A B C

SV/TO STREET SEWER


A B C

SV/TO STREET SEWER


GENERAL NOTES :
1. ALL PLUMBING INSTALLATION SHALL CONFORM TO THE NATIONAL BUILDING CODE OF THE
PUMP/ PUMP/ PHILIPPINE.
WATER SOURCE P WATER SOURCE P
2. SEWER PIPELINES SHALL BE SANIMOLD OR IT'S EQUIVALENT AS SPECIFIEDIN THE WORKING
DRAWING
4" Dia. PVC Pipeline
.

1
FD FCT 3. EXTENT STOCK VENT 0.50M ABOVE ROOF.

1/2" Dia. PVC Pipeline 1/2" Dia. PVC Pipeline 4. ALL PLUMBING FXTURE SHALL BE SANIWARE OR IT'S EQUIVALENT BY THE OWNER.
1/2" Dia. PVC Pipeline
4" Dia. PVC Pipeline

5. ALL TILED SECTION SHALL BE WATER PROOF WITH ASPHALT BASE COATINGS
4" Dia. PVC Wye
WC 6. ALL PLUMBING PIPES SHALL BE MOLDEX BLUE

2
.
1/2" Dia. PVC Pipeline 7. ALL PLUMBING WORKS SHALL BE DONE UNDER THE SUPERVISION OF DULY MASTER PLUMBER OR
FD SANITARY ENGINEER.
FCT/ WC
SHO 4"x2" Reducer Tee
FD
FD
2" Dia. PVC WC
Pipeline
3

3
NOTE :
WPL Water Pipeline
GV Gate Valve
WM Water meter
CB Catch Basin
SV Septic Vault
4

4
VTR Vent Thru Roof
KS Kitchen Sink
LAV. Lavatory
WC Water Closet
SHO. Shower
FIRST FLOOR PLAN SECOND FLOOR FD
CO
Floor Drain
Clean Out
Scale 1 : 100m
PLAN
Scale 1 : 100m

SEWERAGE SYSTEM LAY-OUT


Scale 1 : 100m

INSTRUCTOR: CAD BY: PLATE TITLE: CRITERIA SHEET NO.:


OLIVER A. NIMENZO Accuracy(40%) -
QUIRINO STATE UNIVERSITY Bachelor of Science in Civil Engineering - IIl
Cabarroguis Campus Distribution (30%) -
MARVIN RAY G. SANGLAY
Civil Engineering Department
CIVIL ENGINEER
SUBJECT: Date Submission: Line Weight (20%) -
Time Length (10%) -
P1
ENGINEERING UTILITIES 1 & 2 Total Score: