Professional Documents
Culture Documents
Main Event
1 ADMINISTRASI :
a. Kompensasi Venue 4 unit Rp 2,000,000 1 Rp 8,000,000
b. Izin Kepolisian 4 unit Rp 4,000,000 1 Rp 16,000,000
2 EQUIPMENT PRODUCTION
a. Rigging
- Size Stage <Trus Size min 300 X 300 CM > + Level
60 cm 4x6 meter 1 paket Rp 4,000,000
4 Rp 16,000,000
b. Sound System 5000 watt 1 Set Rp 5,000,000 4 Rp 20,000,000
C. Lighting
- Parled parled 54 x 3 6 unit Rp 200,000 4 Rp 4,800,000
- moving beam 230 2 unit Rp 650,000 4 Rp 5,200,000
- mini brute 1000 watt 2 unit Rp 350,000 4 Rp 2,800,000
- Gun smoke 1500 watt 1 unit Rp 500,000 4 Rp 2,000,000
g. Electricity Support , * Disesuaikan kebutuhan