You are on page 1of 45

FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 719006_2T04_RED MUD PRESSURE FILTRATION

PROJECT/JOB NAME 1.000.000 TPA (EXPANDABLE) SMELTER GRADE

CLIENT NAME PT. BORNEO ALUMINA INDONESIA


SITE NAME MEMPAWAH-KALIMANTAN BARAT
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Transfer Station and Conveyor Belt-B
LOAD COMBINATION GROUP

REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
1 F5 2 F6
3 F7 4 F8
F1
5 F9 6 F10
7 F11 8 F12
9 F13 10 F14
11 F15 12 F16
13 F17 14 F18
F2
15 F19 16 F20
17 F21 18 F22
19 F23 20 F24

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 2

CONTENTS

1. GENERAL
1.1 MATERIALS & UNIT WEIGHT

2. CHECK OF STABILITY
2.1 CHECK OF PILE REACTION

3. DESIGN OF FOOTING
3.1 REQUIRED REINFORCEMENT
3.2 ONE WAY SHEAR FORCE
3.3 TWO WAY SHEAR FORCE
3.4 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 3

1. GENERAL

1.1 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 24.000 N/mm
2
Lean Concrete (Lf'c : compressive strength) 14.000 N/mm
2
Reinforcement (D10 ~ D16 , yield strength) 280.000 N/mm
2
Reinforcement (D19 ~ , yield strength) 420.000 N/mm
3
Rs (Soil unit weight) 18.110 kN/m
3
Rc (Concrete unit weight) 23.536 kN/m
2
Es (Steel Modulus of Elasticity) 196.130 kN/mm
2
Ec (Concrete Modulus of Elasticity) 24.615 kN/mm

- Pile Capacity
Items Value
Pile Name BH.B-03_ Dia 400 Spun pile depth 8
Footing List F13, F14, F15, F16, F17, F18, F19, F20, F21, F22, F23, F24
Diameter 400 mm
Length 8m
Thick 75 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 20 , 54 , 907.5 kN

Items Value
Pile Name BH.B-03_ Dia 400 Spun pile
Footing List F5, F6, F7, F8, F9, F10, F11, F12
Diameter 400 mm
Length 12 m
Thick 75 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 20 , 54 , 1210 kN

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 4

2. CHECK OF STABILITY
2.1 CHECK OF PILE REACTION (Bi-Axial)
2.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz SMy X SMx Y
a. Vertical - Bi Axial : R =
Np S Xi2 S Yi2
- Ru = Rmax
- Uf = Min[ 0 , Rmin ]
- Ru < Va -> OK
(SHxi + SHyi )
2 2

b. Horizontal - Hmax = < Ha -> OK


Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift

2.1.2 Check of Vertical & Uplift Reaction


Group 1 - F1
S Xi (m ) S Yi (m )
2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)
F5 1 1000 1000 0 0
F6 1 1000 1000 0 0
F7 1 1000 1000 0 0
F8 1 1000 1000 0 0
F9 1 1000 1000 0 0
F10 1 1000 1000 0 0
F11 1 1000 1000 0 0
F12 1 1000 1000 0 0

Unit( kN )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
F5 1344 BH.B-03_ 97.718 97.718 97.718 0 1210 54 OK
F6 1524 BH.B-03_ 105.055 105.055 105.055 0 1210 54 OK
F7 1308 BH.B-03_ 106.108 106.108 106.108 0 1210 54 OK
F8 1344 BH.B-03_ 97.704 97.704 97.704 0 1210 54 OK
F9 1348 BH.B-03_ 164.05 164.05 164.05 0 1210 54 OK
F10 1524 BH.B-03_ 171.974 171.974 171.974 0 1210 54 OK
F11 1524 BH.B-03_ 181.522 181.522 181.522 0 1210 54 OK
F12 1347 BH.B-03_ 166.112 166.112 166.112 0 1210 54 OK

