You are on page 1of 4

Data Sheet For Leak detection System

B00 Final Issued 08.25.2020


A00 Issued For Approval 1.12.2019

REV. DESCRIPTION Date Prepared Checked Approved

This document is the property of the owner. Any unauthorized attempt to reproduce it in any form, is strictly prohibited.

Page 1 of 4
Data Sheet For Leak detection System

TABULATION OF REVISED PAGES

REV REV REV REV REV REV


PAGE PAGE
A00 B00 X00 A00 B00 X00
1 * * 46
2 * * 47
3 * 48
4 * 49
5 50
6 51
7 52
8 53
9 54
10 55
11 56
12 57
13 58
14 59
15 60
16 61
17 62
18 63
19 64
20 65
21 66
22 67
23 68
24 69
25 70
26 71
27 72
28 73
29 74
30 75
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

This document is the property of the owner. Any unauthorized attempt to reproduce it in any form, is strictly prohibited.

Page 2 of 4
Data Sheet For Leak detection System

DOC No.: 325250-00-ED-IN-DAS-7020 Rev.: B00


1 Reference Hydraulic Gradiant 1187-50-EB-PR-DWG-0001

2 Reference Project Specification 325250-00-ED-IN-SP-7020

3 Line Diameter Size / Class / Wall Thickness 42" / 600# / 0.546"


Total Pipeline Length 994.921 km
GENERAL

4
5 Location From Gurreh Station to the Jask Terminal Facility

6 Ambient Temp. Min/Max -4.8 / 52.8 °C

7 Maximum Relative Humidity 6 ~ 99 %

8 Atmospheric Condition (mbar) 973.1 ~ 1030.4

9 Area Classification ZONE 2 IIB T3

10 Heavy Crude Oil Light Crude Oil

11 Unit

12 Temperatrure °C 15~40 15~40

13 Compressibility factor cp/cv 1.12 1.12

14 Fluid States - LIQUID LIQUID

15 Operation Condition - CONTINUOUS CONTINUOUS

16 Flow Rate m3/h 6625 6625

17 Density Kg/m3 880 857.7

18 Corrosive / Toxic - YES / NO YES / NO

19 Reid Vapor Pressure psi 5.6 7.45

20 Specific Gravity 0.88 0.858

21 Sulphur Content Wt% 1.93 1.38


H2S Content ppm 75 30
SERVICE CONDITIONS (1)

22
23 Nitrogen Wt% 0.16 0.12

24 Sediment & Water Vol% < 0.05 < 0.05

25 Water Content Vol% < 0.05 < 0.05

26 Salt Content P.T.B 9 3

27 Viscosity @ 15°C cP 25 9.86

28 Pour Point °C -30 -33

29 Asphaltenes Wt% 2.35 1

30 Wax Content Wt% 4.1 5.4

31 Carbon Residue Wt% 6.43 3.9

32 ASH Content N/A N/A

33 Acidity Total mgKOH/gr 0.14 0.09

34 METHANE Wt% Note 1 Note 1

35 ETHANE Wt% Note 1 Note 1

36 PROPANE Wt% Note 1 Note 1

37 I-BUTANE Wt% Note 1 Note 1

38 N-BUTANE Wt% Note 1 Note 1

39 I-PENTANE Wt% Note 1 Note 1

40 NC5+ Wt% Note 1 Note 1

Location Distance from the previous


Inlet Pressure (bar) Outlet Pressure (bar)
41 (km) Station (km)
SERVICE CONDITIONS (2)

42 Station-01 0 7~25 69.6 0

43 Station-02 148.705 11.7 84 148.705

44 Station-03 305.773 6.4 82.2 157.068

45 Station-04 440.272 7 85.9 134.501

46 Station-31 - Pressure Reduction Station 597.551 41.4 41.4 157.277

47 Station-05 761.365 4.6 88.9 163.814

48 Station-32 - Press. Reduction Station 871.042 51 51 109.677

49 Station-41 - Jask Terminal 994.92 5 - 123.879

Note 1: For crude oil analysis and cut range refer to Design Basis, DOC NO. 325251‐00‐ED‐PR‐DBS‐0001.

This document is the property of the owner. Any unauthorized attempt to reproduce it in any form, is strictly prohibited.

Page  3  of 4
Data Sheet For Leak detection System

DOC No.: 325250-00-ED-IN-DAS-7020 Rev.: B00


1 Leak Detection Method Internal Method

2 Operation Mode Start-up, Emergency Shutdown, Normal Operation, Pigging

3 Interface with other Systems DCS/SCADA (Note 5)

At 0.5% of maximum flowrate:


5 Leak Detection Time
<= 5 Min. sensing the leak and <= 8 Min produce an alarm
MAJOR CHARACTERISTICS

8
9 Leak Location Accuracy At 0.5% of maximum flowrate ± 100 m
10
11 False Alarm Frequency Maximum 1 times per year (under normal operating conditions)

12 Availability 99.9 %

13
14
15
16
17
18
19 Hardware and Software Required as necessary for convenient Operating and Maintenance
20 Engineering/Work Station Required (PC, Monitor, Keyboard and Mouse)

21 Compatibility with API TR 1149 Required


GENERAL REQUIREMENTS

22 Compatibility with API RP 1130 Required

23 Documentation Required

24 Site Installation Supervision Required

25 Site Acceptance Test Required

26 Training Required

27 Guarantee Required

28
29
30
31
32 Vendor VTA
OTHERS

33 System/ Software Provider VTA

34 Requisition No. : 325250-00-EP-IN-MTR-7020

35
GENERAL NOTES:

1- Leak Detection System shall be designed for Heavy Crude oil, Light Crude Oil as mentioned in this document.

2- Please refer to Hydraulic Gradient of Pipeline in order to find more information.

3. Vendor shall supply all necessary field instruments. Material selection for Field instruments shall be based on the Piping Material Specification and
to meet the project requirements. However, all wetted parts shall be suitable for corrosive service as per NACE MR 0175/ ISO 5136.

4. Vendor shall note that the pressure and flow rate of the fluids are changing continuously so the proposed system shall be able to detect leaks
under all operation conditions.
5-Leack detection system will be connected to DCS and SCADA system via redundant RS-485 serial link protocol. So any related requirement to be supplied by vendor .

ABBREVIATIONS:
1) VTA : Vendor To Advise / Specify
2) VTC : Vendor To Confirm
3) N/A : Not Applicable