You are on page 1of 10

NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan

FINAL REPORT

8.7.3 Load Spectrum by Axle Configuration on National Highway N-45


The axle load survey data was organized in a way to identify the number of vehicles
carrying load above and below permissible limits. Furthermore, load spectrums were
identified and number of vehicles carrying load in specified spectrums were
calculated. The results are tabulated in Table 8-93. The percentage of trucks for
major axle configuration carrying load above and below permissible limits is
graphically presented in Figure 8-52.
Table 8-93: Load Spectrum w.r.t Axle Configuration on National Highway N-45
Under Over Permissible Limit
Sr. Axle
Parameters Permissible Total
No. Configuration 15.00% 30.00% 50.00% 75.00% >75%
Limit
Max. Load (Tons) 17.5 20.1 22.8 26.3 30.6
Average Load (Tons) 14.52 18.79 21.36 24.20 27.13 -
No. of Trucks 244 208 86 33 4 - 575
Percentage 42.43% 36.17% 14.96% 5.74% 0.70% 0.00% 100%
1 2 Axle Single
Cumulative
42.43% 78.61% 93.57% 99.30% 100.00% 100%
Percentage
Percentage above
57.57% 21.39% 6.43% 0.70% 0.00% 0%
Range Value
Max. Load (Tons) 27.5 31.6 35.8 41.3 48.1
Average Load (Tons) 22.92 29.74 34.13 38.41 43.72 50.59
No. of Trucks 46 70 76 112 66 5 375
Percentage 12.27% 18.67% 20.27% 29.87% 17.60% 1.33% 100%
2 3 Axle Tandem
Cumulative
12.27% 30.93% 51.20% 81.07% 98.67% 100%
Percentage
Percentage above
87.73% 69.07% 48.80% 18.93% 1.33% 0%
Range Value
Max. Load (Tons) 39.5 45.4 51.4 59.3 69.1
Average Load (Tons) 37.45 42.39 48.06 - - -
No. of Trucks 9 18 9 - - - 36
4 Axle Single Percentage 25.00% 50.00% 25.00% 0.00% 0.00% 0.00% 100%
3
Tandem Cumulative 100.00
25.00% 75.00% 100.00% 100.00% 100%
Percentage %
Percentage above
75.00% 25.00% 0.00% 0.00% 0.00% 0%
Range Value
Max. Load (Tons) 48.5 55.8 63.1 72.8 84.9
Average Load (Tons) - - 59.59 67.14 - -
No. of Trucks - - 2 1 - - 3
5 Axle Single Percentage 0.00% 0.00% 66.67% 33.33% 0.00% 0.00% 100%
4
Tridem Cumulative 100.00
0.00% 0.00% 66.67% 100.00% 100%
Percentage %
Percentage above
100.00% 100.00% 33.33% 0.00% 0.00% 0%
Range Value
Max. Load (Tons) 49.5 56.9 64.4 74.3 86.6
Average Load (Tons) - 54.43 58.91 - - -
No. of Trucks - 3 2 - - - 5
5 Axle Tandem Percentage 0.00% 60.00% 40.00% 0.00% 0.00% 0.00% 100%
5
Tandem Cumulative 100.00
0.00% 60.00% 100.00% 100% 100%
Percentage %
Percentage above
100.00% 40.00% 0.00% 0.00% 0% 0%
Range Value
Max. Load (Tons) 58.5 67.3 76.1 87.8 102.4
Average Load (Tons) - 61.29 71.76 82.53 89.98 -
No. of Trucks - 1 3 14 3 - 21
6 Axle Tandem Percentage 0.00% 4.76% 14.29% 66.67% 14.29% 0.00% 100%
6
Tridem Cumulative
0.00% 4.76% 19.05% 85.71% 100.00% 100%
Percentage
Percentage above
100.00% 95.24% 80.95% 14.29% 0.00% 0%
Range Value

% of Trucks carrying Load Under Permissible Load Limits % of Trucks carrying Load Over Permissible Load Limits
100%
80% 57.57%
% of Trucks

60% 87.73% 75.00%


100.00% 100.00% 100.00%
40%
20% 42.43%
12.27% 25.00%
0%
2 Axle Single

Tendem

4 Axle Single

5 Axle Single

Tendem
Tendem

Tendem
Tridem
3 Axle

5 Axle

6 Axle
Tendem

Tridem

Axle Configuration

Figure 8-52: Percentage of Vehicles carrying Load above and below Permissible Limits on National
Highway N-45

