Professional Documents
Culture Documents
DAY
10
Blowout
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
2
Petroleum Engineers Association©
1
07-07-2021
Blowout
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
3
Petroleum Engineers Association©
Blowout Preventer
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
4
Petroleum Engineers Association©
2
07-07-2021
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
5
Petroleum Engineers Association©
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
6
Petroleum Engineers Association©
3
07-07-2021
BOP Stack
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
7
Petroleum Engineers Association©
Ram BOP
Ram Preventers are designed to seal the annulus by forcing two front packing elements
which make contact with each other and seal around the object in the well bore.
1. Pipe Ram : It seals around the well bore and the fixed size of pipe.
45 Days Long 2. Blind Ram : It seals around the well if no pipe in the well bore.
Virtual
Internship on 3. Variable Bore Ram : It seals around several pipe sizes depending on the range of
Oil & Gas
Industrial variable bore ram.
Practices
4. Shear Ram : It shears the pipe in the well and seal the wellbore simultaneously.
8
Petroleum Engineers Association©
4
07-07-2021
Ram BOP
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
9
Petroleum Engineers Association©
Ram BOP
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
Closing
Opening
chamber
chamber
Well Pressure
10
Petroleum Engineers Association©
5
07-07-2021
TOP SEAL
STEEL PLATE
Well Pressure
11
Petroleum Engineers Association©
Block Assembly
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
12
Petroleum Engineers Association©
6
07-07-2021
Block Assembly
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
13
Petroleum Engineers Association©
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
14
Petroleum Engineers Association©
7
07-07-2021
Annular BOP
45 Days Long Can close around different shapes such as square and hexagonal kelly, drill
Virtual
Internship on collars, tool joint etc including wire line.
Oil & Gas
Industrial Can not close on stabiliser, bit and under reamer.
Practices
Can close on open hole.
15
Petroleum Engineers Association©
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
16
Petroleum Engineers Association©
8
07-07-2021
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
17
Petroleum Engineers Association©
An accumulator or Koomey unit is a unit used to hydraulically operate Rams BOP, Annular BOP, HCR
and some hydraulic equipment.
There are several of high pressure cylinders that store gas (in bladders) and hydraulic fluid or water
under pressure for hydraulic activated systems. The primary purpose of this unit is to supply hydraulic
45 Days Long power to the BOP stack in order to close/open BOP stack for both normal operational and emergency
Virtual
Internship on situation.
Oil & Gas
Industrial Stored hydraulic in the system can provide hydraulic power to close BOP’s in well control operation,
Practices therefore, kick volume will be minimized. The accumulator should have sufficient volume to close/open
all preventers and accumulator pressure must be maintained all time.
According to API RP53, your reservoir tank should have a total volume at least 2 times of usable volume
to close all BOP equipment.
18
Petroleum Engineers Association©
9
07-07-2021
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
A: Pressure regulator is used to maintain pressure at annular side at 500-1500 psi
19
Red line for closing equipment as VBR’s, Blind/Shear Rams,Annular, HCR.
Petroleum Engineers Association©
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
20
Petroleum Engineers Association©
10
07-07-2021
BOP Stack
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
21
Petroleum Engineers Association©
BOP Stack
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
22
Petroleum Engineers Association©
11
07-07-2021
Offshore BOP
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
23
Petroleum Engineers Association©
Offshore BOP
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
24
Petroleum Engineers Association©
12