FLOOR BY FLOOR TO THE GROUND FLOOR.
THE CONCRETE OF EACH STRUCTURAL ELEMENT SHALL BE BROKEN DOWN GRADUALLY. THE 6. SPECIAL SITE SAFETY
REINFORCEMENT SHALL BE LEFT IN PLACE UNTIL THE CONCRETE IS BROKEN AWAY AND WHEN ITS SUPPORT
IS NO LONGER NEEDED. 6.1 EMERGENCY EXIT

1.5 THE DEMOLITION OF EACH STRUCTURAL ELEMENT SHALL BE PERFORMED ACCORDING TO THE DETAILS AS THE EXISTING STAIRCASE SHALL BE USED AS EMERGENCY ROUTE. THE EMERGENCY ROUTE SHALL BE
SHOWN ON DEMOLITION PLANS. MAINTAINED THROUGHOUT THE DEMOLITION PROCESS. THE ROUTE SHALL BE CLEARED OF OBSTRUCTION AT
ALL TIME. SIGNS OR MARKINGS SHALL BE INSTALLED TO CLEARLY IDENTIFY THE ROUTE.
1.6 BEFORE DEMOLITION WORKS, THE PROPPING UNDERNEATH CANTILEVER BEAMS IF ANY SHALL BE
INSTALLED. 6.2 PROTECTION OF OPENINGS

1.7 BEFORE DEMOLITION WORKS, ALL UNAUTHORIZED STRUCTURES SHALL BE REMOVED. THE CONTRACTOR SHOULD ENSURE THAT EVERY WORK PLACE AND APPROACH AND ALL OPENINGS
DANGEROUS TO PERSONS EMPLOYED AND OTHERS BE PROPERLY ILLUMINATED AND PROTECTED.
1.8 THE CONTRACTOR SHOULD VERIFY THE STRUCTURE WITH THE LATEST STRUCTURE APPROVED PLANS SATISFACTORY MEASURES SHALL BE PROVIDED TO AVOID PERSONS FALLING FROM HEIGHT.
(INCLUDING A&A WORKS) BEFORE COMMENCEMENT OF THE DEMOLITION WORKS. WHERE CONDITIONS ON
SITE REVEALED SITUATION AND ARRANGEMENT DIFFERENT FROM THE AVAILABLE INFORMATION, OR HAVING 6.3 FIRE PREVENTION
ANY POTENTIAL INSTABILITY, THE CONTRACTORS SHOULD SEEK OPINION AND ADVICE FROM AP/RSE BEFORE
PROCEED. (i) FIRE EXTINGUISHER OR FIRE FIGHTING EQUIPMENT SHALL BE PLACED IN VISIBLE LOCATIONS, ADJACENT TO
THE STAIRCASE, ON EACH FLOOR. ALL FLAMMABLE MATERIALS SHALL BE STORED IN A SAFE LOCATION IN
ACCORDANCE WITH THE FACTORIES AND INDUSTRIAL UNDERTAKING REGULATIONS.
1.9 FOR REFERENCE ONLY
GROUND FLOOR SLAB TO BE RETAINED.
6.4 DUST AND NOISE
1.10 ALL SCAFFOLDING WORKS SHOULD STRICTLY FOLLOW THE GUIDANCE NOTES OF CODE OF PRACTICE
FOR BAMBOO SCAFFOLDING SAFETY AND GUIDANCE NOTES TO RENOVATION SAFETY ISSUED BY LABOUR
DEPARTMENT. (i) WATER SPRAYING SHALL BE APPLIED TO SUPPRESS THE DUST GENERATED DURING THE DEMOLITION
OPERATION AND DEBRIS HAULING.
N
2. DEMOLITION SEQUENCE (TOP DOWN - BY MANUAL METHOD)
(ii) SUPER SILENCED TYPE AIR COMPRESSOR SHALL BE USED. DEMOLITION WORKS SHALL NOT BE
2.1 DEMOLITION SEQUENCE SHALL BE DETERMINED ACCORDING TO THE ACTUAL SITE CONDITIONS, PERFORMED WITHIN THE RESTRICTED HOURS FROM 1900 HRS TO 0700 HRS ON ALL DAY AND FROM 0700 HRS
RESTRAINTS, ORIGINAL BUILDING LAYOUT AND ITS CONSTRUCTION. IN GENERAL, THE FOLLOWING SEQUENCE TO 1900 HRS ON GENERAL HOLIDAYS INCLUDING SUNDAY, OR AS PER EPD'S REQUIREMENT.
SHALL APPLY:
6.5 TRAINING
(i) ALL CANTILEVERED STRUCTURE CANOPIES, AND VERANDAHS SHALL FIRST BE DEMOLISHED PRIOR TO THE
DEMOLITION OF MAIN BUILDING AND ITS INTERNAL STRUCTURES ON EACH FLOOR; ALL SITE PERSONNEL SHALL GO THROUGH A TRAINING PROGRAM TO UNDERSTAND THE PROJECT AND SITE
SAFETY REQUIREMENTS. THE TRAINING PROGRAM SHALL BE CONDUCTED BY A COMPETENT TRAINER. THE
(ii) THE STRUCTURAL ELEMENTS, IN GENERAL, SHALL BE DEMOLISHED IN THE FOLLOWING SEQUENCE: TRAINING PROGRAM SHALL INCLUDE THE FOLLOWING:
- SLAB
- SECONDARY BEAMS, THEN (i) AN INDUCTION TRAINING COURSE AT THE BEGINNING OF THE JOB TO CIRCULATE INFORMATION ON THE
- INTERNAL PRIMARY BEAMS PROPOSED METHOD AND REQUIRED SAFETY MEASURES TO PERFORM THE WORK.
(ii) DAILY SAFETY MEETINGS TO MAINTAIN AND REINFORCE THE SAFETY CONCEPT. (E) 835335933.14 (E) 835350866.21
(iii) ALL DEMOLITION WORKS TO BE CARRIED OUT FLOOR BY FLOOR. (N) 819792735.75
(N) 819789820.33
(iv) THE PERIPHERAL ELEMENT OF THE BUILDING SHALL BE DEMOLISHED IN ACCORDANCE WITH THE 6.6 TYPHOON
DEMOLITION SEQUENCE OF PERIPHERAL ELEMENTS.
IN THE CASE WHEN TYPHOON SIGNAL NO. 3 IS HOISTED, THE CONTRACTOR SHALL INSPECT ALL EXTERNALLY
(v) THE INTERNAL ELEMENT, INCLUDING BEAMS AND COLUMNS SHALL BE DEMOLISHED BY GRADUALLY EXPOSED TEMPORARY WORK AND STRENGTHEN ANY LOOSE CONNECTIONS. AFTER THE TYPHOON, ALL
BREAKING DOWN THE CONCRETE OR BY PULLING THEM DOWN IN A CONTROLLED MANNER. EXTERNALLY EXPOSED TEMPORARY WORKS SHALL BE INSPECTED AND CONFIRMED TO BE SAFE BY THE
COMPETENT AND EXPERIENCED
(vi) THE ABOVE PROCEDURES SHALL BE REPEATED (IF NECESSARY) FOR DEMOLITION DOWN TO THE LOWEST PERSON.
FLOOR AT GROUND LEVEL.
7 MAINTENANCE AND INSPECTION FOR REFERENCE ONLY
3. PRIOR TO COMMENCEMENT OF THE DEMOLITION WORK AN ASBESTOS INVESTIGATION SURVEY SHALL BE
CARRIED OUT BY A SPECIALIST ASBESTOS CONSULTANT FIRM TO DETERMINE ANY ASBESTOS BASED 7.1 THE DEMOLITION WORKS SHALL BE SUPERVISED BY AUTHORIZED PERSON, REGISTERED STRUCTURAL
PRODUCTS WHICH MAY EXIST. ENGINEER, REGISTERED SPECIALIST CONTRACTOR AND THEIR TECHNICALLY COMPETENT PERSON IN
ACCORDANCE WITH THE SITE SAFETY SUPERVISION PLAN LODGED WITH BUILDING AUTHORITY.
7.2 ALL THE PRECAUTIONARY MEASURES AND TEMPORARY SUPPORTS SHALL BE INSPECTED BY THE
CONTRACTOR ON A DAILY BASIS. ANY ACCUMULATION OF BUILDING DEBRIS ON THE CATCH FANS AND CATCH
DEMOLITION SEQUENCE: PLATFORMS SHALL BE REMOVED. ANY DEFICIENCY SHALL BE REPAIRED WHEN FOUND NECESSARY. THE
INSPECTION AND REPAIR RECORDS SHALL BE PROVIDED TO THE AP AND RSE.
1. REMOVE THE UBW WORKS UNDER MINOR WORKS IF APPLICABLE. 7.3 BEFORE LEAVING THE JOB SITE EACH DAY, THE CONTRACTOR SHALL IDENTIFY AND RECTIFY ANY UNSAFE REV DATE AMENDMENT
CONDITIONS SUCH AS PARTIALLY DEMOLISHED STRUCTURAL ELEMENTS AND DAMAGED TEMPORARY
2. PRIOR TO THE DEMOLITION WORKS, THE HOARDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SUPPORTS.
HOARDING PLANS UNDER SEPARATE SUBMISSION. PROJECT
7.4 THE BAMBOO SCAFFOLDING SHALL BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THE CODE OF
3. THE TWO-STORIES PROPPING SHOULD BE PROVIDED PRIOR TO START OF DEMOLITION WORK. PRACTICE FOR BAMBOO SAFETY AND THE CONSTRUCTION SITE (SAFETY) REGULATIONS BY THE
4. REMOVE ALL UBW STRUCTURES.
CONTRACTOR.
CIC SAMPLE PROJECT
8. EMERGENCY PLAN
5. DEMOLITION SEQUENCE OF ROOF FLOOR:
8.1 EMERGENCY TELEPHONE NUMBERS SHALL BE CLEARLY DISPLAYED IN A CONSPICUOUS LOCATION. IN THE
a. PARAPETS, STAIRHOOD AND OTHER STRUCTURES ABOVE ROOF FLOOR LEVEL; EVENT OF ANY EMERGENCY OR ACCIDENT, THE CONTRACTOR SHALL NOTIFY THE POLICE AND FIRE SERVICES
DEPARTMENTS FOR ASSISTANCE. THE CONTRACTOR SHALL ALSO NOTIFY THE AP AND RSE IMMEDIATELY.
b. EXTERIOR WALLS LINKING THE CANTILEVERED STRUCTURE AT ROOF FLOOR;
8.2 AT THE INITIAL WARNING OF A TYPHOON OR A MAJOR STORM EVENT, THE FOLLOWING SHALL BE DRAWING TITLE
c. CANTILEVER SLABS OR CANOPY AT ROOF FLOOR; PERFORMED: 12117
d. REMAINING SLAB AT ROOF FLOOR; 3403 GENERAL NOTES FOR DEMOLITION
8.2.1 CONTRACTOR SHALL SECURE ALL TEMPORARY SUPPORTS AND LOOSE ELEMENTS ON SITE.
e. NON-LOAD BEARING WALLS BETWEEN ROOF AND FLOOR BELOW ROOF FLOOR; 8.2.2 ALL FLAMMABLE MATERIALS, OXYGEN AND ACETYLENE BOTTLES SHALL BE REMOVED OR SECURED IN A
FOR REFERENCE ONLY
f. SECONDARY BEAMS AT ROOF FLOOR;
SAFE LOCATION.
8.2.3 NO UNSTABLE AND/OR PARTIALLY DEMOLISHED STRUCTURAL ELEMENTS SHALL BE BRACED AND
g. MAIN BEAMS AT ROOF FLOOR; SECURED. 3.92 mPD
h. COLUMNS AND LOAD BEARING WALLS BETWEEN ROOF AND FLOOR BELOW ROOF. 9. POST DEMOLITION
SCALE
6. DEMOLITION OF SUBSEQUENT FLOORS BELOW ROOF FLOOR: 9.1 UPON COMPLETION OF THE DEMOLITION, THE SITE SHALL BE LEVELLED AND CLEARED OF DEBRIS.
a. PARAPETS, STAIRHOOD AND OTHER STRUCTURES ABOVE FLOOR LEVEL IF APPLICABLE; 9.2 IN THE CASE OF NO IMMEDIATE REDEVELOPMENT, THE SITE BOUNDARY SHALL BE COMPLETELY DRAWING NO. REV. NO.
ENCLOSED TO PREVENT PUBLIC ACCESS.
b. EXTERIOR WALLS LINKING THE CANTILEVERED STRUCTURES IF APPLICABLE;
9.3 DAMAGE TO PAVEMENT, FOOTPATH AND OTHER ELEMENTS WITHIN THE RIGHT OF WAY SHALL BE D001
c. CANTILEVERED SLABS OR CANOPY; REPAIRED TO ITS ORIGINAL CONDITION PRIOR TO THE COMPLETION OF THE DEMOLITION PROJECT.
d. REMAINING SLABS; 10. SITE SUPERVISION SOURCE ---
e. NON-LOAD BEARING WALLS BETWEEN THE FLOOR AND THE FLOOR BELOW; 10.1 SITE STAFF RESPONSIBLE FOR SUPERVISION AND CONTROL OF DEMOLITION SHALL BE EXPERIENCED IN 3.90 mPD
THE DEMOLITION OF BUILDINGS SIMILAR TO THOSE TO BE DEMOLISHED.
f. SECONDARY BEAMS;
10.2 THE CONTRACTOR SHALL PROVIDE THE FOLLOWING MINIMUM SITE SUPERVISION REQUIREMENTS: 3.86 mPD
g. MAIN BEAMS;
(i) A FULL-TIME SITE ENGINEER WHO SHALL BE REGISTERED PROFESSIONAL ENGINEER, IN THE STRUCTURAL,
h. COLUMNS AND LOAD BEARING WALLS BETWEEN THE FLOOR AND THE FLOOR BELOW. CIVIL OR BUILDING DISCIPLINE AND SHALL BE DIRECTLY RESPONSIBLE TO THE CONTRACTOR DURING 90mm (W) x 40mm (H) space
DEMOLITION OF CANTILEVER STRUCTURES. for COMPANY LOGO
DEMOLITION SEQUENCE OF UBW STRUCTURES: (ii) EXPERIENCED FOREMAN WHO SHALL BE FULL-TIME ON SITE. EACH FOREMAN SHALL BE RESPONSIBLE AND
SUPERVISE THE DEMOLITION WORKS FOR EACH ZONE OF THE DEMOLITION WORKS.
(E) 835353437.65 (E) 835368370.62
1. THE DEMOLITION OF UBW STRUCTURES SHALL BE CARRIED OUT BY HAND HELD TOOLS IN THE FOLLOWING (iii) SITE SUPERVISION REQUIREMENTS AS STIPULATED IN THE LATEST VERSION OF THE DEMOLITION CODE (N) 819700161.08 (N) 819703076.49
SEQUENCE: AND BUILDING (DEMOLITION WORKS) REGULATION.

2678
a. REMOVE STEEL SHEET COVER IN STRIP OF NOT MORE THAN 1m WIDE.
NOTES ON UBW:
FOR REFERENCE ONLY
b. REMOVE THE STEEL BEAMS BY CUTTING AT TWO ENDS AND LIFTING. THE STEEL BEAMS SHALL BE SAFETY
TIED BEFORE CUTTING.
1. UBW SHALL BE REMOVED UNDER MINOR WORKS CONTROL SYSTEM OR UNDER AP
RSE
/ SUPERVISION

9987
c. REMOVE THE RC WALL IN HORIZONTAL STRIP OF NOT MORE THAN 500mm HEIGHT FROM TOP TO BOTTOM. FOR REFERENCE ONLY
UPON ISSUANCE OF THE DEMOLITION CONSENT AS INDICATED ON PLANS.

DEMOLITION OF CANTILEVER STRUCTURE: NOTES ON DEBRIS MANAGEMENT SYSTEM:


90mm (W) x 60mm (H) space
1. PROPPINGS SHALL BE INSTALLED FOR ALL CANTILEVERED STRUCTURES PRIOR TO COMMENCEMENT OF 1. DEBRIS MUST BE DISPOSED OF PROMPTLY. A DEBRIS DISPOSAL AND MANAGEMENT SYSTEM SHALL BE for AP/RSE/RGE's
DEMOLITION WORKS. PREPARED AND IMPLEMENTED BY THE RSC TO THE SATISFACTION OF AP / RSE. THE DEBRIS DISPOSAL AND signature/ and stamp chop
MANAGEMENT SYSTEM SHOULD LAY DOWN THE FOLLOWING DETAILS:
2. NO STRUCTURAL MEMBER WITHIN THE BUILDING ON ABOVE THAT FLOOR CAN BE DEMOLISHED PRIOR TO
THE DEMOLITION OF THE CANTILEVER STRUCTURE AT THAT FLOOR. 1.1 METHOD OF HANDLING DEMOLISHED BUILDING DEBRIS;

FOR REFERENCE ONLY


3. THE EXTERIOR WALL CONNECTED SHALL BE DEMOLISHED FIRST WITH THE CANTILEVER SLAB. 1.2 THE ROUTING AND MOVEMENT OF DEBRIS FROM EACH FLOOR TO ON GRADE HOLDING AREA PRIOR TO
LEAVING THE SITE;
4. ANY STRUCTURE OR DEAD LOAD SUPPORTED BY THE CANTILEVERED SYSTEM SHALL BE REMOVED PRIOR
TO DEMOLISHING THE CANTILEVER SLAB. 1.3 MEANS OF TRANSPORTATION OF DEBRIS OFF THE SITE;
5. THE CONCRETE SHALL BE BROKEN DOWN GRADUALLY STARTING FROM THE EXTERIOR EDGE OF THE 1.4
FOR REFERENCE ONLY
TIME AND FREQUENCY OF DEBRIS DISPOSAL OFF SITE;
BLOCK PLAN ( 1:500 )
CANTILEVER FLOOR, WORKING INWARD AND TOWARD ITS SUPPORTING BEAMS.
1.5 RECORD SCHEME ON THE TONNAGE OF EACH TRUCK LOAD, TRUCK LICENSE PLATE, DRIVER'S NAME, TRIP BD's OFFICAL USE
TICKETS AND LOCATION OF DUMP SITE; AND
DEMOLITION OF BRICK IN-FILL WALL:
1.6 THE SITE SUPERVISORY PERSONNEL RESPONSIBLE FOR THE DEBRIS MANAGEMENT SYSTEM.
TO AVOID ANY POTENTIAL HAZARD OF BRICKS FALLING OUT OF THE BUILDING, ALL THE BRICK IN-FILL SHALL 2. DETAILS OF THE DEBRIS DISPOSAL AND MANAGEMENT SYSTEM SHALL BE SUBMITTED TO THE BUILDINGS
BE REMOVED BY PUSHING INWARD, BEFORE DISMANTLING THE REINFORCED CONCRETE FRAMING. DEPARTMENT TOGETHER WITH THE SITE SAFETY SUPERVISION PLAN PRIOR TO OR AT THE TIME OF CONSENT
FOR REFERENCE ONLY
WORKING PLATFORMS OUTSIDE THE BUILDING SHALL BE USED FOR REMOVAL OF THE BRICK IN-FILL WALLS.
BRICK REMOVAL SHALL BEGIN FROM THE TOP LAYER DOWNWARDS. THE WORKS SHALL BE CARRIED OUT
APPLICATION.
LAYER BY LAYER WITH EACH LAYER NOT LARGER THAN 300mm.
NOTES ON SITE VIDEO CAMERA:
PRECAUTIONARY MEASURES: 1. VIDEO CAMERA TO RECORD THE ENTIRE DEMOLITION PROCESS SHALL BE PROVIDED. THE VIDEO CAMERA
SHALL BE SECURELY PROTECTED FROM BEING TEMPERED WITH SO THAT THE ENTIRE DEMOLITION PROCESS
1. HOARDING (SUBMITTED SEPARATELY) FOR REFERENCE ONLY
INCLUDING THE MOVEMENT OF DEBRIS AND THE OVERALL SEQUENCE OF DEMOLITION CAN BE RECORDED
FOR REFERENCE AND REVIEW PURPOSES. THE LOCATION OF THE VIDEO CAMERA REFERS TO DEMOLITION
THE HOARDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE HOARDING PLANS UNDER SEPARATE PLAN. THE VIDEO CAMERA RECORDS SHALL BE KEPT BY THE RSE FOR AT LEAST 14 DAYS.
SUBMISSION.
2. TEMPORARY SUPPORT NOTES ON BEAM PLUS:
STEEL PROPPING SHALL HAVE A WORKING CAPACITY OF 25kN PER PROP. THE PROPS SHALL BE BRACED WITH
LATERAL RESTRAINTS IN AT LEAST TWO DIRECTIONS. 1. FOR REFERENCE ONLY
DEMOLITION WORKS AND RELEVANT ADMINISTRATIVE PROCEDURES WILL COMPLY WITH THE BUILDING
ENVIRONMENTAL ASSESSMENT METHOD (BEAM) PLUS V1.2 REQUIREMENT.
3. EXISTING UTILITIES 90mm (W) x 150mm (H) space
ALL EXISTING UTILITIES SHALL BE TERMINATED. SEWER SERVICE AND DRAINAGE CONNECTIONS SHALL BE
for BD's approval stamp /
PROPERLY DISCONNECTED AND SEALED OFF AT LAST MANHOLE. CONTRACTOR SHALL ASSIST THE CLIENT TO certification of copies of
COORDINATE WITH UTILITY COMPANIES FOR ALL SERVICE TERMINATION.
approved plans
4. NOTIFICATION TO AP/RSE FOR ANOMALIES OR IRREGULARITIES OBSERVED (PNAP ADM-10 APP A)
FOR REFERENCE ONLY
4.1 THE FRAMING PLANS ARE RECORDED ON SITE. PRIOR TO THE DEMOLITION WORK, THE CONTRACTOR
SHOULD CARRY OUT A DETAILED INSPECTION TO VERIFY THE ACCURACY OF THE INFORMATION AS SHOWN.
WHERE CONDITIONS ON SITE REVEALED SITUATION AND ARRANGEMENT DIFFERENT FROM NORMAL OR
HAVING ANY POTENTIAL HAZARDS. THE
CONTRACTOR SHOULD SEEK OPINION AND ADVICE OF AP/RSE BEFORE PROCEEDING FURTHER.
4.2 THE CONTRACTOR SHOULD EXAMINE AND IDENTIFY FOR THEMSELVES OF THE NATURE OR TAIL-LOADING
OF ANY CANTILEVER CONSTRUCTION SUCH AS BALCONIES, HEAVY CORNICES OR STAIRCASES. IF UNCERTAIN,
AP/RSE ADVICE SHOULD BE SOUGHT. GENERALLY, ALL CANTILEVER CONSTRUCTION SHOULD BE PROPPED
PRIOR TO THE ACTUAL DEMOLITION.
4.3 THE CONTRACTOR SHOULD NOTIFY THE AP/RSE DURING THE COURSE OF DEMOLITION WORKS, THE
FOLLOWING DEFECTS, IF ANY
(i) STRUCTURAL DEFORMATION;
(ii) CRACK; AND
Tekla Structures

(iii) CORROSION OF REINFORCEMENT


BD REF :

BIM REF :
LEGEND :

TEMPORARY STEEL PROP AT 1200mm c/c UNDER

PROPOSED DEBRIS CHUTE

CANTILEVER STRUCTURE

SITE BOUNDARY

CONCRETE FOOTING

VIDEO CAMERA
PA PB PC PD PE PF PG PH PJ

654 10787 12240 11055 9620 15355 12365 6500 9200 3775

( 750x1000 )
2206

( 750x1000 ) ( 1000x750 ) ( 750x1000 ) C17 ( 600x800 ) C19 C21 C23 C27


( 800x600 )
( 750x1000 )

P4 ( 1000x750 ) ( 750x1000 )

( 850x1000 )

( 850x1000 )
( 850x1000 )

( 850x1000 )

( 850x1000 )
( 750x1000 )

( 750x1000 )

( 850x1000 )
5535

C2 ( 1150x1400 ) ( 1150x1400 ) ( 1150x1400 ) C14 ( 1150x1400 ) ( 1150x1400 ) ( 1150x1400 ) ( 1150x1400 ) ( 1150x1400 )


C6 C10 C16 C18 C20 C22 C26

( 850x1000 )

( 750x600 )
( 750x600 )

( 850x1000 )
( 850x1000 )
( 750x1000 )

( 850x1000 )

( 750x800 )
( 750x800 )

P3 ( 750x800 ) ( 750x800 )

( 750x600 )

( 750x600 )
2150

( 550x400 )
( 550x400 )
P2

( 550x400 )
( 550x400 )

( 550x400 )
( 550x400 )
( 550x400 )
( 550x400 )

( 550x400 )
C1 ( 750x800 ) ( 750x800 ) C13 ( 750x800 )
C5 C9 C25
3175

( 400x550 ) ( 550x400 )
REV DATE AMENDMENT

( 750x800 )
( 750x800 )

( 750x800 )
( 750x800 )
( 750x800 )

( 850x1000 ) ( 550x400 )
P1
( 550x400 ) PROJECT
( 550x400 )
2549

C4 ( 750x500 ) ( 750x500 ) ( 750x500 ) ( 550x400 ) ( 550x400 ) ( 550x400 ) ( 750x500 )


CIC SAMPLE PROJECT
C24
C8 C12

DRAWING TITLE
DEMONITION PLAN EXISTING G/F, 1/F
FRAMING PLAN
DEMOLITION PLAN - EXISTING G/F FRAMING PLAN

SCALE

DRAWING NO. REV. NO.

