GT13E2

GAS TURBINE
Superior flexibility / Superior performance

POWER
Power,
productivity, profit

Wherever they operate worldwide, utilities and independent power producers have to cope with rapid
changes - tougher emissions legislation and fierce competition not least among them.
At the same time they need to reduce production costs – yet major power interruptions dramatically
illustrate the danger of cutting cost at the expense of reliability. To increase long-term profits, even
at a time of volatile fuel and electricity prices, it is vital to continue to raise efficiency and productivity.

Alstom’s GT13E2 gas turbine offers the highest engine efficiency of conventional class gas
turbines yet has long inspection intervals. With millions of fired hours of operation to
its credit, the GT13E2 is the perfect core of a power plant, designed to produce reliable,
competitively priced electricity.

The GT13E2 offers superior flexibility through two operating modes – one maximises performance,
the other maximises operating time between inspection intervals. In addition, the engine can actively
support grid frequency with high response and no extra lifetime factors.

The GT13E2, whose gas turbine technology has earned its stripes over the years, is designed
for a wide range of applications. It can operate as a stand-alone turbine in a new or existing
power plant design or as part of a turnkey power plant. Applications cover electrical power
generation in base load, intermediate or peak duty. It can be used in industrial applications
such as aluminium smelters or desalination plants. With its modularised and pre-tested
auxiliaries, the GT13E2 can be brought on-line quickly to support phased plant construction.

Right technology, right products


Alstom’s gas turbines stand out for their high cost efficiency,
availability and flexibility.
The range covers a wide spectrum of products, including machines
for both the 50 Hz and 60 Hz markets. They can operate either in
simple cycle or combined cycle and are fuelled by natural gas,
medium or low calorific gases or light oil; with on-line fuel switch
over capability eliminating dependency on any one fuel.

02
GT13E2: Unmatched efficiency
The GT13E2 has the highest open-cycle efficiency of conventional class gas

the benefits turbines – close to 37% (ISO) – with a high exhaust energy level. This offers
significant fuel cost savings over competing technologies for a wide variety
of applications. It is achieved by carefully optimizing existing proven
technology – without the need for expensive and high-maintenance
technologies used in some advanced gas turbines. The benefit of lower
operating cost is, therefore, not compromised by higher maintenance costs
or reduced availability.

Operational flexibility
The GT13E2 can operate in either a performance optimised mode or a lifetime
optimised mode without having to change hardware. Both respond to
increasingly volatile markets by allowing the operator to select, on-line, the best
operating mode to maximise profit. Operational flexibility also includes the
ability to handle wide fluctuations in gas composition. In addition, the engine
can operate on diesel oil (with or without water injection for NOx control), with
an on-line switch-over between gas and oil even at full load.

Low maintenance cost/


longer inspection intervals
The GT13E2 has a number of family assets. Firstly, the maintenance-free welded
rotor eliminates the need for major overhauls. Secondly, the fully annular
combustor does not require any combustor inspections. With the GT13E2, you
can achieve maintenance intervals of 36,000 Equivalent Operating Hours (EOH)
between hot gas path inspections. This makes the GT13E2 the ultimate choice
for operating regimes with a higher sensitivity to O&M costs and availability.

Continuous evolution
The GT13E2 continues to be at the cutting edge thanks to constant technology
evolution. These incremental improvements use the engineering tools validated
at the Alstom Test Power Plant and confirmed with test campaigns in the field.
Two retrofittable upgrades on the GT13E2 are a prime illustration – improved
turbine blading with the flexible operating concept and a compressor upgrade.

03
Rotor manufacturing
welding process.

Designed for dependable,


low cost operation
Every component of the GT13E2 is the result of The welded rotor design eliminates maintenance work such
time-tested design principles, thorough validation and as restacking and disk replacement or factory rotor overhaul
manufacturing processes conforming to the highest standards. and thus eliminates the need for a so called “major overhaul”
of the GT.

