Bismillahhirrahmanirrahim

30-08-2021
To,
Managing Director
Aristocat Tower
Chandrima Model Town
Dhaka, Bangladesh.

Subject: Proposal for Installation and Commissioning of Electrical House Wiring System
of your Building.

Dear Sir,
In appreciation of your valued inquiry, we are pleased to submit our Proposal for Installation
& Commissioning of Electrical House wiring of your excellent building.

Financial Proposal along with Terms and Condition are attached with this offer. Kindly feel
free to communicate with us for any clarification or queries.

Sincerely yours

Mohammad Mijanur Rahman


(Managing Director)
SHOTOTA ENGINEERING
Financial Proposal for Supply, Installation & Commissioning of 5.25 KWp On- Grid Solar power System

SL Total Price
Item Description of the Item
Qty Per Squire Feet
(BDT)
1. Roof Laying Pipes on the Roof 16 Roofs

2. Group Cutting Group Cutting on Wall As


1 Under ground required
2 Basement
65 Flats
3. Board Electrical Board Fittings
Fitting 1 Under ground As
2 Basement required
65 Flats
4. Pipe Fitting Electrical Pipe Fittings As
1 Under ground required
2 Basement
65 Flats
5. Cable Wiring Electrical Cable Wiring As
1 Under ground
2 Basement
required 19/-
65 Flats
6. SDB Fitting Electrical Sub Distribution Box Installation As
1 Under ground required
2 Basement
65 Flats
7. Circuit Breaker Electrical Circuit Breaker Installation As
Wiring 1 Under ground required
2 Basement
65 Flats
8. Switch & Socket Electrical Switch Socket Installation As
Installation 1 Under ground required
2 Basement
65 Flats
9. Vertical Pipe Electrical Vertical Pipe & wiring Installation As
and Wiring 1 Under ground required
2 Basement
65 Flats
10. Meter Box Electrical Meter Box wiring. As
Wiring 1 Under ground required
2 Basement
65 Flats

In word: BDT

Sincerely yours,

Mohammad Mijanur Rahman


(Managing Director)
SHOTOTA ENGINEERING CO.
Terms and Conditions
Offer validity:
This proposal is valid for Four years (4 Years) Calendar days.

Payment Terms:
Request to pay 20% while laying pipe on the roof of each Floor, 30% after Group Cutting, Pipe Fitting
and MK box fitting on each Flat, 35% during Cable wiring, Switch Fittings, 10% During GI wire Laying,
and remaining 5% after Project Hand over.

Other Installation works (According to the Customer Requests) Will be priced according to the current
market price.

Delivery & Installation:

Installation, Testing & Commissioning time depends on payment and handover Schedule (4 Years).

Sincerely yours,

Mohammad Mijanur Rahman


(Managing Director)
SHOTOTA ENGINEERING CO.