D002

SOURCE ---

PA PB PC PD PE PF PG PH PJ 90mm (W) x 40mm (H) space


for COMPANY LOGO
10740 12240 11055 9620 15355 12365 6500 9200 3075
1506

C17 C19 C21 C23 ( 750x1000 ) C27


( 750x1000 ) ( 750x1000 ) ( 1000x750 ) ( 750x1000 ) ( 600x800 ) ( 800x600 ) ( 1000x750 )
P4
( 750x1000 )

( 850x1000 )

( 850x1000 )
( 750x1000 )

( 850x1000 )

( 850x1000 )
( 750x1000 )

( 850x1000 )

( 850x1000 )
5535

( 1150x1400 ) ( 1150x1400 ) ( 1150x1400 )


C2 ( 1150x1400 ) C6 C18 C20 90mm (W) x 60mm (H) space
C10 C14 C16 ( 1150x1400 ) ( 1150x1400 ) C22 C26
for AP/RSE/RGE's

( 750x600 )
( 750x600 )

( 1150x1400 ) signature/ and stamp chop


( 750x1000 )

( 850x1000 )

( 850x1000 )

( 850x1000 )

( 850x1000 )
( 750x800 )

( 750x600 )

( 750x600 )
P3
2150

( 750x800 ) ( 750x800 )

( 550x400 )

( 550x400 )
( 550x400 )

( 550x400 )

( 550x400 )

( 550x400 )

( 550x400 )

( 550x400 ) ( 550x400 )
P2
C1 C5 C9 C13 ( 400x550 ) ( 550x400 ) ( 750x800 )
3175

( 550x400 ) C25
( 750x800 ) ( 750x800 ) ( 750x800 ) ( 550x400 )
( 750x800 )

( 850x1000 ) ( 750x500 )
( 750x800 )

( 750x800 )

( 750x800 )
( 550x400 )
P1 BD's OFFICAL USE
1849

C8
C4 C12 C24
( 750x500 ) ( 750x500 ) ( 750x500 ) ( 550x400 ) ( 550x400 )

DEMOLITION PLAN - EXISTING 1/F AND TYPICAL FLOOR FRAMING PLAN

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :
NOTES :
1. SECURE THE COLUMN BY WIRE & WINCH TO EXISTING STRUCTURE

DEMOLITION OF R.C. SLAB (MANUAL METHOD) PRE-WEAKENING AND DISMANTLING OF R.C. COLUMN 2. PRE-WEAKENING AT THE BOTTOM OF COLUMN BY HAND HELD TOOLS.
I) BREAK AWAY THE CONCRETE TO EXPOSE THE REINFORCING BARS.
(MANUAL METHOD) II) CUT THE REINFORCING BARS AT THE EXTERIOR HALF OF THE COLUMN.
CUTTING SHALL BE PERFORMED IMMEDIATELY PRIOR TO PULLING.

1. ENSURE ALL LOADS OTHER THAN SELF-WEIGHT, ARE REMOVED FROM SLABS. FOR CANTILEVER SLAB, 3. PULLING DOWN THE COLUMN IN A CONTROLLED MOTION.

THE EXTERIOR WALL OR PARAPET SHALL BE DEMOLISHED FIRST.


CL OF BEAM
2. THE SLAB SHALL BE DEMOLISHED BY GRADUALLY BREAKING AWAY THE CONCRETE. BEAMS TO BE
REMAIN
3. THE REINFORCEMENT SHALL REMAIN AND BE CUT OFF AFTER THE CONCRETE IS BROKEN AWAY. COLUMN
EXTERIOR
DIRECTION
OF FALL
CL OF COLUMN
TEMPORARY SUPPORTS AND/OR TEMPORARY SUPPORTS AND/OR INTERIOR
PLATFORMS SHALL BE PROVIDED PLATFORMS SHALL BE PROVIDED
UNDERNEATH UNDERNEATH LINES OF SUPPORT ATTACHED TO TIE WIRE
REINFORCING BARS TO BE CUT AFTER UNDER THE FLOOR AND WINCH SYSTEM OR
BREAKING AWAY THE CONCRETE EXCAVATOR ARM

REINFORCING BARS TO BE CUT SECTION C1-C1


AFTER REMOVAL OF CONCRETE STRIPS NOT TO EXCEED 500mm
CANTILEVER BEAM LEGEND :
REINFORCING BARS
DEMOLISHED WITH REINFORCING BAR TO BE REMAIN
TO BE CUT AFTER EXISTING COLUMN TO BE DEMOLISHED
THE SLAB REINFORCING BARS
DIRECTIONS OF REMOVAL OF REINFORCING BAR TO BE CUT AWAY
CONCRETE DEMOLITION CONCRETE
DIRECTION OF
CONCRETE DEMOLITION
CANTILEVER TIE WIRE TO EXISTING STRUCTURE
CANTILEVER
BEAM TO BE FOR ADDITION SAFETY
BEAM TO BE
REMAIN (EXTERIOR COLUMNS ONLY)
REMAIN

DIRECTIONS OF EXISTING COLUMN REINFORCEMENT

TL = 46D.
CONCRETE DEMOLITION TO BE REMAINED EXISTING
EXTERIOR INTERIOR
(REMAINING TENSION LAP LENGTH GROUND
DIRECTION OF SPAN AND = 46 BAR DIA.)
MAIN REINFORCEMENT

BEAM TO BE EXISTING FOOTING


REGULAR BEAM REMAIN REINFORCING BARS
TO BE REMAINED
TO REMAIN
C1 C1

REGULAR BEAM
TO BE REMAIN
PLAN PLAN PLAN
PLAN
CANTILEVER SLAB CANTILEVER SLAB AND BEAM TWO WAY SLAB ONE WAY SLAB
TYPICAL DETAIL OF DEMOLITION COLUMN
1. TEMPORARY SUPPORTING STRUCTURES AND/OR CATCH PLATFORM SHALL BE PLACE DIRECTLY THE CANTILEVER BEAM SHALL BE DEMOLISHED AFTER THE DEMOLITION OF THE DEMOLITION OF SLAB SHALL BEGIN IN THE MIDDLE OF THE SLAB AND
1. THE BREAKING OF CONCRETE SHALL BEGIN AT UNSUPPORTED END
DEMOLITION OF R.C. COLUMN
UNDERMEATH THE CANTILEVER STRUCTURE AS PRECAUTION MEASURES, (SEE SECTION REFER TO SEPARATE DRG.) CONNECTING FLOOR SLAB, DEMOLITION OF THE CANTILEVER BEAM SHALL NOT ADVANCE TOWARDS THE SIDES IN 4 DIRECTIONS. AND PROCEED IN STRIPS NOT EXCEEDING 500mm PERPENDICULAR
TO THE LINKS OF SUPPORT.
ABOVE GROUND
THE CONCRETE SHALL BE BRAKEN DOWN GRADUALLY STARTING FROM THE EXTERIOR
ADVANCE FURTHER THAN THE SLAB SO THAT THE SUPPORT FOR THE SLAB IS ALL COLUMN, EITHER EXTERIOR OR INTERIOR MAY BE PRE-WEAKENED AT THE BOTTOM
2. ALWAYS MAINTAINED.
EDGE OF THE CANTILEVER FLOOR, WORKING INWARDS AND TOWARDS ITS SUPPORTING BEAM.
2. THE STRIPS SHALL BE DEMOLISHED FROM THEIR CENTRE TOWARDS OF COLUMN, PULLED DOWN ONTO BUILDING FLOOR FOR FURTHER BREAKEN.
IN BOTH DIRECTION.

DEMOLITION OF R.C. BEAM (MANUAL METHOD)


1. BEAMS MAY BE DEMOLISHED BY GRADUALLY BREAKING AWAY THE CONCRETE.
THE REINFORCEMENT SHALL REMAIN AND CUT OFF AFTER THE CONCRETE IS BROKEN AWAY.
2. ALTERNATIVELY, THE ENTIRE BEAM SECTION MAY BE DISMANTLED AND LOWER ONTO
THE FLOOR LEVEL FOR FURTHER BREAKDOWN.
REV DATE AMENDMENT
CUT CUT COLUMN REINFORCING PRE-DRILLED
ANCHORED AT WINCH OR
INTERNAL BEAM / COLUMN
1&2 3&4 BARS HOLE PROJECT
WITH PULLEY BEAM SECTION TO
ANCHORED AT WINCH OR
BE DISMANTLED
INTERNAL BEAM / COLUMN
WITH PULLEY
MAIN BEAM REINFORCING
BARS CIC SAMPLE PROJECT
CUT 1 & CUT 3 &
CUT 2 CUT 4
CANTILEVER CROSS BRACING TO BE
ADJUSTABLE PROVIDED IN TO DIRECTIONS
B1 B1 PORTION
STEEL JACKET
WIRE CONNECTS TO
WINCH AND ANCHORS WIRE CONNECTS TO
TO STABLE STRUCTURE REINFORCING WINCH AND ANCHORS DRAWING TITLE
BARS TO STABLE STRUCTURE
HORIZONTAL HOLE PLAN REINFORCING
DEMOLITION DETAILS (BY HAND
AT BEAM
ANCHORED AT WINCH OR
BARS ADJUSTABLE
STEEL JACKET
STEEL PROPPINGS HELD TOOLS)
AT 1200c/c MAX.
INTERNAL BEAM / COLUMN SPAN TO BE DEMOLISHED ALTERNATE CONNECTION TO BEAM (CAPACITY = 25kN

1200 MAX.
WITH PULLEY BEAM
(6M MAX.) SECTION
ALTERNATE CONNECTION TO BEAM CA CA
ANCHORED AT WINCH OR
INTERNAL BEAM / COLUMN
CUT 2 CUT 3
PLAN - -

WITH PULLEY

PLAN CUT 1 SCALE

1200 MAX.
CUT 4
PRE-DRILLED HOLE FOR COLUMN REINFORCING
WIRE TO PASS THROUGH BARS DRAWING NO. REV. NO.
CUT 1 CUT 3

EXTERNAL MAIN BEAM BEAM SECTION D003

1200 MAX.
BEAM
CUT 4
CUT 2

ANCHORED AT WINCH OR
WIRE ANCHORED AT WIRE
ADJUSTABLE
STEEL JACKET
SOURCE ---
INTERNAL BEAM / COLUMN RUBBER TIRES PRE-DRILLED HOLE
WITH PULLEY WINCH OR INTERNAL LOCATION OF HOLE TO BE
WIRE ANCHORED AT ADDITIONAL EXTERNAL BEAM EXTERNAL BEAM TIED TO (OPTIONAL) WIRE CONNECTS TO
COLUMN/BEAM WITH COLUMN DETERMINED BY ENGINEER
WINCH OR INTERNAL TIED TO EXISTING BEAM/ EXISTING BEAM /COLUMN

1200 MAX.
WINCH WINCH AND ANCHORS
COLUMN/BEAM WITH COLUMN MAY BE REQUIRED TO STABLE STRUCTURE
PULLEY FOR CORNER SECTION ADJUSTABLE
STEEL JACKET
REINFORCING
RUBBER TIRES ELEVATION BARS PRE-DRILLED HOLE
REINFORCING 90mm (W) x 40mm (H) space
(OPTIONAL) FOR WIRE TO PASS
1. PROP ALL SPAN OF EXTERNAL BEAM . REINFORCING THROUGH LOCATION BARS
WINCH AND PULLEY OF HOLE SHALL BE for COMPANY LOGO
SECTION B1 2. TIE THE SPAN OF BEAM TO DEMOLISHED. (REFER TO DETAILS AS SHOWN)
BARS
WIRE CONNECTS DETERMINED BY
WIRE TO WINCH AND
1. ENSURE NO LOAD ON THE BEAM. 3. REMOVE PROPS AT SPAN TO BE DEMOLISHED. ANCHORS TO
ENGINEER
ALTERNATE CONNECTION TO BEAM SECTION CA
2. TIE THE BEAM TO BE DEMOLISHED (TO DETAILS AS SHOWN) 4. EXPOSE ALL REINFORCEMENT AT CUT 1 TO CUT 4. ALTERNATE CONNECTION TO BEAM STABLE STRUCTURE
ELEVATION
3. EXPOSE REINFORCEMENTS AT BOTH ENDS OF THE BEAM. 5. CUT REINFORCEMENT AT CUT 1, CUT 2, AND CUT 3.
ELEVATION TYPICAL PLAN AT CANTILEVER TYPICAL SECTION AT CANTILEVER
4. CUT REINFORCEMENTS AT POSITIONS CUT 1, CUT 2, AND CUT 3. 6. LOWER THE END AT CUT 1 & CUT 2 ONTO BLDG. FLOOR IN A CONTROLLED MANNER.

5. LOWER THE BEAM AT EXTERNAL END. ONTO BUILDING FLOOR IN A CONTROLLED MANNER. 7. CUT REINFORCEMENT AT CUT 4.
NOTES : NOTES :
6. CUT REINFORCEMENTS AT CUT 4 AND LOWER THE BEAM COMPLETELY. 8. LOWER THE OTHER END OF BEAM IN A CONTROLLED MANNER. THE TIE WIRE ARRANGEMENT IS ILLUSTRATION PURPOSE. IT MAY BE THE TIE WIRE ARRANGEMENT IS ILLUSTRATION PURPOSE. IT MAY BE
NOTE : THE TIE WIRE ARE INDICATIVE. IF THERE ARE PERMANENT ANCHORS OR LIFTING NOTE : THE TIE WIRE ARE INDICATIVE. IF THERE ARE PERMANENT ANCHORS OR LIFTING SIMPLIFIED TO SUIT DEPENDING ON THE AVAILABILITY OF STRUCTURAL ANHOR. SIMPLIFIED TO SUIT DEPENDING ON THE AVAILABILITY OF STRUCTURAL ANHOR.
MACHINES AVAILABLE, TIE WIRE ARRANGEMENTS MAY BE SIMPLIFIED TO SUIT. MACHINES AVAILABLE TIE WIRE ARRANGEMENTS MAY BE SIMPLIFIED TO SUIT.

DETAILS FOR SECURING EXTERNAL BEAMS DETAILS FOR SECURING SECONDARY BEAMS
DEMOLITION OF SECONDARY BEAM DEMOLITION OF MAIN BEAM 90mm (W) x 60mm (H) space
BEFORE DISMANTLING BEFORE DISMANTLING
for AP/RSE/RGE's
signature/ and stamp chop

EXISTING BEAM
A RING SEATS FOR
BAMBOO POSTS
1200 1200 1200 1200 1200
MAX. MAX. MAX. MAX. MAX.

50
NET 3.5mm DIAMETER HEAVY DUTY NET
BD's OFFICAL USE

200
TARPAULIN

SCREEN TIE AT EVERY 2m


HORIZONTALLY AND VERTICALLY
OVER LAPPING WIDTH NOT WALL TIE
MAX.
1200

LESS THAN 300mm

700
BRACING SCREEN
TIE AT CATCHFAN STEEL WIRE WITH ANCHOR BOLT 80x80x6mm
MAXIMUM SPACING 3m EQUAL ANGLE
(S275. JO)
MAX.
1200

TEMPORARY SINGLE PROPPING


@1200 C/C MAX. BOTH DIRECTION METAL SHEET
A

100
(0.5mm)
NET STEEL WIRE WITH ANCHOR BOLT
MAXIMUM SPACING 3m

A
TARPAULIN AT WALL WITHOUT OPENING
BAMBOO WITH EFFECTIVE WINDOW OR WALL
A-A
MAX.
1200

OPENINGS EXISTING R.C. STRICTURE 600


DIAMETER NOT LESS THAN 40mm
- (MIN. 150mm THK.)
100 MIN.
90mm (W) x 150mm (H) space
BAMBOO MAX. SPACING 1000 MAX.
200mm c/c for BD's approval stamp /
certification of copies of
STEEL WIRE WITH ANCHOR BOLT approved plans
MAXIMUM SPACING 3m TYPICAL DETAIL FOR STEEL BRACKET (PNAP ADM-10 APP A)
1.5m (Mim.) WALL TIE AT WALL WITHOUT OPENING
* ALL JOINTS TO BE 5mm F.W. ALL ROUND
TYPICAL DETAIL FOR BAMBOO CATCHFAN & SCREEN COVER NOTES ON ANCHOR BLOTS: TYPE
MIN.
EMBEDMENT MIN.
MIN.
EDGE
RECOMMENDED
LOAD TEST LOAD
CROSS BRACING (FORMED BY 25x25x3mm THICK STEEL ANGLES) EXISTING BEAM TO SOUND
CONCEITS
SPACING
(mm)
DISTANCE TENSION SHEAR
TENSION
(KN)
TYPICAL DETAILS OF PROPPING NOTES : 1. BAMBOO FOR THE CONSTRUCTION OF SCAFFOLD, AND CATCHFAN SHALL HAVE 1. ANCHOR BLOTS SHALL BE INSTALLED STRICTLY IN
(mm)
(mm) (KN) (KN)
AN EFFECTIVE DIAMETER NOT LESS THAN 40mm. ACCORDANCE WITH MANUFACTURER'S SPECIFICATION
TYPICAL PLAN FOR PROPPING N.T.S.
ALL PROPS SHALL HAVE CAPACITY OF 25kN PER LEG WITH BRACING AT 2. METAL SHEET, NET AND TARPAULIN SHALL BE FASTENED TO THE BAMBOO DECK
HST
M12
70 60 75 4.0 11.7 6.0
REQUIRED SPACING TO MANUFACTURER'S RECOMMENDATION AT 4 CORNERS OF THE SHEET OR AT SPACING NO LESS THAN 1.5m APART WHICHEVER
N.T.S. IS LESS.
Tekla Structures
BD REF :

BIM REF :

MEMBER SIZE:
CONCRETE FOORING
(TYPE 1 TO V) T10 @ 250 BW SP2 CH1
REBAR SIZE, SPACING (AT 300c/c)
CH1 B.L.
C1 152 x 152 x 23 kg/m UC CH1
50 x 50 x 6 THK. 152 x 152 x 23 kg/m UC SP1
C2 203 x 203 x 46 kg/m UC C1
M.S. ANGLE 225mm(H).
4mm FILLET
B1 152 x 89 x 16 kg/m UB CONTINUOUS
WELD
CH1 (AT 300 c/c) CONCRETE

1100
B2 203 x 133 x 25 kg/m UB ALL ROUND SP1
12 Ø STEEL PIN. BLOCK FALL 1:50
B3 254 x 146 x 31 kg/m UB WIRE MESH
B1 CH1
4mm FILLET WELD
B4 457 x 191 x 74 kg/m UB
ALL ROUND
B5 178 x 102 x 19 kg/m UB
SP1
B4
SB1,MB1 305 x 165 x 54 kg/m UB 3 THICK NYLON B2
6 FILLET WELDED B1 B1
CH1 127 x 64 x 12.9 kg/m CHANNEL @ 300c/c BUSHING
6 THICK STEEL PLATE C1
CH2 76 x 38 x 6.7 kg/m CHANNEL @ 600c/c B1 C1
(BOTTOM ART)
25 Ø HARDENED 100x100x6mm THK.
SP1 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT
100x100x6mm THK.
SITE CH1
STEEL ROD WITH M.S. STIFFENER
SP2 3mm STEEL PLATE IF GRADE S275 OR EQUIVALENT M.S. STIFFENER
12 Ø STEEL PIN
STIFFENER PLATE 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT
125mm(H).
CONTINUOUS
DETAIL 2 4mm FILLET WELD CONCRETE
BLOCK FALL 1:50
SCALE 1:10 DETAIL 3 ALL ROUND
SP1

SCALE 1:10 CH1

5500
300
DETAIL 1 FALL 1:50 SP2
C1 CH1
DETAIL 4
C1 SCALE 1:10
CONCRETE
FOOTING FULL PENETRATION FULL PENETRATION
BUTT WELD BUTT WELD
6mm FILLET SLIDING GATE
C1 WITH MESH
WELD ALL CH1 SP2
SP1 DOOR PANELS
ROUND X

2300
CORRUGATED
4mm FILLET WELD - CH2
SP2 METAL SHEET
ALL ROUND CH2 (AT 500c/c) C1

500
CH1
DETAIL 5

800
(MI
T10 - 250 E.F.
N.)
1000

M6 S.S. SELF TAPPING SCREW


WITH 2mm THK. NEOPRENG
WASHER OR BOLTING AS SPECIFIED
SECTION X B1 4mm FILLET WELD
3600L. x 250W. x 800H.
PAVEMENT
B1 ALL ROUND
800

BY CORRUGATED STEEL SHEET SCALE 1:10 R.C. FOOTING


CLADDING MANUFACTURER @ 300c/c T10 - 250c/c 250 1500 (MIN.) 250
B1 B1

4mm FILLET WELD


CORRUGATED
METAL SHEET
200x200x6mm THK. CONNECTION DETAIL 100x100x6mm THK. 100x100x6mm THK. SECTION A
M.S. STIFFENER M.S. STIFFENER
ALL ROUND STEEL PLATE (GANTRY)
OF STEEL POST SCALE 1:50
DETAIL 1
50

M6 S.S. SELF TAPPING SCREW


SCALE 1:10 WITH 2mm THK. NEOPRENG
REV DATE AMENDMENT
250/300/450/500 SCALE 1:10 WASHER OR BOLTING AS SPECIFIED
50

6mm THICK MILD BY CORRUGATED STEEL SHEET


CH1 PROJECT
DETAILS OF HOARDING FOOTING 250/300/450/500
STEEL PLATE CLADDING MANUFACTURER @ 300c/c

(WITH CORRUGATED STEEL SHEET)


CORRUGATED METAL CIC SAMPLE PROJECT
DETAILS OF HOARDING FOOTING SHEET 0.4mm THK.

1100
SCALE 1:10 SCALE 1:10

B1
B2
DETAIL 7 DRAWING TITLE
SCALE 1:10 DETAIL FOR DEMOLITION WORKS (1/2)
CH1

CH1 (BEHIND) SP1 CH1 SP1 CH1 (BEHIND)


CH1 (BEHIND)

SCALE

5500 (CLEAR)
DRAWING NO. REV. NO.

D004
3mm THICK 3mm THICK 3mm THICK
SP2
STEEL PLATE STEEL PLATE STEEL PLATE SOURCE ---

DETAIL 2
(600mm TUBE LIGHT
AT 3000mm c/c)

EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. 90mm (W) x 40mm (H) space
CORRUGATED METAL SHEET CORRUGATED METAL SHEET for COMPANY LOGO
2300

2300
3600L. x 250W. x 800H. 3600L. x 250W. x 800H.
METAL R.C. FOOTING
R.C. FOOTING
GATE
1100

1100

1100

1100
800

800
CH2 (BEHIND)
2800L. x 250W. x 1100H.
R.C. FOOTING
100

200 2400 200 2000 200 2400 200 1950 250 3100 250 STEEL CASTOR 7500 LATCH BOLT BEHIND 250 3100 250 1950 200 2400 200 2000 200 2400 200

2800 2000 2800 1950 3600 A 7500 3600 1950 2800 2000 2800
-
CH2 (BEHIND)
SP1 CH1 (BEHIND) CH1 ELEVATION OF COVERED WALKWAY & GANTRY 1 (VIEW -1) SECTION OF 2800L. x 250W. x 1100H. 90mm (W) x 60mm (H) space
SCALE 1:50 HOARDING TYPE A R.C. FOOTING for AP/RSE/RGE's
CH1 signature/ and stamp chop

CH1
SP1

1100
FALL 1:50
SP1

1100
3mm THICK CH1 FALL 1:50
CH1
B.L.
STEEL PLATE

300
B2 FALL 1:50
B1 B1 CH1
100mm(H). BD's OFFICAL USE

300
CONTINUOUS SP2 B3 FALL 1:50
B1 B1
CONCRETE SP1
1100

CH1
(600mm TUBE LIGHT BLOCK FALL 1:50 SP2
B1
AT 3000mm c/c) SITE DETAIL 4 C2 CH1
CORRUGATED METAL SHEET CH1 C2 B1
C2
FALL 1:50
300

C2
B1 B1

SP2
CH1 B1
DETAIL 7 DETAIL 3

4000
WATERPROOF C1
C1 FLUORESCENT

4000
LAMP
2300

CORRUGATED
CH2 METAL SHEET
3000L. x 300W.
1200

1200

1200

500 x 1200H.
90mm (W) x 150mm (H) space
1200
(MI R.C. FOOTING 3000L. x 450W.
800

N.) x 1000H. for BD's approval stamp /


R.C. FOOTING certification of copies of

1000
200 2600 200 1800 200 2600 200 1800 200 2600 200
approved plans
2800L. x 250W. x 800H. (PNAP ADM-10 APP A)
3000 1800 3000 1800 3000 R.C. FOOTING 300 300
250 1500 (MIN.) 250 450 450
3300 (MIN.)
CH2 (BEHIND) 4750 (MIN.)
ELEVATION OF TYPE B COVERED WALKWAY (VIEW - 2) TYPICAL SECTION OF HOARDING TYPE A TYPICAL SECTION OF HOARDING TYPE B
SECTION OF TYPICAL SECTION OF HOARDING TYPE C
HOARDING TYPE B SCALE 1:50
SCALE 1:50 SCALE 1:50
SCALE 1:50
Tekla Structures
BD REF :

BIM REF :

STEP 1
(TOP SLAB)
1
SS

STEP 2

DEMOLITION
LS2

DIRECTION
(SIDE WALL)
NO PERSONNEL ON
THIS SIDE OF THE
WALL DURING SS
DEMOLITION OF WORKER DEMOLISHES THE 1
THE BRICK WALL BRICK WALL BY HAMMERING
STEP 3 THE BRICK FROM TOP TO
(BOTTOM SLAB) BOTTOM.

SEQUENCE FOR DEMOLITION OF STAIRCASE:


STEP 4
(PLINTH) LS1
R/F 1. ERECT THE STEEL PROPS AT 1.2m c/c MAX. IN BOTH DIRECTION
FB12 FB14 UNDERNEATH THE STAIRCASE BEFORE DEMOLITION.
2. DEMOLITION OF STAIR FLIGHT SS1 OF STAIRCASE.

