45 Days Long Virtual Internship on Oil & Gas Industrial Practices


Agenda: Blowout Preventers

DAY
10

Blowout

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

2
Petroleum Engineers Association©

1
07-07-2021

Blowout

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

3
Petroleum Engineers Association©

Blowout Preventer

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

4
Petroleum Engineers Association©

2
07-07-2021

Baghjan – 5 Blowout, Assam

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

5
Petroleum Engineers Association©

Baghjan – 5 Blowout, Assam

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

6
Petroleum Engineers Association©

3
07-07-2021

BOP Stack

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

7
Petroleum Engineers Association©

Ram BOP

 Ram Preventers are designed to seal the annulus by forcing two front packing elements
which make contact with each other and seal around the object in the well bore.

1. Pipe Ram : It seals around the well bore and the fixed size of pipe.

45 Days Long 2. Blind Ram : It seals around the well if no pipe in the well bore.
Virtual
Internship on 3. Variable Bore Ram : It seals around several pipe sizes depending on the range of
Oil & Gas
Industrial variable bore ram.
Practices
4. Shear Ram : It shears the pipe in the well and seal the wellbore simultaneously.

8
Petroleum Engineers Association©

4
07-07-2021

Ram BOP

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

9
Petroleum Engineers Association©

Ram BOP

Top seal energized by well bore


pressure at sealing surface of the
ram body Front packer sealing against pipe

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

Closing
Opening
chamber
chamber
Well Pressure
10
Petroleum Engineers Association©

5
07-07-2021

Closing of Ram BOP

TOP SEAL
STEEL PLATE

45 Days Long STEEL PLATE PUSHED BY


OTHER SIDE PACKER
Virtual STEEL PLATES
Internship on
Oil & Gas
Industrial
RAM BLOCK PACKER RUBBER
Practices

Well Pressure

11
Petroleum Engineers Association©

Block Assembly

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

12
Petroleum Engineers Association©

6
07-07-2021

Block Assembly

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

13
Petroleum Engineers Association©

Ram BOP Specifications

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

14
Petroleum Engineers Association©

7
07-07-2021

Annular BOP

 A large circular valve used to control wellbore fluid.

 Rounded Elastomer with reinforced steel segments

 Deforms the rubber radially inwards and seals

45 Days Long  Can close around different shapes such as square and hexagonal kelly, drill
Virtual
Internship on collars, tool joint etc including wire line.
Oil & Gas
Industrial  Can not close on stabiliser, bit and under reamer.
Practices
 Can close on open hole.

15
Petroleum Engineers Association©

Closing Sequence of Annular BOP

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

16
Petroleum Engineers Association©

8
07-07-2021

Annular BOP Specifications

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

17
Petroleum Engineers Association©

Accumulator or Koomey Unit

 An accumulator or Koomey unit is a unit used to hydraulically operate Rams BOP, Annular BOP, HCR
and some hydraulic equipment.

 There are several of high pressure cylinders that store gas (in bladders) and hydraulic fluid or water
under pressure for hydraulic activated systems. The primary purpose of this unit is to supply hydraulic
45 Days Long power to the BOP stack in order to close/open BOP stack for both normal operational and emergency
Virtual
Internship on situation.
Oil & Gas
Industrial  Stored hydraulic in the system can provide hydraulic power to close BOP’s in well control operation,
Practices therefore, kick volume will be minimized. The accumulator should have sufficient volume to close/open
all preventers and accumulator pressure must be maintained all time.

 According to API RP53, your reservoir tank should have a total volume at least 2 times of usable volume
to close all BOP equipment.

18
Petroleum Engineers Association©

9
07-07-2021

Accumulator or Koomey Unit

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
 A: Pressure regulator is used to maintain pressure at annular side at 500-1500 psi

 B: Pressure regulator is used to maintain the manifold pressure at 1,500 psi

 Blue line for opening equipment as VBR’s, Blind/Shear Rams,Annular, HCR.

19
 Red line for closing equipment as VBR’s, Blind/Shear Rams,Annular, HCR.
Petroleum Engineers Association©

Accumulator or Koomey Unit

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

20
Petroleum Engineers Association©

10
07-07-2021

BOP Stack

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

21
Petroleum Engineers Association©

BOP Stack

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

22
Petroleum Engineers Association©

11
07-07-2021

Offshore BOP

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

23
Petroleum Engineers Association©

Offshore BOP

45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices

24
Petroleum Engineers Association©

12

You might also like