Maintenance-free welded rotor


Alstom’s welded rotor was first introduced in 1929 for steam Low-stage loaded compressor
turbines and has been operating successfully in both Alstom The 21-stage compressor with its low stage loading yields
gas and steam turbines. The rotor is welded from forged discs a high surge margin and high reliability.
that ensure high rotor stiffness with two-bearing support. Variable inlet guide vanes control airflow efficiently, increasing
part load efficiency and starting reliability.

Annular combustor
A fully annular combustion chamber distributes the
circumferential temperature evenly while avoiding problem
zones such as cross-firing tubes or transition pieces. In
addition the annular combustion systems of Alstom do not
need a so called "combustor inspection" as for can-annular
systems which reduces the amount of maintenance leading to
higher availability.

04
Turbine
Advanced aerodynamics and multi-convective cooling schemes
contribute significantly to the GT13E2’s outstanding efficiency.

The design of the first turbine stage, combined with thermal


Dry low NOx EV burner barrier coating (TBC) and conservative firing temperatures,
EV (EnVironmental) burner technology, operating successfully allows extended inspection intervals of up to 36,000 EOH.
for several millions of hours throughout the Alstom gas turbine
fleet, gives long burner life, no maintenance between hot gas All Inconel 738 conventional cast turbine airfoils and heat
path inspection and low emissions. shields ensure long parts life and allow for full, cost-effective
refurbishment.
The EV burner gives the benefit of dry low NOx combustion
for operation with different natural gases, with the option to
run with liquid fuel as an alternative. Axial exhaust system
The straight-line arrangement of gas turbine and heat recovery
steam generator (HRSG) facilitates compact plant layouts.

The elimination of the turning elbow reduces back-pressure


and turbulence at the HRSG inlet. This improves unit
performance in simple and combined cycle mode.

05
Flexibility and efficiency
The longer and more flexible inspection intervals that
the GT13E2 offers, linked to higher efficiency when required,
provide the optimal hedging against fuel price uncertainty.

Extended inspection Efficiency


intervals The GT13E2 has the highest efficiency
One of the key benefits of the GT13E2 of conventional class gas turbines in
is the ability to operate with extended simple cycle. It offers unrivalled
inspection intervals for low fuel cost performance in markets where fuel
applications or in schemes where fuel prices are high or fluctuate regularly.
is provided by the power off-taker The combination of high power output
(Tolling or Energy Conversion and high conventional class availability
schemes). You get this benefit with in both simple and combined cycle are
only a marginal reduction in efficiency compelling advantages. The
and output. The GT13E2’s optimised performance optimised operation mode
operation mode allows for 36,000 also offers the lowest Cost of Electricity
equivalent operating hours between (CoE) when fuel prices are high.
Hot Gas Path inspections.

The importance
of flexibility
Where demand is seasonal or fuel prices
are volatile, the ability to switch between
operation modes on-line provides an
added operational advantage. The
GT13E2 has been designed to deliver
the high operational flexibility that allows
a plant owner to maximise profits with
the same hardware.

06
Meeting customer requirements
Our long experience working with customers and
our understanding of different markets across the globe
enable us to adapt to a variety of customer needs.

Low fuel prices Hot Gas Path inspection intervals run High fuel and/or
When fuel prices are low, O&M costs to 36,000 equivalent operating hours. electricity prices
have a significant impact on the total Furthermore, at around 0.2%, the When fuel prices are high, the fuel
Cost of Electricity (CoE). To keep O&M reduction in simple-cycle efficiency is portion of CoE becomes the dominant
costs down, as plant owner you may negligible. The contributions of O&M, cost factor. Here, efficiency has a huge
decide to run the plant with longer fuel and capital costs to the total Cost leverage effect. You cannot influence
inspection intervals. Using this operation of Electricity, and the preferable the fuel prices, but you can strive to get
mode of the GT13E2, maintenance configuration, are shown in the figure maximum power from the fuel to partly
costs can be contained since the EOH below. compensate.