DEMOLITION PROCEDURE 1
3. DEMOLITION OF UPPER LANDING LS2
SS 4. DEMOLITION OF LOWER LANDING LS1
FOR WATER TANK 5. DEMOLITION THE SUPPORTING BEAM FB9&FB12
1. ENSURE NO WATER INSIDE THE WATER TANK. DEMOLITION OF BRICK WALL 6. THE MAIN BEAM FB7 AND FB14 SHALL BE DEMOLISHED UNTIL
DEMOLISHED ALL THE SUPPORTING MEMBER.
2. USE HAND APPLIANCE TO HACK OFF THE CONCRETE OF
THE WATER TANK STEP BY STEP AND IN THE DEMOLITION FB7 LS2 FB9
DIRECTION AS SHOWN ABOVE.
SS
1

LS1
FB12 FB14
FELLING OF R.C. WALL (MANUAL METHOD)
1. REINFORCEMENT CONCRETE WALLS MAY BE DEMOLISHED BY CUTTING DOWN THE WALL INTO 1
MANAGEABLE SECTIONS, PRE-WEAKED AT THE WALL BASE AND PULLED DOWN ONTO SS
BUILDING FLOOR FOR FURTHER BREAKDOWN.
W1 REINFORCING BARS IN THE BEAM DEMOLITION SEQUENCE OF STAIRCASE
- CONNECTING TO EXTERIOR COLUMN
TO REMAIN FOR ADDITIONAL
1M~2M 1M~2M 1M~2M SUPPORT

FB7 LS2 FB9


SS
1
BEING WITH SECTION AT MID SPAN.
BREAK AWAY A VERTICAL GROOVE
WITH SOME REINFORCING BARS
REMAIN TO SUPPORT THE
STRUCTURE
REV DATE AMENDMENT
LS1
FB12 FB14
PROJECT
ADDITIONAL TIE WIRE FOR
EXTERNAL WALLS ONLY SIZE
AND NO. OF TIE WIRE SHALL BE
DETERMINED BY THE RES. AND WALL TIE ANCHORED TO INTERIOR
COLUMN OR BEAM
CIC SAMPLE PROJECT
SHALL BE SPECIFIED ON THE
DEMOLITION PLANS

SITE BOUNDARY SITE BOUNDARY

EXTERNAL R.C. WALL (VIEW FROM INSIDE) ADJOINING BUILDING ADJOINING BUILDING
DRAWING TITLE
REINFORCING BARS TO REMAIN
FOR ADDITIONAL SUPPORT
DETAIL FOR DEMOLITION WORKS (2/2)
600 MAX.

TIE WIRE TO PULL


THE WALL DOWN
TIE WIRE FOR ADDITION
SAFETY (EXTERNAL WALLS ONLY) EXISTING BUILDING
TO BE DEMOLISHED WATER-PROOF
SIZE AND NO. OF TIE WIRE SHALL CEMENT EXTERIOR
BE DETERMINED BY THE RSE AND FINISHING AND
PULLEY SHALL BE SPECIFIED ON THE
DEMOLITION PLANS
MAKE GOOD
EXPOSED
SCALE
EXTERNAL WALL
BREAK OUT THE CONCRETE
ON THE INTERIOR FACE. CUT DRAWING NO. REV. NO.
REINFORCING BARS TO
REMAIN
PULLEY D005
SECTION W1
PRIOR TO PULLING SOURCE ---

CUTTING AWAY THE


REINFORCING BARS
CONNECTING THE WALL
SECTION.
REINFORCING BAR AT
THE BOTTOM TO REMAIN.
90mm (W) x 40mm (H) space
PULLING DOWN THE WALL for COMPANY LOGO
SECTION BY WIRE AND
WINCH IN A CONTROLLED
MOTION.

NOTES:
RUBBER TIRES CEMENT EXTERIOR FINISHING SHALL BE APPLIED IN TWO COATS :
(OPTIONAL) (i) THE FIRST COAT SHALL HAVE A MINIMUM THICKNESS OF 10mm
WITH A CEMENT-LIME-SAND MIX RATIO OF 1:2:6
SECTION W1 (ii) THE SECOND COAT SHALL HAVE A MINIMUM THICKNESS OF 10mm
NOTES : WITH A CEMENT-LIME-SAND MIX RATIO OF 1:3:6
THIS METHOD MAY APPLY TO BOTH HAND-FELLING OF INTERIOR AND
EXTERNAL WALLS.

FELLING OF REINFORCED CONCRETE WALL TYPICAL DETAIL FOR CEMENT EXTERIOR FINISHING
TO ADJOINING EXTERAL WALL 90mm (W) x 60mm (H) space
N.T.S. for AP/RSE/RGE's
signature/ and stamp chop

BD's OFFICAL USE

90mm (W) x 150mm (H) space


for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :

BIM REF :

LEGEND N (E) 835350866.21


(E) 835335933.14
(N) 819789820.33 (N) 819792735.75

Proposed Covered Walkway

Proposed Gantry

Concrete Footing

Site Boundary

Pedestrain Railing
12217
3194

Manhole
3.92 mPD

3.90 mPD

3.86 mPD REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT


(E) 835353437.65 (E) 835368370.62
(N) 819700161.08 (N) 819703076.49

2639
DRAWING TITLE
HOARDING LAYOUT PLAN

10078
SCALE

DRAWING NO. REV. NO.


H001

BLOCK PLAN ( 1:500 ) SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
PA PB PC PD PE PF PG PH PJ signature/ and stamp chop
Type C Hoarding
Type 1 (GANTRY) Type 1 Hoarding

BD's OFFICAL USE

P4

Type B Hoarding
5535
P3

2150
Type A Hoarding

P2

3175
10740 12240 11055 9620 15355 12365 6500 9200
P1
90mm (W) x 150mm (H) space
for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
g
ardin
B Ho
Type A Hoarding Type

Plan EGL (1:200)


Tekla Structures
BD REF :

MEMBER SIZE: BIM REF :


CONCRETE FOORING
(TYPE 1 TO V) T10 @ 250 BW
REBAR SIZE, SPACING
50x50x6 THK.
C1 152 x 152 x 23 kg/m UC M.S. ANGLE SP2 CH1
C1 FULL PENETRATION
C2 203 x 203 x 46 kg/m UC FULL PENETRATION
BUTT WELD BUTT WELD
B1 152 x 89 x 16 kg/m UB WIRE MESH
12 DIA. STEEL PIN.
B2 203 x 133 x 25 kg/m UB C1
B3 254 x 146 x 31 kg/m UB
3mm THK. B1 X
-
B4 457 x 191 x 74 kg/m UB 6mm FILLET WELDED
NYLON BUSHING
B5 178 x 102 x 19 kg/m UB
SB1,MB1 305 x 165 x 54 kg/m UB 6mm THICK STEEL 4mm FILLET WELD ALL B1
PLATE (BOTTOM ART) ROUND
CH1 127 x 64 x 12.9 kg/m CHANNEL @ 300c/c
25 DIA. HARDNED
CH2 76 x 38 x 6.7 kg/m CHANNEL @ 600c/c
STEEL ROD WITH 12
100X100X6mm THK. M.S.
SECTION X
SP1 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT DIA. STEEL PIN
STIFFENER SCALE 1:10
SP2 3mm STEEL PLATE IF GRADE S275 OR EQUIVALENT
STIFFENER PLATE 6mm STEEL PLATE IF GRADE S275 OR EQUIVALENT

CONNECTION DETAIL
DETAIL 2 DETAIL 3
1 : 10 1 : 10 OF STEEL POST
SCALE 1:10
CH1

1105.877
225mm(H) B.L. SP1
C1
C1 CONCRETE FOOTING CONTINUOUS
CONCRETE FOOTING CH1 1:50
C1 CONCRETE
BLOCK
CH1

B2 B1
SP1 SP2 B4
CH2 (AT 500 c/c)

B.L.
4mm FILLET WELD
T10-250 E.F. CH1 CH1
ALL ROUND M6 S.S SELF TAPPING SCREW
WITH 2mm THK. NEOPRENG
WASHER OF BOLTING AS 6mm FILLET WELD 100mm(H)
800

ALL ROUND CONTINUOUS 100mm(H) CH1


800

SPECIFIED BY CORRUGATED SP1


STEEL SHEET CLADDING CONCRETE 1:50 CONTINUOUS
T10-250 c/c
MANUFACTURER @ 300c/c
B1 BLOCK CONCRETE D ETA I L 1
B1 CH1 D ETA I L 4
BLOCK

450
CORRUGATED CH1 SP2 REV DATE AMENDMENT
1:50 SP2

5500
METAL SHEET 200x200x6mm THK. B1 1:50
D ETA I L 3 PROJECT
STEEL PLATE
B1
WATERPROOF B1 CIC SAMPLE PROJECT
50

200x200x6mm THK. D ETA I L 7


CH1
50

STEEL PLATE FLUORESCENT


250/300/450/500
LAMP
C1
DETAIL 1 CORRUGATED
SLIDING GATE
C1
DETAIL 8 DETAIL 5 DRAWING TITLE

2200
1 : 10 METAL SHEET CH2 CH2
WITH MESH H002 HOARDING TYPICAL DETAILS
1 : 10 1 : 10

1100
DOOR PANELS
D ETA I L 8 D ETA I L 5
500 (MIN.)

800
CORRUGATED 500 (MIN.)
METAL SHEET
SP2
SP1 2800L. x 250W. x 1100H. 250 2000 250 2800L. x 250W. x 800H. SCALE
CH1 250 1500 (MIN.) 250
R.C. FOOTING R.C. FOOTING
C1 DRAWING NO. REV. NO.
C1
CH1
B1 SOURCE ---
4mm FILLET WELD
TYPICAL SECTION OF HOARDING TYPE A SECTION A (GANTRY)
B1 ALL ROUND
1 1 : 50 A 1 : 50
B1 90mm (W) x 40mm (H) space
CH2
4mm FILLET WELD ALL 100X100X6mm THK. for COMPANY LOGO
B1 M.S. STIFFENER
ROUND
M6 S.S SELF TAPPING SCREW WITH
CORRUGATED METAL 2mm THK. NEOPRENG WASHER OF
100X100X6mm THK. M.S. SHEET 0.4mm THK. BOLTING AS SPECIFIED BY
STIFFENER CORRUGATED STEEL SHEET CLADDING
MANUFACTURER @ 300c/c CH1

DETAIL 4 DETAIL 7 A
H002
90mm (W) x 60mm (H) space
1 : 10 1 : 10 for AP/RSE/RGE's
signature/ and stamp chop
B1
B2
1
H002

CH1 BD's OFFICAL USE


CH1
5500 (CLEAR)

D ETA I L 2

600mm TUBE LIGHT AT


3000mm c/c 90mm (W) x 150mm (H) space
for BD's approval stamp /
CORRUGATED certification of copies of
METAL SHEET approved plans
1100

1100
(PNAP ADM-10 APP A)
800

800
2800L. x 250W. x 1100H.
CH2 CH2
R.C. FOOTING
100

STEEL CASTOR 2800L. x 250W. x 800H.


METAL GATE
200 2400 200 2000 200 2400 200 2000 200 2350 250 6000 Max R.C. FOOTING 2400 Max. 200 2000 200 2400 200 2000 200 2400 200

SECTION OF
HOARDING TYPE C
Tekla Structures

ELEVATION OF COVERED WALKWAY & GANTRY


2 1 : 50
BD REF :

SCHEDULE OF WALING SCHEDULE OF SEONDARY STRUT AND CORNER STRUT BIM REF :
COMPRESSION PILE
GENERAL NOTES: STANDARD FOR FILLING WORK NOTES ON PRE-BORING FOR INSTALLATION OF SHEET PILES (kNm) SHEAR (kNm) MOMENT (kNm) LAYER STRUT MEMBER SIZE STRUT LEVEL
PILE TYPE
TYPE LAYER WALING MEMBER SIZE
=1.4*Fh* =1.4*Fh* =1.4*Fh* A 1 UC305*305*97 +3.254
1. ALL DIMENSIONS ARE IN mm AND LEVELS IN mPD. 1. FILL MATERIAL SHALL BE GRADED, CONTAINING NO PARTICLES COARSER THAN 200mm 1. THE PRE-BORED HOLES SHALL BE SUNK ALONG THE ALIGNMENT OF THE SHEET PILE (1.414*3.15) (0.6*3.15) (3.15^2/9)
2. ALL DESIGN SHALL COMPLY WITH HONG KONG BUILDING (CONSTRUCTION) REGULATION 1990 AND THE PERCENTAGE BY MASS PASSING 75mm BS TEST SIEVE SHALL BE 75% TO WALL USING SYMMETRIX DRILLING METHOD. THE PRE-BORED HOLES SHALL BE A 2 UC305*305*97 +1.754
100%. A 1 UB533*210*92 531 228 100
EDITION AND STRUCTURAL DESIGN OF STEEL IS IN ACCORDANCE WITH THE CODE OF SUPPORTED BY TEMPORARY STEEL CASING ALONG THE FULL DEPTH OF THE EXCAVATION.
A 3 UC356*368*177 +0.284
PRACTICE FOR THE STRUCTURAL USE OF STEEL 2011. 2. THE IN SITU FIELD DRY DENSITIES OF COMPACTED MATERIALS FORMING THE 2. THE PRE-BORED HOLES SHALL BE DRILLED IN ACCORDANCE WITH THE FOLLOWING A 2 UB533*210*92 803 344 151
3. THIS SET OF DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOUNDATION PLAN. EARTH FILL SLOPE SHALL BE NOT LESS THAN 95% OF THE MAXIMUM DRY REQUIREMENTS: - A 4 UC356*368*177 -1.216
A 3 UB610*305*179 1550 665 291
4. THE CONTRACTOR SHALL CHECK ALL RELEVANT DRAWINGS AND VERIFY LEVELS AND DENSITY DESCRIBED IN ITEM (2) BELOW. a) DEVIATION FROM THE CORRECT LINE FOR THE LOCATION NOT
DIMENSIONS IN ADVANCE OF THE WORK AND WORK AND REPORT ANY DISCREPANCY TO 1196 A 5 UC356*368*202 -2.713
3. THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENTS SHALL BE GREATER THAN 20mm. A 4 UB610*305*179 2791 524
THE ENGINEER IMMEDIATELY. A 6 UC356*406*235 -4.210
DETERMINED IN ACCORDANCE WITH THE STANDARD GIVEN IN GEO SPEC 3 b) DEVIATION FROM VERTICALITY OF INDIVIDUAL PRE-BORED HOLES IN A 5 UB610*305*238 3952 1694 741
5. ALL EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED GROUND LEVEL AFTER
COMPLETION OF FOUNDATION CONSTRUCTION. CLAUSE 10.1 & 10.2. EACH SOIL TYPE SHALL BE TESTED WHEN FIRST USED ANY DIRECTION SHALL BE LESS THAN 1:100. 6 2181 A 7 UC356*406*287 -5.703
A UB610*305*238 5088 9541
6. THE CONSTRUCTION SEQUENCE FOR EXCAVATION AND LATERAL SUPPORT, REFER TO THEREAFTER AT THE SAME TIME AS EVERY SET OF FIELD DENSITY TESTS c) DRILL 250mm MINIMUM DIAMETER HOLES FROM EXISTING GROUND A 8 UC356*406*287 -7.203
ARE OBTAINED. RECORDS SHALL BE KEPT, IDENTIFYING ON DRAWINGS THE LEVEL TO THE REQUIRED LEVEL BY SYMMETRIX DRILLING METHOD. A 7 UB610*305*238 4871 2131 932
DRG. NO. S-ELS-006 TO 007.
7. THE INSTALLATION OF SHEET PILE SHALL BE WALL CARRIED OUT TO ACCORDING TO SOIL TYPE, PLAN LOCATION AND ELEVATION REFERENCE TO PRINCIPAL DATUM 3. AFTER DRILLING THROUGH TO THE REQUIRED DEPTH OF OBSTRUCTIONS THE 243 B 1 UC305*305*97 +3.254
A 8 UB914*305*289 5934 113
APPROVAL DRAWINGS PRIOR TO THE COMMENCEMENT OF EXCAVATION AND OF EACH TEST TOGETHER WITH THE MAXIMUM DRY DENSITY AND OPTIMUM INTERIOR OF EACH CASING SHALL BE FILLED WITH APPROVED GRANULAR BACKFILL 199 B 2 UC356*368*177 +0.284
AA 1 UB533*210*92 464 87
LATERAL SUPPORT WORKS. MOISTURE CONTENTS. GRAPHS OF DRY DENSITY VS MOISTURE CONTENTS, MATERIAL SHALL BE TOPPED UP IMMEDIATELY.
509 B 3 UC356*368*177 -2.716
LABORATORY TEST RECORD SHEETS AND A COMPLETE SOIL DESCRIPTION ARE 4. UPON COMPLETION SHEET PILE WALL SHALL BE INSTALLED TO THE REQUIRED TOE AA 2 UB533*210*92 1186 223
TO BE KEPT IN A COMPANION FOLDER. LEVEL BY THE METHOD APPROVED BY THE RSE. THROUGH A GUIDE FRAME AT 755 B 4 UC356*368*202 -4.213
AA 3 UB610*305*179 1760 330
NOTES ON CONSTRUCTION MATERIAL 4. THE IN SITU FIELD DENSITY AND MOISTURE CONTENTS SHALL BE DETERMINED GROUND LEVEL TO ENSURE PROPER PITCHING, VERTICALITY AND ALIGNMENT OF B 5 UC356*368*202 -5.713
AA 4 UB610*305*238 3020 1294 567
IN ACCORDANCE WITH THE STANDARD GIVEN IN GEO SPEC 3 CLAUSE 11.1 SHEET PILE WALL
1570 B 6 UC356*406*235 -7.210
1. STRUCTURAL STEEL MEMBERS & PNAP 55 TO DETERMINE THE RELATIVE COMPACTION ACHIEVED. THE 5. NO WITHSTANDING THE ABOVE-MENTIONED MINIMUM PRE-BORING REQUIREMENTS, AA 5 UB610*305*238 3662 687
a. ALL STRUCTURAL STEEL MEMBERS SHALL BE GRADE S355 (CLASS 1) WELDABLE NUMBER OF DETERMINATIONS FOR EACH BATCH OF FILL MATERIAL SHALL BE IT IS THE CONTRACOTR'S RESPONSIBILITY TO PROVIDE ANY ADDITIONAL 1588 C 1 UC305*305*97 +3.254
AA 6 UB610*305*238 3705 695
STRUCTURAL STEEL AND COMPLY WITH TO BS EN 10025:2004. AS STATED IN TABLE 1 BELOW. RECORDS SHALL BE KEPT, IDENTIFYING ON PRE-BORING OR ALTERNATIVE MEASURES TO ENSURE THAT ALL SHEET PILE WALLS 2
1665 C UC356*368*177 +0.284
b. ALL WELDING SHALL COMPLY WITH THE CODE OF PRACTICE FOR STRUCTURAL USE OF AA 7 UB610*305*238 3884 729
DRAWINGS THE SOIL TYPE, PLAN LOCATION AND ELEVATION REFERENCE TO ARE TO BE PRESSED IN FREE OF OBSTRUCTIONS TO ACHIEVE THE REQUIRED TOE
STEEL 2005, BS EN 1011-1:2009, BS EN 1011-2:2001 & BS EN 499:1995. 413 C 3 UC356*368*202 -2.713
PRINCIPAL DATUM OF EACH TEST TOGETHER WITH DRY DENSITY OF SOIL TESTED, LEVELS SPECIFIED. B 1 UB533*210*92 964 181
c. ALL CONNECTIONS SHALL BE 10mm FILLET WELDS ALL ROUNDED UNLESS OTHERWISE C 4 UC356*406*287 -5.703
SPECIFIED. MOISTURE CONTENTS AND RELATIVE COMPACTION ACHIEVED (%). THE FIELD 6. THE CONTRACTOR SHALL SUBMIT A DETAILED METHOD STATEMENT TOGETHER WITH B 3 UB610*305*179 2532 1085 475
d. SAMPLES OF WELDING MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE SHEETS, CALCULATION SHEETS AND A COMPLETE SOIL DESCRIPTION ARE TO BE THE PLANT AND EQUIPMENT FOR PRE-BORING to AP, RSE & RGE FOR APPROVAL
B 3 UB610*305*179 2538 1088 476
SUBMITTED TO RSE FOR APPROVAL. ALL WORKS, MATERIALS AND TESTING KEPT IN A COMPANION FOLDER. BEFORE COMMENCEMENT OF WORKS. THE PROPOSED METHOD AND SEQUENCE OF
SUCH AS TESTING OF STEEL BAR SHALL COMPLY WITH GENERAL SPECIFICATION FOR 5. ALL TESTS SHALL BE CARRIED OUT BY OR UNDER THE SUPERVISION OF THE PRE-BORING SHALL BE ARRANGED SO AS TO MINIMIZE THE CONSTRUCTION NOISE B 5 UB610*305*179 2538 1088 476
CIVIL ENGINEER WORKS 1992 EDITION AND HONG KONG BUILDING(CONSTRUCTION) GEOTECHNICAL ENGINEER, OR BY AN INDEPENDENT TESTING AGENCY. DURING PRE-BORING. B 6 UB610*305*238 3705 1588 695
REGULATION 1990 EDITION UNLESS OTHERWISE STATED IN THE DRAWING. 7. SHALL ANY UNDUE SETTLEMENT OCCUR DUE TO PRE-BORING, THE CONTRACTOR
B 7 UB610*305*238 3874 1649 722
SHALL SUBMIT A REMEDIAL PROPOSAL FOR THE APPROVAL OF THE RSE TO PREVENT
NOTES ON PROTECTION OF EARTHWORKS AGAINST HEAVY RAINFALL FURTHER UNDUE SETTLEMENT PRIOR TO THE RE-COMMENCEMENT OF THE B 8 UB610*305*238 3260 1398 612
NOTES FOR EXCAVATION AND LATERAL SUPPORT (ELS) WORKS (TEMPORARY) PRE-BORING WORKS. C 1 UB533*210*92 803 344 151
1. SURFACE WATER FLOWING INTO AND OUT OF THE SITE SHALL BE 8. THE CONTRACTOR SHALL KEEP RECORD OF EACH PRE-BORED HOLES FOR
1. THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR THE ERECTION, MAINTENANCE AND C 3 UB610*305*179 2594 1112 487
INTERCEPTED AND CONDUCTED FROM THE SITE TO AN INDICATED SAFE ENGINEER INSPECTION.
REMOVAL OF ALL TEMPORARY WORKS DURING CONSTRUCTION. DISCHARGE POINT. AT EACH INTERSECTION AND ABRUPT CHANGE IN C 5 UB610*305*238 4156 1781 780
2. NECESSARY PRECAUTIONS SHALL BE TAKEN TO PREVENT DAMAGE TO EXISTING FOUNDATIONS, DIRECTION OF SURFACE DRAINAGE, CHANNELS AND ACCESSIBLE CATCH 2731
C 7 UB914*305*289 6372 1195
DRAINS, PAVEMENTS, FEATURES, SERVICES ETC. SHOULD ANY DAMAGE OCCUR, NOTIFY THE PIT SHALL BE PROVIDED. ALL DRAINAGE WORKS SHALL BE KEPT CLEAR
ARCHITECT AND RELEVANT AUTHORITIES CONCERNED IMMEDIATELY AND MAKE GOOD BY THE OF DEBRIS.
CONTRACTOR AT NO EXTRA COST AND NO EXTENSION OF TIME. SOIL PARAMETER
2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WORKS DISCHARGE WITHIN
3. ALL TEMPORARY WORKS SHALL BE WITHIN THE SITE BOUNDARY. THE SITE, A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE DISCHARGE POINT. SOIL PARAMETER SECTION PROPERTIES OF WALING
4. DURING SUBSTRUCTURE CONSTRUCTION, THE GROUNDWATER LEVEL SHALL BE KEPT BELOW THE 3. DURING EXCAVATION, A METHOD OF WORKING SHALL BE ADOPTED IN WHICH MOMENT OF SECTION WEB FLANGE
Ø' (DEGREE) C' (kpa) SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
FINAL FORMATION LEVEL. THE MINIMUM AMOUNT OF BARE SOIL IS EXPOSED AT ANY TIME. EXCAVATION GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
FILL 33 1 ITEM
5. THE CONTRACTOR SHALL INCREASE THE FREQUENCY OF MONITORING AS INSTRUCTED BY THE TO FORM THE FINAL FACE SHALL BE FOLLOWED UP IMMEDIATELY WITH
MD 33 1 UB533*210*92 S355 118 55333 92 2076 533.1 209.3 10.1 15.6
ENGINEER SHOULD ANY UNDUE GROUND MOVEMENT BE OBSERVED. SURFACE PROTECTION AND DRAINAGE WORKS AND THE FACE PANEL SIZE REV DATE AMENDMENT
6. MAX. ANGLE FOR TEMPORARY SOIL CUT SLOPE SHALL BE REFERRED TO PLANS AND SHALL BE SMALL ENOUGH TO PERMIT THIS. ALL. 32 2 UB610*305*179 S355 228 151434 178 4906 620.2 307.1 14.1 23.6
SECTIONS. BUT IN NO CIRCUMSTANCE BE GREATER THAN 20?IN MD LAYER. PROJECT
4. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE, THEY CDG 34 5 UB610*305*238 S355 304 207747 238 6564 635.8 311.4 18.4 31.4
SHALL BE PROTECTED WITH HEAVY DUTY SHEETING ADEQUATELY SECURED UB914*305*289 S355 369 504850 289 10897 926.6 307.7 19.5 32.0 CIC SAMPLE PROJECT
AT THE EDGES, SEALED AT THE CREST, AND LAPPED AT JOINTS. WHERE
NOTES ON STRUCTURAL STEELWORK SLOPE FACES ARE TO BE TEMPORARILY EXPOSED FOR MORE THAN TWO
WEEKS, TEMPORARY DRAINS SHALL BE INSTALLED IN ADDITION TO SURFACING. SCHEDULE OF VERTICAL TIE
1. ALL STRUCTURAL STEELWORK SHALL BE COMPLED WITH CODE OF PRACTICE FOR THE STRUCTURAL 5. TRENCHES ON/OR ADJACENT TO SLOPES SHALL BE EXCAVATED WITH ITEM MEMBER MARK GRADE MEMBER SIZE SECTION PROPERTIES OF STRUTS
USE OF STEEL 2011. EXTREME CARE IN SHORT SECTIONS AT A TIME. PRECAUTIONS SHALL MOMENT OF SECTION WEB FLANGE
VERTICAL_TIE D4 S355 UBP356*368*174 SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T DRAWING TITLE
2. ALL LEVEL SHOWN ARE IN METERS AND OTHER DIMENSIONS SHOWN ARE IN MILLIMETERS UNLESS ALWAYS BE TAKEN TO PREVENT WATER ENTERING AND CONNECTING ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
OTHERWISE STATED. IN THE TRENCHES. UC305*305*97 S355 123 22184 96 1442 307.9 305.3 9.9 15.4
EXCAVATION & LATERAL SUPPORT
3. ALL STRUCTURAL STEEL SECTION SHALL BE WELDABLE STRUCTURAL STEEL TO BS EN 10025:2004 NOTES ON SHEET PILING FOR REFERENCE ONLY GENERAL NOTES
UNLESS OTHERWISE NOTED. UC356*368*177 S355 226 57040 177 3099 368.2 372.6 14.4 23.8
4. DESIGN SURCHARGE: 1. STEEL SHEET PILES TO COMPLY WITH BS EN 1993-5 2007 GRADE S355. SCHEDULE OF HORIZONTAL TIE UC356*368*202 S355 258 66255 202 3538 374.6 374.7 16.5 27.0
a) BACK SERVICE LANE (2.0m WIDE) : 10kPa 2. UPON COMPLETION OF INSTALLING SHEET PILE WALLS, A RECORD PLAN FOR SHEET ITEM MEMBER MARK GRADE MEMBER SIZE
UC356*406*235 S355 300 79103 235 4153 381.0 394.8 18.4 30.2
b) RECLAMATION STREET (9.0m WIDE) : 20kPa PILES SHALL BE SUBMITTED TO THE BUILDING AUTHORITY VIA THE R.S.E. FOR CONSENT T1 S355 UC203*203*46
HORIZONTAL_TIE SCALE AS SHOWN@A1
c) FOOTPATH ALONG RECLAMATION STREET (2.0m WIDE) : 5kPa APPLICATION. UC356*406*287 S355 366 99817 287 5073 393.6 399.0 22.6 36.5
d) BEARING PRESSURE AT HOARDING FOOTPATH (0.45m WIDE) : 20kPa 3. IN CASE ROCK OR OBSTRUCTION DUE TO BOULDER OR CORESTONE IS ENCOUNTERED, DRAWING NO. REV. NO.
e) D.L. & L.L. OF EXISTING BUILDING VIA PILING SYSTEM : PREBORING SHOULD BE CARRIED OUT.
(REFER TO RECORD PLAN) DATUM FOR SURCHARGE AT 4. TOLERANCE - THE MAXIMUM PERMISSIBLE DEVIATION FROM THE VERTICAL AT ANY LEVEL SECTION PROPERTIES OF SHORT STRUT / SPACER E001
2/3 OF THE LENGTH OF PILE MEASURED FROM GROUND LEVEL OF A FINISHED PILE IS 1 IN 75.
SCHEDULE OF MAIN STRUT MOMENT OF SECTION WEB FLANGE
f) LIVE LOAD FOR EACH LAYER OF WALING/ STRUT : 2kPa PILE HORIZONTAL DESIGN LOAD SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
5. THE SHEET PILE WALLS SHALL BE INSTALLED BY PRESS-IN, NO VIBRO DRAWING IS ALLOWED
TYPE LAYER STRUT MEMBER SIZE STRUT LEVEL LOAD (kN/m) FOR STRUT (kN) ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
SOURCE ---
DURING INSTALLATION.
A 1 UC305*305*97 +3.254 86 569 152X89X24 S355 30.4 1168 29.05 153 152.4 88.9 7.1 11.6
NOTES ON WELDING A 2 UC305*305*97 +1.754 130 860
NOTES ON EXISTING SERVICES, UTILITIES AND STRUCTURES
A 3 UC356*368*177 +0.284 251 1661 90mm (W) x 40mm (H) space
1. THE CONTRACTOR SHALL SUBMIT TO AP/ RSE HIS PROPOSED PROCEDURE
FOR WELDING. WELDING PROCEDURE WILL BE TESTED IN ACCORDANCE WITH 1. BEFORE CONSTRUCTION COMMENCES, THE CONTRACTOR SHALL CONSULT THE VARIOUS A 4 UC356*368*177 -1.216 452 2990 for COMPANY LOGO
BS EN ISO 15614-1:2004+A1:2008. SERVICES AND UTILITY AUTHORITIES FOR THE EXTENT OF WORKS TO BE CARRIED OUT. 5 640 4234 SECTION PROPERTIES OF HORIZONTAL TIE
A UC356*368*202 -2.713
2. THE CONTRACTOR SHALL ONLY USE QUALIFIED WELDERS WHO HAVE DEMONSTRATED 2. THE CONTRACTOR SHALL EXERCISE DUE CARE DURING THE WORKS ON SITE TO AVOID MOMENT OF SECTION WEB FLANGE
A 6 UC356*406*235 -4.210 824 5451 SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T
THEIR COMPETENCE IN WELDING TO THE AGREED PROCEDURE. EACH WELDER CAUSING DAMAGE TO ADJACENT STRUCTURES PAVETMENT, UTILITIES/SERVICES, PRIVATE ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm)
WILL BE TESTED AS DESCRIBED IN BS EN 287-1:2004. AND GOVERNMENT PROPERTIES. A 7 UC356*406*287 -5.703 805 5326
UC203*203*46 S355 58.8 4565 46.18 449 203.2 203.6 7.2 11.0
3. ALL WELDS SHALL MEET THE ACCEPTANCE CRITERIA LAID DOWN IN BS EN 1011-1:2009 3. SHOULD ANY DAMAGE OCCUR TO THE ADJACENT STRUCTURES, PAVEMENT, A 8 UC356*406*287 -7.203 961 6358
& BS EN 1011-2:2001. UTILITIES/SERVICES,
4. UPON REQUESTED BY THE ARCHITECT WELDS WILL BE TESTED BY RADIOGRAPHIC B 1 UC305*305*97 +3.254 156 1032
PRIVATE AND GOVERNMENT PROPERTIES DUE TO THE CONTRACTOR'S WORKS, THE
EXAMINATION TO BS EN 1435:1997 OR ULTRASONIC EXAMINATION TO BS EN 1714:1998 CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COST INCURRED FROM THE DAMAGE. THE B 2 UC356*368*177 +0.284 410 2713
5. UNLESS OTHERWISE APPROVED, ALL SPLICES TO BE CONTINUOUS FULL-STRENGTH CONTRACTOR SHALL REPAIR, REINSTATE AND MAKE GOOD ANY DAMAGE DUE TO THE 411 2719
B 3 UC356*368*177 -2.716 SECTION PROPERTIES OF VERTICAL TIE
FULL PENETRATION BUTT WELDS. CONTRACTOR'S WORKS TO THEIR ORIGINAL CONDITIONS OR TO THE SATISFACTION OF THE 90mm (W) x 60mm (H) space
6. UNLESS OTHERWISE STATED, ALL FILLET WELDS SHALL BE 8mm ALL ROUND. B 4 UC356*368*202 -4.213 600 3969 MOMENT OF SECTION WEB FLANGE
CM, UNLESS OTHERWISE SPECIFIED. SECTION AREA INERTIA WEIGHT MODULUS DEPTH D WIDTH B THICKNESS t THICKNESS T for AP/RSE/RGE's
7. ALL IMPROPER MATERIALS (e.g. SLAG, DIRT, IRREGULARITIES, OIL etc.) TO BE B 5 UC356*368*202 -5.713 623 4122 ITEM GRADE (cm²) (cm4) (kg/m) (cm³) (mm) (mm) (mm) (mm) signature/ and stamp chop
REMOVED FROM JOINTS PRIOR TO WELDING. 3493 UBP356*368*174 S355 221.5 5100 172.32 2820 361.4 378.5 20.3 20.4
B 6 UC356*406*235 -7.210 528
8. ALL WELDING SHALL COMPLY WITH BS EN 1011, P.T. 1:2009, P.T. 2:2001. PRECAUTIONARY MEASURES TO PREVENT THE
9. SAMPLES OF ALL MATERIALS USED SHALL BE TESTED & TEST RESULTS SHALL BE SUBMITTED TO C 1 UC305*305*97 +3.254 130 860
OCCURRENCE OF OVER BREAK DURING PREBORING
RSE FOR APPROVAL. ALL WORKS, MATERIALS AND TESTING SUCH AS TESTING OF STEEL C 2 UC356*368*177 +0.284 420 2779
BAR SHALL COMPLY WITH GENERAL SPECIFICATION FOR CIVIL ENGINEER WORKS 1992 EDITION AND 4452
C 3 UC356*368*202 -2.713 673
HONG KONG BUILDING (CONSTRUCTION) REGULATION UNLESS OTHERWISE STATED IN 1. A PROCEDURE SHALL BE CARRIED OUT TO MONITOR THE CONDITION OF OVER
THE DRAWING. C 4 UC356*406*287 -5.703 1032 6827
BREAK. IF THE DRILL BIT IS FOUND NOT TO PROPAGATE AFTER A CONSIDERABLE BD's OFFICAL USE
AMOUNT OF DRILLING, THE OPERATOR OF THE DRILLING RIG SHALL STOP THE
DRILLING PROCESS AND INFORM THE ENGINEER IMMEDIATELY. THE RGE/RSE SHALL
REVIEW THE GEOLOGY OF THE SPECIFIC LOCATION. PROPOSAL TO LIMIT ANY OVER
NOTES ON SITE SUPERVISION BREAK OF SOIL SHALL BE SUBMITTED TO AND AGREED BY THE RSE/RGE PRIOR TO
ANY FURTHER DRILLING WORKS MAY COMMENCE.
THE TCP T5 SITE SUPERVISION PERSONNEL UNDER THE RGE'S STREAM SHALL SUBMIT 2. SHOULD ANY UNDUE OVER BREAK OF SOIL OBSERVED DURING THE DRILLING
REGULAR REPORTS OF HER/HIS/THEIR FINDINGS AND RECOMMENDATIONS TO THE RGE. THE OPERATIONS, THE DRILLING AT THAT LOCATION SHOULD BE STOPPED AND THE RSE
RGE SHALL FORMALLY SUBMIT THESE REPORTS TO THE BD AND PROVIDE A COPY TO THE SHALL BE INFORM IMMEDIATELY. THE MONITORING DATA AND METHOD OF
GEO AT MONTHLY INTERVALS OR MORE FREQUENTLY AS NECESSARY PREBORING SHALL BE REVIEWED. PROPOSAL TO LIMIT ANY FURTHER OVER BREAK
TYPICAL CONTENTS OF THE REGULAR REPORTS PREPARED BY THE TCP T5 SITE OF SOIL SHALL BE SUBMITTED AND AGREED WITH RSE PRIOR TO ANY FURTHER
SUPERVISION PERSONNEL INCLUDE THE FOLLOWING: DRILLING WORKS MAY COMMENCE.

