Professional Documents
Culture Documents
ATR 72 -212
ACCEPTANCE MANUAL
CUSTOMER RUN UP
F/O: AIRLINE :
FTE : DATE :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :1/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
FOREWORD
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :2/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :3/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
On pedestal set ATPCS RTY sel to ENG. 1 "ARM" NH decrease to 66% (both eng)
ARM illuminated
TQ 1/2 - Needles at ≈ 85%
ATPCS
RTY sel to ENG 1 TQ 1 = 0 %
Eng. 2 : Up trim illuminates
NH 2 increase about 1%
ENGINES
PARAMETERS Both ENGINES running : check and note ALL
CHECK parameters (see Page 4)
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :4/17
Ref: AT7202121030000
NP 71 ± 1% 71 ± 1% 92 ± 1%
NH 75 ± 3%
NL
FF
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :5/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
ENG 1/2
EEC REVERSION SET PL between 53° and 60° PLA
Pull EEC C/b's NORM then EMER NO power change, EEC "FAULT" flashes
(B21-D21) / (C21-D26)
PL GI
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :6/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
Fuel QTY test 2 "LO LEVEL" LT illuminated
FUEL 2 Fuel pump Pb's : RUN illuminated
Fuel illuminated on CAP
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :7/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
Power levers ENG 1 and 2 : GI
AIR BLEED FLOW P/b : Normal
COMPT Temp. rty sel at 12 O'clock
PACK VALVE AUTO TEMP sel 1 and 2 P/b's : IN TEMP SEL 1 and 2 P/b's : extinguished
RECIRC FAN 1 and 2 Pb's : IN
ENG 1 and 2 bleed valves P/b's : IN
PACK VALVE 1 and 2 P/b's : IN All Lt exting after ≈ 6 sec
FLT COMPT Temp. indicator "COMPT +
DUCT" realistic values
COMPT Temp. rty sel 1&2 full COLD
COMPT Temp. sel IN (auto) MAN extinguished
PACK TEMP DUCT Temp. to ≈ 5°c (if Compt Temp >18°)
COMPT Temp. sel OUT (manual mode) MAN illuminated
AUTO and MAN DUCT Temp. to ≈ 5° c ( or below)
COMPT Temp. sel IN (auto)
COMPT Temp. rty sel 1&2 full HOT MAX DUCT TEMP depends on flight deck
and CAB ambiant temp
COMPT Temp. sel OUT (manual mode) MAN illuminated. DUCT TEMP ≈ 100 °c
COMPT Temp. rty sel back to 12 O'clock
PACK 1 and 2 P/b's : ON
PACK VALVE FLOW P/b : IN "HI" illuminated
ENG 1 & 2 : ITT ind increases
HI FLOW FLOW P/b : OUT (Normal) "HI" extinguished
ENG 1 & 2 : ITT ind decreases
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :8/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
ENG 1 : set power lever to obtain NP ≈ 88 %
HP / LP then throttle back to GI ITT decreases then rises within about 5 sec
COMMUTATION
Same test ENG 2 Same results
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :9/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
PROPELLERS Power levers ENG. 1 and 2 : GI
ANTI-ICING Condition levers ENG. 1 and 2 : AUTO
TIMER LH and RH windshields HTG : OFF 2 OFF illuminated
AND ACW GEN. 1 and 2 P/b's : OUT 2 OFF illuminated
POWER CHECK Mode select P/b : AUTO "MAN" extinguished
ANTI-ICING PROP 1 and 2 P/b's ON 2 "ON" illuminated in blue
2 "FAULT" illuminated during the cycle
ACW GEN. 1 and 2 P/b's : ON 2 "OFF" extinguished
NO FAULT during the cycle
WINDSHIELD HTG WINDSHIELD HTG P/b's : IN OFF extinguished, NO FAULT
RIGHT HORN DE-ICING P/b : OUT and AOA reset AOA extinguished
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :10/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
AUTOMATIC
ENG 1 and 2 : Power levers FI
PRESSURE All doors closed
Altimeters QNH
TEST Landing elevation : 500 ft (at TOULOUSE)
Pack valves 1 and 2 : OFF
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :11/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
Pack valves 1 and 2 : ON "MAN" illuminated on P/b
MANUAL Check "MAN RATE" knob to max decrease RATE : - 800 to - 1300 ft/mn
CAB PRESS MODE SEL P/b : OUT Landing elevation : NO DIGIT
PRESSURE
Select the "MAN RATE" knob for RATE = -500 ft/mn Cabin ALT decreases and DIFF increases
When DIFF > 1 Psi select "MAN RATE" knob for Rate = 0 Check cabin leaks
(particulary around seals doors)
Select the "MAN RATE" knob to max increase RATE : 1500 to 3000 ft/mn
Select the "MAN RATE" knob on green band stop
AUTOMATIC CAB PRESS MODE SEL P/b : IN "MAN" extinguished
Land elevation shows previous
PRESSURE setting (500ft)
RATE : + 550 ft/mn
"DESCENT RATE" P/b : IN "FAST" illuminated. No change on RATE
TEST When DIFF ≈ 0,35 Psi push "DUMP" P/b "ON" illuminated on DUMP P/b
Landing elevation extinguished
FAULT illuminated on CAB PRESS P/b
"AIR" on CAP + SC
RATE : increases
When RATE = 0
Push DUMP and DESCENT RATE P/b's No light on P/b's
Landing elevation = 500 ft
RATE stays at zero
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :12/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
DC GEN 1 and 2 P/b's : OUT 2 "OFF" illuminated
ELECTRICAL DC SVCE/UTLY BUS : SHED illuminated
EMER BUS and ESS BUS : arrows
illuminated
INV FAULT 2 illuminated + AC Bus OFF (1 and 2)
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :13/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
PROBES HTG Capt "PITOT & ALPHA" + STAT illuminated
ICE and RAIN
Stby PITOT "STAT" illuminated
PROTECTION
"EXHAUST MODE" P/b : FAULT illuminated
AVIONICS VENT Cabin ALT indication : Available
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :14/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
CCAS : Warning (red only) available
ENGINES
ON EFIS control box:Select HSI DIM to OFF AHRS 1 available
CAPT ATT/HDG switching P/b : IN AHRS 2 available on EADI 1
NAVIGATION CAPT ATT/HDG switching P/b : OUT ATT/HDG P/b extinguished
Stby HORIZON available
VOR/ILS 1 available
COURSE 1 and HDG available
Audio VOR 1 available
Marker 1 available
ATC 1 available
ADF 1 available
CAPT clock available
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :15/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
REMARKS :
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :16/17
Ref: AT7202121030000
72 - 212 msn :
TEST PROCEDURE RESULTS UTC S U
DEP Time
AR Time
Block time
Fuel used
Fuel remaining
ENG 2 shut down
All systems OFF
Master switch BATT OFF
SNAGS
© ATR - 2001 This document is property of ATR, it shall not be copied or its content shall not be communicated to third parties without written authorization of ATR. Page :17/17