The performance optimised operation


mode of the GT13E2 assures
IMPACT OF CAPITAL COST AND O&M COST (I.E. INSPECTION INTERVALS) maximum power - the highest power
Operating regime output in its class, with the added
LIFETIME CONCEPT PERFORMANCE CONCEPT benefit of high efficiency, both in simple
cycle and combined cycle, at high
CoE (cents/kWh) CoE (cents/kWh)
Peaking
availability and reliability levels.
In times of peak demand, when
electricity prices are high, switching to
the performance optimised operation
Intermediate
mode allows you to maximise
revenues. Alstom also offers integrated
inlet cooling and power increase
Baseload options that give even more operational
Fuel price
flexibility for following a variable
Investment Fuel O&M
Cost Cost Cost electricity demand.
IMPACT OF FUEL COST (I.E. EFFICIENCY)

07
Seamless integration
Developing, building, and operating a profitable gas turbine
power plant goes far beyond selecting components with
promising individual specification parameters.

A key aspect is integration, With the Alstom GT13E2 gas turbine,


because it can substantially enhance all the above come as standard.
flexibility and performance. As a gas The GT13E2 is the result of years of
turbine plant EPC contractor, this would Alstom experience in gas turbine plant
include the following requirements: design and construction. This
experience goes back to the world’s first
T The gas turbine should be designed commercial gas turbine plant in
for simple and cost effective Neuchatel, Switzerland, in 1939. Today,
integration into the overall plant. Alstom is the leading EPC contractor
T In-depth, comprehensive user worldwide, with technology for all plant
information should be readily available. components in house.
T Application consulting needs to be
available when required. The GT13E2 is also backed by Alstom’s
plant operating and maintenance
As a plant owner/operator, you would add service expertise, with a portfolio from
the following requirements to the list: spare parts delivery up to full operation
and maintenance. Operational support
T Operational flexibility to support plant is also available on a 24 hour / 7 day
dispatch requirements such as quick basis with the on-line Alstom Monitoring
start-up, fuel flexibility, black start, and Diagnosis System (AMODIS).
power augmentation, air inlet cooling.
T Operational stability to accommodate
sudden load changes, active grid
frequency support, black grid
restoration, partial or global load
rejection.
T An efficient Operation and
Maintenance regime.

08
GT13E2 key benefits
1] Engine design 3] Project Development Support
T Compact arrangement, particularly for multi-unit or T Project feasibility studies and commercial modeling.
combined-cycle configurations. T Plant concept and technical/commercial assessment.
T Lower investment and better use of lay-down space by T Site evaluation and foundation engineering.
using a common crane. T Permitting and environmental impact analysis.
T Reduced dust ingestion and longer filter life from an T Site access and heavy equipment transport studies
elevated air intake location. and advice.
T Effective maintenance of indoor or outdoor T Grid interface and grid stability studies.
configurations through a spacious off-base GT T Financial engineering assistance.
enclosure. T Plant design.
T Quick installation and start-up through pre-assembled
and pretested mechanical and electrical auxiliaries. 4] Integration Support
T A comprehensive standard scope for low integration T Engineering documents available to customers and
and maintenance costs and high availability. in electronic form for simple integration into bid or
T A generator breaker, eliminating costly HV in-feed for project documentation.
start-up. T Staggered provision of information to match the
T A static starting device to allow for multiple starts. project’s development phase:
T A TOPAIR high-efficiency totally enclosed air-cooled - Application Information Package for project
generator avoiding the use of hydrogen and the development.
corresponding expensive auxiliaries. - Proposal Integration Package for proposal support.
T Full on-site maintainability of the engine. - Project Start-Up Package for contract start phase.
T Commitment on power train performance is also
2] Scope flexibility provided as part of the life-cycle cost analysis.
T As both a leading equipment OEM and a major turnkey
constructor, Alstom can tailor its scope to meet any
customer needs.
T With our experience, we can contribute to projects of
any size or scope – from a single gas turbine unit to a
full turnkey operation.
T Additional services such as training, spare parts and
customised operation as well as maintenance solutions
can be provided, depending on customer requirements.

09
Kuala Langat,
Malaysia.

The GT13E2 in action – delivering profit


The GT13E2 is Alstom’s answer to the increasing worldwide demand for high-performance
gas turbines. Equally suitable for combined-cycle and open-cycle plants, it supports almost
every type of application.