(1) PROGRESS OF THE WORKS


(2) RESULTS OF MONITORING DURING CONSTRUCTION PRECAUTIONARY MEASURES FOR PREBORING METHOD
(3) SITE OBSERVATIONS
(4) INSPECTION RECORDS 90mm (W) x 150mm (H) space
1. (a) THE AMOUNT OF AIR SUPPLY TO LIMIT THE PRESSURE OF DRILLINGS SHOULD BE for BD's approval stamp /
(5) REVIEW MONITORED. certification of copies of
(b) THE ADVANCEMENT RATE OF DRILL BIT SHOULD BE MONITORED DURING THE BORING. approved plans
2. THE OVERBREAK SHOULD NOT BE ALLOWED. (PNAP ADM-10 APP A)
3. THE DRILL BIT SHOULD BE ADVANCED SIMUTANOUSLY WITH THE STEEL CASING.

DEPROPPING SEQUENCE OF STRUTS

ALL STRUT SHALL NOT BE REMOVED UNTIL CONSTRUCTION UP TO THE GROUND FLOOR
OF THE SUPERSTRUCTURE HAS BEEN COMPLETED AND THE REQUIRED 28-DAY CONCRETE
STRENGTH HAS BEEN ACHIEVED.
STAGE 1 : CAST PILE CAPS, STRAP/ GROUND BEAM (UNDER SEPARATE SUBMISSION)
STAGE 2 : CAST BASEMENT WALL, COLUMN, WALL, BEAM & SLAB OF B1/F & G/F
(UNDER SEPARATE SUBMISSION)
Tekla Structures

STAGE 3 : REMOVE ALL STRUTS WHEN G/F SLAB AND BASEMENT WALL ACHIEVE
28 DAYS OF STREMGTH
BD REF :

BOUDARY COORDINATES BIM REF :

LEGEND: SHEET PILE SCHEDULE N POINT


A
E (m)
835335.928
N (m)
819789.845
SHEET PILE MEMBER SIZE TOE LEVEL MAX RETAINING FINAL EXCAVATION MIN. EMBEDMENT GRADE N 819792760
SITE BOUNDARY TYPE (mPD) HEIGHT (m) LEVEL (mPD) LENGTH (m) E 835350861 B 835350.861 819792.760
A FSP-VIL-BOX -23.000 12.675 -10.325 14.225 S275 N 819789845
BH1, BH1(P) EXISTING BOREHOLE E 835335928 C 835368.366 819703.101
AA FSP-VIL -18.900 11.275 -7.375 11.525 S275
PROPOSED SHEET PILE D 835353.433 819700.186
B FSP-VIL -18.900 12.175 -8.075 10.825 S275
C FSP-IV -18.900 12.175 -8.075 10.825 S275
PROPOSED SHORT STRUT
D CHS508.0*16.0 -18.900 11.275 -7.375 11.525 S275
4.5 EXISTING LEVEL

PROPOSED MAX. 30°


OPEN CUT SLOPE

KA1 KA1
PROPOSED STRUT SHEET PILE SECTION PROPERTIES
SA1 SA1 MOMENT OF SECTION SECTION AREA MOMENT OF SECTION
DIMENSION (mm) SECTION AREA WEIGHT (PER WEIGHT (PER 1m
(PER PILE) (cm²) INERTIA (PER PILE) (kg/m) MODULUS (PER (PER 1m PILE) INERTIA (PER 1m MODULUS (PER
ITEM w h t PILE) (cm4) PILE) (cm³) (cm²) PILE) (cm4) PILE) (kg/m) 1m PILE) (cm³)
+2.90 PROPOSED EXCAVATION LEVEL FSP-IV 400 170 97 4670 76.1 362 242.5 38600 153.00 2270
15.5
FSP-VIL 500 225 27.6 153 11400 120.0 680 306.0 86000 300.00 3820
PROPOSED BASEMENT WALL
FSP-VIL-BOX 500 450 27.6 306 22800 240.0 1360 306.0 172000 600.00 7640
(UNDER SEPARATE SUBMISSION)
T1 SITE
PROPOSED TIE
K.I.L 201
SHEET PILE SECTION PROPERTIES
GAS GAS PIPE
MOMENT OF SECTION SECTION AREA MOMENT OF SECTION
DIMENSION (mm) SECTION AREA WEIGHT (PER WEIGHT (PER 1m
(PER PILE) (cm²) INERTIA (PER PILE) (kg/m) MODULUS (PER (PER 1m PILE) INERTIA (PER 1m MODULUS (PER
S WAT SALT WATER PIPE ITEM d t PILE) (cm4) PILE) (cm³) (cm²) PILE) (cm4) PILE) (kg/m) 1m PILE) (cm³)
ELEC CHS508.0*16.0 508.0 16.0 247 74909 194 2949 618.27 74909 390.00 2949
ELECTRIC CABLE

FOUL FOUL WATER PIPE


F WAT FRESH WATER PIPE

SITE REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT


N 819703101
E 835368366
N 819700186
E 835353433
DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
LAYOUT PLAN

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
BLOCK PLAN E002
1:500
SOURCE ---

90mm (W) x 40mm (H) space


for COMPANY LOGO

B A
E003 90mm (W) x 60mm (H) space
PG
E003
PA PB PC PD PE PF PH PJ for AP/RSE/RGE's
39629 22158 23500 6064 signature/ and stamp chop
TYPE C SHEET PILE ( TOE LEVEL -18.9 mPD ) TYPE B SHEET PILE ( TOE LEVEL -18.9 mPD ) TYPE A SHEET PILE ( TOE LEVEL -23.0 mPD ) TYPE AA SHEET PILE
( TOE LEVEL -18.9 mPD )
3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150

VERTICAL TIE P4 VERTICAL TIE P4 VERTICAL TIE P4

BH4
BD's OFFICAL USE
-8.075
3043

3043
BH2 -8.075 BH6 BH8 BH10
TYPE C SHEET PILE ( TOE LEVEL -18.9 mPD )

P4 W1 -8.075 W1

TYPE D SHEET PILE ( TOE LEVEL -18.9 mPD )


(TYP.)
T1

2750

T1
CS
6

KA
KC

KC

KC

KA
KB
KB
6

6
CS

KB

6
6
6

6
KC

KC

KC

6
KB
KB
KB

KA

KA
6
6

CS
6
6
6

6
CS
3043

3043
FINAL

6
C EXCAVATION
E004 FINAL LEVEL FINAL
EXCAVATION -8.075 EXCAVATION
LEVEL LEVEL
P3
15215

15215
FINAL
3043

3043
SB6
SC6

SC6

SB6
SC6

SC6

SC6

SA6
SB6
SB6

SA6
SB6

SA6

W1
SB6

SA6
SC6

-6.975 EXCAVATION -7.375


LEVEL
P2 -10.325
3043

3043
-8.075

6
CS
CS

KA
KC

KC

KC

6
KB

KA
KB
KB

6
(TYP.)
6

6
6
T1

T1
2750

KA
KB

KA
KC

KC

KC

KB

KB

-8.075 -8.075 -8.075

6
6

6
6
6

P1 BH7
W1
CS

90mm (W) x 150mm (H) space

6
3043

3043
BH3
6

BH1

CS
BH5 for BD's approval stamp /
BH9
certification of copies of
approved plans
3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3149 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 3150 (PNAP ADM-10 APP A)

VERTICAL TIE P4 VERTICAL TIE P4 VERTICAL TIE P4

ELS LAYOUT PLAN


Tekla Structures
BD REF :

mPD mPD BIM REF :


B.L. B.L. B.L. B.L.
+5.0 EXISTING GROUND LEVEL XXX STREET +5.0 EXISTING GROUND LEVEL XXX STREET LEGEND AND NOTES:
BH8 BH5(P) BH6(P)
BH7 (OFFSET 2.15m) +3.92 (OFFSET 1.37m)
(OFFSET 2.18m) +3.84 ADJACENT EXISTING STRUCTURE (OFFSET 1.32m)
ADJACENT EXISTING STRUCTURE
+3.10 (1st EXCAVATION LEVEL )+2.900 +3.10 W1 (1st EXCAVATION LEVEL )+2.900
W1 SA6 W1 W1 SB6 BOUNDARY LINE
3528 3528
SA6 +1.60 W2 (2nd EXCAVATION LEVEL )+1.400
W2 FILL FILL
N=11 FILL N=16 FILL N=11 FILL N=9 FILL
+0.10 (3rd EXCAVATION LEVEL )-0.100 +0.10 W2 (2rd EXCAVATION LEVEL )-0.100
DESIGN W3 SA6 W3 DESIGN W2 SB6
+0.0 G.W.T.
+0.0
G.W.T. CDG COMPLETELY DECOMPOSED GRANITE
-1.20 N=20 -1.40 -1.20 N=22
N=11 W4 SA6 W4 (4th EXCAVATION LEVEL )-1.600
N=13
IV HIGHLY DECOMPOSED GRANITE
-2.90 -2.90
W5 SA6 N=4 W5 (5th EXCAVATION LEVEL )-3.100 W3 SB6 W3 (3rd EXCAVATION LEVEL )-3.100
N=12 III MODERATELY DECOMPOSED GRANITE

SA6 -4.40 (6th EXCAVATION LEVEL )-4.600 N=9 -4.40 (4th EXCAVATION LEVEL )-4.600
W6 W6 W4 SB6 W4 II SLIGHTLY DECOMPOSED GRANITE
-5.0 N=14 -5.0
N=5
SA6 N=6 -5.90 W7 (7thEXCAVATION LEVEL )-6.100 -5.90 (5thEXCAVATION LEVEL )-6.100
W7 W5 SB6 W5 N=28 SPT N VALUE
N=17
N=12 -7.40
N=16 W8 MD SA6 N=13 -7.40 W8 (8th EXCAVATION LEVEL )-7.600 W6 MD SB6 W6 (6th EXCAVATION LEVEL )-7.600
-8.075 -8.075 PROPOSED SHEET PILE


N=18 N=13
N=24
N=24 PROPOSED WALING
PROPOSED FINAL
-10.0 -10.325 -10.0 EXCAVATION PROFILE

35°
N=13 N=14 ALLU PROPOSED SHORT STRUT
N=13 N=30
PROPOSED FINAL
EXCAVATION PROFILE
PROPOSED STRUT
N=15 N=8 N=20
PROPOSED EXCAVATION PROFILE
N=18
ALLU
-15.0 N=33 -15.0 N=26
N=53 N=49
N=27
N=62
MIN TOE LEVEL
N=41 MIN TOE LEVEL N=27 N=32
-18.90 -18.90
PROPOSED
N=64 TYPE B
-20.0 -20.0 N=38
SHEETPILE WALL
N=60 (TYPE A) N=38 PROPOSED
N=70 N=48 TYPE B
-22.09 SHEETPILE WALL
MIN TOE LEVEL MIN TOE LEVEL CDG CDG (TYPE A)
-23.16 -23.00 N=62 CDG -23.00 N=39
N=75 (INDICATIVE ONLY)
N=51
REV DATE AMENDMENT
(INDICATIVE ONLY)
N=85
-25.0 N=73 PROPOSED PROPOSED -25.0 N=57 PROJECT
BOX TYPE BOX TYPE
SHEETPILE WALL N=108
CDG SHEETPILE WALL N=64 CIC SAMPLE PROJECT
(TYPE A) (TYPE A)
N=27
N=77
N=78
N=115
N=31
N=85
DRAWING TITLE
-30.0 -30.0
EXCAVATION & LATERAL SUPPORT
N=92
N=102 N=200/70 N=59 SUPPORT SECTIONS (1 OF 2)
IV
N=120
N=200/70 N=129
IV II
SCALE AS SHOWN@A1
N=109 N=200/70
-35.0 -35.0 IV DRAWING NO. REV. NO.

N=200/30 E003
N=200/170 III
N=68 N=200/50
II IV SOURCE ---
CDG
IV N=200/20
N=200/50
IV
-40.0 III -40.0
90mm (W) x 40mm (H) space
III III N=200/20 for COMPANY LOGO
IV III
III IV
II
IV III
III
IV N=200/50 III IV
-45.0 IV -45.0
III
III
II
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
N=200/50 IV III N=200/50 III
II signature/ and stamp chop

-50.0 -50.0
III

II

BD's OFFICAL USE


III
-55.0 -55.0

-60.0 -60.0

A ELS SECTION A B ELS SECTION B 90mm (W) x 150mm (H) space


1:150 1:150 for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
Tekla Structures
BD REF :
mPD B.L. BH2(P) B.L.
+5.0 (OFFSET 6.94m) BIM REF :
EXISTING GROUND LEVEL BH10(P) XXX STREET
BH3 BH7
ADJACENT EXISTING STRUCTURE BH1 +3.800 BH5 +3.800 BH9 (OFFSET 6.97m) ADJACENT EXISTING STRUCTURE

W1 +3.10 SB6 +3.10 W1 (1st EXCAVATION LEVEL )+2.900


(1st EXCAVATION LEVEL )+2.900 SC6 SB6 SB6 SB6 SB6 SB6
SC6 SC6 SC6 SC6 SC6 SA6 SA6 SA6 SA6
+1.60 W2 (2nd EXCAVATION LEVEL )+1.400
N=9 N=9 SA6 SA6 SA6 SA6
FILL FILL N=16 FILL N=10 +0.10 FILL
(2nd EXCAVATION LEVEL )-0.100 W2 +0.10 FILL (3rd EXCAVATION LEVEL )-0.100
+0.0 DESIGN SB6 SB6 SB6 W3
SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
G.W.T.
-1.20 N=20 N=14 -1.40
N=11 N=22 N=22 W4 (4th EXCAVATION LEVEL )-1.600
SA6 SA6 SA6 SA6
-2.90 -2.90
(3rd EXCAVATION LEVEL )-3.100 W3 N=4 W5 (5th EXCAVATION LEVEL )-3.100
SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6 N=4
MD MD SC6 MD SB6
N=11 N=24 MD
-4.40 W6 (6th EXCAVATION LEVEL )-4.600
N=5 SB6
SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
-5.0 N=10 N=23 N=6 N=5
-5.90 (7thEXCAVATION LEVEL )-6.100
(4th EXCAVATION LEVEL )-6.100 W4 -5.90 W7
SC6 SC6 SC6 SC6 SC6 SC6 SB6 SB6 SB6 SB6 SB6 SB6 SA6 SA6 SA6 SA6
N=11 -6.975 N=13
N=12 N=9 -7.375
SB6 SB6
N=30 SB6 SB6 -8.075 SB6 SB6 SA6 SA6 SA6 SA6

25°
MD
N=18

MAX.
N=17 N=13 N=24
CDG N=37 CDG ALLU PROPOSED FINAL CDG
-10.0 EXCAVATION PROFILE -10.325 N=20

25°

25°
N=22 N=14

MAX.