8-91
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

8.7.4 Rear Axle Load Spectrum (Single) on National Highway N-45


The damaging effect of front axle on pavement structure is negligible. The rear axles
including single, tandem and tridem have significant effect on the road deterioration.
The spectrum of rear axle loads (single) for all axle configurations is presented in
Table 8-94.
Table 8-94: Rear Axle Load Spectrum (single) for all Axle Configuration on National Highway N-45
Range
Sr. No. Total Percentage Cum. Percentage Percentage above Range Value
(Tonnes)
1 0 - 8.16 69 4.39 4.39 95.61
2 8.17 - 9.99 110 7.01 11.40 88.60
3 10 - 10.99 168 10.70 22.10 77.90
4 11 - 11.99 243 15.48 37.58 62.42
5 12 - 12.99 190 12.10 49.68 50.32
6 13 - 13.99 246 15.67 65.35 34.65
7 14 - 14.99 174 11.08 76.43 23.57
8 15 - 19.99 361 22.99 99.43 0.57
9 20 & Above 9 0.57 100.00 0.00

8.7.5 Distribution of Vehicles by Make Type on National Highway N-45


The distribution of trucks as per make type is illustrated in Table 8-95 and is
graphically presented in Figure 8-53.
Table 8-95: Percentage of Vehicles w.r.t Make Type on National Highway N-45
Sr. No. Make Count Percentage
1 Bedford 365 36.00
2 Nissan 44 4.34
3 Faw 9 0.89
4 Hino 590 58.19
5 Isuzu 1 0.10
6 Mercedes 2 0.20
7 UD 0 0.00
8 Others 3 0.30
Total 1014 100.00

58.19%
60%

50%

40% 36.00%
% of Trucks

30%

20%

10% 4.34%
0.89% 0.10% 0.20% 0.00% 0.30%
0%
365 44 9 590 1 2 0 3
Vehicle by Make

Figure 8-53: Percentage of Vehicles w.r.t Make Type on National Highway N-45

8.7.6 Analysis by Make Type on National Highway N-45


The statistical analysis comprising minimum, maximum and average loads per axle
carried by trucks of major axle configuration along with standard deviation and
variance with respect to make type is presented in Table 8-96.
Table 8-96: Stdev., Var., Min., Max. & Avg. Load Comparison w.r.t Make Type for major Axle Configuration
on National Highway N-45
Load (Tons)
Sr.
Axle Configuration Make Count %age Parameters Rear Rear Rear Rear
No. Front Rear 2 Total
1 3 4 5
Min. Load 2.99 3.56 6.72
Max. Load 9.95 20.93 26.56
Avg. Load 5.90 12.05 17.94
Bedford 364 63.30%
1 2 Axle Single Standard
1.28 2.63 3.49
Deviation
Variance 1.64 6.91 12.18
Nissan 2 0.35% Min. Load 3.26 4.46 8.07

8-92
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Load (Tons)
Sr.
Axle Configuration Make Count %age Parameters Rear Rear Rear Rear
No. Front Rear 2 Total
1 3 4 5
Max. Load 3.61 5.09 8.35
Avg. Load 3.44 4.78 8.21
Standard
0.25 0.45 0.20
Deviation
Variance 0.06 0.20 0.04
Min. Load 3.38 4.62 8.00
Max. Load 3.41 4.76 8.17
Avg. Load 3.40 4.69 8.09
Faw 2 0.35%
Standard
0.02 0.10 0.12
Deviation
Variance 0.00 0.01 0.01
Min. Load 2.94 4.12 7.26
Max. Load 9.37 19.56 27.79
Avg. Load 5.61 11.96 17.58
Hino 206 35.83%
Standard
1.20 2.80 3.78
Deviation
Variance 1.44 7.81 14.25
Min. Load 4.25 7.09 11.34
Max. Load 4.25 7.09 11.34
Avg. Load 4.25 7.09 11.34
Others 1 0.17%
Standard
- - -
Deviation
Variance - - -
Total 575 100%
Min. Load 6.16 14.54 16.11 36.81
Max. Load 6.16 14.54 16.11 36.81
Avg. Load 6.16 14.54 16.11 36.81
Bedford 1 0.27%
Standard
- - - -
Deviation
Variance - - - -
Min. Load 4.16 4.59 3.62 12.51
Max. Load 8.62 14.51 17.23 40.36
Avg. Load 5.99 9.21 9.17 24.37
Faw 7 1.87%
Standard
1.58 3.57 4.66 9.78
Deviation
Variance 2.51 12.76 21.68 95.57
Min. Load 3.87 4.56 3.62 12.40
Max. Load 11.59 21.54 26.71 55.22
Avg. Load 7.90 13.69 13.82 35.42
Hino 333 89.04%
Standard
1.53 2.64 2.95 6.54
Deviation
Variance 2.35 6.97 8.72 42.83
2 3 Axle Tandem Min. Load 7.03 13.26 15.45 35.74
Max. Load 7.03 13.26 15.45 35.74
Avg. Load 7.03 13.26 15.45 35.74
Isuzu 1 0.27%
Standard
- - - -
Deviation
Variance - - - -
Min. Load 4.02 4.69 3.71 12.63
Max. Load 10.87 17.67 18.51 45.75
Avg. Load 7.97 13.39 13.72 35.08
Nissan 30 8.02%
Standard
1.89 3.34 3.79 8.56
Deviation
Variance 3.58 11.15 14.40 73.19
Min. Load 7.14 13.92 16.51 37.57
Max. Load 7.14 13.92 16.51 37.57
Avg. Load 7.14 13.92 16.51 37.57
Others 2 0.54%
Standard
- - - -
Deviation
Variance - - - -
Total 374 100%
Min. Load 4.91 8.20 8.52 9.94 34.69
Max. Load 9.60 15.69 12.71 15.94 50.60
Avg. Load 7.23 12.81 10.54 12.16 42.74
Hino 28 77.78%
Standard
1.03 1.81 1.12 1.40 4.38
Deviation
Variance 1.05 3.27 1.24 1.96 19.21
4 Axle Single
3 Min. Load 4.81 11.22 8.69 10.14 36.20
Tandem
Max. Load 8.30 15.13 13.29 13.66 48.80
Avg. Load 6.77 12.82 10.69 11.68 41.96
Nissan 8 22.22%
Standard
1.14 1.40 1.40 1.19 4.00
Deviation
Variance 1.30 1.96 1.97 1.43 16.04
Total 36 100%
Min. Load 8.71 14.31 12.44 13.06 13.68 62.20
Max. Load 8.71 14.31 12.44 13.06 13.68 62.20
4 5 Axle Single Tridem Hino 1 33.33% Avg. Load 8.71 14.31 12.44 13.06 13.68 62.20
Standard
- - - - - -
Deviation