With more than one hundred GT13E2s month later – both units completed
in operation and millions of fired hours exactly on time.
to its credit, this superior gas turbine The plant layout was prepared such that
has already built an impressive track the planned addition of further units,
record of reliability and performance in including the conversion to combined
various stringent conditions. cycle can be accomplished without
disturbing the operation of the Phase 1
portion of the plant.
The GT13E2 in simple cycle
T Efficient, reliable operation Ever since F’Kirina has gone commercial,
T Packaged for fast, low-cost it has been a cornerstone of Sonelgaz
installation F’Kirina / ALGERIA power supply to the Algerian national
T Fast start and loading 2xGT13E2, 292 MW grid. With its exceptional reliability and
T Excellent grid stabilising Fuel: natural gas/oil No.2 availability, the plant has become one of
capability Sonelgaz’ premiere moneymakers.
Sonelgaz’ base load simple cycle power
The GT13E2 in combined cycle plant, operating since October 2004,
T High exhaust energy and is a key support of the Algerian grid Cockburn / AUSTRALIA
temperature for superior at its far northeastern end. The plant 1xKA13E2-1, 240 MW
thermodynamic performance is located 120 km South-East of Fuel: natural gas/oil No. 2
T Cold-end drive and axial exhaust Constantine, the third largest city in
for reduced exhaust system Algeria. Western Power’s 240 MW combined-
pressure losses and better layout The plant was built on a turnkey basis cycle Cockburn power plant is situated
T Available pre-engineered multi- in record time, from contract signing to adjacent to the existing coal-fired
shaft configurations the first unit’s commercial operation power plant in Kwinana, 30 km south
date. The second unit was on-line one of Perth in Western Australia.

10
The plant supplies power to the state’s The desalination plant is designed for
south-western region and the state a water production of 150,000 m3 per
capital’s metropolitan area. The day. To meet the rapidly growing power
strategic location is near an established demand, the power plant capacity has
transmission infrastructure, natural gas been augmented by 377 MW with the
fuel supply pipelines and cooling ocean completion in 2002 of the expansion
water. The construction began in June Ras Abu Fontas B1, with three additional
2002 and cold commissioning took gas turbines of same GT13E2 type.
place at the end of March 2003. All eight gas turbines are installed in one
Completion was achieved in early air-conditioned gas turbine building.
October 2003, nearly four months
ahead of schedule. Operating on natural gas from 14
different sources, with a wide range of
upgrading the gas turbines to the latest gas compositions without any hardware
Kuala Langat / MALAYSIA version. In early 2007, all gas turbines change, the power plant has
1xKA13E2-3, 670 MW were upgraded to a flexible operating demonstrated its exceptional fuel
Fuel: natural gas/oil No. 2 mode that allows choosing on-line flexibility.
between higher output and extended
This cogeneration plant was the first of lifetime.
several independent power projects
with the GT13E2 in Malaysia. Owned
by Genting Sanyen Power, the 667 MW Ras Abu Fontas B & B1 /
combined-cycle plant was built on a QATAR
fast track, completed only 24 months 8xGT13E2, total 1000 MW
after contract signing – two months Fuel: natural gas
ahead of schedule. The first turbine
was installed in simple cycle mode in Ras Abu Fontas B, in commercial
November 1994 and all three were operation since 1995, is the largest and
being operated by March 1995. With most important power and water
the completion of the steam cycle, the production plant in Qatar. The power
plant generated 667 MW and supplied plant is based on five gas turbines type
57 tons/hour of process steam to the GT13E2, operating in simple cycle with
adjacent paper mill. Power output has a nominal capacity of 625 MW of
been increased in steps since 2002 by power at 48°C ambient temperature.

