Professional Documents
Culture Documents
KEDIAMAN
DENSITI RENDAH
DENSITI SEDERHANA
BP2 DENSITI TINGGI
P. Meranti PERDAGANGAN
BP1 PERDAGANGAN
Air ENTERPRISE
Hitam REKREASI
TAMAN WILAYAH
TAMAN KEJIRANAN
TANAH LAPANG
ZON PENAMPAN
KEMUDAHAN
PENDIDIKAN
T/SR/SM KEAGAMAAN
S/M KESIHATAN
K/PK/H BALAI POLIS
BP BALAI BOMBA
BP3 BB DEWAN SERBAGUNA
Bukit Baja D
INFRASTRUKTUR & UTILITI
REZAB UTILITI
JALAN RAYA
TALIAN RENTIS ELEKTRIK
PENCAWANG MASUK UTAMA
PENCAWANG PEMBAHAGI UTAMA
PMU
PENCAWANG ELEKTRIK
PPU
PE
EKOLOGI SEMULAJADI
BP4 TANAH BUKIT
Bukit Damar SUNGAI/PARIT/BADAN AIR
PERTANIAN
PEMBANGUNAN EKO
Data Collection - Soil Investigation and
Survey Works
SG. RASAU, SG. GAJAH AND SG.
AIR HITAM CATCHMENT
200
180
160
140
Rainfall Depth (mm)
120
100
80
60
40
20
0
0.1 1 10 100
Duration (hr)
DR
MSC RAINFALL DEPTH - DURATION FREQUENCY CURVES
A S S O C I A TES
2 y e a rs R e tu rn P e r io d 5 y e a rs R e tu rn P e r io d
8 0 1 0 0
9 0
7 0
8 0
Intensity(mm/hr)
Intensity (mm/hr)
6 0
7 0
5 0 6 0
4 0 5 0
3 0 4 0
3 0
2 0
2 0
1 0 1 0
0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
D u r a tio n (h r) D u r a tio n (h r)
1 0 y e a rs R e tu rn P e rio d 2 5 y e a rs R e tu rn P e r io d
1 2 0 1 4 0
1 0 0 1 2 0
Intensity (mm/hr)
Intensity (mm/hr)
1 0 0
8 0
8 0
6 0
6 0
4 0
4 0
2 0 2 0
0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
D u r a tio n (h r) D u r a tio n (h r)
1 0 0 y e a rs R e tu rn P e r io d 5 0 y e a rs R e tu rn P e rio d
1 6 0 1 4 0
1 4 0 1 2 0
Intensity (mm/hr)
Intensity (mm/hr)
1 2 0 1 0 0
1 0 0
8 0
8 0
6 0
6 0
4 0
4 0
2 0 2 0
0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
D u r a tio n (h r) D u r a tio n (h r)
DR
DESIGN RAINFALL HYETOGRAPHS FOR VARIOUS
A S S O C I A TES RETURN PERIODS
12 hours
5 0
6 hours
4 5 3 hours
4 0 1/2 hour
10
13
16
19
22
25
28
31
34
37
40
43
46
1
7
D u r a tio n
1 2 H o u rs D e s ig n H y e to g ra p h 6 H o u rs D e s ig n H y e to g ra p h
7 0 2 Hours 4 5 1 Hour
6 0 4 0
% Mean Rainfall
3 5
% Mean Rainfall
5 0
3 0
4 0 2 5
3 0 2 0
2 0 1 5
1 0
1 0
5
0 0
1 2 3 4 5 6 1 2 3 4 5 6
D u r a t io n D u r a t io n
3 H o u rs D e s ig n H y e to g ra p h 1 /2 H o u rs D e s ig n H y e to g ra p h
4 0
4 5
10 mins
4 0 3 5
3 5 3 0
% Mean Rainfall
% Mean Rainfall
3 0
1/2 Hour 2 5
2 5
2 0
2 0
1 5
1 5
1 0
1 0
5
5
0 0
1 2 3 4 5 6
1 2 3 4 5 6
D u r a t io n D u r a t io n
DR
COMPARISON OF RAINFALL TEMPORAL PATTERN
BETWEEN THE MSC AND HYDROLOGICAL
A S S O C I A TES
PROCEDURE NO. 1
DESIGN FLOOD HYDROGRAPH FOR ALL THE SUB-CATCHMENTS
[m]
20.0
19.0
18.0
17.0
16.0
15.0
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0 LEGEND :
6.0
100 years RP
5.0 50 years RP
25 years RP
4.0 10 years RP
5 years RP
3.0 2 years RP
2.0
0.0 1000.0 2000.0 3000.0 4000.0 5000.0 6000.0 7000.0 8000.0 9000.0
[m]
11.5
11.0
10.5
10.0
9.5
9.0
8.5
8.0
7.5
7.0
6.5
6.0
5.5 LEGEND :
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
0.0 1000.0 2000.0 3000.0 4000.0 5000.0 6000.0 7000.0 8000.0 9000.0 10000.0 11000.0 12000.0
[m]
PROPOSED RIVER IMPROVEMENT WORKS FOR SUNGAI RASAU
PROPOSED RIVER IMPROVEMENT WORKS FOR SUNGAI AIR HITAM
PROPOSED IMPROVED CROSS SECTIONS FOR SG. RASAU AND SG. AIR HITAM
1600
1400
1200
Discharge (m3/s)
1000
800
600
400
200
0
0 10 20 30 40 50 60
Time (hr)
DR
COMPARISON OF PRESENT AND FUTURE CONDITION FOR THE 100
A S S O C I A TES YEAR DESIGN HYDROGRAPH AT SUNGAI KLANG
PRELIMINARY RESULTS OF THE GEOTECHNICAL ANALYSIS
RIVER SLOPE PROTECTION USING RIP-RAP LINING RIVER SLOPE PROTECTION USING INTERLOCKING BLOCK
RIVER SLOPE PROTECTION USING GABION MATRESS RIVER SLOPE PROTECTION USING RUBBLE-PITCHING
RIVER SLOPE PROTECTION USING SHEETPILE RIVER SLOPE PROTECTION USING L-SHAPE UNIT
Acquisition Land
Government’s Land
Federal’s Land