MAX.
N=45 N=30
N=21
N=32 N=20
N=8
N=53 ALLU
CDG N=26 ALLU N=22
-15.0 N=200/10 II N=33
N=62
N=27
II N=62 N=54
N=61
MIN TOE LEVEL N=200/10 MIN TOE LEVEL
-18.90 IV -18.900
N=32
N=64
N=29 N=65 N=52
-20.0 CDG
PROPOSED
N=70 TYPE D
PROPOSED N=200/30 III N=38 N=65
N=200/70 CDG SHEETPILE WALL
TYPE C
SHEETPILE WALL II
N=55 N=75 N=68
II N=39

N=78
CDG N=81 REV DATE AMENDMENT
-25.0 N=57 N=85
PROJECT
N=200/20 CDG N=111
CDG
II
N=27
N=108
CIC SAMPLE PROJECT
N=95 N=200/70
CDG
N=200/60 CDG

N=200/20 II N=31
N=200/40 N=200/70
N=115
II DRAWING TITLE
-30.0
N=168
N=59 N=200/70
EXCAVATION & LATERAL SUPPORT
III CDG N=200/70 CDG SUPPORT SECTIONS (2 OF 2)
N=31 N=200/190
N=200/70 N=200/60
N=129

CDG N=200/60
SCALE AS SHOWN@A1
-35.0 IV N=200/70
N=200/20 DRAWING NO. REV. NO.
N=200/30
E004
IV N=200/50 N=200/50

III IV SOURCE ---


N=200/40
N=200/50
-40.0
III 90mm (W) x 40mm (H) space
N=200/20 III
III for COMPANY LOGO
IV IV
IV
III
III
III
IV IV
-45.0 N=200/50 IV
III
III
III
IV

90mm (W) x 60mm (H) space


for AP/RSE/RGE's
III II III II signature/ and stamp chop
-50.0
III

IV

BD's OFFICAL USE


-55.0
LEGEND AND NOTES:

III BOUNDARY LINE

FILL FILL
-60.0
CDG COMPLETELY DECOMPOSED GRANITE

II IV HIGHLY DECOMPOSED GRANITE

III MODERATELY DECOMPOSED GRANITE 90mm (W) x 150mm (H) space


C ELS
1:150
SECTION C
II SLIGHTLY DECOMPOSED GRANITE
for BD's approval stamp /
certification of copies of
approved plans
(PNAP ADM-10 APP A)
N=28 SPT N VALUE

PROPOSED SHEET PILE

PROPOSED WALING

PROPOSED SHORT STRUT

PROPOSED STRUT
Tekla Structures

PROPOSED EXCAVATION PROFILE


BD REF :
mPD B.L. B.L. mPD B.L. B.L. mPD B.L. B.L.
EXISTING GROUND LEVEL EXISTING GROUND LEVEL EXISTING GROUND LEVEL BIM REF :
+5.0 XXX STREET +5.0 XXX STREET +5.0 XXX STREET
ADJACENT EXISTING STRUCTURE BH7 +3.84 BH8 ADJACENT EXISTING STRUCTURE BH7 +3.84 BH8 ADJACENT EXISTING STRUCTURE BH7 +3.84 BH8
+3.100 W1 W1
(1st EXCAVATION LEVEL )+2.900

FILL FILL FILL +1.600 (2nd EXCAVATION LEVEL )+1.400


W2 W2
N=11 N=16 N=11 N=16
FILL FILL N=11 N=16 FILL
+0.0 DESIGN +0.0 DESIGN +0.0 DESIGN
G.W.T. G.W.T. G.W.T.
-1.20 -1.20 -1.20
N=11 N=11 N=11

N=12 N=12 N=12

-5.0 N=14 -5.0 N=14 -5.0 N=14


N=6 N=6 N=6

N=16 MD N=13 N=16 MD N=13 N=16 MD N=13

MD MD MD

N=24 N=24 N=24 N=24 N=24 N=24


-10.0 -10.0 -10.0

N=13 N=30 N=13 N=30 N=13 N=30

N=8 N=8 N=8


N=15 N=15 N=15
ALLU ALLU ALLU
-15.0 N=33 -15.0 N=33 -15.0 N=33
N=53 N=53 N=53

PROPOSED N=62 PROPOSED PROPOSED N=62 PROPOSED PROPOSED N=62 PROPOSED


BOX TYPE N=41 BOX TYPE BOX TYPE N=41 BOX TYPE BOX TYPE N=41 BOX TYPE
SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL
(TYPE A) (TYPE A) (TYPE A) (TYPE A) (TYPE A) (TYPE A)
N=64 N=64 N=64
-20.0 -20.0 -20.0
N=60 N=60 N=60
N=70 N=70 N=70
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
-23.00 -23.00 -23.00 -23.00 -23.00 -23.00
N=62 N=75 N=62 N=75 N=62 N=75
CDG CDG CDG
REV DATE AMENDMENT
-25.0 N=73 N=85 -25.0 N=73 N=85 -25.0 N=73 N=85
PROJECT

CIC SAMPLE PROJECT

1. INSTALL MONITORING CHECKPOINTS AS SHOWN ON DRAWING NO. E008 AND TAKE INITIAL READING 1. DEWATER AND EXCAVATE TO +2.90mPD. 1. DEWATER AND EXCAVATE TO +1.4mPD.
2. CARRY OUT INSTALLATION OF SHEET PILES AS SHOWN ON PLAN TO REQUIRED LEVEL. 2. INSTALLATION OF THE 1st LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 2nd LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PUMPING TEST AS SHOWN ON DWG NO.: E009. 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & AA (REFER TO STRUT PRELOAD SCHEDULE IN
(TYPE A) DWG. NO.: E001.) DWG. NO.: E001) DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
CONSTRUCTION SEQUENCE (1 OF 2)
0 STAGE
1:150
0
1 STAGE
1:150
1 2 STAGE
1:150
2

SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
mPD B.L. B.L. mPD B.L. B.L.
+5.0 EXISTING GROUND LEVEL XXX STREET +5.0 EXISTING GROUND LEVEL XXX STREET E005
BH7 +3.84 BH8 BH7 +3.84 BH8
ADJACENT EXISTING STRUCTURE ADJACENT EXISTING STRUCTURE
W1 W1 W1 W1
SOURCE ---
LEGEND AND NOTES:
FILL FILL
W2 W2 W2 W2
N=11 N=16 FILL N=11 N=16 FILL BOUNDARY LINE
+0.100 (3rd EXCAVATION LEVEL ) -0.10 90mm (W) x 40mm (H) space
+0.0 DESIGN W3 W3 +0.0 DESIGN W3 W3
G.W.T. G.W.T. for COMPANY LOGO
-1.20 -1.20 N=11 FILL FILL
N=11 W4 -1.400 W4 (4th EXCAVATION LEVEL ) -1.60

CDG COMPLETELY DECOMPOSED GRANITE


N=12 N=12
IV HIGHLY DECOMPOSED GRANITE

-5.0 N=14 -5.0 N=14 III MODERATELY DECOMPOSED GRANITE


N=6 N=6

II SLIGHTLY DECOMPOSED GRANITE 90mm (W) x 60mm (H) space


N=16 MD N=13 N=16 MD N=13 for AP/RSE/RGE's
N=28 SPT N VALUE signature/ and stamp chop
MD MD

N=24 N=24 N=24 N=24


PROPOSED SHEET PILE
-10.0 -10.0

N=13 N=30 N=13 N=30 PROPOSED WALING

PROPOSED SHORT STRUT BD's OFFICAL USE


N=8 N=8
N=15 N=15
PROPOSED STRUT
ALLU ALLU
-15.0 N=33 -15.0 N=33
PROPOSED EXCAVATION PROFILE
N=53 N=53

PROPOSED N=62 PROPOSED PROPOSED N=62 PROPOSED


BOX TYPE N=41 BOX TYPE BOX TYPE N=41 BOX TYPE
SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL
(TYPE A) (TYPE A) (TYPE A) (TYPE A)
N=64 N=64
-20.0 -20.0
N=60 N=60
N=70 N=70
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
-23.00 -23.00 -23.00 -23.00 90mm (W) x 150mm (H) space
N=62 N=75 N=62 N=75 for BD's approval stamp /
CDG CDG certification of copies of
approved plans
-25.0 N=73 N=85 -25.0 N=73 N=85 (PNAP ADM-10 APP A)

1. DEWATER AND EXCAVATE TO -0.10mPD. 1. DEWATER AND EXCAVATE TO -1.60mPD.


2. INSTALLATION OF THE 3rd LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 4th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & AA (REFER TO STRUT PRELOAD SCHEDULE IN
DWG. NO.: E001) DWG. NO.: E001)

3 STAGE 3 4 STAGE 4
Tekla Structures

1:150 1:150
BD REF :
mPD B.L. mPD mPD
B.L. B.L. B.L. B.L. BIM REF :
+5.0 EXISTING GROUND LEVEL XXX STREET +5.0 EXISTING GROUND LEVEL XXX STREET +5.0 EXISTING GROUND LEVEL XXX STREET
BH7 +3.84 BH8 BH7 +3.84 BH8 BH7 +3.84 BH8
ADJACENT EXISTING STRUCTURE ADJACENT EXISTING STRUCTURE ADJACENT EXISTING STRUCTURE
W1 W1 W1 W1 W1 W1

FILL FILL FILL


W2 W2 W2 W2 W2 W2
N=11 N=16 FILL N=11 N=16 N=11 N=16
FILL FILL
+0.0 DESIGN W3 W3 DESIGN W3 W3 DESIGN W3 W3
G.W.T. +0.0 +0.0
G.W.T. G.W.T.
-1.20 N=11 -1.20 N=11 -1.20 N=11
W4 W4 W4 W4 W4 W4
-2.90 (5th EXCAVATION LEVEL ) -3.10
W5 W5 W5 W5 W5 W5
N=12 N=12 N=12
-4.40 (6th EXCAVATION LEVEL ) -4.60
W6 W6 W6 W6
-5.0 N=14 -5.0 N=14 -5.0 N=14
N=6 N=6 -5.90 N=6 (7th EXCAVATION LEVEL ) -6.10
W7 W7

N=16 MD N=13 N=16 MD N=13 N=16 MD N=13

MD MD MD
N=24 N=24 N=24 N=24 N=24 N=24
-10.0 -10.0 -10.0
N=13 N=30 N=13 N=30 N=13 N=30

N=8 N=8 N=8


N=15 N=15 N=15
ALLU ALLU ALLU
-15.0 N=33 N=33 N=33
-15.0 -15.0
N=53 N=53 N=53
PROPOSED N=62 PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED
BOX TYPE BOX TYPE BOX TYPE N=62 BOX TYPE N=62
N=41 BOX TYPE BOX TYPE
SHEETPILE WALL SHEETPILE WALL SHEETPILE WALL N=41 SHEETPILE WALL SHEETPILE WALL N=41 SHEETPILE WALL
(TYPE A) (TYPE A) (TYPE A) (TYPE A) (TYPE A) (TYPE A)
N=64 N=64 N=64
-20.0 -20.0 -20.0
N=60 N=60 N=60
N=70 N=70 N=70
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
-23.00 -23.00 -23.00 -23.00 -23.00 -23.00
N=62 N=75 N=62 N=62
CDG N=75 N=75
CDG CDG
REV DATE AMENDMENT
-25.0 N=73 N=85 -25.0 N=73 N=85 -25.0 N=73 N=85 PROJECT

CIC SAMPLE PROJECT

1. DEWATER AND EXCAVATE TO -3.10mPD. 1. DEWATER AND EXCAVATE TO -4.60mPD. 1. DEWATER AND EXCAVATE TO -6.10mPD.
2. INSTALLATION OF THE 5th LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 6th LAYER WAILINGS, STRUTS & TIES 2. INSTALLATION OF THE 7th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A & B (REFER TO STRUT PRELOAD SCHEDULE IN 3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE AA, A, B & C (REFER TO STRUT
DWG. NO.: E001) DRAWING TITLE
DWG. NO.: E001) PRELOAD SCHEDULE IN DWG. NO.: E001)
EXCAVATION & LATERAL SUPPORT
CONSTRUCTION SEQUENCE (2 OF 2)
5 STAGE 5 6 STAGE 6
7 STAGE 7
1:150 1:150
1:150

SCALE AS SHOWN@A1
mPD B.L. B.L. DRAWING NO. REV. NO.
+5.0 EXISTING GROUND LEVEL XXX STREET E006
BH7 +3.84 BH8
ADJACENT EXISTING STRUCTURE
W1 W1 SOURCE ---
FILL
W2 W2
N=11 N=16 FILL
+0.0 DESIGN W3 W3 90mm (W) x 40mm (H) space
G.W.T. LEGEND AND NOTES: for COMPANY LOGO
-1.20 N=11
W4 W4 (4th EXCAVATION LEVEL ) -1.60

W5 W5
BOUNDARY LINE
N=12
FILL FILL
W6 W6
-5.0 N=14
W7 N=6 W7
CDG COMPLETELY DECOMPOSED GRANITE

N=16 -7.40 N=13 (8th EXCAVATION LEVEL ) -7.60 IV HIGHLY DECOMPOSED GRANITE 90mm (W) x 60mm (H) space
W8 MD W8
-8.075 for AP/RSE/RGE's
MD signature/ and stamp chop
III MODERATELY DECOMPOSED GRANITE
N=24 N=24
-10.0 -10.325 II SLIGHTLY DECOMPOSED GRANITE
30°

N=13 N=30
PROPOSED FINAL
N=28 SPT N VALUE
EXCAVATION PROFILE
N=8 PROPOSED SHEET PILE BD's OFFICAL USE
N=15
ALLU PROPOSED WALING
-15.0 N=33
N=53 PROPOSED SHORT STRUT
PROPOSED N=62 PROPOSED
BOX TYPE BOX TYPE PROPOSED STRUT
SHEETPILE WALL N=41 SHEETPILE WALL
(TYPE A) (TYPE A) PROPOSED EXCAVATION PROFILE
N=64
-20.0
N=60
N=70
MIN TOE LEVEL MIN TOE LEVEL
-23.00 -23.00 90mm (W) x 150mm (H) space
N=62 N=75
CDG for BD's approval stamp /
certification of copies of
approved plans
-25.0 N=73 N=85 (PNAP ADM-10 APP A)

1. DEWATER AND EXCAVATE TO -7.60mPD.


2. INSTALLATION OF THE 8th LAYER WAILINGS, STRUTS & TIES
3. CARRY OUT PRELOADING FOR MAIN STRUTS OF TYPE A & B (REFER TO STRUT PRELOAD SCHEDULE IN DWG. NO.: E001)
4. DEWATER AND EXCAVATE TO FINAL EXCAVATE PROFILE (i.e.: -8.075/-10.325mPD) WITH TEMPORARY CUT SLOPE(25° MAX). (REFER TO
ELS LAYOUT PLAN IN DWG. NO.: E002).
5. CARRY OUT REMAINING PILE CAP CONSTRUCTION (UNDER SEPARATE SUBMISSION) AND BACKFILL TO PILE CAP TOP
6. CARRY OUT BASEMENT CONSTRUCTION (UNDER SEPARATE SUBMISSION)
7. ALL STRUT SHALL NOT BE REMOVED UNTIL CONSTRUCTION UP TO G/F.

8 STAGE 8
Tekla Structures

1:150
BD REF :

B C BIM REF :
A E004
E003
E003

D A A B
90°
TYPE AA SHEET PILE TYPE A SHEET PILE ( FSP VIL BOX-TYPE ) TYPE B SHEET PILE (FSP-VIL) TYPE C SHEET PILE ( FSP-IV ) TYPE C SHEET PILE ( FSP IV )
(FSP-VIL)
5965 23569 22178 39639 15215
mPD mPD
+5.0 VERICAL TIE P4 VERICAL TIE P4 VERICAL TIE P4 +5.0
BH9(P) FOR WALING BH5(P) FOR WALING BH1(P) FOR WALING BH1(P)
(1st EXCAVATION LEVEL )+2.900 (1st EXCAVATION LEVEL )+2.900
(1st EXCAVATION LEVEL )+2.900

(2nd EXCAVATION LEVEL )+1.400 D4 D4 N=11


(2nd EXCAVATION LEVEL )+1.400
(3rd EXCAVATION LEVEL )-0.100 FILL D4 D4 FILL (3rd EXCAVATION LEVEL )-0.100 N=9
+0.0 (3rd EXCAVATION LEVEL )-0.100 +0.0
(4th EXCAVATION LEVEL )-1.600 N=19 D4 D4 FILL
N=13 DIAGONAL (4th EXCAVATION LEVEL )-1.600
DIAGONAL WALING N=10
(5th EXCAVATION LEVEL )-3.100 N=4 D4 D4 WALING (5th EXCAVATION LEVEL )-3.100
(5th EXCAVATION LEVEL )-3.100
D4 N=9
(6th EXCAVATION LEVEL )-4.600 D4 (6th EXCAVATION LEVEL )-4.600
-5.0 N=4 N=15
(7th EXCAVATION LEVEL )-6.100 -5.0
(7th EXCAVATION LEVEL )-6.100 D4 D4 N=17 MD CDG (7th EXCAVATION LEVEL )-6.100

(8th EXCAVATION LEVEL )-7.600 -7.375 N=6 D4 D4


-6.975 -6.975 -6.975 -6.975 -6.975
-8.075 -8.075 -8.075 -8.075 -8.075 (8th EXCAVATION LEVEL )-7.600

30°

30°

45°
45°
-8.075 -8.075

27°

23°

23°
23°
20°

27°
30°
N=13 DIAGONAL N=18 N=15
WAILING
-10.0 -10.325
-10.0
30°

30°
N=20 N=13 ALLU
N=19

N=8 ALLU N=24


N=18
-15.0 N=25 N=26 -15.0
N=49
N=65 N=72
MIN TOE LEVEL MIN TOE LEVEL MIN TOE LEVEL
N=27 MIN TOE LEVEL
-18.900 -18.900 -18.900 -18.900
N=59
N=76
-20.0 N=38
-20.0
N=82
MIN TOE LEVEL N=48 N=97
-23.000
N=87 N=100
CDG N=51
-25.0 N=80 N=97
-25.0
N=64
N=88 N=105 REV DATE AMENDMENT
N=78
PROJECT
N=200/60 N=200/60
CIC SAMPLE PROJECT
-30.0 N=92 -30.0

1 ELS
1:200
ELEVATION D-A 2 ELS
1:200
ELEVATION A-B DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
ELEVATION

A C
B E003 E004
SCALE AS SHOWN@A1
E003
B C D DRAWING NO. REV. NO.
TYPE C SHEET PILE ( FSP-IV ) TYPE B SHEET PILE ( FSP-VIL ) TYPE A SHEET PILE ( FSP VIL BOX-TYPE ) TYPE AA SHEET PILE TYPE AA SHEET PILE ( FSP VIL) E007
(FSP-VIL)
39639 22178 23569 5965 15215
SOURCE ---
mPD VERICAL TIE P4 VERICAL TIE P4 VERICAL TIE P4 mPD
+5.0 FOR WALING FOR WALING FOR WALING +5.0
BH2(P) BH4 BH6(P) BH8 BH10
(1st EXCAVATION LEVEL )+2.900 (1st EXCAVATION LEVEL )+2.900 (1st EXCAVATION LEVEL )+2.900
90mm (W) x 40mm (H) space
D4 D4 D4 for COMPANY LOGO
N=9 D4
D4 D4 N=9
FILL FILL FILL (2nd EXCAVATION LEVEL )-0.100 D4 N=16 FILL D4 D4 N=10 FILL
(3rd EXCAVATION LEVEL )-0.100 +0.0 (3rd EXCAVATION LEVEL )-0.100 +0.0
N=11 N=22 D4 N=20 D4 D4 N=14
N=22 D4 D4 DIAGONAL D4
(5th EXCAVATION LEVEL )-3.100 WALING (3rd EXCAVATION LEVEL )-3.100 D4 N=4 D4 D4 N=4 (5th EXCAVATION LEVEL )-3.100
DIAGONAL
N=11 N=24 MD D4 (4th EXCAVATION LEVEL )-4.600 D4 D4 WALING D4 D4
-5.0 N=10 D4 -5.0
(7th EXCAVATION LEVEL )-6.100 N=23 D4 N=5 (5th EXCAVATION LEVEL )-6.100 D4 D4 N=6 D4 D4 N=5 (7th EXCAVATION LEVEL )-6.100
-6.975 -6.975 -6.975 -6.975 -7.375
N=11 D4 N=12 -8.075 (6th EXCAVATION LEVEL )-7.600 D4 D4 N=13 D4 D4 -7.375 90mm (W) x 60mm (H) space
-8.075 -8.075 -8.075 D4 -8.075 -8.075 N=9
N=30 MD for AP/RSE/RGE's
30°

27°
27°
27°

27°
27°

23°

23°
23°

30°

MD
N=17 N=13 N=24 signature/ and stamp chop
CDG ALLU DIAGONAL WAILING N=18
-10.0 N=37 -10.0
N=22 N=14 N=30
N=45 N=20
N=26
N=32 N=8 N=21
N=53 CDG
N=33 ALLU ALLU
-15.0 N=20 N=22 -15.0 BD's OFFICAL USE
N=200/10 II
N=62
II N=62 N=54
N=27 MIN TOE LEVEL
N=200/10 MIN TOE LEVEL N=61 MIN TOE LEVEL
IV -18.900
-18.900 -18.900
N=29 N=32 N=64 N=52
-20.0 CDG N=65 -20.0
N=200/30 N=38 N=70 N=65
III
N=200/70 CDG MIN TOE LEVEL
II -23.000
N=55 N=39 N=75 N=68
II CDG
N=78
-25.0 N=57 N=85 N=81 -25.0
N=200/30 CDG
N=200/70 II
N=95 N=27
CDG N=200/60 CDG N=111 CDG 90mm (W) x 150mm (H) space
N=108
for BD's approval stamp /
N=200/40 II N=31 certification of copies of
N=200/20
N=115 approved plans
-30.0 II N=200/70 -30.0
N=168 (PNAP ADM-10 APP A)
N=59

3 ELS
1:200
ELEVATION B-C
4 ELEVATION C-D
1:200
Tekla Structures
BD REF :

BIM REF :
T10 T11
T9

S1
S10

TYPE C SHEET PILE TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -18.9 mPD) (TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)

SP1(P) U10 RW2 OW4 RW3 OW6


S4 V9 RW1 OW2 S8
U8 S5 S U11 S7 V11
O O SP2(P) O
V10 S6
U9 S
U12
BH2 P O
BH4 P O P O
P1 OW1 BH6 BH10
P2 OW3 BH8 P3 OW5
(TOE LEVEL -18.9 mPD)
TYPE C SHEET PILE

OW7 OW8

(TOE LEVEL -18.9 mPD)


TYPE D SHEET PILE
O O

V8
V7 P
P4
RW4 U7

BH1 BH3 P6 OW11 BH7


P7 OW13 P5 OW9 BH9
P O BH5 P O P O
SP3(P)
S
S S
O OW14 SP4(P) O
OW12 O OW10 SP5(P) S3
U1 T1 RW7 RW5
S1 BS2 U2 V2 T4 U5
T2 V4 V5 S2 V6
BS10 U4
V3 BS8 T6
BS4 T3 T5 BS12
V1 BS6
TYPE C SHEET PILE TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -18.9 mPD) (TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)
REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
WORKS MONITORING PLAN