11
Lumut extension,
Malaysia

Alba / BAHRAIN extended inspection intervals, increased gas turbines and has been operational
Power station 3 & 4 expected lifetime and improved overall since September 2000. The turbines
2xKA13D-3, 723MW/2xKA13E2-2, 807MW availability. The NOx emissions have also are equipped with advanced high-
been considerably reduced. efficiency, low-emission burner
Fuel: natural gas/oil No.2 / natural gas The GT13E2s of Power Station 4 operate technology to help meet the strict
in the lifetime optimised mode and are environmental requirements at the
With an installed production capacity able to cope with the possibility of large site. Alstom also supplied the overall
of more than 800,000 tonnes per year, power surges. power plant control system, plant
Aluminium Bahrain (Alba) is currently The gas turbines GT13D and GT13E2 engineering, and associated
one of the largest modern aluminium have demonstrated their excellent installation and commissioning.
smelters in the world. capabilities in powering an industrial
The main power system supplying plant with stringent reliability and
the aluminium pot lines is run flexibility requirements. Lumut Extension /
independently from the national grid MALAYSIA
system, thus puting some unusual 1xKA13E2-3, 650 MW
electrical system control requirements Pelican Point / AUSTRALIA Fuel: natural gas/oil No. 2
on the captive power system. High gas 1xKA13E2-2, 480 MW
turbine and combined cycle flexibility Fuel: natural gas The Lumut IPP project is playing an
and continuous reliability are a must. important role in meeting Malaysia’s
3/4 of Alba installed power generation In 1998, the government of South increasing power demand. When
capacity is supplied by Power Stations 3 Australia knew it would need to act Alstom won the turnkey contract to
& 4 installed by Alstom. The GT13D gas quickly if it was to prevent power supply another block to the GT13E2
turbines of Power Station 3 have been shortages. It decided to call on the based 1,400 MW combined-cycle
continuously improved and upgraded, private sector; the result was Pelican power plant Lumut in Malaysia, it
resulting in increased performance, Point, a 500 MW combined-cycle made the plant the largest independent
power project developed on a fast (IPP) CCPP in Southeast Asia.
track basis by National Power. The After the 1997 crisis, the government
plant increased South Australia’s wanted a new peaking plant to be in
generating capacity by 20 per cent. operation by the end of 2001. With an
Alstom was awarded the turnkey existing plant at Lumut and therefore
project in 1999 by National Power an available infrastructure, it decided to
South Australia Investments Ltd, a look at expanding the site to increase
subsidiary of National Power plc. The the capacity of the plant. In order to be
plant is equipped with two GT13E2 operational before the projected

12
erection and commissioning works. northeast of Ho Chi Minh City, and all
Ruwais / UNITED ARAB power plants are of the gas turbine
EMIRATES combined cycle type. The first plant has
4xGT13E2 500 MW been operational since mid 1990’s
Fuel: natural gas and the last plant was completed in
May 2006, now with the total capacity
In 1998 Alstom was awarded an order of over 3,800 MW making it the largest
for the Ruwais power and desalination power generating complex in Vietnam.
plant in Abu Dhabi, United Arab Emirates. Alstom’s power plants in the complex
shortage, the new Lumut Block 3 The cogeneration plant, operating since include:
would have to be given fast track August 2000, provides 500 MW of - Phu My 2.1 - 300 MW, commercial
status, and in order to have power power and eight million gallons of water operation 1997
available to meet the expected per day for Abu Dhabi National Oil - Phu My 2.1 - Add-On 160 MW,
demand, the project developers Company (ADNOC). The facility is commercial operation 2003
invested in a bypass stack. This allowed located in the coastal industrial area of - Phu My 4 - 450 MW, commercial
open-cycle operations so that 431 MW Ruwais, 230 km west of the capital Abu operation 2004
would be available while work was Dhabi City. Alstom supplied four - Phu My 2.1 - 160 MW add-on,
being done to convert the plant to GT13E2 gas turbines and generators, commercial operation 2006
combined cycle. along with the associated HRSGs and All plants feature Alstom’s GT13E2
desalination plant. We also provided the gas turbine, which has the capability
The Lumut power plant is located in overall plant control system, the BoP for on-line switchover from fuel-gas
the state of Perak, Malaysia. The equipment and complete engineering, to fuel oil and vice versa.
customer is GB3 Sdn Bhd, a fully installation and commissioning work. All plants were awarded to Alstom
owned subsidiary of Malakoff Berhad. as turnkey contracts in consortium
Malakoff is the largest independent with Marubeni Corporation and Lilama
power producer in Malaysia with a total Phu My / VIETNAM (Vietnam Machinery Erection Cooperation).
power generating capacity of over 1xKA13E2-2, 450 MW
2,000 MW. Alstom was responsible Fuel: natural gas/oil No. 2
for the supply of 3x165 MW GT13E2
gas turbines, a steam turbine, three The Phu My power plant is Vietnam’s
HRSGs, electrical generators, the entire largest power complex helping to serve
auxiliary system, control system and the country’s increasing electricity
interconnection facility. Alstom was demand. The complex is located in the
also responsible for the supervision of southern part of the country, 80 km

