MINISTRY OF COMMUNICATIONS
NATIONAL TRANSPORT RESEARCH CENTRE
FINAL REPORT
December, 2020
F I N I T E E N G I N E E R I N G ( P V T . ) L T D.
nd
2 Floor, Ghousia Plaza, Main Jinnah Avenue, Blue Area,
Islamabad - Pakistan
Tel: +92-51-2604350
Fax:+92-51-2604351
info@finite-engr.com
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
TABLE OF CONTENTS
ACKNOWLEDGEMENTS..................................................................................................................... vii
LIST OF ABBREVIATIONS.................................................................................................................. xv
i
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
3.4 Calibration of Existing Weigh Bridges and Portable Weigh Pads .......................................................................... 3-3
ii
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
iii
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
iv
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
v
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
10 CONCLUSIONS OF STUDY & RECOMMENDATIONS FOR AXLE LOAD CONTROL ......... 10-1
10.1 Conclusions........................................................................................................................................................ 10-1
10.2 Recommendations ............................................................................................................................................. 10-3
REFERENCES ......................................................................................................................................... i
ANNEXURES .......................................................................................................................................... i
vi
NTRC Axle Load Survey on National Highway & Motorway Network of Pakistan
FINAL REPORT
ACKNOWLEDGEMENTS
All praises and thanks to Allah Almighty alone, the most Merciful and the most Beneficent,
Who is the entire source of knowledge and wisdom to mankind. It is He who gave us courage, ability
and fortitude to accomplish this project. All praises and respect for the Holy Prophet (PBUH) who
preached his followers to seek knowledge from cradle to grave.
We first take the opportunity to record our deep and sincere gratitude for our respected client,
National Transport Research Centre (NTRC) whose valuable guidance, active supervision,
continuous encouragement and all time cooperation has helped us on every stage of the project
activities to complete the assigned task of national interest. We would also like to pay our special
thanks to Mr. Hameed Akhtar, Chief NTRC, Mr. Khizer Javed, Dy. Chief, Mr. Muhammad Sayyar,
Dy. Chief and allied staff for assistance and collaboration extended by them during project execution.
We are greatly indebted to the Secretary, Ministry of Communications, for his unforgettable
cooperation in execution and successful completion of the project.
Last but not the least we cannot forget the hard work and commitment of our entire team members
that led us to the accomplishment of this project.
May Allah Bless Us All.
Finite Engineering (Pvt.) Ltd.
vii