8-93
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Load (Tons)
Sr.
Axle Configuration Make Count %age Parameters Rear Rear Rear Rear
No. Front Rear 2 Total
1 3 4 5
Variance - - - - - -
Min. Load 5.15 10.54 12.13 12.41 12.27 56.97
Max. Load 5.30 24.86 12.45 13.79 15.21 67.14
Avg. Load 5.23 17.70 12.29 13.10 13.74 62.06
Mercedes 2 66.67% Standard
0.11 10.13 0.23 0.98 2.08 7.19
Deviation
102.5
Variance 0.01 0.05 0.95 4.32 51.71
3
Total 3 100%
Min. Load 7.16 12.12 11.02 11.02 13.22 54.54
Max. Load 7.81 13.22 12.02 12.02 14.42 59.49
Avg. Load 7.39 12.50 11.37 11.37 13.64 56.26
Hino 3 60.00%
Standard
0.37 0.62 0.57 0.57 0.68 2.80
Deviation
Variance 0.13 0.39 0.32 0.32 0.46 7.84
5 Axle Tandem
5 Min. Load 4.81 10.61 11.92 12.54 14.11 53.99
Tandem
Max. Load 4.99 11.21 13.54 13.68 14.91 58.33
Avg. Load 4.90 10.91 12.73 13.11 14.51 56.16
Nissan 2 40.00%
Standard
0.13 0.42 1.15 0.81 0.57 3.07
Deviation
Variance 0.02 0.18 1.31 0.65 0.32 9.42
Total 5 100%
Min. Load 6.13 10.42 11.03 9.81 11.03 12.87 61.29
Max. Load 9.78 15.56 16.47 14.70 16.47 19.22 91.51
Avg. Load 8.17 13.57 14.43 13.03 14.64 17.05 80.89
Hino 19 90.48%
Standard
0.83 1.45 1.42 1.24 1.38 1.58 7.36
Deviation
Variance 0.69 2.11 2.00 1.55 1.90 2.49 54.21
6 Axle Tandem
6 Min. Load 7.95 13.52 14.31 12.72 14.31 16.70 79.51
Tridem
Max. Load 8.55 14.54 15.39 13.68 15.39 17.96 85.51
Avg. Load 8.25 14.03 14.85 13.20 14.85 17.33 82.51
Nissan 2 9.52%
Standard
0.42 0.72 0.76 0.68 0.76 0.89 4.24
Deviation
Variance 0.18 0.52 0.58 0.46 0.58 0.79 18.00
Total 21 100%

8.7.7 Distribution of Vehicles by Body Type on National Highway N-45


The percentage of vehicles with respect to Body Type i-e Flat, Half, Full & Container
plying on National Highway N-45 is tabulated in Table 8-97 and is graphically
presented in Figure 8-54.
Table 8-97: Percentage of Vehicles w.r.t Body Type on National Highway N-45
Sr. No. Body Type Count Percentage
1 Flat 128 12.62
2 Half 3 0.30
3 Full 680 67.06
4 Covered 102 10.06
5 Container 101 9.96
Total 1014 100.00

Container Flat
9.96% 12.62% Half
Covered 0.30%
10.06%

Full
67.06%

Figure 8-54 : Percentage of Vehicles w.r.t Body Type on National Highway N-45

8.7.8 Analysis by Body Type on National Highway N-45


The statistical analysis comprising minimum, maximum and average loads per axle
carried by trucks of major axle configuration along with standard deviation and

8-94
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

variance with respect to body type is presented in Table 8-98.