13
Keppel, Singapour.

The Alstom Power Train


Power Train 1 Steam Turbine
Arrangments Alstom steam turbines offer:
Alstom has extensive experience T HP turbine shrink ring design for sustained efficiency and fast start-up
with various sizes of multishaft T welded rotor design for fast start-up and low maintenace
arrangement in all types of T single bearing designs for compact arrangement
operative regimes from base load T single lateral exhaust designs also available
to daily start and stop, in utility, for lower foundations and lower first costs.
cegeneration and industrial
applications.

4
3

2
2 Turbogenerator
1
Alstom turbogenerators demonstrate
high efficiency, reliability and availability 2
with low maintenance requirements.

TOPAIR 3 Gas Turbine 4 Heat Recovery Steam


T multi-chamber Totally Enclosed Alstom gas turbines - the core of any Generator (HRSG)
Water to Air Cooled (TEWAC) combined cycle plant. Alstom's range of HRSGs provide:
system for high efficiency T drum type of once-through technology
T self retightening stator end windings T optimised hot and cold end
for low maintenance performance for maximised combined
T proven relaibility in various cycle efficiency
applications and shaft arrangements. T high thermal flexibility for fast start up
T highly modularised design for fast site
erection

14
GT Test Power Plant at the
rotor factory in Birr, Switzerland.
Alstom Power R&D
Alstom Power R&D is decidedly market and customer oriented
and focuses on creating innovative technologies to apply at all
stages of our products’ life cycles.

We aim for the best utilisation of the Customers’ Cologne's DLR on combustion, Oxford University on heat
investment, the earth’s materials and the fuel used, through transfer as well as with engineering institutes in China, India
efficiency, availability and cost reduction. The increased and Russia.
environmental concern means that we place a focus on
minimising CO2 emissions through the development of In the field of international collaboration, Alstom Power has
mitigation and renewable technologies for application in played a leading role in establishing the European technology
new and retrofit installations. platform for zero emission fossil fuel power generation (ZEP).

The engineering and R&D workforce totals 5,500 people,


of which 4,000 are in engineering and 1,500 in R&D in The Gas Turbine Test Power Plant
22 R&D centres. There are 13 laboratories with dedicated The Gas Turbine Test Power Plant located in Birr, Switzerland,
infrastructure, equipment and testing facilitities. provides a unique environment for maintaining Alstom’s
competitive advantage through product improvement, all
Alstom Power R&D policy takes a global approach which has within the proximity of Alstom's R&D facility, the gas turbine
several benefits. First, it puts the work where the expertise is development department and the manufacturing facility.
located. Secondly, it helps to nurture close contacts with
universities and design institutes that can complement our in- The shortened feedback loop (in terms of time and distance)
house efforts. Thirdly, it enables us to stay in touch with of field experience helps in speeding up design validation
global customers' expectations, anticipate their needs and and implementation in Alstom's gas turbine fleet. The Gas
lead the technology trends. Turbine Test Power Plant, in combination with the Product
Support organization and the GT development department
Alstom Power works with more than 30 universities worldwide. puts Alstom in a position to insure seamless implementation
We establish close, long-term links with institutions and of evolutionary product improvements.
professors who are experts in fields which are important to
us, for example, with MIT and Stanford Research Institute on
CO2, Grenoble and Lausanne universities on hydro turbines,

