SAUDI BINLADIN GROUP <<
Contadtna C0. wi
s IV
GREEN LINE - ELEVATED & AT-GRADE
Method Statement for Concrete Repair
Works
RTC/082/2013
Document No.:
| Moog SPH STR MES 00002 Revision 2
Document Type MES - Method Statement
Reason for issue (04 - Issued for SONO
caana Project Engineer Signature Date
Diana Bird RO los orm
Construction Manager Signature Date
Tomas Posker faa WA /or/*
Risk Manager “Signature Date
Robert Burrus ae eZ UT A/ts
Quality Manage ‘Signature Date
Kevin Sanders in osfoqpoos.
Health&Safety Manager Signature ? Date
Stephen PauiDunne | 3) > | 1/4/ i.
Project Director Signature Date
Approved by: -
Hussein ElSaied 9 }-<-\ —<.—___ p Ino Is
Revision History
Rev. No. Description of Revision Date of Revision
1 First Issue 28 March 2015
2 incor paral QR comments as per M009-STR-ERS- oa/e7 205°
Printed copy is uncontrolled and only valid at the time of printing. Always refer fo Aconex asthe latest version.Guagewllialcracgors Gay HBK
SAUDI BINLADIN GROUP wy
Contractina Co, vt
GREEN LINE - ELEVATED & AT-GRADE
TABLE OF CONTENTS
LIST OF APPENDICES.
HARDCOPY DISTRIBUTION LIST ..
ABBREVIATIONS
1 PURPOSE...
44 General
4.2 Purpose
2 SCOPE.
24 Interdependence with Management Plans.
2.2 Revision of MS.
3 ROLES, RESPONSIBILITIES AND RESOURCES .
3.4 Construction Manage!
3.2 Project / Site Engi
3.3. QA/QC Manager.
3.4 QC Engineer.
3.5 QC Inspector.
3.6 Material Enginee
3.7 Design Verification Engin
3.8 Surveyor.
3.9 Document Controller.
3.10 HS Manager.
3.11 Environment Manage:
4 RESOURCES.
441 Labour.
4.2 Equipment...
4.3 Material Used..
5 QUALITY ASSURANCE / QUALITY CONTROL..
5.1 Handling and Storing of Materials..
5.2. Material Sampling and Testing...
5.3 Documentatior
1008-SPH-STR-MES-00002 Ver 2 Page 2 of 17
Mathod Statement for Concrete Repair
Prntee copy is uncontrlled and only val atthe time of printing Always refer to Aconex 2s the latest versionayagewlluairdegora Gay KBK
SAUDI BINLADIN GROUP WD
Cortractina Co, is
GREEN LINE - ELEVATED & AT-GRADE
5.3.1. Daily Manpower, Equipment Reports and Daily Occurrence Log...
5.3.2 Quality Records ..
5.3.3 Materials Conformance Record
6 HEALTH, SAFETY, ENVIRONMENT ..
RISK ASSESSMENT.
METHODOLGY.
8.1 Identification of Repair Method
8.2 Prior to works
8.3 Subtrate Preparation...
8.4 Primar/ Bonding Agent
8.5 Material Application........
86 Curing.
87 Post repair
LIST OF APPENDICES
Appendix 1 — Inspection and Test Plan — ITP, Sample of Check Sheets
Appendix 2 — Risk Assessment
Appendix 3 - Heavy Equipment Checklist
Appendix 4 - Material datasheets and MS
‘Moog.SPH-STR-MES-00002 Ver 2 Page 3 of 17
“Method Statement for Concrete Repair
Printed copy is unconttlied and only vali a he time of printing. Aways afer to Aconex 2s he latest versionAyagcwlaerdcgors Gap HBK
SAUDI BINLADIN GROUP GF natn
GREEN LINE - ELEVATED & AT-GRADE
HARDCOPY DISTRIBUTION LIST
Pee mer
Copy No. | Name Company: Position Signature
001 Qatar Rail Project Owner
002) Qatar Rail Employer's Personnel
(003 SPH Project Director
004 SPH Construction Director
(005 SPH Station Manager**
006 SPH (QA7QC Manager
007 SPH HS Manager
008 SPH Viaduct Manager**
009)
010
* The final distribution may be modified after consultation with Qatar Rail
** itis the responsibilty of the Station / Viaduct Manager to provide this Method Statement to
the respective Project or Site Engineers and obtain sign off that they have received and
understood the document, Please refer to the communication protocol
Moo9-SPH-STR-MES-00002 Ver2 Page 4 of17
Method Statement for Concrete Repair
Pinted copy is uncontrolled and only vad a the timo of printing. Aways refer lo Aconex as the latest versionAyagcuwll aller degosa => FIBK
SAUDI BINLADIN GROUP
Contractina Co.
GREEN LINE - ELEVATED & AT-GRADE
ABBREVIATIONS
BS British Standard
DVE Design Verification Engineer
HS Health, Safety and Environment
IT Information Technology
ime Inspection and Test Plan
ms Method Statement
msps Material Safety Data Sheet
NCR Noneonformity Report
PD Project Director
PPE Personal Protective Equipment
SPH Joint Venture of Saudi Binladin Group ,PORR and HBK
aac Quality Assurance / Quality Control
acs Qatar Construction Specification
ams Quality Management System
as Qatar Standard
SONO Statement of No Objection
‘Mon9-SPH.STR-MES-00002 Ver 2 Page 5 of 17
Mathod Statement for Conerote Repa
Printed copy is uncontroted and only vail a the time of printing. Aways refer to Aconex as the latest version,@yagcullaatirdegora Gy HBK
SAUDI BINLADIN GROUP