BS1 BS3 BS5 BS7 BS9


SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
ELS MONITORING PLAN E008
NOTES ON EXISTING UTILITIES 1:200
LEGEND AND NOTES: SOURCE ---
1. THE POSITION OF EXISTING UTILITIES SHOWN ON THIS DRAWING IS 5. EXISTING PIEZOMETERS/STANDPIPES INSTALLED ON SITE PREVIOUSLY SHOULD BE e. RSE/RGE TO REVIEW THE INCIDENT AND AGREE WITH RC ON FURTHER REMEDIAL AND
APPROXIMATE ONLY.EXACT LOCATION AND DEPTH OF THE UTILITIES MONITORED ON DAILY BASIS CONTINUOUSLY THROUGHOUT THE CONSTRUCTION. THE PREVENTIVE MEASURES TO ENABLE RESUMPTION OF THE SUSPENDED WORKS.
BOUNDARY LINE
MUST BE ASCERTAINED BY TRIAL PITS ON SITE. EXTREME CARE MUST READINGS SHOULD BE SUBMITTED TO RSE / RGE / BA ON BIWEEKLY BASIS. INITIAL f. CONSTRUCTION ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE NECESSARY INSTRUMENT SCHEDULE
BE TAKEN DURING EXCAVATIONS IN THE PROXIMITY OF THE UTILITIES. READING SHOULD ALSO BE SUBMITTED BEFORE THE COMMENCEMENT OF WORKS. REMEDIAL AND PREVENTIVE MEASURES HAVE BEEN COMPLETED TO THE
PRECAUTIONS SHALL BE TAKEN TO PREVENT DAMAGE TO ANY OF THE 6. CHECK POINT READINGS TO BE KEPT ON SITE FOR INSPECTION. SATISFACTION OF THE BD. BH2(P) BORED HOLE (WITH PIEZOMETER) SYMBOL TYPE NUMBER
90mm (W) x 40mm (H) space
UTILITIES. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLICATION OF EXCAVATION g. IF THE TRIGGER VALUES AND RESPONSE ACTION ARE REVISED, THE AMENDED PLANS (BH1 (P), BH2 (P) AND BH5 (P) BUILDING SETTLEMENT MARKER 12 for COMPANY LOGO
BS1
2. THE INFORMATION INDICATED IS GIVEN IN GOOD FAITH AND NO PERMIT FOR INSTALLATION OF MONITORING CHECK POINTS OUTSIDE SITE BOUNDARY. SHOULD BE SUBMITTED TO THE BD FOR APPROVAL. THE SUSPENDED CONSTRUCTION BH6 (P), BH9 (P) AND BH10 (P) 6NOS.) (BS1-BS12)
GUARANTEE IS GIVEN AS TO ITS ACCURACY OR COMPLETENESS. THE THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR SEEKING CONSENT FROM THE ACTIVITIES SHOULD NOT BE RESUMED UNTIL THE AMENDED PLANS ARE APPROVED BY BUILDING TILTING CHECK POINT WITH 11
BH2 T1
USE OF THIS INFORMATION BY THE CONTRACTOR OR ANY OTHER ADJACENT LOT OWNERS FOR INSTALLATION OF MONITORING CHECK POINT AT INSTRUMENT CRITERION ALERT ALARM ACTION BORED HOLE VERTICAL DISPLACEMENT (T1-T11)
PARTY SHALL NOT RELIEVE HIM OF ANY OF HIS OBLIGATIONS OR ADJACENT LOTS / BUILDINGS. (BH3, BH4, BH7 AND BH8 4 NOS.) GROUND SETTLEMENT CHECK POINT 10
RESPONSIBILITY UNDER THE CONTRACT. GROUND SETTLEMENT S1
CHECK POINT
TOTAL SETTLEMENT 12mm 18mm 25mm (S1-S10)
3. THE CONTRACTOR SHALL ARRANGE FOR ANY REALIGNMENT OF THE 4.15
UTILITY SETTLEMENT EXISTING GROUND LEVEL OW1 OBSERVATION WELL (OW1-OW14) 14
EXISTING UTILITIES AT THE WORKING LOCATION PRIOR TO THE ALERT LEVEL TOTAL SETTLEMENT 12mm 18mm 25mm
CONSTRUCTION OF WORKS, IF REQUIRED.
CHECK POINT P1 PUMP WELL (P1 TO P7) 7
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT TO THE RESPONSE ACTION: GAS PIPE RW1 RECHARGE WELL (RW1-RW7) 7
TILTING CHECK POINT ANGULAR DISTORTION 1:1000 1:750 1:500 GAS
EXISTING UTILITIES DURING THE CONSTRUCTION WORKS, IF REQUIRED. a. RC TO NOTIFY AND SUBMIT WRITTEN REPORT TO AP/RSE/RGE. STANDPIPE (WITH PIEZOMETER) (SP1(P) 5
5. THE CONTRACTOR'S PARTICULAR ATTENTION IS DRAWN TO THE b. AP/RSE/RGE TO ASSESS EFFECT OF MOVEMENTS AND PREDICT FUTURE MOVEMENTS. VIBRATION CHECK PEAK PARTICLE
7.5mm/s 10mm/s 15mm/s
SP1(P)
TO SP5(P)) 90mm (W) x 60mm (H) space
c. AP/RSE/RGE TO AGREE WITH RC ON THE SUITABLE ACTION PLAN WHICH MAY INCLUDE POINT (VB1 TO VB3) VELOCITY S WAT SALT WATER PIPE
EXISTENCE OF UNDERGROUND SERVICE WITHIN AND AROUND THE SITE. for AP/RSE/RGE's
THE INSTALLATION OF ADDITIONAL CHECK POINTS AND/OR INCREASING MONITORING BUILDING SETTLEMENT U1
UTILITY SETTLEMENT MONITORING POINT 12
HE SHALL PROTECT AND MAINTAIN ALL THOSE WORKS DURING THE TOTAL SETTLEMENT 12mm 18mm 25mm signature/ and stamp chop
FREQUENCY, AND THE REMEDIAL/MITIGATING MEASURES TO BE TAKEN UPON CHECK POINT ON GROUND (U1-U12)
ENTIRE CONTRACT PERIOD. NECESSARY PRECAUTIONS AND ELEC ELECTRIC CABLE
REACHING THE "ALARM LEVEL". STANDPIPE RISE OF GROUND +2.00mPD +2.50mPD +3.10mPD V1 VIBRATION CHECK POINT (V1-V11) 11
MONITORING SHALL BE TAKEN TO PREVENT DAMAGE TO THE EXISTING
PIEZOMETER WATER LEVEL +3.00mPD +3.50mPD +4.10mPD
UPPER GROUND SERVICE. FOUL FOUL WATER PIPE
STANDPIPE DRAIN OF GROUND -0.35mPD -0.40mPD -0.47mPD
6. THE CONTRACTOR SHALL IDENTIFY AND ESTABLISH HIMSELF THE
TYPES AND EXACT LAYOUT/LOCATION OF THE EXISTING SERVICES
FOR REFERENCE ONLY PIEZOMETER WATER LEVEL -0.40mPD -0. 45mPD -0. 52mPD

BEFORE CARRYING OUT ANY CONSTRUCTION WORKS ON SITE. HE F WAT FRESH WATER PIPE
ALARM LEVEL THE "ACTION LEVEL" RESPONSE ACTION SHOULD BE TAKEN IF ANY OF THE FOLLOWING
SHALL ALSO PLAN AND ARRANGE HIS WORKS TAKING INTO ACCOUNT SITUATION OCCURS: CONC.PAVEMENT 100 100 BD's OFFICAL USE
100 100
THE EXISTENCE OF ALL SUCH WORKS THAT MAY AFFECT THE RESPONSE ACTION: OR GRD. COVERING OPENABLE STEEL COVER

50
1. ANY MONITORING STATION HAS A READING REACHING THE SERVICEABILITY LIMIT.
CONSTRUCTION SEQUENCE OF HIS WORKS. SHALL ANY SERVICES FALL a. RC TO NOTIFY AND SUBMIT UPDATED REPORT TO AP/RSE/RGE AND NOTIFY THE BACKFILLED WITH CONC.
2. UNDUE SETTLEMENT AS INDICATED IN ANY CHECK POINTS (E.G. AN INCREASE OF 5mm
WITHIN THE SITE, THE CONTRACTOR SHALL PROPOSE AND SUBMIT A BD IMMEDIATELY. GRD. LEV.
BETWEEN TWO CONSECUTIVE DAILY READINGS).
METHOD STATEMENT ON PROTECTING OR DIVERTING THE EXISTING b. AP/RSE/RGE AND RC TO CONDUCT JOINT SITE INSPECTION TO DETERMINE IF ANY
3. SIGN OF DISTRESS OR DAMAGES OBSERVED IN ANY ADJACENT STRUCTURES AND/OR
UTILITIES FOR ARCHITECT'S APPROVAL AT NO EXTRA COST. IF CONSTRUCTION ACTIVITIES SHOULD BE TEMPORARILY SUSPENDED.
UTILITIES.
NECESSARY, THE CONTRACTOR SHALL MODIFY THE DESIGN OF ELS c. RC TO IMPLEMENT THE NECESSARY REMEDIAL/MITIGATING MEASURES IN 75MM DIA. PVC PIPE WELL COMPACTED
GRD. LEV. SOFT BACKFILL
WORKS AND/OR PROVIDE TEMPORARY SUPPORTS FOR THE SERVICES ACCORDANCE WITH THE AGREED ACTION PLAN.
AND SUBMIT THE METHOD STATEMENT FOR THE SERVICES AND SUBMIT d. AP/RSE/RGE AND RC TO DISCUSS THE INSTRUMENT RESPONSE AND REVIEW THE 10MM DIA. MILD STEEL ROD STEEL PLATE OF
THE METHOD STATEMENT FOR ARCHITECT'S APPROVAL. SHOULD ANY EFFECTIVENESS OF THE RESPONSE ACTION. MASTER CONSTRUCTION SEQUENCE WELDED TO STEEL PLATE 150 x 150 x 10MM
DAMAGE OCCUR, NOTIFY THE ARCHITECT'S AND RELEVANT e. AP/RSE/RGE TO AGREE WITH RC ON THE EMERGENCY PLAN DETAILING THE 1. INSTALL MONITORING CHECK POINTS AND TAKE INITIAL READINGS. SURFACE BOX

1000
C BACKFILLED WITH 75mm
AUTHORITIES CONCERNED IMMEDIATELY AND MAKE GOOD BY THE MEASURES TO BE TAKEN UPON REACHING "ACTION LEVEL". 2. CONSTRUCT BORED PILES FOUNDATION.
LEVEL TO BE LEAN CONCRETE
CONTRACTOR AT NO EXTRA COST. f. ANY CONSTRUCTION ACTIVITIES MAY BE SUSPENDED IF THE RESPONSE ACTION 3. CARRY OUT EXCAVATION AND LATERAL SUPPORT WORKS. (UNDER PERFORATED 20mm Ø
DETERMINED
HAS BEEN IMPLEMENTED AND ON THE ADVICE OF THE AP/RSE/RGE AS SEPARATE SUBMISSION) PVC PIPE OR EQUIVALENT
BY THE ENGINEER WRAPPED WITH 2 LAYERS
NECESSARY. 4. CARRY OUT THE CONSTRUCTION OF PILE CAP AND FOOTING. (UNDER B
ON SITE
g. AP/RSE/RGE TO REVIEW THE METHOD STATEMENTS OF PILING/ELS WORKS TO SEPARATE SUBMISSION)
OF NYLON MESH EXISTING UTILITIES
PIEZOMETER TUBE
DETERMINE WHETHER MODIFICATION TO THE CONSTRUCTION METHODS IS 5. CONSTRUCTION OF SUPERSTRUCTURE. (UNDER SEPARATE SUBMISSION) 90mm (W) x 150mm (H) space
NOTES ON MONITORING DETAILS OF UTILITY SETTLEMENT CHECK POINT

1500
REQUIRED TO PREVENT ACTION LEVEL FROM BEING REACHED. NOTE : ITEM 2, 3, 4, 5 CAN BE CARRIED OUT CONCURRENTLY AND A FOR REFERENCE ONLY for BD's approval stamp /
1. INSTALL ALL CHECK POINTS AS SHOWN ON PLAN. INDEPENDENTLY. (N.T.S.) certification of copies of
A = BENTONITE SEAL OPENABLE STEEL COVER approved plans
2. INITIAL READINGS OF CHECK POINTS AND BENCH MARKS SHALL BE

VARIES

50mm
20 64 6 B = SAND FILTER
SUBMITTED TO BUILDINGS DEPT. BEFORE COMMENCEMENT OF THE (PNAP ADM-10 APP A)
ACTION LEVEL GROUT D C = 1:1 CEMENT-BENTONITE GROUT 19mm I.D. PVC PIPE

MIN.
WORK.
RESPONSE ACTION: VIBRATION MONITORING DEVICE
D = BACKFILL GRD. LEV.
3. ALL CHECK POINTS SHALL BE PROPERLY MAINTAINED AND
a. ALL WORKS THAT WILL CAUSE GROUND MOVEMENT ARE TO BE CEASED. THREADED STEEL

150
1500
MONITORED ON DAILY INTERVAL AND THE READINGS SHALL BE LEVELING MARKER A CONC.PAVEMENT
SUBMITTED TO THE AP/RSE/RGE AND BUILDING AUTHORITY BI- b. RC TO NOTIFY AND CARRY OUT A JOINT SITE INSPECTION WITH THE RSE/RGE GRD. LEV. PIEZOMETER OR GRD. COVERING
2000

WEEKLY. ANY DEFECTIVE MONITORING DEVICES SHALL BE IMMEDIATELY. THE BD AND THE RELEVANT PARTIES SHOULD BE NOTIFIED LEVEL TO BE TIP

100
IMMEDIATELY. DETERMINED
1500 MIN.
500
REPLACED ASAP. BACKFILLED WITH CONC.
300

450
BY THE ENGINEER
4. THE LEVEL SHALL BE REPORTED IN mPD AND THE CHECK POINTS c. RC TO IMPLEMENT THE NECESSARY EMERGENCY MEASURES IN ACCORDANCE CONCRETE PLINTH FREE DRAINING
ON SITE B GRANULAR MATERIAL COMPACTED GRANULAR
SHALL BE SURVEYED ACCORDING TO HONG KONG METRIC GRID. WITH WITH THE AGREED EMERGENCY PLAN. (500mm X 500mm) COLUMN/WALL BACKFILL
19mm Ø
d. RC TO SUBMIT AN INCIDENT REPORT TO RSE/RGE AND THE BD DETAILING THE
500

5 ANCHOR SOCKET 100mm DIA. PVC PIPE STEEL PLATE OF


FULL HISTORY OF THE MOVEMENTS AND REMEDIAL/EMERGENCY MEASURES DETAILS OF VIBRATION DETAIL A 25x250x12mm
30mm DRILLHOLE
IMPLEMENTED. CHECK POINTS ON GROUND DETAIL A A
Tekla Structures

BOTTOM OF 25mmDIA. MILD STEEL ROD 500


(N.T.S.) DETAILS OF TILTING CHECKPOINT BOREHOLE WELDED TO STEEL PLATE
(N.T.S.) STANDPIPE DETAILS DETAILS OF SETTLEMENT CHECK POINTS ON GROUND
(ALSO FUNCTION AS BUILDING SETTLEMENT CHECKPOINT) (N.T.S.) (N.T.S.)
BD REF :

BIM REF :
T10 T11
T9

S1
S10

TYPE C SHEET PILE TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -18.9 mPD) (TOE LEVEL -18.9 mPD)
1200 (TOE LEVEL -23.0 mPD) 1200 (TOE LEVEL -18.9 mPD)
SP1(P) U10 RW2 1200 OW4

1200

1200

1200
OW6

1200

1200

1200
S4 V9 RW3 S8
U8 RW1 OW2
O S5 S O SP2(P) U11 S7 V11 O
V10 S6
U9 S
U12
BH4 P O P O

1200

1200

1200
1200

1200

1200
P O
BH2 OW1 BH6 BH10
P1 P2 OW3 P3 OW5
BH8
1200 1200 1200 1200 1200

OW7 OW8

(TOE LEVEL -18.9 mPD)


TYPE D SHEET PILE
(TOE LEVEL -18.9 mPD)

O O
TYPE C SHEET PILE

1200

1200
V8
P
V7
P4
RW4 U7

1200 1200

1200 1200 1200

1200

1200

1200
1200

1200

1200
P7 BH3 P6 OW11 BH7
BH1 OW13 P5 OW9
P O BH5 P O P O
SP3(P) BH9
S
S S
O OW14 SP4(P) O OW10 SP5(P) S3
T1 RW7 T5
1200

1200

1200
U1

1200

1200

1200
O
S1 BS2 U2 V2 T4 RW5 U5
T2 V4 OW12 BS10
1200 V3 BS8 V6 T6
BS4 T3 1200 V5 S2 U4 BS12 1200
V1 BS6
TYPE C SHEET PILE TYPE B SHEET PILE TYPE A SHEET PILE TYPE AA SHEET PILE
(TOE LEVEL -18.9 mPD) (TOE LEVEL -18.9 mPD) (TOE LEVEL -23.0 mPD) (TOE LEVEL -18.9 mPD)
REV DATE AMENDMENT

PROJECT

CIC SAMPLE PROJECT

DRAWING TITLE
EXCAVATION & LATERAL SUPPORT
WORKS PUMPING TEST SETTING OUT
PLAN

BS1 BS3 BS5 BS7 BS9


SCALE AS SHOWN@A1
DRAWING NO. REV. NO.
E009
ELS PUMPING TEST SETTING OUT PLAN
(I) PUMPING TEST PROCEDURES
1. INSTALL THE DEWATERING WELLS (P1-P7), STANDPIPES AND OBSERVATION WELLS (OW1-OW15) AS SHOWN IN DWG. NO.
NOTES FOR PARTIAL PUMPING TEST 1 1 : 200
SOURCE ---
(IV) PUMP TEST CRITERIA
ELS-13. 1. PARTIAL PUMPING TEST SHALL BE CARRIED OUT AFTER INSTALLATION OF PILES AND BEFORE
2. THE PROPOSED TOE LEVEL OF THE DEWATERING WELL AND OBSERVATION WELLS ARE AS FOLLOWS: THE PUMPING TEST SHALL BE CONSIDERED ACCEPTABLE IF THE FOLLOWING CRITERIA ARE MET WHEN THE COMMENCEMENT OF BULK EXCAVATION.
DESIGNATED WATER LEVEL IS ACHIEVED INSIDE THE SITE: 2. INSTALL PUMP WELL, OBSERVATION WELL, RECHARGING WELL AND PIEZOMETER.
PROPOSED PROPOSED LEVEL OF WATER LEVEL CONTROL ELECTRODES a. NO UNDUE SETTLEMENT OR MOVEMENT OF ANY SETTLEMENT CHECKPOINTS OR TILTING 3. THE PUMPING TEST PROPOSAL TO BE SUBMITTED SEPARATELY. 90mm (W) x 40mm (H) space
HOLE 4. THE CRITERIA OF PUMPING TEST REFERS TO THE DWG. NO. ELS-13.
INSTRUMENT SCHEDULE for COMPANY LOGO
TOE LEVEL (mPD) CUT-ON LEVEL (mPD) CUT-OUT LEVEL (mPD) CHECKPOINTS AS STATED IN APPROVED EXCAVATION AND LATERAL SUPPORT WORKS PLAN OR NO
DEFECT/DAMAGE TO ADJACENT GROUND/ STRUCTURES/ UTILITIES. 5. AFTER COMPLETION OF THE PARTIAL PUMPING TEST, AN ASSESSMENT REPORT SHALL BE PREPARED
-12.50 -13.50 BY CONTRACTOR. THIS REPORT SHOULD BE SUBMITTED TO BUILDING AUTHORITY.
SYMBOL TYPE NUMBER
DEWATERING WELL (P1-P7) -15.00 b. THE GROUND SETTLEMENT DURING DEWATERING SHOULD NOT EXCEED 5.0mm.
BUILDING SETTLEMENT MARKER
OBSERVATION WELL (OW1-OW15) -15.00 N/A N/A
(V) ASSESSMENT REPORT BS1 12
(BS1-BS12)
3. BEFORE INSERTION OF THE SUBMERSIBLE PUMP, THE DEWATERING WELLS SHALL BE CLEANED, FLUSHED AND THE 1. AFTER COMPLETION OF THE PUMPING TEST, THE CONTRACTOR SHALL PREPARE AN ASSESSMENT MEASURED GROUNDWATER DRAWDOWN T1 BUILDING TILTING CHECK POINT WITH
DEPTH OF THE WELL SHALL BE ACCURATELY MEASURED REPORT BASED ON THE TEST RESULTS DISCUSSING THE ASSUMED AND ACTUAL CONDITIONS ON SITE. 11
4. THE DEWATERING WELLS INCLUDING DISCHARGE PIPES SHALL THEN BE COMPLETED AND TESTED TO BE FUNCTIONAL VERTICAL DISPLACEMENT (T1-T11)
INTERPERT THE RESULTS AND ASSESS THE EFFECTS TO THE SURROUNDING STRUCTURES AND ALERT ALARM ACTION
5. THE PROPOSED DEWATERING PUMP TO BE INSTALLED IS 'MASTRA' MODEL R95-S-08 WITH A MINIMUM DISCHARGE LEVEL LEVEL LEVEL GROUND SETTLEMENT CHECK PONT
UTILITIES. THIS REPORT SHALL BE SUBMITTED TO THE AP/RSE/RGE FOR VERIFICATION OF THE WATER S1 10
CAPACITY OF 10CU.M/HR/WELL UNDER A DELIVERY HEAD OF 46M AND BE ABLE TO LOWER WATER LEVEL WITHIN 1M CUT-OFF EFFECTIVENESS OF THE SHEET PILE WALL. THIS REPORT SHALL BE SUBMITTED TO BD'S 0.75m BELOW THE 0.80m BELOW THE 0.87m BELOW THE (S1-S10)
ABOVE THE PUMP. OBSERVATION WELLS
LOWEST MEASURED LOWEST MEASURED LOWEST MEASURED
SATISFACTION AFTER REVIEWED AND APPROVED BY AP/RSE/RGE. (OW2, OW4, OW6, OW1 OBSERVATION WELL (OW1-OW14) 14 90mm (W) x 60mm (H) space
6. FLOW METER AND GATE VALVE TO CONTROL FLOW SHALL BE INCOPORATED INTO EACH DEWATERING WELL. GROUND WATER TABLE GROUND WATER TABLE GROUND WATER TABLE
OW6, OW8, OW10, for AP/RSE/RGE's
7. BEFORE COMMENCEMENT OF PUMP TEST, WATER LEVELS IN ALL DEWATERING WELLS, STANDPIPES, OBSERVATION (VI) CONTINGENCY MEASURES (RECORDS WITHIN 72 (RECORDS WITHIN 72 (RECORDS WITHIN 72 P1 PUMP WELL (P1 TO P7) 7
OW12, OW14) signature/ and stamp chop
WELLS SHALL BE MEASURED AT 4 HOURS INTERVALS FOR A PERIOD OF 72 HOURS. THE LOWEST MEASURED LEVELS IN HOURS PRIOR TO THE HOURS PRIOR TO THE HOURS PRIOR TO THE RW1
1. 2 NUMBERS OF RECHARGE WELL WOULD BE PROVIDED AS CONTINGENCY MEASURES IF RECHARGE WELL (RW1-RW7) 7
THE PUMP WELL AND STANDPIPES SHALL BE USED AS INITIAL READINGS FOR THE PUMPING TEST. CARRYING OUT OF CARRYING OUT OF CARRYING OUT OF
8. ALL DEWATERING PUMPS SHALL BE SWITCHED ON SIMULTANEOUSLY. GROUNDWATER DRAWDOWN EXCEEDING THE LIMIT AND UNSATISFACTORY PERFORMANCE DURING STAND PIPE (WITH PIEZOMETER) (SP1(P)
PUMPING TEST) PUMPING TEST) PUMPING TEST) SP1(P)
RECOVERY PHASE WERE FOUND. THE LOCATION OF RECHARGE WELL ARE SHOWN AT DWG. NO. ELS-13 5
9. STEADY STATE SHALL BE DEFINED AS SUCH THAT THE RATE OF GROUNDWATER DRAW DOWN BOTH INSIDE AND TO SP5 (P)
OUTSIDE THE SITE IS LESS THEN 0.1M OVER AN HOUR. UTILITY SETTLEMENT MONITORING POINT
10. THE WATER LEVEL IN THE PUMP WELL SHALL BE MAINTAINED AT THE SPECIFIED LEVEL FOR AT LEAST 72 HOURS. GENERAL NOTES ON PUMPING TEST FOR REFERENCE ONLY U1
ON GROUND (U1-U2)
12
11. SHOULD THE SPECIFIED STEADY STATE IN GROUNDWATER DRAWDOWN NOT BE REACHED, PUMPING SHALL BE
CONTINUED UNTIL SUCH A STATE IS REACHED OR AS DIRECTED BY THE ENGINEER.THE MINIMUM TEST PERIOD IS 7 1. THE PUMPING WELLS SHOWN ARE MINIMUM REQUIREMENT ONLY. NOTWITHSTANDING THESE FLOW METER V1 VIBRATION CHECKPOINT (V1-V11) 11 BD's OFFICAL USE
MINIMUM REQUIREMENTS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE WHATEVER POWER SUPPLY
DAYS. TO DISCHARGE SYSTEM
& SWITCH SYSTEM
12. DURING THE TEST THE WATER LEVELS IN ALL DEWATERING WELL, OBSERVATION WELLS AS SHOWN ON DWG. NO. ADDITIONAL MEASURES THAT ARE NECESSARY TO ENSURE THE WATER LEVEL INSIDE THE SITE CAN
ELS-13 SHALL BE REACHED AT REGULAR INTERVALS WHICH SHOWN BELOW (II) WATER LEVEL MEASURMENT. BE LOWERED TO THE TO THE DESIGNATED LEVEL WITHOUT EXCEEDING THE DRAWDOWN AND
EXISTING GROUND LEVEL
13. ALL MONITORING DATA SHALL BE PRODUCED IN BOTH TABULAR AND GRAPHICAL FORM DURING THE COURSE OF THE SETTLEMENT CRITERIA STATED IN THIS DRAWING.
PUMPING TEST AND SUBMIT TO ENGINEER FOR BUILDINGS DEPARTMENT'S APPROVAL. 2. INSTALLATION RECORDS AND RESPONSE TEST RESULTS OF THE PIEZOMETERS, STANDPIPES, BENTONITE BALL VALVE TO HEADER
STEEL PLATE COVER LEGEND AND NOTES:
14. WATER LEVELS SHALL BE MONITORIED AFTER CESSATION OF PUMPING UNTIL RECOVERY TO INITIAL LEVELS IS PUMPING WELLS AND OBSERVATION WELLS SHALL BE SUBMITTED PRIOR TO THE COMMENCEMENT EXISTING
150mm DIA. G.I. TO CONTRACTOR'S DESIGN
COMPLETED OF THE PUMPING TEST. GROUND LEVEL
HEADER PIPE BOUNDARY LINE
GROUND LEVEL
3. THE PUMPING WELLS AND OBSERVATION WELLS FORM PART OF THE DEWATERING SYSTEM FOR BOREHOLE CASING
THE FURTURE EXCAVATION. OF SOIL DURING
WELL INSTALLATION PLAIN PIPE BH2(P) BORED HOLE (WITH PIEZOMETER)
(II) WATER LEVEL MEASUREMENT 4. THE TARGET GROUNDWATER TABLES TO BE LOWERED WITHIN THE SITE, AS RECORD BY Ø 19mm PERFORATED
1:1 CEMENT
50mm PVC BLANK
BENTONITE (BH1 (P), BH2 (P) AND BH5 (P)
OBSERVATION WELLS PIPE 50mm NO-FINES RISER PIPE
DURING THE PUMPING AND RECOVERY TESTS, THE WATER LEVELS IN THE DEWATERING WELLS, OBSERVATION WELLS GROUT BH6 (P), BH9 (P) AND BH10 (P) 6NOS.)
CONCRETE CEMENT
AND STANDPIPES SHALL BE MEASURED AT THE FOLLOWING INTERVALS: BENTONITE BALL
BEDDING BENTONITE GROUT
500 BELOW TOP BH2
TARGET
8-12mm LEVEL OF CEMENT BORED HOLE
TIME FROM COMMENCEMENT INTERVAL BETWEEN AGGREGATE FILTER 50mm DIA. G.I. BENTONITE GROUT
OBSERVATION WELL P1 P2 P3 P4 P5 P6 P7 (BH3, BH4, BH7 AND BH8 4 NOS.)
OF PUMPING TEST (mins) READINGS (mins) MATERIAL BACKFILL PIPE WITH 90mm (W) x 150mm (H) space
DRAWDOWN LEVEL (mPD) -8.075 -8.075 -8.075 -7.375 -10.325 -8.075 -8.075
IN STAGE AS CASING Ø 19mm FITTINSG TO for BD's approval stamp /
0-30 5 BEING WITHDRAWN REINFORCED 4.15 EXISTING GROUND LEVEL
PERFORATED CLEAN 10mm certification of copies of
SWITCH PVC PIPE WITH FLEXIBLE HOSE
30-60 10 ON-SWITCH GRAVEL FILTER approved plans
TWO LAYERS 10mm SINGLE AND COUPLERS
50mm PVC PERFORATED GAS PIPE (PNAP ADM-10 APP A)
60-120 15 5. THE PUMPING TEST SHALL BE STOPPED IN CASE THE GROUNDWATER DRAWDOWN OUTSIDE THE SITE OF NYLON MESH SIZE AGGREGATE GAS
RISER PIPE 6% OPEN AREA
EXCEEDS 2.0m. THE CONTRACTOR SHALL INVESTIGATE THE CAUSE OF THE DRAWDOWN AND
OFF-SWITCH RATID FORMED BY 5mm
120-360 30 IMPROVEMENT MEASURES SHALL BE PROPOSED AND IMPLEMENTED. CONTINGENCY MEASURES SUCH DIA. HOLES MAPPED WITH 2 S WAT SALT WATER PIPE
360-END OF TEST 60 AS INSTALLATION OF RECHARGE WELLS BEHIND SHEET PILE WALLS MAY BE REQUIRED. LAYERS OF NYLON NESH OF
SUMBERSIBLE
6. COMPLETE PUMPING TESTS RESULT SHALL BE SUBMITTED TO BD AFTER THE SUCCESSFUL PUMP OF
2mm OPENINGS
TO BE EQUIVALENT TO ELEC ELECTRIC CABLE
200