Group 2 - F2
S Xi (m ) S Yi (m )
2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)
F13 2 1000 2000 0 0.72
F14 2 1000 2000 0 0.72
F15 2 1000 2000 0 0.72
F16 2 1000 2000 0 0.72
F17 2 1000 2000 0 0.72
F18 2 1000 2000 0 0.72
F19 2 1000 2000 0 0.72
F20 2 1000 2000 0 0.72

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 5

F21 2 1000 2000 0 0.72


F22 2 1000 2000 0 0.72
F23 2 1000 2000 0 0.72
F24 2 1000 2000 0 0.72

Unit( kN )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
F13 1308 BH.B-03_ 141.154 139.963 141.154 0 907.5 54 OK
F14 1224 BH.B-03_ 264.53 110.004 264.53 0 907.5 54 OK
F15 1223 BH.B-03_ 283.742 101.026 283.742 0 907.5 54 OK
F16 1308 BH.B-03_ 147.56 146.518 147.56 0 907.5 54 OK
F17 1308 BH.B-03_ 154.474 153.61 154.474 0 907.5 54 OK
F18 1308 BH.B-03_ 370.552 212.638 370.552 0 907.5 54 OK
F19 1323 BH.B-03_ 342.01 185.766 342.01 0 907.5 54 OK
F20 1308 BH.B-03_ 163.943 163.007 163.943 0 907.5 54 OK
F21 1308 BH.B-03_ 102.622 101.95 102.622 0 907.5 54 OK
F22 1308 BH.B-03_ 208.057 124.081 208.057 0 907.5 54 OK
F23 1101 BH.B-03_ 186.652 82.34 186.652 0 907.5 54 OK
F24 1308 BH.B-03_ 75.449 74.841 75.449 0 907.5 54 OK

2.1.3 Check Of Horizontal Reaction


Group 1 - F1
Ft.Name L.Comb. Pile Hmax (kN) Ha (kN) Result
BH.B-03_
F5 1323 Dia 400 10.623 20 OK

BH.B-03_
F6 1524 Dia 400 7.167 20 OK

BH.B-03_
F7 1308 Dia 400 7.202 20 OK

BH.B-03_
F8 1323 Dia 400 9.584 20 OK

BH.B-03_
F9 1327 Dia 400 12.156 20 OK

BH.B-03_
F10 1323 Dia 400 16.124 20 OK

BH.B-03_
F11 1331 Dia 400 7.802 20 OK

BH.B-03_
F12 1323 Dia 400 13.777 20 OK

Group 2 - F2
Ft.Name L.Comb. Pile Hmax (kN) Ha (kN) Result
BH.B-03_
F13 1220 Dia 400 3.257 20 OK

BH.B-03_
F14 1224 Dia 400 29.398 20 NG

BH.B-03_
F15 1223 Dia 400 34.702 20 NG

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 6

BH.B-03_
F16 1216 Dia 400 2.075 20 OK

BH.B-03_
F17 1220 Dia 400 3.029 20 OK

BH.B-03_
F18 1224 Dia 400 38.349 20 NG

BH.B-03_
F19 1323 Dia 400 31.254 20 NG

BH.B-03_
F20 1328 Dia 400 2.284 20 OK

BH.B-03_
F21 1220 Dia 400 2.619 20 OK

BH.B-03_
F22 1224 Dia 400 19.541 20 OK

BH.B-03_
F23 1101 Dia 400 21.199 20 NG

BH.B-03_
F24 1101 Dia 400 2.128 20 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 7

3. DESIGN OF FOOTING

3.1 REQUIRED REINFORCEMENT


3.1.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 = bd
fy
3 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy
1- 1- (
0.85fck )
3.1.2 Check of Footing Reinforcement
Group 1 - F1
Footing Name : F5 GroupType : Isolated
- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.273 0.002 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2
As4(mm )
2
As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 1.624 2.165 1001.300 886.139 6398.470

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 8

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.273 0.002 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 1.664 2.218 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F6 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.321 0.003 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 1.910 2.546 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.321 0.003 0.0000

