b) Temporary Lighting max. 5 bulb @ max 100 watt Day 20.00 Unit Rate
Repair on board or on docking per 100 watt lamp Lamp 5.00 Unit Rate
Connect and Disconnect Line/Time 50.00 Unit Rate
8 Fresh Water Supply
Fresh Water (Min. charge 10 Tons) Ton 10.00 Unit Rate
Connect and Disconnect Line/Time 20.00 Unit Rate
9 Gas Free Inspection During Docking Days 7 Days 50.00 350.00 350.00
10 Gangway Order 150.00 Unit Rate
11 Fire Line
Fire Line, allow 1 line 30 Days 50.00 1,500.00 1,500.00
Connect and Disconnect Line/time 50.00 Unit Rate
12 Fire Watchman During Working Hour (8.00 - 16.00) 30 Man/day 10.00 300.00 300.00
13 Security Guard
To provide security guard to carry out regular inspection & patrol though out the
vessel (If requested by owner)
- Allow for 1 man for 1 shift / 8 hours Shift/day 25.00 Unit Rate
14 Garbage Disposal (per time) 7 times 45.00 315.00 315.00
15 Ventilation Blower during repair Include Connect and disconnect Pc/day 50.00 Unit Rate
16 Cooling Line
Supply Cooling System, allow for 1 line line/day 50.00 Unit Rate
Connect and Disconnect line/time 50.00 Unit Rate
17 Ballast Water Supply (if required)
Ballast Water Ton 0.50 Unit Rate
Connect and Disconnect line/time 100.00 Unit Rate
18 Sewage
Daily disposal of sewage (min. 4 ton) Ton 60.00 Unit Rate
Connect and Disconnect line/time 80.00 Unit Rate
19 Compressed Air Supply
Compressed Air Line/day 55.00 Unit Rate
Connect and Disconnect Line/time 80.00 Unit Rate
20 Removal and Disposal of Mud, Sludge and Oily Bilge
- Mud Ton 200.00 Unit Rate
- Oily Mud Ton 450.00 Unit Rate
- Sludge (Min. Charge S$ 500 per operation) Ton 50.00 Unit Rate
- Oily Bilge Water (Min. Charge S$ 500 per operation) Ton 50.00 Unit Rate
21 Remove and refit Buttom Plug Pcs 35.00 Unit Rate
22 Manhole Cover (estimated 10 pcs)
- Open & Close Manhole Cover Pcs 45.00 Unit Rate
- Renew Packing / Gasket Pcs 35.00 Unit Rate
- Renew Stud / Nut Each 10.00 Unit Rate
- Renew nut only Each 5.00 Unit Rate
23 Staging
Tower staging min. charge size @ 3mL x 3mL x Height m3 5.00 Unit Rate
Min charge S$ 250 / stage
Hanging staging @ S$ 15 / m/ plank
min charge S$ 300 / stage
24 NDT (Non Destructive Test)
Page 1 of 6
UNIT RATE APPROVED AS
NO DESCRIPTIONS QTY UNIT TOTAL SGD INSPECTION REMARKS
SGD
- Radigraphic Test (x-ray) sheet 42.00 Unit rate
- Ultrasonic Gauging
Up to 200 - above 500 spot 2.80 Unit rate
Min. Charge 200 spot
B HEAVY EQUIPMENTS for Lifting & Shifting goods Min. Charge 3 hours per order (if required)
Crawler Crane 50 - 55 ton Hour 85.00 Unit Rate
Forklift 2 - 3 ton Hour 20.00 Unit Rate
5 - 6 ton Hour 25.00 Unit Rate
10 - 15 ton Hour 50.00 Unit Rate
Loader 10 - 15 ton Hour 50.00 Unit Rate
Cherry Picker - Unit/hour 85.00 Unit Rate
C REPAIR WORK
C.1 BLASTING AND PAINTING WORK (ALL PAINT / COATING PRODUCT ARE TO BE SUPPLIED BY OWNER)
Estimated area :
Top side area : 300 m2
Vertical area : 400 m2
Bottom area : 480 m2
Estimated total area : 1180 m2
a) High Pressure Washing & Cleaning with 3,000 PSI M2 0.70 Unit Rate
b) Hose Down with Fresh Water M2 0.30 Unit Rate
c) Hard Scrap for Light Marine Growth Barnacles 880 M2 1.00 880.42 880.00
d) Chemical Cleaning for Oil Stain (Min. charge 200 M2) M2 6.00 Unit Rate
Notes :
- Min. charge for hull gritblasting is 300 m2 for vessel bellow 100 m LOA
- Min. charge for touch up coat is 70% of full coat area
- Paint and thinner to be supplied by Owner.
