NNTV Time Period and Overnight TimePeriod Report

Task Name No of Days in Person Start Date


Requirement Analysis 0

FSD and Existing Report Analysis 16- May- 14

Design 7

Physical table design(fact and mstr views) 1 21- May- 14


MSTR schema Design 2 21- May- 14

NNTV Time Period design Document 2 23- May- 14

UTP Design 2 27- May- 14

AO Review on Design 1 29- May- 14

Development 9

MSTR object creation (Schema, Public and Report) 5 29- May- 14


Media view Integration 2 29- May- 14
Export Process configuration 2 2- Jun- 14

Unit Testing 11
Database Unit Testing 2 5- Jun- 14
MSTR Unit Testing 5 9- Jun- 14
MSTR Report integration with MV 4 16- Jun- 14

AO Review on Development 1 18- Jun- 14

Performance Testing & Tuning

QA Build Preparation
QA Support
Total Effort 28

Time Period and Overnight Audit Report


Task Name No of Days in Person Start Date
Requirement Analysis 3
FSD and Existing Report Analysis 28- May- 14
Existing Boilerplate Store procedure Analysis 3 30- May- 14

Design 8
Physical table design 2 4- Jun- 14
MSTR schema Design 2 6- Jun- 14
NNTV design Document 2 10- Jun- 14
UTP Design 2 12- Jun- 14

AO Review Design 1 16- Jun- 14

Development 7
Stored Proceedure for Boilerplate 4 16- Jun- 14
MSTR object creation (Schema, Public and Report, Document) 3 18- Jun- 14
Media view Integration 2 18- Jun- 14
Export Process configuration 2 20- Jun- 14

Unit Testing 5
Database Unit Testing 2 23- Jun- 14
MSTR Unit Testing 2 23- Jun- 14
MSTR Document Integration with MV 1 25- Jun- 14

AO Review on Development 1 25- Jun- 14

IPMS Tasks 1
IQA 0.25 20- Jun- 14
EQA 0.25 23- Jun- 14
FI 0.5 25- Jun- 14
Performance Testing & Tuning

QA Build Preparation 1 26- Jun- 14


QA Support
Total Effort 25
End date Resource Details Comments

Mockup yet to be received. 29th


received the updated SRS
TBD R3/R2/R1 Platform Requirements.

Partially created MSTR Views


and Fact. Subject to
TBD R3/R2 modifications.
22- May- 14 R4/R2
Done with available information
but need to be modified based
26- May- 14 R4 on change.
Partially done with available
information but need to be
28- May- 14 R4 modified based on change.

29- May- 14 R1

Created attributes and metrics


4- Jun- 14 R4 with available information.
30- May- 14 R5
3- Jun- 14 R5

6- Jun- 14 R4
13- Jun- 14 R4
19- Jun- 14 R4

18- Jun- 14 R1/R2

End date Resource Details Comments

TBD R1/R2/R3 Mockup yet to be received


3- Jun- 14 R1/R2/R3

5- Jun- 14 R1/R3/R2
9- Jun- 14 R1/R3/R2
11- Jun- 14 R3
13- Jun- 14 R3

16- Jun- 14 R1

19- Jun- 14 R3
20- Jun- 14 R4/R3
19- Jun- 14 R5
23- Jun- 14 R5

24- Jun- 14 R3
24- Jun- 14 R4
25- Jun- 14 R3/R4

25- Jun- 14 R1

20- Jun- 14 R3
23- Jun- 14 R4
25- Jun- 14 R3/R4

26- Jun- 14 R3/R4


Resource
*R1-MSTR Architect

R2-MSTR Tech Lead


R3-MSTR Developer
R4- MSTR Developer

R5-Export Process Developer

*Estimation dates may vary based on requirement changes


Risk&Limitations
Sno Risk/Limitations
1 SDK Resource pending
2 Stored proceedure for prompts
3 Information extraction from GUISPEC to database table
4 Export Process configuration
5 Media view Integration
6 Data model
7 Apply Rank option will be available in WP2

Page 6
Risk&Limitations
Dependency Complexity
High
ETL Developer
MV Team
Export Process Developer
Export Process Developer
Data Modeler
SDK Resource

Page 7
Risk&Limitations