You are on page 1of 26

PETA CADANGAN 2015

KEDIAMAN
DENSITI RENDAH
DENSITI SEDERHANA
BP2 DENSITI TINGGI
P. Meranti PERDAGANGAN
BP1 PERDAGANGAN
Air ENTERPRISE

Hitam REKREASI
TAMAN WILAYAH
TAMAN KEJIRANAN
TANAH LAPANG
ZON PENAMPAN

KEMUDAHAN
PENDIDIKAN
T/SR/SM KEAGAMAAN
S/M KESIHATAN
K/PK/H BALAI POLIS
BP BALAI BOMBA
BP3 BB DEWAN SERBAGUNA
Bukit Baja D
INFRASTRUKTUR & UTILITI
REZAB UTILITI
JALAN RAYA
TALIAN RENTIS ELEKTRIK
PENCAWANG MASUK UTAMA
PENCAWANG PEMBAHAGI UTAMA
PMU
PENCAWANG ELEKTRIK
PPU
PE
EKOLOGI SEMULAJADI
BP4 TANAH BUKIT
Bukit Damar SUNGAI/PARIT/BADAN AIR
PERTANIAN
PEMBANGUNAN EKO
Data Collection - Soil Investigation and
Survey Works
SG. RASAU, SG. GAJAH AND SG.
AIR HITAM CATCHMENT
200

180

160

140
Rainfall Depth (mm)

120

100

80

60

40

20

0
0.1 1 10 100

Duration (hr)

DR
MSC RAINFALL DEPTH - DURATION FREQUENCY CURVES
A S S O C I A TES
2 y e a rs R e tu rn P e r io d 5 y e a rs R e tu rn P e r io d
8 0 1 0 0
9 0
7 0
8 0

Intensity(mm/hr)
Intensity (mm/hr)
6 0
7 0
5 0 6 0
4 0 5 0
3 0 4 0
3 0
2 0
2 0
1 0 1 0
0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2

D u r a tio n (h r) D u r a tio n (h r)

1 0 y e a rs R e tu rn P e rio d 2 5 y e a rs R e tu rn P e r io d
1 2 0 1 4 0

1 0 0 1 2 0

Intensity (mm/hr)
Intensity (mm/hr)

1 0 0
8 0
8 0
6 0
6 0
4 0
4 0
2 0 2 0

0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
D u r a tio n (h r) D u r a tio n (h r)

1 0 0 y e a rs R e tu rn P e r io d 5 0 y e a rs R e tu rn P e rio d
1 6 0 1 4 0
1 4 0 1 2 0

Intensity (mm/hr)
Intensity (mm/hr)

1 2 0 1 0 0
1 0 0
8 0
8 0
6 0
6 0
4 0
4 0
2 0 2 0

0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
D u r a tio n (h r) D u r a tio n (h r)

DR
DESIGN RAINFALL HYETOGRAPHS FOR VARIOUS
A S S O C I A TES RETURN PERIODS
12 hours
5 0
6 hours
4 5 3 hours
4 0 1/2 hour

Rainfall Depth (mm)


3 5
3 0
2 5
2 0
1 5
1 0
5
0

10

13

16

19

22

25

28

31

34

37

40

43

46
1

7
D u r a tio n

1 2 H o u rs D e s ig n H y e to g ra p h 6 H o u rs D e s ig n H y e to g ra p h

7 0 2 Hours 4 5 1 Hour
6 0 4 0
% Mean Rainfall

3 5

% Mean Rainfall
5 0
3 0
4 0 2 5
3 0 2 0
2 0 1 5
1 0
1 0
5
0 0
1 2 3 4 5 6 1 2 3 4 5 6