- Install scupper drains pcs 15.00 Unit Rate
Page 2 of 6
UNIT RATE APPROVED AS
NO DESCRIPTIONS QTY UNIT TOTAL SGD INSPECTION REMARKS
SGD
150 267 107 91
200 341 139 120
250 429 178 156
300 535 224 199
C.3 STEELWORK
Page 3 of 6
UNIT RATE APPROVED AS
NO DESCRIPTIONS QTY UNIT TOTAL SGD INSPECTION REMARKS
SGD
- Single curvature plus 15%
- Double curvature plus 25%
- The Rates above are for steel renewal at one location
- Staging, removals for access work, cleaning, special shoring,
surface treatment, painting, non-destructive test, using of
Charge additional
special electrodes, vacuum test and tank air test are to be
charged additionally
Steel work calculation based on
8,000 kg/m3
Max. length x breadth x actual fitted thickness x steel density
Additional charges shall be applied for steel thickness less than
plus 10%
10 mm
Minimum weight for Insert Plate 100 kg/piece
Minimum weight for Bracket, Stiffener 15 kg/piece
Deck outfitting shall be charged separately
High tensile steel EH36 / equivalent steel to be charged plus 35%
Build up Welding on hull external S$ 35/m
Minimum charge for Build up Welding 2 m/location
Gouging of existing welding seam S$ 15/m
Measure & Record for Anchor & Chain (P&S) 1 ls 300.00 300.00 300.00
Submit record to class and owner
CHAIN LOCKER
- Clean and Paint (Paint supply by Owner) 1 bothside 1,200.00 1,200.00 1,200.00
- Mud disposal ton 180.00 Unit rate
Note :
a. Removal of grating and floor plates excluded 20% of the rate
b. Removal of mud and pumping out water excluded
c. Extra charge if staging required.
d. Pumping out Chain Locker S$ 120 per locker
Removal Mud S$ 180 per ton
e. Price based on one chain locker each at port and starboard side only
a. Rope Guard
- Crop rope guard for inspection and refit and weld 1 ls 250.00 250.00 250.00
b. Stern tube
- Measure Stern tube weardown clearance 1 ls 300.00 300.00 300.00
c. Tail Shaft
Estimated Dia. Shaft 250 mm
Withdraw and refit 1 pc 3,742.00 3,742.00 3,742.00
Dismantle seals clean & Reclose 1 pc 960.00 960.00 960.00
Measure 1 pc 120.00 120.00 120.00
Note : All material seals supply by Owner's
d. Propeller
Estimated Diameter propeller 1,500 mm (Conventional Propeller)
Remove & refit propeller 2 pc 1,400.00 2,800.00 2,800.00
Clean and normal polish propeller in place by disc-sanding 2 pc 400.00 800.00 800.00
Balancing propeller pc 3,600.00 Unit Rate
Note : Price excluded repairs, renewals and staging
e. Rudder
Measure rudder stock & pintle wear down clearance 2 ls 300.00 600.00 600.00
Unship rudder to dock bottom for examination and refit 1 ls 3,000.00 3,000.00 3,000.00
Remove/refit rudder stock ls 1,500.00 -
Note : Price excluded air testing, repairs, renewals and staging
Page 4 of 6
UNIT RATE APPROVED AS
NO DESCRIPTIONS QTY UNIT TOTAL SGD INSPECTION REMARKS
SGD
Note :
a. Removal of rope guard for taking clearance
b. Staging for access to work 2 stage 250.00 500.00 500.00
c. Magnaflux test tailshaft taper onboard test 300.00 Unit Rate
d. Dye penetration test test 150.00 Unit Rate
e. Alignment checks, repairs, renewals and access works are not included
Note
Exclude refill & Hydro test
b. Hull Costruction
Hull Construction
Midship Section
Shell Expansion Plan
Construction Profile and Deck Plan
Fore and Aft Construction
Engine room layout
Deckhouse construction
Wheelhouse construction
Docking Plan
Tank Capacity Plan 15,000.00 15,000.00
Sounding Scale Tank
Tank calibration
c. Machinery
Engine Room Arrangement
Sea Chest
Engine Room ventilation
Main engine & Auxilary engine pondation
Pipe Routing Plans are Delivered in Schematics
Schematic Fuel Oil
Schematic Bilge
Schematic Fresh Water & Sea Water;
d. Electrical
Electric Load Balance Calculation
Switchboard, Electric Wiring, and Distribution
C.11 Deck
C. Ventilation Room
Rewinding motor 2 unit 800.00 1,600.00 1,600.00
Page 5 of 6
UNIT RATE APPROVED AS
NO DESCRIPTIONS QTY UNIT TOTAL SGD INSPECTION REMARKS
SGD
Total 126,606.00