DURING THE RECOVERY PHASE, THE READINGS SHALL BE TAKEN CONTINUOUSLY UNTIL THE WATER LEVEL IN ALL COMPLETION. SUFFICIENT
165 CUT-OFF LEVEL OF
OBSERVATION WELLS AND STANDPIPES HAVE RECOVERED TO THEIR PRE-TEST LEVELS OR FOR A PERIOD OF TWO 7. PUMP WELLS AND OBSERVATION WELLS SHALL BE PROTECTED FROM DAMAGE. WORKS SHALL BE CAPACITY ADJACENT PUMP WELL
DAYS, WHICHEVER IS THE SOONER. PRIOR TO TERMINATING READINGS, THE ARCHITECT SHALL BE NOTIFIED. CARRIED OUT WITH DUE CARE IN PROXIMITY OF THOSE WELLS. 250 FOUL WATER PIPE
FOUL
8. IN CASE THE PUMP/OBSERVATION WELL HAS BEEN DAMAGED DURING ANY TIME OF THE TYPICAL DETAILS OF
(III) MONITORING OF CHECKPOINTS CONSTRUCTION WORKS, THE CONTRACTOR SHALL INFORM AP/RSE/RGE IMMEDIATELY AND TYPICAL DETAILS OF PUMP WELL TYPICAL DETAILS OF RECHARGE WELL
OBSERVATION WELL F WAT FRESH WATER PIPE
REINSTATEMENT SHALL BE CARRIED OUT WITHOUT DELAY. (N.T.S.)
(N.T.S.) (N.T.S.)
Tekla Structures

1. DURING THIS TEST AND UNTIL ALL STANDPIPES/ OBSERVATION WELLS HAVE RECOVERED TO THEIR PRE-TEST LEVELS,
ALL SETTLEMENT CHECKPOINTS TILTING CHECK POINTS AND UTILITY CHECK POINTS AS SHOWN ON THE DRAWING NO.
ELS-01 SHALL BE MONITORIED ONCE PER DAY. THE RESULTS SHALL BE PRODUCED IN ACCORDANCE WITH NOTE (I) 13.
BD REF :

BIM REF :
XXX ROAD GIU_REPORT_04934_BH2283
XXX ROAD

75

T
15
S

4.
0

Basketball Court

Building 2
Building 1
R

15
7.
6
SITE 75

T
TS

15
GIU_REPORT_04934_BH2281
15

3.
9
3
.4

15
S
TS
SH

4.0
P
R

154 DH4(P/S)

Basketball Court
Q

150

Building 2
R
15
Building 1
DH2(P/S)

4.
9
14

15
6

15
.5

3.

7.6
4
14

N
7.
2
14

GIU_REPORT_04934_BH2280 GIU_REPORT_04934_BH2279
5.
6

14
5.
2

TS
DH3(P/S) REV DATE AMENDMENT

BLOCK PLAN PROJECT

15
DH1(P/S)

15
1 : 500 CIC SAMPLE PROJECT

3.9
3.4
GIU_REPORT_04934_BH2278

TS
SH
SURFACE BOX CAP DRAWING TITLE

R
WITH COVER
PROPOSED GROUND INVESTIGATION

P
20mm PVC PIPE GROUND LEVEL 154 PLAN

Q
SCALE As indicated@A1
150 DRAWING NO. REV. NO.
1500

DRAIN CONDUIT
G001

15
BENTONITE BALL

4.9
SOURCE ---

14
10mm SINGLE SIZE AGGREATE

6.5

15
90mm (W) x 40mm (H) space
∅19mm PERFORATED PVC PIPE

3.4
for COMPANY LOGO

14
WITH 2 LAYERS OF NYLON MESH

N
7.2
14
5.6

PLASTIC TUBE

14
5.2
90mm (W) x 60mm (H) space
CEMENT BENTONITE GROUT for AP/RSE/RGE's
(1 : 1 BY WEIGHT) signature/ and stamp chop
LY
NOTES FOR GI PLAN
PROPOSED GROUND INVESTIGATION PLAN
1 : 250 LEGEND:
ON

BD's OFFICAL USE

1. LEVEL SHALL REFER TO METERS ABOVE PRINCIPAL DATUM, HONG KONG.


1500

BENTONITE BALL SITE BOUNDARY


2. THE CONTRACTOR SHALL SET OUT THE LOCATIONS OF Gl STATIONS PRIOR TO COMMENCEMENT OF THE
WORKS. EXACT LOCATIONS ARE TO BE CONFIRMED BY OF WORKS.
CE

3. THE CONTRACTOR SHALL EXERCISE EXTREME CARE SO AS NOT TO DISTURB OR DAMAGE ANY UTILITIES PROPOSED VERTICAL DRILLHOLE
SAND FILTER PRIOR TO THE COMMENCEMENT OF ROTARY DRILLING. A HAND EXCAVATED INSPECTION PIT SHALL BE WITH STANDPIPE / PIEZOMETER
1500

CARRIED OUT AT EACH DRILLHOLE TO LOCATE ANY UNDERGROUND UTILITIES BEFORE DRILLING.
AVAILABLE EXISTING DRILLHOLES
EN

PIEZOMETER 4. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE RECOMMENDATIONS OF GEOGUIDE 2, NEARBY THE PROJECT SITE
CEOGUIDE 3, APP49 AS WELL AS APP24.
500

5. INSPECTION PIT (APPROXIMATELY 1.2m x 1.2m x 1.5m DEEP) SHALL BE HANG DUG AND ARE CARRIED OUT TO
R

ENSURE THAT THE PROPOSED DRILLING LOCATION WILL NOT INTERECEPT THE EXISTING UNDERGROUND
1500

BENTONITE BALL 90mm (W) x 150mm (H) space


UTILITIES AND FOUNDATION. SHOULD EXISTING UTILITIES AND FOUNDATIONS BE ENCOUNTERED THE
FE

for BD's approval stamp /


DRILLHOLE WILL BE RELOCATED IN THE VICINITY OF THE CONCERNED LOCATION BY THE INSTRUCTION OF certification of copies of
THE ENGINEER. PROPOSED DRILLHOLE SCHEDULE EXISTING DRILLHOLE SCHEDULE approved plans
CEMENT BENTONITE GROUT (PNAP ADM-10 APP A)
1500 MIN.

6. PROPOSED BOREHOLES SHALL BE H SIZE IN SOIL AND ROCK AND SHALL BE SUNK BY ROTARY DRILLING MARK EASTHING NORTHING MARK EASTHING NORTHING
RE

(1 : 1 BY WEIGHT)
METHOD USING WATER AS FLUSHING MEDIUM.
DH1(P/S) 832043.740 813811.230 GIU_REPORT_04934_BH2278 832057.107 813825.725
BOTTOM OF HOLE 7. MAZIER SAMPLES SHALL BE TAKEN AT 20m INTERNALS COMMENCING AT 0.5m BELOW INSPECTION PIT OF
DRILLHOLES. DH2(P/S) 832029.510 813821.270 GIU_REPORT_04934_BH2279 832056.999 813847.010
8. STANDARD PENETRATION TEST (SPT) WITH LINER SAMPLES SHALL BE CARRIED OUT AT 2.0m INTERNALS. IF
R

DH3(P/S) 832062.200 813841.590 GIU_REPORT_04934_BH2280 832026.548 813804.907


SPT ARE CARRIED OUT AT LEVEL SAME AS THE LEVEL FOR MAZIER SAMPLING. THE SPT SHOULD BE
DH4(P/S) GIU_REPORT_04934_BH2281 832025.530 813829.383
FO

CARRIED OUT AFTER MAZIER SAMPLING. 832046.550 813852.060


STANDPIPE / PIEZOMETER 9. ROCKHEAD SHAL BE DEFINED AS THE SURFACE OF CAT I(C) OR BETTER ROCK WITH TOTAL CORE GIU_REPORT_04934_BH2283 832017.296 813862.569
N.T.S. RECOVERY (TCR OF THE DESIGNATED GRADE) GREATER THAN 85%. THE DEFINITION OF TOTAL CORE GIU_REPORT_04934_BH2283 832017.296 813862.569
RECOVERY IS IN ACCORDANCE WITH CODE OF PRACTICE FOR FOUNDATIONS, 2017.
BD REF :

BIM REF :

SURFACE BOX CAP


WITH COVER
20mm PVC PIPE GROUND LEVEL

SITE FORMATION BLOCK PLAN OVERVIEW IN 3D (FOR INFORMATION ONLY)

1500
DRAIN CONDUIT
REV DATE AMENDMENT
NTS. NTS. BENTONITE BALL
PROJECT

10mm SINGLE SIZE AGGREATE


CIC SAMPLE PROJECT

∅19mm PERFORATED PVC PIPE


INSCRIBE WITH 2 LAYERS OF NYLON MESH
PIEZOMETER NUMBER
STANDARD LOCKABLE IN CONCRETE
C.I. HINGED COVER SURROUND DRAWING TITLE
PLASTIC TUBE SITE FORMATION BLOCK PLAN
PVC CAP WITH VENT HOLE
NOTES
UTILITIES PVC TUBING
1. THE CONTRACTOR SHALL MAINTAIN AND PROTECT ALL EXISTING FACILITIES AND DRAINAGE CONCRETE BOX CEMENT BENTONITE GROUT
SYSTEM WITHIN AND NEARBY THE SITE UNLESS OTHERWISE INSTRUCTED BY THE 1. PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL CONFIRM 20mmØ PVC PIPE (1 : 1 BY WEIGHT)
GRADE 20/20

2.

3.
SUPERVISOR.

ANY UTILITIES SHOWN ON THIS PLAN ARE INDICATIVE ONLY.THE CONTRACTOR IS


RESPONSIBLE FOR CONFIRMING THE EXACT LOCATIONS AND ALIGNMENT ON SITE.

IF THE CUT SLOPE TO BE LAST FOR MORE THAN A YEAR, SHOTCRETE OR SIMILAR SLOPE
2.
LY
THE EXACT LOCATIONS OF THE EXISTING UTILITIES AFFECTING OR TO BE AFFECTED
BY THE WORKS USING INSPECTION PITS OR OTHER MEANS AS RECOMMENDED BY
THE RELEVANT UTILITY / SERVICES COMPANIES OR PARTIES CONCERNED.

THE CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE ANY EXISTING
UTLITIES OR SERVICES WITHIN OR IN THE VICINITY OF THE WORKS SITE AND WORKS
LAID TO NOMINAL 1
IN 50 FALL
APPROVED FILLING

BENTONITE BALLS / PELLETS


SCALE

T001
As indicated@A1
DRAWING NO. REV. NO.

AREA AND SHALL PROVIDE NECESSARY PROTECTION AND SUPPORT TO THE SOURCE ---

1500
SURFACE PROTECTIVE MEASURE SHALL BE APPLIED. BENTONITE BALL
ON
EXISTING UTLITIES OR SERVICES ACCORDANCE WITH THE REQUIREMENTS OF THE
4. TEMPORARY DRAINAGE REFER TO TEMPORARY DRAINAGE MANAGEMENT PLAN. RELEVANT OF UTILITY / SERVICES COMPANIES OR PARTIES CONCERNED DURING
THE EXECUTION WORKS. SHOULD ANY DAMAGE OCCUR TO THE UTILITIES /
SERVICES DUE TO THE THE WORKS. SHOULD ANY DAMAGE OCCUR TO THE SAND FILTER
5. IF THE LOADING OR GROUNDWATER CONDITIONS ARE DEVIATED FROM THE DESIGN

1500
UTILITIES / SERVICES DUE TO THE CONTRACTOR'S WORKS, THE CONTRACTOR SAND FILTER SURROUND 90mm (W) x 40mm (H) space
ASSUMPTIONS, FURTHER DESIGN OR CHECKING SHALL BE REQUIRED TO CONFIRM THE PIEZOMETER
SHALL BE RESPONSIBLE FOR ANY COST INCURRED FROM THE DAMAGE. for COMPANY LOGO
MAXIMUM CUT SLOPE ANGLE.

500
6. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATIONS AND THE
THE PROTECTION OF EARTHWORKS AGAINST HEAVY RAINFALL

1500
PARTICULAR REQUIREMENTS WHICH ARE SHOWN ON INDIVIDUAL DRAWINGS. POROUS ELEMENT BENTONITE BALL
E

1. SURFACE WATER FLOWING INTO THE SITE FROM UPHILL SHALL BE INTERCEPTED
7. UNLESS OTHERWISE SPECIFIED, THESE GENERAL NOTES ARE APPLICABLE TO ALL
AND CONDUCTED FROM THE SITE TO SAFE DISCHARGE POINT. AT EACH
GEOTECHNICAL WORKS OF SITE FORMATION. CEMENT BENTONITE GROUT

1500 MIN.
INTERSECTION AND ABRUPT CHANGE IN DIRECTION OF SURFACE DRAINAGE
(1 : 1 BY WEIGHT)
C

CHANNELS AN ACCESSIBLE CATCHPIT SHALL BE PROVIDED, ALL DRAINAGE BENTONITE BALLS / PELLETS
8. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE GENERAL SPECIFICATION
WORKS SHALL BE KEPT CLEAR OF DEBRIS. BOTTOM OF HOLE
FOR CIVIL ENGINEERING WORKS 2006 OR OTHERWISE SPECIFIED.
2. WHERE PARTIALLY COMPLETED DRAINAGE WORKS DISCHARGE WITHIN THE SITE, 90mm (W) x 60mm (H) space
9. THE BOTTOM OF THE EXCAVATION SHALL BE KEPT DRY. WATERFLOW INTO THE EXCAVATION END OF HOLE
EN

A TEMPORARY CONDUIT SHALL BE PROVIDED TO THE DISCHARGE POINT. for AP/RSE/RGE's


SHALL BE PUMPED TO SAFE DISCHARGE POINT TO AVOID PONDING AT BASE OF EXCAVATION. signature/ and stamp chop
3. ALL EARTHWORKS SHALL BE GRADED AND SEALED TO ENSURE RUN-OFF AND TO
10. ALL EXCAVATION WORK SHALL NOT REDUCE THE REQUIRED STABILITY OF THE SLOPE.
AVOID PONDING.
DETAILS OF PIEZOMETER STANDPIPE / PIEZOMETER
11. IF DURING EXECUTION OF THE WORKS, THE GROUND CONDITIONS ARE FOUND TO BE N.T.S.
4. A METHOD OF WORKING SHALL BE ADOPTED IN WHICH THE MINIMUM OF BARE N.T.S.
SUBSTANTIALLY DIFFERENT FROM THE DESIGN, THE ENGINEER MAY CHANGE THE DESIGN
SOIL IS EXPOSED AT ANY TIME. EARTHWORK TO FORM THE FINAL FACE SHALL BE
AND THE EXTENT OF THE WORKS IN ORDER TO ADDRESS THE ACTUAL GROUND CONDITIONS.
R

FOLLOWED UP IMMEDIATELY WITH SURFACE PROTECTION AND DRAINAGE


WORKS AND THE FACE PANEL SIZE SHALL BE ENOUGH TO PERMIT THIS. BD's OFFICAL USE
12. DURING THE EXECUTION OF WORKS, RECORDS SHALL BE SUBMITTED TO THE ENGINEER OF
THE GROUND ENCOUNTERED. THESE RECORDS SHALL INCLUDE THE LEVELS OF SOIL AND See detail "X"
5. EXCAVATION SHALL NOT BE LEFT OPEN ON OR ADJACENT TO SLOPES. Grating
ROCK ACROSS THE SLOPE FACE, THE OCCURRENCE OF GROUNDWATER AND THE
FE

LOCATIONS OF ANY VOIDS OR WEAK OR WET GROUND.


6. IF TRENCHES ON OR ADJACENT TO SLOPE HAVE TO BE EXCAVATED DURING THE SECTION B_B
13. REGULAR CLEAN-UP OF DIESEL AND OIL SPILLS SHALL BE CARRIED OUT TO PREVENT
WET SEASON, THIS SHALL BE DONE WITH EXTREME CARE IN SHORT SECTIONS SECTION A_A
AT A TIME. PRECAUTIONS SHALL ALWAYS BE TAKEN TO PREVENT WATER FROM Contract Manufacturer's
CONTAMINATION OF SURFACE DRAINAGE WATER. Manufacturer's
ENTERING AND COLLECTING IN THE TRENCH. number name
name
7. WHERE TEMPORARY BARE EARTH SLOPE FACES ARE UNAVOIDABLE, THEY SHALL
RE

BE PROTECTED WITH IMPERMEABLE SHEETING WELL-SECURED AGAINST THE


WIND. WHERE SLOPE FACES ARE TO BE TEMPORARILY EXPOSED FOR MORE
THAN TWO WEEKS TEMPORARY HARD SURFACING SHALL BE PROVIDED AND
DIMENSIONS, LEVELS & SETTING-OUT TEMPORARY DRAINS SHALL BE INSTALLED.

1. COORDINATES ARE BASED ON HONG KONG METRIC GRID (1980) UNLESS


OTHERWISE SPECIFIED. 90mm (W) x 150mm (H) space
Contract for BD's approval stamp /
2. LEVELS ARE IN METRES RELATIVE TO HONG KONG PRINCIPAL DATUM (mPD) number certification of copies of
TYPICAL CROSS SECTION
R

UNLES OTHERWISE SPECIFIED. approved plans


(PNAP ADM-10 APP A)
OF CHANNEL
3. DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
GRANTING - OBLIQUE
FO

4. SETTING OUT DIMENSIONS, LEVELS, COORDINATES ARE TO BE CALCULATED BY 25 x 25 x3 tk. hot dip
THE CONTRACTOR. NO INFORMATION SHOULD BE SCALED PHYSICALLY OR galvanised angle BARS PATTERN GRANTING - SQUARE HOLES
ELECTRONICALLY FROM THE DRAWINGS OR FILES. 4 dia. stainaless steel stud ( All slots and ribs are 18 in width. PATTERN
bolts at 300 spacing Exact no. of slots and ribs to be ( All hole are 25 x 25 in size and all ribs are
5. SETTING OUT OF ALL SLOPES SHALL BE VERIFIED BY THE CONTRACTOR AND adjusted to suit channel width ) of equal width. Exact no. of holes and ribs to
AGREED WITH THE ENGINEER ON SITE. be adjusteed to suit channel width )
DETAIL "X"
(Scale 1:5)
.0 0

0
95.0
96
BD REF :

0
94.0

0
LEGEND:

93.0

0
92.0

0
BIM REF :

91.0

0
90.0

0
89.0

0
88.0

0
87.0
GIU_REPORT_04934_BH2283

86.0
SITE BOUNDARY .00 .00
85 84 .00
83 .00
82 .00
EL. +5.00 SLOPE BERM / PLATFORM LEVEL 81 .00
80 .00
225UC
U-CHANNEL
N:813859.16 79 .00
E:832043.03 78 .00
77

76.00
RETAINING WALL
N:813855.10 DN300
E:832010.17
CATCHPIT WITHOUT COVER


SOIL NAIL DH4

50.5
76.00
30
SOIL CUT SLOPE U C 0U
300

30
C

0
UC
SN3

96.00
SOIL FILL SLOPE

0
N:813837.96

97.00

76.0
GIU_REPORT_04934_BH2279

98.00
E:832009.60

99.0 0
ROCK CUT SLOPE 57
.59 DH3

FAL
100.00
°

5
22
C
ROCK FILL SLOPE

L
DN
5U
1 EL.92.000m

DN3
22

P IT

LE
00

CH
T003

HO
EXISTING GROUND PROFILE 54

T
150 .48

CA

AN
151 °

TM
ST
C

LA

EN
0U
150

NM
FINAL SITE FORMATION LEVEL COMPACTED SOIL FILL OR

30

ET
SN6

300
151

ER
PI P
N:813836.81 DECOMPOSED LANDFILL

V
UC
L

GO
FAL

AI N
E:832011.18

TO
DR
DH1 PROPOSED VERTICAL DRILLHOLE FA
LL
WITH STANDPIPE / PIEZOMETER
63
.04 SN5 FMH4012623
° EL.85.000m
N:813835.56 ELE. +78.900
DH2 SN2
E:832009.93
AVAILABLE EXISTING DRILLHOLES N:813836.61 A1 -0.12-150
SN4
NEARBY THE PROJECT SITE E:832008.50 A3 400
N:813834.33 X1 -0.12-400
SN1 E:832008.87
N:813835.30 GIU_REPORT_04934_BH2281
E:832007.54 ° N:813829.47
55.24 E:832054.99
EL.92.000m

300
N:813826.34

UC
225

225 U
E:831989.31

UC
REV DATE AMENDMENT
SOIL NAIL SCHEDULE ° DH2(P)

P
7 FA GIU_REPORT_04934_BH2278
56.2

A
LL

TR
PROJECT

ND
ELEVATION SOIL NAIL SOIL NAIL CIC SAMPLE PROJECT

SA
MARK EASTING NORTHING DESCRIPTION

L
FAL
(mPD) DIA. INCLINATION

UC
300
SN1 832007.543 813835.295 90.856 50 20.00° Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 4000

UC
00
99.

300
0

00
0
SN2 832008.495 813836.607 90.751 50 20.00° Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 5000

98.

00
78.
00
2 DRAWING TITLE

00
77.
97.
300

00
76.
SN3 832009.604 813837.956 90.741 50 20.00° Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 4000 UC

°
0
T003 225 UC SITE FORMATION LAYOUT PLAN
96.0

00
75.
67

00
74.
48.