Table 8-98: Stdev., Var., Min., Max. & Avg. Load Comparison w.r.t Body Type for major Axle Configuration
on National Highway N-45
Sr. Axle Body Load (Tons)
Count %age Parameters
No. Configuration Type Front Rear 1 Rear 2 Rear 3 Rear 4 Rear 5 Total
Min. Load 2.99 3.89 6.88
Max. Load 8.00 17.00 25.00
Avg. Load 5.71 11.08 16.79
Flat 15 2.61%
Standard
1.64 3.73 5.25
Deviation
Variance 2.70 13.89 27.61
Min. Load 7.25 11.44 18.75
Max. Load 9.77 15.42 24.69
Avg. Load 8.11 13.93 22.04
Half 3 0.52%
Standard
1.44 2.17 3.02
Deviation
Variance 2.07 4.70 9.12
Min. Load 2.94 3.56 6.72
Max. Load 9.95 20.93 27.79
Avg. Load 5.79 12.11 17.90
Full 447 77.74%
1 2 Axle Single Standard
1.29 2.81 3.74
Deviation
Variance 1.67 7.91 13.99
Min. Load 2.98 5.14 8.70
Max. Load 8.61 19.56 26.98
Avg. Load 5.73 11.45 17.18
Covered 71 12.35%
Standard
1.12 2.47 3.34
Deviation
Variance 1.26 6.08 11.12
Min. Load 3.95 6.07 10.68
Max. Load 7.81 16.18 23.80
Avg. Load 5.50 11.32 16.82
Container 39 6.78%
Standard
0.90 1.77 2.36
Deviation
Variance 0.82 3.14 5.58
Total 575 100%
Min. Load 5.11 8.31 8.09 21.51
Max. Load 11.35 21.54 22.36 52.00
Avg. Load 8.26 14.26 14.72 37.24
Flat 102 27.27%
Standard
1.36 2.10 2.42 5.11
Deviation
Variance 1.86 4.41 5.87 26.14
Min. Load 3.87 4.56 3.62 12.40
Max. Load 11.59 21.12 26.71 55.22
Avg. Load 7.77 13.48 13.51 34.76
Full 229 61.23%
Standard
1.64 3.02 3.36 7.51
Deviation
Variance 2.70 9.15 11.29 56.36
2 3 Axle Tandem Min. Load 4.95 9.51 9.41 25.55
Max. Load 10.85 17.63 17.23 45.66
Avg. Load 7.62 12.92 13.11 33.66
Covered 31 8.29%
Standard
1.57 2.35 2.63 6.08
Deviation
Variance 2.46 5.51 6.93 36.99
Min. Load 5.61 9.48 9.23 24.54
Max. Load 9.46 15.37 14.97 39.80
Avg. Load 6.78 11.45 11.56 29.79
Container 12 3.21%
Standard
1.25 1.94 2.17 5.01
Deviation
Variance 1.56 3.78 4.69 25.06
Total 374 100%
Min. Load 6.04 10.22 8.52 9.94 35.51
Max. Load 7.61 13.88 12.71 15.94 46.41
Avg. Load 7.12 12.27 10.46 12.42 42.27
Flat 5 13.89%
Standard
0.68 1.63 1.54 2.23 4.39
Deviation
Variance 0.46 2.65 2.39 4.96 19.27
Min. Load 6.78 12.37 9.58 11.17 39.90
Max. Load 8.60 15.69 12.14 14.17 50.60
Avg. Load 7.69 14.03 10.86 12.67 45.26
4 Axle Single Full 3 8.33%
3 Standard
Tandem 0.91 1.66 1.28 1.50 5.35
Deviation
Variance 0.83 2.76 1.64 2.25 28.62
Min. Load 4.81 8.20 8.69 10.14 34.69
Max. Load 9.60 15.38 13.29 13.89 49.60
Avg. Load 7.07 12.78 10.56 11.92 42.33
Container 28 77.78%
Standard
1.13 1.72 1.13 1.18 4.20
Deviation
Variance 1.27 2.96 1.28 1.39 17.65
Total 36 100%

8-95
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Sr. Axle Body Load (Tons)