15
Service during operation
s
s
s
s
(
s
Alstom
( offers extensive service experience in power Long-term service contracts
generation.
g It has a complete range of services from Alstom’s long-term service contracts are flexible in scope of
traditional spare parts supply and field service specialists to services and equipment covered as well as contract duration
the full operation and maintenance of gas turbine and in order to meet your unique business requirements. Their
combined-cycle power plants. As the Original Equipment modular scope allows tailor made packages to be assembled
Manufacturer (OEM) we are ideally placed to provide based on the level of risk mitigation and guarantees required,
continuous plant improvement packages, e.g. performance enabling you to choose the correct contract model that fits
upgrades, lifetime extensions or emission reduction packages your strategy in terms of operating and maintaining your
to meet changing market requirements during a plant’s power generation assets. With traditional purchase order
operational lifetime. contracts, customers can purchase spare parts according to
With over 100 years experience and an installed fleet of more their needs. Service agreements can add guaranteed
than 650 GW, Alstom’s 200 Local Service Centers (LSCs), availability and fixed prices for parts, services and consulting.
located in 70 countries, are there to provide local facilities and With our Operations and Maintenance contracts, customers
expertise directly to our customers, keeping your plant can have Alstom employees operating and / or maintaining
competitive. their plants.

Our experience covers over 25 plants and 60 gas turbines of


the GT13E2 type with long term service contracts. Such
contracts with the OEM benefit from the extensive first-hand
POWER SERVICE PORTFOLIO
experience gained from site operations and make full use
of the knowledge gained from the complete installed fleet.
Full operation O&M

General/daily maintenance o&M Operation & With our service contracts, our partners obtain significantly
Maintenance
Operation & maintenance support o&m Risk mitigation Contracts more value to ensure key requirements (depending upon
by dedicated
Planned & unplanned maintenance m OEM
scope of supply) are met:

Planned outages Support & Consulting T Predictable operation & maintenance costs
Service
Field Services Agreements T Reliability and availability
(LTSA)
Parts Optimization of costs
T Heat rate and power output
and performance T Environmentally sound products
Purchase T 24 hour / 7 day plant support
Purchase Order
Orders
T Broad OEM experience

16
Plant Integrator™ –
Plant Support Centre
creating customer value
Alstom’s Plant Support Centre (PSC)
located in Baden, Switzerland, offers Plant Integrator™ is Alstom's unique concept that creates
remote, fast and comprehensive
value for our customers. Plant Integrator™’s starting point
technical support for the whole power
plant around the clock. In addition to is the customers’ viewpoint. It then systematically analyses,
trouble shooting, the PSC provides data measures and optimises the specific customer benefits
monitoring services including early desired, technically, economically and ecologically. As a result,
warnings and Monitoring & Diagnostic
Reports, assessment of health Plant Integrator™ matches customer needs and priorities with
parameters and consulting regarding products and services, delivering a thoroughly tailored
performance and RAM (reliability, solution and maximising customer value. This then becomes
availability, maintainability)
optimization. The PSC reduces
the benchmark for future fine-tuning and upgrades.
operational risks through its focus on
pro-active monitoring, which provides The unrivalled Plant Integrator™ offering from Alstom covers
early warning of emerging equipment
the full palette, from single component packages and control
problems through advanced diagnostic
programs. systems to power islands and complete plants, operation and
maintenance services, as well as retrofit solutions.

Plant Integrator™ benefits to customers:


T Improve cash flow – by achieving lowest costs
T Generate more power
T Increase installation efficiency
T Burn less fuel
T Improve operational flexibility

17
Lumut, Malaysia.

A world leader in
clean power generation
Alstom is a global leader in the world of power
generation and sets the benchmark for innovative and
environmentally friendly technologies.
A world leader
The company designs, manufactures and delivers state-of- Alstom supplies major equipment for 25% of
the-art products and systems to the power generation the world‘s installed base, making us:
(gas, coal and hydro power plants) and industrial markets. N°1 in turnkey power plants
In addition, Alstom provides the conventional equipment for
nuclear power plants.
N°1 in air quality control systems
N°1 in hydro turbines and generators
Our objective is to build the cleanest integrated power N°1 in the number of installed boilers
solutions for our customers. We supply and integrate all
components of a clean power system, from boilers to air
worldwide
quality control and energy recovery systems. We also have N°1 in installed turbines and generators
extensive experience in retrofitting, upgrading and for nuclear power plants
modernising existing power plant equipment. We can also
N°1 in steam turbine retrofit and integrated
boast unrivalled expertise in project management for all types
and sizes of power generation systems – small to large as retrofit projects
well as single equipment to complete turnkey solutions.