73.
Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 4000
SN4 832008.869 813834.333 87.817 50 20.00°
95.0
0 .00
72
.00
SN5 832009.933 813835.564 87.499 50 20.00° Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 5000
94.0
0 71
.00
0 70
SN6 832011.183 813836.811 87.465 50 20.00° Type Nail Head_400x400, Dia 50mm, Inclination(Degree) 20.00, L = 4000 93.0
DH1
.00
SCALE As indicated@A1
69
.00 .00
DRAWING NO. REV. NO.
92 1.00 68
9
90
.00 T002
CATHPIT SCHEDULE 9.0
0
8 ---
.00 SOURCE
CATCHPIT CATCHPIT 88 GIU_REPORT_04934_BH2280
CATCHPIT CATHPIT CATHPIT CATHPIT CATCHPIT 87.00
EASTING NORTHING TOP LEVEL BOTTOM LEVEL
NAME WIDTH (mm) LENGTH (mm) DEPTH (m) MATERIAL
(mPD) (mPD) 00
86. 00
85. 90mm (W) x 40mm (H) space
PIT_15 831998.530 813834.705 800 800 0.800 97.492 96.692 Concrete Grade 20/20 .00
84 for COMPANY LOGO
.00
PIT_14 832015.553 813854.103 800 800 0.800 94.589 93.789 Concrete Grade 20/20 83
.00
82
PIT_16 832006.946 813816.170 800 800 0.800 93.997 93.197 Concrete Grade 20/20 .00
81
.00
80
PIT_12 832017.175 813851.862 800 800 0.800 92.000 91.200 Concrete Grade 20/20 .00
79
.00
PIT_11 832004.808 813833.124 800 800 0.800 92.000 91.200 Concrete Grade 20/20 78
.00
77
PIT_10 832009.415 813815.479 800 800 0.800 91.994 91.194 Concrete Grade 20/20 .00
76
.00
75 N:813794.05
PIT_09 832014.243 813821.001 800 800 0.800 85.000 84.200 Concrete Grade 20/20 .00 E:832033.83 90mm (W) x 60mm (H) space
74 .00 for AP/RSE/RGE's
PIT_06 832037.217 813852.757 800 800 0.800 85.000 84.200 Concrete Grade 20/20 73 .00
72 .00 signature/ and stamp chop
71
PIT_07 832020.420 813847.490 800 800 0.800 85.000 84.200 Concrete Grade 20/20
SITE FORMATION LAYOUT PLAN
PIT_08 832009.615 813832.519 800 800 0.800 85.000 84.200 Concrete Grade 20/20 1:200
PIT_05 832043.215 813846.967 800 800 0.800 85.000 84.200 Concrete Grade 20/20

PIT_03 832039.157 813811.679 800 800 0.800 85.000 84.200 Concrete Grade 20/20 BD's OFFICAL USE

PIT_04 832049.642 813829.492 800 800 0.800 85.000 84.200 Concrete Grade 20/20

PIT_13 832040.839 813857.052 800 800 0.800 84.188 83.400 Concrete Grade 20/20

PIT_02 832040.211 813809.921 800 800 0.800 79.445 78.850 Concrete Grade 20/20

PIT_01 832051.335 813828.475 800 800 0.800 79.243 78.700 Concrete Grade 20/20
+85.000
SAND TRAP 832053.290 813830.186 1200 1200 0.800 78.983 78.223 Concrete Grade 20/20
+85.000
+85.4
FMH4012623 832054.156 813833.144 800 800 0.800 79.053 78.100 Concrete Grade 20/20 +85.300
+ 85.457
+ 85.457 +85.700
+85.500 +85.491
+85.700
GI SCHEDULE +85.491 90mm (W) x 150mm (H) space
+85.300 for BD's approval stamp /
+85.500
MARK EASTING NORTHING +85.4 certification of copies of
approved plans
DH1 832044.484 813810.690 (PNAP ADM-10 APP A)

DH2(P) 832023.778 813823.615

DH3 832037.467 813845.788

DH4 832046.564 813852.050

3D VIEW FROM SOUTH (FOR INFORMATION ONLY) 3D VIEW FROM EAST (FOR INFORMATION ONLY)
NTS. NTS.
SITE BOUNDARY
BD REF :
ELEVATION BIM REF :
(mPD)

100.0

99.0

98.0

97.0

96.0

51 °
95.0
EXISTING GROUND PROFILE
94.0

93.0
SN1 EL. +92.00
92.0 ELE. +90.856

91.0

20°
90.0 DH2(P)
SN4
Ground Level: 0.000

63°
89.0 ELE. +87.817
Fill
PROPOSED SURFACE CHANNEL
88.0

20°
COMPACTED SOIL FILL OR DECOMPOSED LANDFILL PROPOSED FORMATION LEVEL
87.0

86.0
SITE BOUNDARY

EL. +85.40
DESIGN G.W.T.
EL. +85.00
+84.86
85.0

84.0
MEASURED HIGHEST G.W.T.
+82.86
83.0

82.0
7.16 VI REV DATE AMENDMENT

81.0 PROJECT
CIC SAMPLE PROJECT
80.0

SITE BOUNDARY
79.0 EL. +76.40

78.0 DRAWING TITLE


11.19
SITE FORMATION SECTION
77.0
EL. +75.10

ELEVATION
SECTION 1
(mPD) 1:100 T200 SCALE 1 : 100@A1
DRAWING NO. REV. NO.

96.0
T003
SOURCE ---
95.0
EXISTING GROUND PROFILE
94.0

57°
90mm (W) x 40mm (H) space
93.0 for COMPANY LOGO
EL. +92.00

92.0

91.0

90.0
GIU REPORT 04934 BH2281

56°
89.0 Ground Level: 0.000
Fill 90mm (W) x 60mm (H) space
88.0 for AP/RSE/RGE's
N=9 signature/ and stamp chop
SITE BOUNDARY

COMPACTED SOIL FILL OR DECOMPOSED LANDFILL PROPOSED FORMATION LEVEL


87.0

86.0 EL. +85.50


EL. +85.00
85.0 DESIGN G.W.T.
+84.86
4.00 COLLU BD's OFFICAL USE
84.0
MEASURED HIGHEST G.W.T.
83.0 +82.86

82.0
N=15
81.0

80.0
N=33
79.0
10.00 VI
78.0 90mm (W) x 150mm (H) space
EL. +76.40 N=38 for BD's approval stamp /
77.0 certification of copies of
12.00 III approved plans
(PNAP ADM-10 APP A)
76.0
N=200
75.0
EL. +75.10

74.0

73.0
16.00

SECTION 2
1:100 T200
BD REF :

LEGENDS BIM REF :


GENERAL NOTES 20. ALL INVERT LEVELS SHOWN ON MANHOLES ARE THE INVERT LEVEL OF THE MAIN
1. THE WHOLE DRAINAGE INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF THE CHANNELS IN THE CENTRE OF MANHOLES.
BUILDINGS ORDINANCE AND BUILDING REGULATIONS AND THE CURRENT REGULATIONS OF 21. ALL UNDERGROUND DRAINS SHALL BE DULY TESTED AND COMPLIED WITH THE DIRECTION OF FLOW F.A.I.
REQUIREMENT STATED ON PNRC 11 & PNAP APP-58 PRIOR TO THE BACKFILLING OF FRESH AIR INLET
HONG KONG ENVIRONMENTAL PROTECTION DEPARTMENT.
2. ALL DIMENSIONS AND PIPE SIZES SHOWN ON THE DRAWINGS ARE IN mm UNLESS TRENCHES. WASTE PIPE
22. WHETHER SHOWN ON THE DRAWING OR NOT, SUFFICIENT PROTECTIVE GUARD SHALL WIRE MESH BALLOON (VENT COWL)
OTHERWISE STATED.
3. WHERE THE WASTE PIPE FROM A WASTE FITMENT IS CONNECTED TO A SOIL PIPE, THE TRAP BE SUPPLIED AND INSTALLED BY MAIN CONTRACTOR.
23. POSITION OF MANHOLES SHALL BE CO-ORDINATE WITH OTHER TRADES/SERVICES. SOIL & WASTE PIPE / SOIL PIPE
PROVIDED FOR EACH FITMENT SHALL HAVE A WATER SEAL NOT LESS THAN 80mm AND BE VRWO VERTICAL RAIN WATER OUTLET
VENTED BY MEANS OF ANTISYPHONAGE PIPE OR ANTISYPHONAGE TRAP. EXACT POSITION AND SET-OUT TO BE DETERMINED ON SITE.
24. CAST IRON AIRTIGHT BOLTED COVER SHALL BE USED TO BACK INLET TRAPPED RAIN WATER PIPE
4. HORIZONTAL VENT PIPE SHALL BE INSTALLED IN A MANNER THAT THERE IS A CONTINUOUS
FALL BACK AT A GRADIENT OF NOT LESS THAN 1 IN 300 INTO THE DISCHARGE PIPE SYSTEM. GULLIES WHICH ARE SITUATED INSIDE BUILDING AND THE AIR TIGHT TRAPPED GULLIES RWO RAIN WATER OUTLET
SHALL BE VENTILATED. VENTILATING PIPE/
5. UNLESS OTHERWISE STATED GRADIENT OF DRAIN PIPES SHALL BE AS FOLLOWS:- ANTI-SYPHONAGE PIPE
25. EVERY STORM WATER PIPE WHICH DISCHARGE TO A CHANNEL OR A TRAP SHALL TFD
∅100 FALL 1 : 40 DISCHARGE AT A POINT NOT MORE THAN 150MM ABOVE THE TOP OF THE CHANNEL OR TOP ACCESS FLOOR DRAIN
∅150 FALL 1 : 70 DISCHARGE INTO A TRAPPED AND VENTED INSPECTION CHAMBER. A/C CONDENSATION DRAIN PIPE
∅225 FALL 1 : 100 26. SIZE OF TRAPS FOR FITMENTS SHALL BE THE SAME AS THE PIPE SIZE NOTED FOR TSD
∅300 OR ABOVE FALL 1 : 150 FITMENTS. TOP ACCESS SHOWER DRAIN
SMH STORMWATER MANHOLE
6. ALL UNDERGROUND PIPES SHALL BE PROVIDED WITH PIPE HAUNCHING OR SURROUNDED BY 27. FACES OF EVERY MANHOLE WITHIN SITE SHALL BE RENDERED WITH CEMENT MORTAR
FD
CONCRETE AS SHOWN ON DETAILS DRAWINGS. THE DRAINAGE SUB-CONTRACTOR SHALL SO AS TO PROVIDE A SMOOTH AND IMPERVIOUS SURFACE. WMH SOIL & WASTE MANHOLE FLOOR DRAIN
CHECK THE SITE BEFORE CONSTRUCTION AND RECTIFY THE PROPOSED PIPE ROUTING. 28. UPON THE COMPLETEION OF DRAINAGE CONNECTION WORKS BY THE SUB-
7. INSPECTION PANELS OF ADEQUATE SIZE SHALL BE PROVIDED AT PIPE DUCTS AND SHAFTS CONTRACTOR. A JOINT INSPECTION WITH D.S.D SHALL BE CARRIED OUT AND THE AS
TERMINAL STORMWATER VFD VERTICAL FLOOR DRAIN
FOR INSPECTION AND MAINTENANCE OF PIPES. BUILT SEWER AND STORMWATER DRAINS RECORDS WILL BE FURNISHED TO D.S.D. STMH
29. ALL BENDING RADIUS OF THE UNDERGROUND PIPE SHOULD BE GREATER THAN 6 MANHOLE
8. ALL BACK INLET TRAPPED GULLIES SHALL BE VENTILATED BY MEANS OF 80mm DIA. VENT PIPE.
9. ALL SOIL WASTE AND VENT STACKS SHALL BE CARRIED UP TO THE ROOF AND TERMINATED TIMES OF THE PIPE DIA.. TERMINAL FOUL WATER BITG
30. ALL CONDENSATE DRAIN PIPES SHALL BE CONNECTED TO THE STORM WATER PIPE IS FTMH
AT NOT LESS THAN 1000mm ABOVE THE ROOF OR AS SHOWN IN DRAWINGS. MANHOLE BACK INLET TRAPPED GULLY
10. EVERY ANTI-SYPHONAGE PIPE SHALL BE CONNECTED WITH BRANCH SOIL PIPE OR BRANCH NOT REQUIRED TO CONNECT WITH ANTI SYPHONIC TRAP. BITG C/W VENT PIPE
WASTE PIPE AT A POINT NOT MORE THAN 300mm FROM TRAP OUTLET. 31. UNLESS OTHERWISE SPECIFIED, ALL FINISHED FLOOR GRADIENT SHALL BE 1 IN 100
11. WHETHER SHOWN ON THE DRAWINGS OR NOT, SUFFICIENT ACCESS SHALL BE PROVIDED BY FALL. WATER CLOSET OTG
MEANS OF CLEANING EYES OR OTHER APPROVED METHOD TO ENABLE ALL DRAINAGE PIPES 32. UNDERGROUND DRAIN SHALL HAVE AN INTERNAL DIAMETER OF NOT LESS THAN
TO BE CLEARED OF ANY OBSTRUCTION. SUCH ACCESS POINTS SHALL BE SO SITED AT TO 100mm DIA. OTG OPEN TRAPPED GULLY
33. BEFORE CONSTRUCTION OF THE DRAINAGE WORKS, THE SUB-CONTRACTOR SHOULD WASH BASIN
ALLOW CLEARANCE FOR THE EASY ENTRY OF CLEANING ROD.
12. ALL BENDS IN SOIL PIPES AND WASTE PIPES SHALL HAVE AN OBTUSE ANGLE AND HAVE THE CHECK THE EXACT LOCATION AND INVERT LEVELS OF THE EXISITNG GOVERNMENT
PIPELINES AND MANHOLES. SINK
LARGEST PRACTICABLE RADIUS OF CURVATURE. THE BENDS SHALL NOT CHANGE IN ANY WAY
34. ALL PIPES SHALL BE SURROUNDED WITH 150mm CONCRETE WHEN COVER DEPTH IS CLEANSING EYE
OF THE SECTION OF THE PIPE AND A CLEANING EYE SHALL BE PROVIDED AT OR NEAR THE
BEND. LESS THAN 900mm UNDER ROAD AND 450mm UNDER FOOTWAY.
35. NO PIPE JOINTS SHALL BE PERMITTED WITHIN THE THICKNESS OF WALLS OR FLOORS. URINAL
13. ALL FLOOR DRAINS ARE TO BE COMPLETED WITH FLAT GRATING. THEIR SIZE ARE NOTED AS
FOLLOW: 36. FRESH AIR INLETS SHALL BE STRONG CAST IRON APPROX. 50MM(W)x115MM(H) x140(D)
WITH CURVED BACK FIXING EATS CASTED ON FOR CONNECTION PIPE 100MM SUMP PIT WITH SUBMERSIBLE PUMPS
DIAMETER WITH POLISHED STAINLESS STEEL SKILLED FRONT SCREWED ON AND SHOWER
OUTLET SIZE GRATING SIZE
∅50 ∅100 FOR REFERENCE ONLY FITTED WITH THIN ALUMINIUM-FLAP VALVE FIXED AT MINIMUM 2.5M ABOVE GROUND
∅80 ∅150 LEVEL OR SHOWN ON THE DRAWINGS. BATH-TUB
∅100 ∅225 37. TRAPPED GULLIES SHALL BE WITH HINGED CAST IRON GRATING OR COVER WITH GREASE TRAP
∅150 ∅300
FRAME. CAST IRON GULLY TRAP OF APPROPRIATE SIZE SHALL MATCH WITH THE DRAIN
PIPES AND PROVIDE A MIN. 75MM DEEP-WATER SEAL AND WITH MIN. 50MM DIAMETER HALF ROUND / FLAT CHANNEL
14. THE SUB-CONTRACTOR SHOULD CHECK AND ALLOW ADEQUATE FALL FOR THE VENT PIPE FOR SEALED COVER GULLY. S.T.
SOIL/WASTE PIPE RUNNING ON FLOOR LEVEL. SEPTIC TANK
38. FLOOR DRAINS OR VERTICAL GRATINGS SHALL BE SET IN POSITIONS AND SEAL THE COVERED CHANNEL
15. ALL PIPES PASSING THROUGH EXIT STAIRCASES, FIRE PROTECTED LOBBIES SHALL BE CLEARANCE BETWEEN THE FLOOR DRAINS AND THE FLOOR SLABS AFTER
ENCLOSED IN FRR -/60/60 MATERIAL & BASEMENT IN FRR -/120/120 MATERIAL BY MAIN INSTALLATION. 200 DEPTH SUNKEN SLAB REV DATE AMENDMENT
CONTRACTOR. 39. DRAINAGE WORKS OUTSIDE LOT BOUNDARY ARE FOR BD REFERENCE ONLY. SOAKAWAY PIT
PROJECT
16. EXPANSION JOINTS SHALL BE PROVIDED FOR PIPEWORK PASSING THROUGH BUILDING 40. CCTV AND MANHOLE SURVEY SHALL BE CARRIED OUT AT THE EARLY STAGE OF THE
EXPANSION JOINTS. CONSTRUCTION AND THE COMPLETION OF THE WHOLE DRAINAGE SERVICES SYSTEM. 400 DEPTH SUNKEN SLAB CIC SAMPLE PROJECT
17. UNLESS OTHERWISE STATED, BRANCH PIPE SIZE SHALL BE AS FOLLOWS: THE EXTENT OF CCTV SURVEY SHALL SUBJECT TO ARCHITECT/ ENGINEER'S PETROL INTERCEPTOR
WASTE BRANCH FOR EACH WASH BASIN 32mm APPROVAL. DISCONNECTING TRAP
WASTE BRANCH FOR EACH KITCHEN SINK 40mm A A CONNECTION FROM A TO A
WASTE BRANCH FOR EACH FLOOR DRAIN IN TOILET 50mm
WASTE BRANCH FOR EACH SHOWER DRAIN IN TOILET 50mm ANIT-SYPHONAGE BOTTOM TRAP
WASTE BRANCH FOR EACH BATH IN TOILET 40mm B B CONNECTION FROM B TO B DRAWING TITLE
WASTE BRANCH FOR EACH FLOOR DRAIN IN PLANT RM. 100mm GENERAL NOTES FOR DRAINAGE
SOIL BRANCH FOR EACH URINAL 40mm EARLY STAGE - FROM GOVERNMENT MANHOLE FMH4055942 TO FMH4055943
SOIL BRANCH FOR EACH WATER CLOSET 100mm - FROM GOVERNMENT MANHOLE SMH4074523 TO SMH4074524
VENT BRANCH FOR EACH WATER CLOSET 50mm - FROM GOVERNMENT MANHOLE SMH4074527 TO SMH4074529 4.3
VENT BRANCH FOR EACH URINAL 32mm
18. ALL MANHOLE AND BITG FRAMES AND COVERS (INCLUDING CAST IRON COVER AND COMPLETION - FROM FOUL WATER TERMINAL MANHOLE T.FMH-B01 TO FMH4055942
OF SYSTEM - FROM GOVERNMENT MANHOLE FMH4055942 TO FMH4055943 SCALE 1:500
MATCHING COVER) SHALL BE OF AN APPROVED DESIGN CONFORMING TO THE
FOLLOWING REQUIREMENTS, UNLESS OTHERWISE INDICATED:
a. INDOOR CARPARK AREA/DRIVE WAY -HEAVY DUTY TYPE DOUBLE SEAL
b. OUTDOOR CARPARK AREA/DRIVE WAY -HEAVY DUTY TYPE SINGLE SEAL
- FROM STORM WATER TERMINAL MANHOLE T.SMH-101 TO SMH4074523
- FROM GOVERNMENT MANHOLE SMH4074523 TO SMH4074524
- FROM STORM WATER TERMINAL MANHOLE T.SMH-B01 TO SMH-B13
N Y YY S T
4.1 DRAWING NO.

M001
REV. NO.

c.INSIDE BUILDING -MEDIUM DUTY TYPE DOUBLE SEAL - FROM GOVERNMENT MANHOLE SMH-B13 TO SMH4074527 R E ET
- FROM GOVERNMENT MANHOLE SMH4074527 TO SMH4074529
19. ALL UNDERGROUND DRAINS ARE TO BE LAID ON A CONCRETE BED NOT LESS THAN 4.0 B SOURCE ---
41. SUNKEN TRENCH SHALL BE BACKFILL WITH LIGHT WEIGHT CONCRETE. A
100mm THICK AND AT LEAST 150mm WIDER THAN THE PIPE BORE AND AUNCHED UP CLEANSING EYE SHALL BE PROVIDED FOR PIPEWORKS INSIDE SUNKEN TRENCH.
BOTH SIDES WITH CONCRETE TO MEET THE PIPE BARREL TANGENTIALLY.

N O .9 8 2
B LO CK

ø300
90mm (W) x 40mm (H) space

SM H407
A1 300
X1 300

2709
for COMPANY LOGO

ø150
PIPEWORK MATERIAL SCHEDULE
GALVANIZED STEEL TUBE TO BS EN 10255 ‘MEDIUM’

ø300
ABOVEGROUND: ABBREVIATION
∅32 - ∅40 GRADE WITH SCREW JOINT FOR INSIDE PIPE DUCT &
19.3
(INSIDE PIPE DUCT / PODIUM AREA) PODIUM AREA OR UPVC PIPE TO BS EN 465*-1 / BS 4514 T/A TO ABOVE STG SEAL TRAPPED GULLY P.D. PLANTER DRAIN
ABOVEGROUND SOIL / WASTE / FOR INTERNAL AREA.

SM H407
CL 3.75
A1 2.35-
A2 2.54- 300
X1 2.35-
OTG OPEN TRAPPED GULLY

X XX S T
∅50 - ∅300 T/B TO BELOW S.S. STAINLESS STEEL

2708
300
150
SOIL & WASTE / RAIN WATER
VENT PIPE (INSIDE PIPE DUCT / PODIUM AREA / CAST IRON TO BS 416 / BS 437 F/A FROM ABOVE WP WASTE PIPE S.W.P. SOIL & WASTE PIPE N O .9 78
WITHIN 2m FROM TRANSFER PLATE) 12.7
F/B FROM BELOW SP SOIL PIPE R.W.P. RAINWATER PIPE

ø300
ALL SIZES (INSIDE SUNKEN SLAB / U/S UNDERSLAB RW RAIN WATER G.S.P. GALVANIZED STEEL PIPE N O .9 76 90mm (W) x 60mm (H) space
UPVC PIPE TO BS 4514 / BS EN 1329-1 for AP's signature/ and stamp chop
WITHIN SAME COMPARTMENT AREA)

R EE T
VP VENT PIPE D.I.P. DUCTILE IRON PIPE

SM H407
CL 3.74
A1 2.44-
A2 2.56- 300
X1 2.44-
N O .9 74

2707
∅32 TO ∅65 UPVC PIPE TO BS 5255 & BS EN 1329

300
150

ø150
ø300
Z ZZ R O
∅80 - ∅150 U/G UNDERGROUND

SM H407
F/L FLOOR LEVEL

CL 3.74
A1 2.43-
F.D.

A2 2.94-
X1 2.43-
N O .9 72
(EXTERNAL & ABOVE 2m ABOVE UPVC PIPE TO BS 4514 / BS EN 1329-1 FLOOR DRAIN
SITE

2706
300
150
300

ø300
H/L HIGH LEVEL AFFL ABOVE FINISHED
TRANSFER PLATE)) V.G. VERTICAL GRATING
FLOOR LEVEL

SM H401
CL 3.76
A1 2.44-
X1 2.44-
M/L MID LEVEL N O .9 70 K.I.L 201

3018
C.L. COVER LEVEL

300
300
DUCTILE IRON TO BS EN 598 WITH INTERNAL HIGH

HAI
∅350 AND ABOVE C/W COMPLETE WITH

FM H401
CL 3.91
A1 150
X1 2.84-
ALUMINA CEMENT COATING L/L LOW LEVEL I.L. INVERT LEVEL

202 5
150
P.I. PETROL INTERCEPTOR

ø300

T
AD
G.I. PIPES TO BS EN 10255 MEDIUM GRADE FOR A/G ABOVE GROUND N O .9 68

SM H3.84
A/C AIR CONDITIONING BD's OFFICAL USE

CL

G
A1 2.44-

STREE
X1 2.44-
ø150
F.M.H. FOUL WATER MANHOLE

4072712
PUMPED DRAINAGE PIPE UP TO ∅65

300
300
FOR REFERENCE ONLY ABOVEGROUND, HEAVY GRADE FOR UNDERGROUND

N
S.M.H. STORM WATER MANHOLE C.E. CLEANING EYE

FM H401
X1 150
X2 150
N O .9 66

A
DUCTILE IRON TO BS EN 598 WITH INTERNAL HIGH

202FM
4 H401
X1 150
X2 150
∅80 AND ABOVE

202

H
ø300
ALUMINA CEMENT LINING

8
DN DIAMETER(MM) UNPLASTICIZED POLYVINYL TFD TOP ACCESS FLOOR DRAIN
UPVC.P. N O .9 64

S
A/C CONDENSATE DRAIN SYSTEM GOVT. GOVERNMENT CHLORIDE PIPE
EXTERNAL AND ALL SIZES UPVC PIPES AND FITTINGS TO BS EN 1329-1 / BS 4514 TSD TOP ACCESS SHOWER DRAIN

SM H 407
CL 3.78
A1 2.68- 225
A2 2.95-
X1 2.68-
R.W.O. RAIN WATER OULET BITG BACK INLET TRAPPED GULLY

300
2711
300
S ITT IN
INSIDE PIPE DUCT / PODIUM AREA G.I. PIPE TO BS EN 10255 MEDIUM GRADE C/W 9mm C.I.P. CAST IRON PIPE VERTICAL RAIN WATER
M.H. MANHOLE VRWO
/ TRANSFER PLATE AND ALL SIZES ELASTOMERIC THERMAL INSULATION CLASS O C.D.P. CONDENSATE DRAIN PIPE OUTLET
D.T.I.L. DISCONNECTING TRAP

G -O U T
∅100 - ∅225 CAST IRON TO BS 437

ø150
CON. PIPE CONCRETE PIPE INVERT LEVEL
UNDERGROUND SOIL / WASTE /

SM H 407
CL 3.81
A1 2.70-
A2 2.77- 300
X1 2.69-
SOIL & WASTE / RAIN WATER ∅250 - ∅375 CAST IRON TO BS 1211 / BS 4622 AP ACCESS PANEL

300
2710
225
AR EA
VENT PIPE ∅400 AND ABOVE DUCTILE IRON TO BS EN 598
STMH-01 FTMH-01
UNDERGROUND SOIL AND WASTER ALL SIZE HIGH DENSITY POLYETHYLENE PIPES TO
PIPE CONNECT TO PUBLIC C.L.: 3.43 C.L.: 3.42

N O .95

FM H401
A1 150
X1 150

ø300
B LC O
BS EN 12201-2:2011, PE 100. I.L.: 2.42

262 1
DRAINAGE SYSTEM I.L.: 2.43
D.T.I.L: 2.28 D.T.I.L.: 2.27 90mm (W) x 150mm (H) space

0 -9 5 4
KB

SM H401
CL 3.53
for BD's approval stamp /

X1 300
UNDERGROUND RAIN WATER ALL SIZE 4.0

3017
ø150
CONCRETE PIPE TO BS EN 5911 PART 100 CLASS H certification of copies of

ø3
PIPE CONNECT TO PUBLIC 3.8

00
DRAINAGE SYSTEM approved plans

FM H401
CL 3.75
C

A1 1.92-
50

X1 1.92-
ø2

262 2
150
150
W WW S (PNAP ADM-10 APP A)
D

ø150
TREET

FM H401
CL 3.42
A1 -0.12 250
A2 0.22-
A3 400
X1 -0.12

262 3
-150
-400
ø400

3.7
ø400

BLOCK PLAN
1 : 500

GSPublisherVersion 451.3.4.100
BD REF :
KITCHEN TOILET

1100 AFFL
ø50 TR/F BIM REF :
+109.500

ø32 FRESH WATER PUMP


ROOM

ø32
ø50

ø100
ø50 TSD
TFD UR2/F ø100
+106.300 VFD

ø50 ø50
ø50 ø50
ø100 SUNKEN FLUSHING WATER PUMP
ø50

ø100
ROOM
2500 AFFL

2500 AFFL

2500 AFFL

2500 AFFL

2500 AFFL
2500 AFFl
VFD
R/F
DETAIL E ø100
ø100

ø100

You might also like