Count %age Parameters
No. Configuration Type Front Rear 1 Rear 2 Rear 3 Rear 4 Rear 5 Total
Min. Load - - - - -
Max. Load - - - - -
Avg. Load - - - - -
Flat 0 0.00%
Standard
- - - - -
Deviation
Variance - - - - -
5 Axle Single Min. Load 5.15 10.54 12.13 12.41 12.27 56.97
4
Tridem Max. Load 8.71 24.86 12.45 13.79 15.21 67.14
Avg. Load 6.39 16.57 12.34 13.09 13.72 62.10
Container 3 100%
Standard
2.01 7.42 0.18 0.69 1.47 5.09
Deviation
Variance 4.05 55.10 0.03 0.48 2.16 25.86
100.00
Total 3
%
Min. Load 4.81 10.61 11.92 12.02 14.11 53.99
Max. Load 7.81 13.22 13.54 13.68 14.91 59.49
Avg. Load 5.87 11.68 12.49 12.75 14.48 57.27
Flat 3 60.00%
Standard
1.68 1.37 0.91 0.85 0.40 2.90
Deviation
Variance 2.83 1.87 0.82 0.72 0.16 8.41
5 Axle Tandem
5 Min. Load 7.16 12.12 11.02 11.02 13.22 54.54
Tandem
Max. Load 7.19 12.17 11.06 11.06 13.27 54.75
Avg. Load 7.18 12.15 11.04 11.04 13.25 54.65
Container 2 40.00%
Standard
0.02 0.04 0.03 0.03 0.04 0.15
Deviation
Variance 0.00 0.00 0.00 0.00 0.00 0.02
Total 5 100%
Min. Load 8.23 10.54 12.37 13.17 14.82 17.29 81.97
Max. Load 9.78 14.18 15.01 14.70 16.22 18.36 83.39
Avg. Load 8.78 12.91 14.07 13.74 15.35 17.72 82.56
Flat 3 14.29%
Standard
0.86 2.05 1.47 0.84 0.76 0.57 0.74
Deviation
Variance 0.75 4.21 2.17 0.70 0.58 0.32 0.54
Min. Load 6.13 10.42 11.03 9.81 11.03 12.87 61.29
Max. Load 6.13 10.42 11.03 9.81 11.03 12.87 61.29
Avg. Load 6.13 10.42 11.03 9.81 11.03 12.87 61.29
6 Axle Tandem Full 1 4.76%
6 Standard
Tridem - - - - - - -
Deviation
Variance - - - - - - -
Min. Load 6.92 11.76 12.46 11.07 12.46 14.53 69.20
Max. Load 9.15 15.56 16.47 14.64 16.47 19.22 91.51
Avg. Load 8.19 13.93 14.75 13.11 14.75 17.21 81.94
Container 17 80.95%
Standard
0.61 1.03 1.09 0.97 1.09 1.27 6.05
Deviation
Variance 0.37 1.06 1.19 0.94 1.19 1.62 36.65
Total 21 100%

8.7.9 Distribution of Vehicles by Type on National Highway N-45


The percentage of vehicles with respect to Type i-e Truck, Semi-Trailer and Tanker
plying on National Highway N-45 is tabulated in Table 8-99 and is graphically
presented in Figure 8-55.
Table 8-99: Percentage of Vehicles w.r.t Type on National Highway N-45
Sr. No. Vehicle Type Count Percentage
1 Truck 944 93.10
2 Semi-Trailer 65 6.41
3 Tanker 5 0.49
Total 1014 100.00

Semi Trailer
6.41%
Tanker
0.49%

Truck
93.10%

Figure 8-55: Percentage of Vehicles w.r.t Type on National Highway N-45

8-96
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

8.7.10 Analysis by Type on National Highway N-45


The statistical analysis comprising minimum, maximum and average loads per axle
carried by trucks of major axle configuration along with standard deviation and
variance with respect to truck type is presented in Table 8-100.
Table 8-100: Stdev., Var., Min., Max. & Avg. Load Comparison w.r.t Type for major Axle Configuration on
National Highway N-45
Sr. Load (Tons)
Axle Configuration Vehicle Type Count %age Parameters
No. Front Rear 1 Rear 2 Rear 3 Rear 4 Rear 5 Total
Min. Load 2.94 3.56 6.72
Max. Load 9.95 20.93 27.79
Truck 570 99.13% Avg. Load 5.78 11.95 17.73
Standard Deviation 1.27 2.74 3.67
Variance 1.62 7.52 13.46
1 2 Axle Single Min. Load 4.52 9.43 13.95
Max. Load 7.42 19.56 26.98
Tanker 5 0.87% Avg. Load 5.57 12.57 18.15
Standard Deviation 1.19 4.12 5.29
Variance 1.41 16.94 27.94
Total 575 100.00%
Min. Load 3.87 4.56 3.62 12.40
Max. Load 11.59 21.54 26.71 55.22
Truck 374 100.00% Avg. Load 7.86 13.58 13.75 35.18
2 3 Axle Tandem
Standard Deviation 1.58 2.77 3.11 6.90
Variance 2.49 7.65 9.67 47.64
Total 374 100.00%
Min. Load 4.81 8.20 8.52 9.94 34.69
Max. Load 9.60 15.69 13.29 15.94 50.60
4 Axle Single Semi-Trailer 36 100.00% Avg. Load 7.13 12.82 10.57 12.05 42.57
3
Tandem Standard Deviation 1.05 1.71 1.17 1.36 4.26
Variance 1.11 2.92 1.36 1.84 18.14
Total 36 100.00%
Min. Load 5.15 10.54 12.13 12.41 12.27 56.97
Max. Load 8.71 24.86 12.45 13.79 15.21 67.14
5 Axle Single Semi-Trailer 3 100.00% Avg. Load 6.39 16.57 12.34 13.09 13.72 62.10
4
Tridem Standard Deviation 2.01 7.42 0.18 0.69 1.47 5.09
Variance 4.05 55.10 0.03 0.48 2.16 25.86
Total 3 100.00%
Min. Load 4.81 10.61 11.02 11.02 13.22 53.99
Max. Load 7.81 13.22 13.54 13.68 14.91 59.49
5 Axle Tandem Semi-Trailer 5 100.00% Avg. Load 6.39 11.87 11.91 12.06 13.99 56.22
5
Tandem Standard Deviation 1.39 1.00 1.02 1.11 0.73 2.51
Variance 1.93 1.00 1.05 1.23 0.54 6.28
Total 5 100.00%
Min. Load 6.13 10.42 11.03 9.81 11.03 12.87 61.29
Max. Load 9.78 15.56 16.47 14.70 16.47 19.22 91.51
6 Axle Tandem Semi-Trailer 21 100.00% Avg. Load 8.18 13.62 14.47 13.04 14.66 17.07 81.05
6
Tridem Standard Deviation 0.80 1.39 1.36 1.19 1.32 1.51 7.07
Variance 0.63 1.94 1.85 1.42 1.74 2.29 49.92
Total 21 100.00%

