You are on page 1of 1

Shedule of rates

COIMBATORE CORPORATION
R.O.C NO.3087/2002/M.H.5 DATED 12.04.2002
QUANTITY
SL.NO DETAILS OF FEES LICENCE PERIOD RATE
(PlinthArea)
New /Alteration/Addition Construction and also Roof conversion o
1
Residential Building 10sqm 2 years
a.Ground Floor or Part 70
b.Semi Basement Cellar 135
c.Stilt or Mezzanine floor 80
d.First Floor 90
e.Second Floor 120
f.Third Floor 140
g.Fourth floor and for every additional floor 250

2 Debris Charges for Residential,Commercial & Industrial Building 10sqm 125


3 New /Alteration/Addition Construction of Commercial Building 10sqm 2 years
a.Ground Floor or Part 100
b.Semi Basement Cellar 190
c.Stilt or Mezzanine floor 130
d.First Floor 130
e.Second Floor 150
f.Third Floor 180
g.Fourth floor and for every additional floor 400
For Industries running with Steam/Hydro/Mechanical/Electrica
4 Energy(or) Building for the same(or) Alteration/Additional
construction(or) for Roof Conversion 10sqm 2 years
a.Ground Floor or Part 100
b.First Floor 150
c.Second Floor 200
d.Third Floor 500
e.Fourth floor and for every additional floor 500
5 Renewal of approval for construction of Building New Proposal along with drawing has to be
6 When the Applicant claim refund, after deciding not to construction the Building, 25% of the amount collected may be
7 Photo copy of approved plan per copy 20
8 Photo copy of approved sub division per copy 75
9 Inspection charges singh time only for Layout Approval per Acre and part thereof 1250
Establishment charges single time only forerecting Machineries o
10
steam,Hydro,Electrically powered and operated
1 to 5 Horse power 100
5 to10 Horse power 300
10 to 20 Horse power 500
20 to 30 Horse power 800
30 to 40 Horse power 1000
40 to 50 Horse power 1500
50 to 100 Horse power 2000
100 to 200 Horse power 3000
For more than 200 Hores power, Rs. 100/- is collected for every 1 HP increment
Licence fees on towers erected already or to be erected b Height of tower
11 Govt/Private sector for communication(including private wireless above GL up to
tower) 10 m 3000
Up to 15 m 8000
Up to 20 m 10000
From 20m each 1m increment 700
1 License Fees Calculated----- As above Chart
2 Debris Charges ------As per Above Chart
3 Labour Welfare Fund ------Estimated cost x 0.3%(For All Cases)
4 LPADC---Residential =Site Area x Rs.4.00 + Total Builtup Area x Rs.20.00
-------------Commercial =Site Area x Rs.8.00 + Total Builtup Area x Rs.40.00
5 UGD (Total Built up Area)
Residential
Upto1000 sqft---Rs.5000/-
1000 to 2000 sqft---Rs.7,500/-
More than 2000sqft---Rs.10,000/-
Commercial----Per Floor----Rs.20,000/-

Page 1

You might also like