Name of Work : Improvement of Goods shed by released sleeper at loni under ADEN/DD
C.A. No. A/N 530/PA dated 24-07-2019 Name of Agency : M/S Sangeeta Constructions, Jalna
Schedule 1 Part MS Genral Item
Schedule 1st variation 2nd & Final variation Excess Saving
sr.No. Item No. Description Rate %age Remarks
Qty Amt Qty Amt Qty Amt Qty Amt Qty Amt
2 13120 Earthwork in filling in embankment, 369.90 295.00 109120.50 295.00 109120.00 0.00 0.00 0.00 0.00 295.00 109120.50 saving due to no requrement
3 21070 Loading\unloading ballast,….. 54.94 30.00 1643.20 6500.00 357110.00 4492.47 246816.19 4462.47 245167.99 0.00 14874.89 excess due to excavation qty
additional lead for every subsequent 50m
excess due to excavation qty
4 21081 or part thereof, over 50m and upto 500m 32.84 30.00 985.20 8000.00 262720.00 7139.46 234459.80 7109.46 233474.60 0.00 23698.19
increased
over item no. 021110
5 182033 demolishind stone rubble masonry 611.98 5.00 3059.90 5.00 3059.90 0.00 0.00 0.00 0.00 5.00 3059.90 saving due to no requrement
8 42011 centering and shuttering including 114.90 1500.00 172350.00 1500.00 172350.00 1020.58 117264.64 0.00 0.00 479.42 55085.36 31.96 saving due to acutal axecution
9 31061 centering and shuttering including 115.35 200.00 23070.00 200.00 23070.00 129.26 14910.14 0.00 0.00 70.74 8159.86 35.37 saving due to acutal axecution
10 252120 coarse sand (minimum zone 3) 1380.00 1500.00 1500.00 150.00 2070000.00 1656.59 2286099.72 156.59 216099.72 0.00 excess due to axecution
Total 2617826.80 4134142.10 3857321.41 1414920.24 175425.62
Add 9.74% ESCALATION 254976.33 402665.44 375703.11 137813.23 17086.46
Gross Total 2872803.13 4536807.54 4233024.52 1552733.47 192512.07
Contractor's at par 2872803.13 4536807.54 4233024.50 1552733.00 192512.07
Total of part 'A' MS Genl Items2872803.13 4536807.54 4233024.50 1552733.00 192512.07
Providing and laying water bound exees due to extra provision made
3 231042 1371.51 50.00 68575.50 1050.00 1440085.50 926.43 1270602.52 876.43 1202027.02 1752.85
macadam with specify stone agreegate for strengthing of sub base
Description Schedule Proposed 1st variation 2nd & Final Excess Saving %age Remarks
(1)Schedule 1 part A ms general
2872803.13
items 4536807.54 4233024.54 1552733.46 192512.05
Schedule 1A - part A (I) MS general
38903.93
items:- 38903.93 38903.92 7343.48
Schedule 1B - part B MS cement2006403.03
items:- 2208210.22 2175873.55 180832.66 11362.14
Schedule 1C - partC MS steel 1602346.66
items:- 2002933.32 1652794.86 50448.20
Schedule 1D - part D MS Road 817751.16
items:- 3632358.73 3186743.63 2499679.75 130687.28
Schedual 1E - part E MS Pway1889897.56
items:- 1889897.56 1238419.30 734253.90 1385732.15
Schedual 1F - part F NS items:-990722.90 990722.56 1037187.21 154022.62 107558.31
Total 10218828.40 15299834.20 13562947.01 5171970.59 1835195.41
Net variation
amount 3344118.61 32.73