8.7.11 Commodities carried by vehicles on National Highway N-45


The percentage of major commodities carried by heavy vehicles on National Highway
N-45 is tabulated in Table 8-101 and is graphically presented in Figure 8-56. For the
sake of analysis, each commodity is assigned a code, details of which are attached in
Annex- 2.
Table 8-101: Percentage of Vehicle w.r.t Commodities on National Highway N-45
Sr. No. Commodity Type Code Count Percentage
1 Agriculture Items 100 66 6.51
2 Food Items 200 355 35.01
3 Animals and Animal Products 300 11 1.08
4 Raw Materials 400 42 4.14
5 Bulk Manufactures 500 152 14.99
6 Basic Manufactures 600 99 9.76
7 Miscellaneous Manufactures 700 13 1.28
8 Mining and Quarrying 800 221 21.79
9 Fuel, Lubricants (Minerals) 900 17 1.68
10 Miscellaneous Goods not Classified A00 11 1.08
11 Empty E00 27 2.66
Total 1014 100.00

8-97
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Fuel, Lubricants (Minerals)


Miscellaneous Mining and Quarrying 1.68%
Manufactures 21.79% Miscellaneous Goods not
1.28% Classified
Empty 1.08%
Basic Manufactures
2.66%
9.76%
Agriculture Items
6.51%

Bulk Manufactures
14.99%
Raw Materials
4.14% Animals and Animal
Food Items
Products
35.01%
1.08%

Figure 8-56: Percentage of Vehicles w.r.t Commodities on National Highway N-45

8.7.12 Analysis based on Commodities on National Highway N-45


The statistical analysis comprising minimum, maximum and average loads per axle
carried by trucks of major axle configuration along with standard deviation and
variance with respect to commodities carried by trucks is presented in Table 8-102.
Table 8-102: Stdev., Var., Min., Max. & Avg. Load Comparison w.r.t Commodities for major Axle
Configuration on National Highway N-45
Load (Tons)
Sr. Axle
Commodities Code Count %age Parameters Rear Rear Rear Rear Rear
No. Configuration Front Total
1 2 3 4 5
Min. Load 3.17 6.73 9.90
Max. Load 8.23 17.21 25.00
Avg. Load 5.84 12.48 18.31
Agriculture Items 100 44 7.65%
Standard
1.21 2.37 3.29
Deviation
Variance 1.46 5.64 10.81
Min. Load 2.94 5.14 9.87
Max. Load 9.95 17.34 25.50
Avg. Load 5.72 11.94 17.66
Food Items 200 223 38.78%
Standard
1.13 2.17 2.93
Deviation
Variance 1.27 4.70 8.57
Min. Load 3.84 6.93 12.00
Max. Load 6.73 13.14 19.33
Animals and Avg. Load 5.27 10.10 15.37
300 8 1.39%
Animal Products Standard
1.01 2.14 2.83
Deviation
Variance 1.01 4.57 7.99
Min. Load 3.70 7.85 11.55
Max. Load 9.70 16.29 23.60
Avg. Load 6.03 12.29 18.32
Raw Materials 400 27 4.70%
Standard
1.17 2.05 2.73
1 2 Axle Single Deviation
Variance 1.36 4.18 7.45
Min. Load 2.98 6.32 9.30
Max. Load 8.00 19.17 25.90
Bulk Avg. Load 5.63 11.84 17.47
500 67 11.65%
Manufactures Standard
1.05 2.10 2.89
Deviation
Variance 1.10 4.41 8.37
Min. Load 3.53 5.17 8.70
Max. Load 8.10 19.24 27.20
Basic Avg. Load 5.85 12.40 18.25
600 44 7.65%
Manufactures Standard
1.25 2.92 3.96
Deviation
Variance 1.57 8.51 15.67
Min. Load 3.54 5.81 9.35
Max. Load 7.81 16.18 23.80
Miscellaneous Avg. Load 5.79 11.60 17.39
700 10 1.74%
Manufactures Standard
1.37 2.82 3.77
Deviation
Variance 1.88 7.98 14.22
Min. Load 3.91 9.04 13.30
Mining and
800 114 19.83% Max. Load 9.85 20.93 27.79
Quarrying
Avg. Load 6.36 13.28 19.64

