A. CARRIAGE OF MATERIAL: Item No. Rate Descriptions Unit (Volume to be computed as per provisions in clause 514) 1A.1 Transportation of metal i) For a lead upto 1 Km. Cum. 41.00 ii) For a lead upto 2 Km. Cum. 44.00 iii) For a lead upto 3 Km. Cum. 46.00 iv) For a lead upto 4 Km. Cum. 48.00 v) For a lead upto 5 Km. Cum. 51.00 vi) Beyond 5 Kms. and upto 10 Kms. Cum. 2.40 (Add for every 1 Km.) vii) Beyond 10 Kms. and upto 20 Kms. Cum. 2.10 (Add for every 1 Km.) viii) Beyond 20 Kms. and upto 50 Kms. Cum. 1.80 (Add for every 1 Km.) ix) Beyond 50 Kms. (Add for every 1 Km.) Cum. 1.50 1A.2 Transportation of different other material Rate as %age of metal transportation rates a) Flag Stone/cut stone Cum. 40% above b) Masonry stones Cum. 75% above c) Rubble Cum. 15% above d) Loose moorum/sand/earth/surkhi/cement/stone Cum. 10% below dust/hot mix asphalt material e) Excavated/compacted ordinary & other soil Cum. 20% above measured as per clause 301.8, 304.4 and 305.8 f) Excavated ordinary rock measured as per clause Cum. 90% above 304.4 g) Coal/fuel wood/Iron work/steel/G.I. Sheets/ pipes/ M.T. 7.5% below lime/machinary etc. h) 150 mm dia ballies R.M. 1.5% of metal i) 75/100 mm diameter ballies R.M. 0.75% of metal j) Tar/paints/bitumen etc. M.T. 5% above k) Hume pipe/NP4 i) 1000mm dia R.M. 80% of metal ii) 1200mm dia R.M. 110% of metal 1A.3 Transportation by trucks on hire i) Trucks hired for full load excluding loading/unloading and stacking for items not covered above for distances: a) Upto 15 kms. Per Km. 23.00 b) Beyond 15 Kms. and upto 50 Kms. add extra over Per Km. 18.00 a) above c) Beyond 50 Kms. add extra over b) above. Per Km. 13.00 ii) Loading of trucks Cum. 18.00 iii) Unloading of trucks and stacking Cum. 18.00
1A.4 Unloading and stacking etc. at the railway yard
from wagons. a) Cement M.T. 26.00 b) Lime/Coal M.T. 25.00 c) Fuel/wood/iron/steel/G.I. Sheet/Pipes/machinary M.T. 24.00 d) Tar/bitumen/oil paints etc. M.T. 21.00
B. SUPPLY OF MATERIAL:
Item No. Rate
Descriptions Unit 1B.1 Supply of mineral aggregate like broken stone/crushed stone (crushed in mechanical crusher) as per clause 5.14 at road site including all lead and stacking etc. complete. i) 75 mm standard size broken stone Cum. 262.00 ii) 63 mm standard size broken stone Cum. 300.00 iii) 45 mm standard size broken stone Cum. 330.00 iv) 45 mm standard size Crushed stone Cum. 450.00 v) 26.5mm standard size Crushed stone Cum. 525.00 vi) 22.4 mm standard size Crushed stone Cum. 525.00 vii) 13.2 mm standard size Crushed stone Cum. 525.00 viii) 11.2 mm standard size Crushed stone Cum. 525.00 ix 6.7 mm standard size Crushed stone Cum. 250.00 1B.2 Supply as per clause 5.14 including all lead and stacking etc. complete i) Crusher stone dust (clause 507.2.3) Cum. 190.00 ii) Sand/Shingle/Kanker/Laterite Cum. 190.00 iii) Moorum with CBR not less than 20 and P.I. Not Cum. 150.00 exceeding 6. 1B.3 Supply of binding material at road site having P.I. Cum. 140.00 Value less than 6 comfirming to clause 404.2.7 Note: In case of suitable binding material having a P.I. Value of less than 6 is not available within reasonable distances. The contractor (at his own cost) may add an admixture of lime to lower down the P.I. to bring it within the above range. A factor of safety of 2 should be applied to the results of laboratory to decide the percentage of lime to be added. 1B.4 Supply and stacking of aggregates, precoated with 1% of its weight with bitumen as per clause 514 t work site. i) 22.4 mm size Cum. 875.00 ii) 13.2 mm size Cum. 875.00 iii) 11.2 mm size Cum. 875.00 iv) 6.7 mm size Cum. 600.00 1B.5 Supply transportation and stacking of hot Cum. 2074.00 premixed bituminous macadam using crushed aggregate of grading -1 confirming to clause 504 with binder content 3.1% by weight of from hotmix plant site to site inclusive of all leads. (For this item prior permission of S.E.NH(of the circle)shall be obtained).