Alstom‘s unique offering brings real value to our customers. Expertise in clean power solutions
With our innovative plant integration concept, we help Plant operators today face multiple challenges in their efforts
operators to maximise their plant performance, while fully to make their plants more competitive, while complying with
complying with environmental regulations and obligations. the different environmental regulations.

Alstom is delivering clean power solutions now. As the


uncontested leader in clean power generation technologies,
we provide the cleanest integrated power solutions
on the market.

18
Dunkirk combined cycle
power plant, France.

They cover all plants (both existing and new ones), all energy Research in action
sources (from fossil fuels to hydro and nuclear), and all In addition to our own R&D efforts to develop new emission
emissions (NOx, SOx, Mercury, particulate matter). control technologies and improve existing techniques, we are
Alstom offers the complete range of products designed to help also involved in a number of public projects and partnerships,
power plants to either reduce pollutant and CO2 emissions, or notably in the field of CO2 capture and storage. The CASTOR
to produce clean electricity from the outset. project (founded by the European Union) is studying
For example, we deliver new coal-fired power plants with an procedures for post-combustion separation that lower the cost
advanced supercritical design using proven clean combustion of CO2 capture and develop an understanding of the long
solutions that are integrated with state-of-the-art emission term storage mechanism. Within the ENCAP programme
controls. Similarly, we improve the thermal and (founded by the European Union), research is under way to
environmental efficiency of existing power plants by develop new pre-combustion and post-combustion CO2
retrofitting plant components or upgrading the whole system. capture technologies. The “Zero Emission Fossil Fuel Power
Plants” (ZEP) technology platform launched by the European
Commission aims to develop and deploy new competitive
Investing in the future of clean power options for zero emission fossil fuel power plants.
Alstom is uniquely placed as a plant integrator and full-service
provider to design and manufacture all the components
of a clean power plant, from turbines such as the GT13E2
to generators, boilers and air quality control systems.

Alstom also invests substantially in the research and


development of new, environmentally friendly power solutions.
Together with partners, universities and customers in Europe
and the United States, we are working on collaborative
projects to develop solutions for pre- and post-combustion
CO2 capture and oxy-firing.

19
PT-PE/BPROB/GT13E207/eng/TMG/06.09/CH/6262 © - Alstom, the Alstom logo and any alternative version thereof are trademarks and service marks of Alstom. The other names mentioned, registered or not, are the property
of their respective companies. The technical and other data contained in this document is provided for information only. Neither Alstom, its officers nor employees accept responsibility for or should be taken as making any repre-
sentation or warranty (whether express or implied) as to the accuracy or completeness of such data or the achievements of any projected performance criteria where these are indicated. No liability is accepted for any reliance
placed upon the information contained in this brochure. Alstom reserves the right to revise or change this data at any time without further notice. If any provision of this disclaimer is held by any competent authority to be invalid
or unenforceable in whole or in part the validity of the other provisions and the remainder of the provision in question shall not be affected.
Design and realisation: Les Editions Stratégiques. Photo credits: © 2007 Bryon Paul McCartney | www.atelier-mccartney.com, Alstom and others.
Printed on paper made with pure ECF (Elemental Chlorine Free) ecological cellulose produced from trees grown in production forests under responsible management, and selected recycled three-layer fibres.

Switzerland
CH-5401 Baden

www.alstom.com
Fax +41 56 205 28 88
Brown-Boveri Strasse 7

Phone +41 56 205 70 58


Alstom (Switzerland) Ltd