D u r a t io n D u r a t io n

3 H o u rs D e s ig n H y e to g ra p h 1 /2 H o u rs D e s ig n H y e to g ra p h

4 0
4 5
10 mins
4 0 3 5

3 5 3 0

% Mean Rainfall
% Mean Rainfall

3 0
1/2 Hour 2 5
2 5
2 0
2 0
1 5
1 5
1 0
1 0
5
5

0 0
1 2 3 4 5 6
1 2 3 4 5 6

D u r a t io n D u r a t io n

DR
COMPARISON OF RAINFALL TEMPORAL PATTERN
BETWEEN THE MSC AND HYDROLOGICAL
A S S O C I A TES
PROCEDURE NO. 1
DESIGN FLOOD HYDROGRAPH FOR ALL THE SUB-CATCHMENTS
[m]

20.0

19.0

18.0

17.0

16.0

15.0

14.0

13.0

12.0

11.0

10.0

9.0

8.0

7.0 LEGEND :
6.0
100 years RP
5.0 50 years RP
25 years RP
4.0 10 years RP
5 years RP
3.0 2 years RP
2.0

0.0 1000.0 2000.0 3000.0 4000.0 5000.0 6000.0 7000.0 8000.0 9000.0
[m]

MAX WATER LEVEL PROFILE FOR FIG. 1


VARIOUS RETURN PERIOD AT SUNGAI RASAU-AIRHITAM
[m]

11.5

11.0

10.5

10.0

9.5

9.0

8.5

8.0

7.5

7.0

6.5

6.0

5.5 LEGEND :

5.0 100 years RP


50 years RP
4.5 25 years RP
10 years RP
4.0 5 years RP
2 years RP
3.5
0.0 500.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 4000.0 4500.0 5000.0 5500.0 6000.0 6500.0
[m]

MAX WATER LEVEL PROFILE FOR FIG. 2


VARIOUS RETURN PERIOD AT SUNGAI AIRHITAM
[m]
Water Level - 1-1-2000 04:30

14.0

13.0

12.0

11.0

10.0

9.0

8.0

7.0

6.0

5.0

4.0

3.0

2.0

0.0 1000.0 2000.0 3000.0 4000.0 5000.0 6000.0 7000.0 8000.0 9000.0 10000.0 11000.0 12000.0
[m]
PROPOSED RIVER IMPROVEMENT WORKS FOR SUNGAI RASAU
PROPOSED RIVER IMPROVEMENT WORKS FOR SUNGAI AIR HITAM
PROPOSED IMPROVED CROSS SECTIONS FOR SG. RASAU AND SG. AIR HITAM
1600

1400

1200
Discharge (m3/s)

1000

800

600

400

200

0
0 10 20 30 40 50 60

Time (hr)

DR
COMPARISON OF PRESENT AND FUTURE CONDITION FOR THE 100
A S S O C I A TES YEAR DESIGN HYDROGRAPH AT SUNGAI KLANG
PRELIMINARY RESULTS OF THE GEOTECHNICAL ANALYSIS
RIVER SLOPE PROTECTION USING RIP-RAP LINING RIVER SLOPE PROTECTION USING INTERLOCKING BLOCK

RIVER SLOPE PROTECTION USING GABION MATRESS RIVER SLOPE PROTECTION USING RUBBLE-PITCHING

TYPICAL BANK PROTECTION LINING FIG. 8.5(a)


RIVER SLOPE PROTECTION USING GEOTEXTILE-BONDED RIVER SLOPE PROTECTION USING
CONCRETE BLOCKS SANDFILL MATTRESS LINING

RIVER SLOPE PROTECTION USING SHEETPILE RIVER SLOPE PROTECTION USING L-SHAPE UNIT

TYPICAL BANK PROTECTION LINING FIG. 8.5(b)


DETAIL OF THE TIDALGATE FIG. 8.13
BRIDGE CROSSING FIG. 8.12
LEGEND

Acquisition Land

Government’s Land

Federal’s Land

Forest Land Reserve

Land Acquisition for River Improvement


Works for Sg. Rasau and Sg Air Hitam

You might also like