8-98
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Load (Tons)
Sr. Axle
Commodities Code Count %age Parameters Rear Rear Rear Rear Rear
No. Configuration Front Total
1 2 3 4 5
Standard
1.28 2.21 2.81
Deviation
Variance 1.65 4.88 7.90
Min. Load 4.19 7.12 11.39
Max. Load 7.54 19.56 26.98
Fuel, Lubricants Avg. Load 5.65 11.37 17.02
900 16 2.78%
(Minerals) Standard
1.23 3.15 4.07
Deviation
Variance 1.51 9.92 16.57
Min. Load 4.61 6.07 10.68
Max. Load 4.94 7.61 12.55
Miscellaneous
Avg. Load 4.75 7.03 11.78
Goods not A00 3 0.52%
Classified Standard
0.17 0.84 0.98
Deviation
Variance 0.03 0.70 0.95
Min. Load 2.99 3.56 6.72
Max. Load 3.61 5.26 8.68
Avg. Load 3.21 4.17 7.38
Empty E00 19 3.30%
Standard
0.16 0.47 0.58
Deviation
Variance 0.03 0.22 0.33
Total 575 100.00%
Min. Load 5.46 11.00 10.72 28.49
Max. Load 10.37 19.54 17.23 45.45
Avg. Load 8.55 15.10 15.44 39.08
Agriculture Items 100 15 4.01%
Standard
1.54 2.03 1.77 4.49
Deviation
Variance 2.38 4.11 3.12 20.20
Min. Load 4.78 8.31 8.09 21.51
Max. Load 11.59 18.84 18.35 48.78
Avg. Load 7.61 13.06 13.01 33.68
Food Items 200 102 27.27%
Standard
1.61 2.41 2.59 6.16
Deviation
Variance 2.61 5.83 6.71 37.90
Min. Load 4.92 8.00 7.79 20.71
Max. Load 9.82 15.95 15.55 41.31
Avg. Load 7.17 12.24 12.09 31.49
Raw Materials 400 14 3.74%
Standard
1.33 2.20 2.46 5.67
Deviation
Variance 1.78 4.84 6.03 32.13
Min. Load 5.76 9.48 9.23 24.54
Max. Load 10.85 19.11 19.94 45.66
Bulk Avg. Load 8.09 14.06 14.51 36.67
500 81 21.66%
Manufactures Standard
1.33 2.02 2.41 4.99
Deviation
Variance 1.78 4.10 5.83 24.87
Min. Load 5.14 9.48 9.23 24.54
Max. Load 11.33 18.67 26.71 55.22
Basic Avg. Load 8.37 14.01 14.65 37.02
600 47 12.57%
2 3 Axle Tandem Manufactures Standard
1.55 2.49 3.14 6.61
Deviation
Variance 2.40 6.21 9.88 43.69
Min. Load 5.23 14.31 13.95 36.61
Max. Load 10.39 16.89 16.45 43.73
Miscellaneous Avg. Load 8.14 15.46 15.54 39.14
700 3 0.80%
Manufactures Standard
2.64 1.31 1.38 3.98
Deviation
Variance 6.99 1.73 1.90 15.88
Min. Load 5.11 8.31 8.09 21.51
Max. Load 11.59 21.54 22.36 52.00
Mining and Avg. Load 7.99 14.13 14.19 36.31
800 103 27.54%
Quarrying Standard
1.35 2.69 2.83 6.18
Deviation
Variance 1.83 7.25 8.04 38.21
Min. Load 6.41 11.92 10.11 28.44
Max. Load 6.41 11.92 10.11 28.44
Fuel, Lubricants Avg. Load 6.41 11.92 10.11 28.44
900 1 0.27%
(Minerals) Standard
- - - -
Deviation
Variance - - - -
Min. Load 3.87 4.56 3.62 12.40
Max. Load 4.26 4.92 3.96 12.66
Avg. Load 4.07 4.70 3.76 12.53
Empty E00 8 2.14%
Standard
0.13 0.11 0.12 0.10
Deviation
Variance 0.02 0.01 0.02 0.01
Total 374 100.00%
4 Axle Single Min. Load 6.04 10.22 8.52 9.94 35.51
3 Agriculture Items 100 5 13.89%
Tandem Max. Load 7.61 13.88 12.71 15.94 46.41

