Professional Documents
Culture Documents
Only an application form with a complete requirements and attachments will be processed. Application found
with incomplete requirements will be given 15 calendar days to comply. Failure to comply within the
prescribed period, the application will be deemed disapproved.
Sub-contractors’ Profile/License
Name of Sub-contractors (If , any) Scope of Work and No. of PCAB Validity Date of DOLE
Project Cost Workers License Date Registration
1.
2.
3.
4.
5.
B. Project Profile/Description
REVISED APPLICATION FORM for
Department of Labor and Employment EVALUATION/ APPROVAL OF
REGIONAL OFFICE NO. _NCR_ CONSTRUCTION SAFETY & HEALTH
PROGRAM (CSHP)
Name of the Project: (Please attach copy of Invitation to Bid/other documents indicating name and details of the project)
Abucay, Bataan
Email : _____________
Brief Description of Activities/Work Flow (You may attach additional sheet, if necessary)
Profile of the person who prepared the CSH Program for the abovementioned Project:
Name and Signature Educational Background:
BS NURSING
Work Experience in OSH:
Other Qualifications:
HUBERT B. PIZARRO
COSH TRAINING
Signature over printed name
8 HOURS FIRE SAFETY TRAINING (March 22, 2019)
DOLE/OSHC 40 HOUR TRAINING LOSS CONTROL MANAGEMENT
– March 18-21, 2019-
Submitted By:
Position: MANAGER/OWNER
Date:
The approved CSHP shall not be limited to its existing provisions but may include other systems and procedures
applicable to the project. The CSHP may be reviewed by the main contractor from time to modify or include appropriate
systems and procedures which must be in accordance with the prescribed standards, rules and regulations.
Let a copy of this letter be furnished the tendering agency and the appropriate LGU for their respective information
and/action as they deem fit.
Concurred by:
________________________
DOLE