You are on page 1of 97
dyagcwll alr dcgora SAUDI BINLADIN GROUP << Contadtna C0. wi s IV GREEN LINE - ELEVATED & AT-GRADE Method Statement for Concrete Repair Works RTC/082/2013 Document No.: | Moog SPH STR MES 00002 Revision 2 Document Type MES - Method Statement Reason for issue (04 - Issued for SONO caana Project Engineer Signature Date Diana Bird RO los orm Construction Manager Signature Date Tomas Posker faa WA /or/* Risk Manager “Signature Date Robert Burrus ae eZ UT A/ts Quality Manage ‘Signature Date Kevin Sanders in osfoqpoos. Health&Safety Manager Signature ? Date Stephen PauiDunne | 3) > | 1/4/ i. Project Director Signature Date Approved by: - Hussein ElSaied 9 }-<-\ —<.—___ p Ino Is Revision History Rev. No. Description of Revision Date of Revision 1 First Issue 28 March 2015 2 incor paral QR comments as per M009-STR-ERS- oa/e7 205° Printed copy is uncontrolled and only valid at the time of printing. Always refer fo Aconex asthe latest version. Guagewllialcracgors Gay HBK SAUDI BINLADIN GROUP wy Contractina Co, vt GREEN LINE - ELEVATED & AT-GRADE TABLE OF CONTENTS LIST OF APPENDICES. HARDCOPY DISTRIBUTION LIST .. ABBREVIATIONS 1 PURPOSE... 44 General 4.2 Purpose 2 SCOPE. 24 Interdependence with Management Plans. 2.2 Revision of MS. 3 ROLES, RESPONSIBILITIES AND RESOURCES . 3.4 Construction Manage! 3.2 Project / Site Engi 3.3. QA/QC Manager. 3.4 QC Engineer. 3.5 QC Inspector. 3.6 Material Enginee 3.7 Design Verification Engin 3.8 Surveyor. 3.9 Document Controller. 3.10 HS Manager. 3.11 Environment Manage: 4 RESOURCES. 441 Labour. 4.2 Equipment... 4.3 Material Used.. 5 QUALITY ASSURANCE / QUALITY CONTROL.. 5.1 Handling and Storing of Materials.. 5.2. Material Sampling and Testing... 5.3 Documentatior 1008-SPH-STR-MES-00002 Ver 2 Page 2 of 17 Mathod Statement for Concrete Repair Prntee copy is uncontrlled and only val atthe time of printing Always refer to Aconex 2s the latest version ayagewlluairdegora Gay KBK SAUDI BINLADIN GROUP WD Cortractina Co, is GREEN LINE - ELEVATED & AT-GRADE 5.3.1. Daily Manpower, Equipment Reports and Daily Occurrence Log... 5.3.2 Quality Records .. 5.3.3 Materials Conformance Record 6 HEALTH, SAFETY, ENVIRONMENT .. RISK ASSESSMENT. METHODOLGY. 8.1 Identification of Repair Method 8.2 Prior to works 8.3 Subtrate Preparation... 8.4 Primar/ Bonding Agent 8.5 Material Application........ 86 Curing. 87 Post repair LIST OF APPENDICES Appendix 1 — Inspection and Test Plan — ITP, Sample of Check Sheets Appendix 2 — Risk Assessment Appendix 3 - Heavy Equipment Checklist Appendix 4 - Material datasheets and MS ‘Moog.SPH-STR-MES-00002 Ver 2 Page 3 of 17 “Method Statement for Concrete Repair Printed copy is unconttlied and only vali a he time of printing. Aways afer to Aconex 2s he latest version Ayagcwlaerdcgors Gap HBK SAUDI BINLADIN GROUP GF natn GREEN LINE - ELEVATED & AT-GRADE HARDCOPY DISTRIBUTION LIST Pee mer Copy No. | Name Company: Position Signature 001 Qatar Rail Project Owner 002) Qatar Rail Employer's Personnel (003 SPH Project Director 004 SPH Construction Director (005 SPH Station Manager** 006 SPH (QA7QC Manager 007 SPH HS Manager 008 SPH Viaduct Manager** 009) 010 * The final distribution may be modified after consultation with Qatar Rail ** itis the responsibilty of the Station / Viaduct Manager to provide this Method Statement to the respective Project or Site Engineers and obtain sign off that they have received and understood the document, Please refer to the communication protocol Moo9-SPH-STR-MES-00002 Ver2 Page 4 of17 Method Statement for Concrete Repair Pinted copy is uncontrolled and only vad a the timo of printing. Aways refer lo Aconex as the latest version Ayagcuwll aller degosa => FIBK SAUDI BINLADIN GROUP Contractina Co. GREEN LINE - ELEVATED & AT-GRADE ABBREVIATIONS BS British Standard DVE Design Verification Engineer HS Health, Safety and Environment IT Information Technology ime Inspection and Test Plan ms Method Statement msps Material Safety Data Sheet NCR Noneonformity Report PD Project Director PPE Personal Protective Equipment SPH Joint Venture of Saudi Binladin Group ,PORR and HBK aac Quality Assurance / Quality Control acs Qatar Construction Specification ams Quality Management System as Qatar Standard SONO Statement of No Objection ‘Mon9-SPH.STR-MES-00002 Ver 2 Page 5 of 17 Mathod Statement for Conerote Repa Printed copy is uncontroted and only vail a the time of printing. Aways refer to Aconex as the latest version, @yagcullaatirdegora Gy HBK SAUDI BINLADIN GROUP

You might also like