8-99
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT

Load (Tons)
Sr. Axle
Commodities Code Count %age Parameters Rear Rear Rear Rear Rear
No. Configuration Front Total
1 2 3 4 5
Avg. Load 7.12 12.27 10.46 12.42 42.27
Standard
0.68 1.63 1.54 2.23 4.39
Deviation
Variance 0.46 2.65 2.39 4.96 19.27
Min. Load 4.81 10.34 8.69 10.14 36.20
Max. Load 9.60 15.13 13.29 13.66 48.80
Avg. Load 7.13 12.80 10.51 11.85 42.30
Food Items 200 16 44.44%
Standard
1.11 1.36 1.16 1.10 3.60
Deviation
Variance 1.23 1.85 1.35 1.21 13.00
Min. Load 4.91 10.11 9.46 11.03 39.08
Max. Load 7.03 12.81 11.92 12.14 41.33
Animals and Avg. Load 6.21 11.71 10.43 11.58 39.94
300 3 8.33%
Animal Products Standard
1.14 1.42 1.31 0.56 1.22
Deviation
Variance 1.30 2.01 1.71 0.31 1.48
Min. Load 8.60 15.69 12.14 14.17 50.60
Max. Load 8.60 15.69 12.14 14.17 50.60
Avg. Load 8.60 15.69 12.14 14.17 50.60
Raw Materials 400 1 2.78%
Standard
- - - - -
Deviation
Variance - - - - -
Min. Load 4.98 8.20 9.05 10.17 34.69
Max. Load 8.30 15.13 11.71 13.66 48.80
Basic Avg. Load 6.93 12.52 10.40 11.70 41.56
600 7 19.44%
Manufactures Standard
1.12 2.30 1.08 1.35 5.15
Deviation
Variance 1.25 5.30 1.17 1.81 26.53
Min. Load 8.43 15.38 11.90 13.89 49.60
Max. Load 8.43 15.38 11.90 13.89 49.60
Mining and Avg. Load 8.43 15.38 11.90 13.89 49.60
800 1 2.78%
Quarrying Standard
- - - - -
Deviation
Variance - - - - -
Min. Load 6.82 12.43 9.62 11.23 40.10
Max. Load 8.43 15.38 11.90 13.89 49.60
Miscellaneous
Avg. Load 7.57 13.80 10.68 12.46 44.50
Goods not A00 3 8.33%
Classified Standard
0.81 1.49 1.15 1.34 4.79
Deviation
Variance 0.66 2.21 1.32 1.80 22.93
Total 36 100.00%
Min. Load - - - - - -
Max. Load - - - - - -
Avg. Load - - - - - -
Agriculture Items 100 0 0.00%
Standard
- - - - - -
Deviation
Variance - - - - - -
Min. Load 5.15 10.54 12.13 12.41 12.27 56.97
Max. Load 5.30 24.86 12.45 13.79 15.21 67.14
Avg. Load 5.23 17.70 12.29 13.10 13.74 62.06
Bulk
5 Axle Single 500 2 66.67% Standard
4 Manufactures 0.11 10.13 0.23 0.98 2.08 7.19
Tridem Deviation
102.5
Variance 0.01 0.05 0.95 4.32 51.71
3
Min. Load 8.71 14.31 12.44 13.06 13.68 62.20
Max. Load 8.71 14.31 12.44 13.06 13.68 62.20
Mining and Avg. Load 8.71 14.31 12.44 13.06 13.68 62.20
800 1 33.33%
Quarrying Standard
- - - - - -
Deviation
Variance - - - - - -
Total 3 100.00%
Min. Load 4.81 10.61 11.92 12.54 14.11 53.99
Max. Load 4.99 11.21 13.54 13.68 14.91 58.33
Avg. Load 4.90 10.91 12.73 13.11 14.51 56.16
Agriculture Items 100 2 40.00%
Standard
0.13 0.42 1.15 0.81 0.57 3.07
Deviation
Variance 0.02 0.18 1.31 0.65 0.32 9.42
Min. Load 7.19 12.17 11.06 11.06 13.27 54.75
Max. Load 7.81 13.22 12.02 12.02 14.42 59.49
5 Axle Tandem Avg. Load 7.50 12.70 11.54 11.54 13.85 57.12
5 Food Items 200 2 40.00%
Tandem Standard
0.44 0.74 0.68 0.68 0.81 3.35
Deviation
Variance 0.19 0.55 0.46 0.46 0.66 11.23
Min. Load 7.16 12.12 11.02 11.02 13.22 54.54
Max. Load 7.16 12.12 11.02 11.02 13.22 54.54
Basic Avg. Load 7.16 12.12 11.02 11.02 13.22 54.54
600 1 20.00%
Manufactures Standard
- - - - - -
Deviation
Variance - - - - - -

8-100