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 9

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 1.956 2.608 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F7 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.322 0.003 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 1.916 2.554 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.322 0.003 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 1.963 2.616 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F8 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 10

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.272 0.002 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 1.618 2.157 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.272 0.002 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 1.658 2.210 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F9 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.556 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 3.308 4.409 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 11

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.556 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 3.389 4.517 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F10 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

216 top 1.52 - D16 @ 200 0.650 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


216 top 0.039 0.000 0.0000
S1
524 bottom 0.612 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

216 top 243.840 0.209 0.278 1113.882 985.772 7117.884


S1
524 bottom 243.840 3.641 4.854 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
216 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

216 top 1.52 - D16 @ 200 0.650 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


216 top 0.039 0.000 0.0000
S1
524 bottom 0.612 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

216 top 243.840 0.213 0.284 1090.015 964.650 6965.368


S1
524 bottom 243.840 3.730 4.972 977.433 865.016 6245.954

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 12

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
216 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F11 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

216 top 1.52 - D16 @ 200 0.660 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


216 top 0.001 0.000 0.0000
S1
524 bottom 0.648 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

216 top 243.840 0.005 0.007 1113.882 985.772 7117.884


S1
524 bottom 243.840 3.855 5.139 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
216 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

216 top 1.52 - D16 @ 200 0.660 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


216 top 0.001 0.000 0.0000
S1
524 bottom 0.648 0.006 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

216 top 243.840 0.005 0.007 1090.015 964.650 6965.368


S1
524 bottom 243.840 3.950 5.265 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
216 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Footing Name : F12 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 742.050 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 667.050 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.565 0.005 0.0000

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 13

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1113.882 985.772 7117.884


S1
524 bottom 243.840 3.362 4.481 1001.300 886.139 6398.470

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 1.52 - D16 @ 200 0.500 0.305 726.150 301.806


S1
524 botom 1.52 - D16 @ 200 0.650 0.305 651.150 301.806

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
524 bottom 0.565 0.005 0.0000

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 243.840 - - 1090.015 964.650 6965.368


S1
524 bottom 243.840 3.444 4.590 977.433 865.016 6245.954

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 301.806 243.840 OK
S1
524 bottom 301.806 243.840 OK

Group 2 - F2
Footing Name : F13 GroupType : Isolated
- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 14

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 43.333 0.378 0.0009

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 179.036 238.656 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 238.656 OK

Footing Name : F14 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

603 top 2.03 - D19 @ 150 0.700 0.305 721.350 581.638


S1
238 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


603 top 28.855 0.202 0.0005
S1
238 bottom 79.235 0.691 0.0017

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

603 top 216.157 106.353 141.769 721.873 638.849 3972.453


S1
238 bottom 216.157 329.998 439.887 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
603 top 581.638 216.157 OK
S1
238 bottom 581.638 439.887 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 15

Footing Name : F15 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

604 top 2.03 - D19 @ 150 1.300 0.305 721.350 581.638


S1
237 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


604 top 26.842 0.188 0.0004
S1
237 bottom 85.400 0.745 0.0018

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

604 top 216.157 98.899 131.833 721.873 638.849 3972.453


S1
237 bottom 216.157 356.170 474.774 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
604 top 581.638 216.157 OK
S1
237 bottom 581.638 474.774 OK

Footing Name : F16 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 16

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 46.361 0.405 0.0010

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 191.675 255.502 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 255.502 OK

Footing Name : F17 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 51.755 0.452 0.0011

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 17

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 214.231 285.569 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 285.569 OK

Footing Name : F18 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

603 top 2.03 - D19 @ 150 0.700 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


603 top 11.999 0.084 0.0002
S1
104 bottom 119.105 1.039 0.0025

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

603 top 216.157 44.097 58.781 721.873 638.849 3972.453


S1
104 bottom 216.157 500.589 667.285 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
603 top 581.638 216.157 OK
S1
104 bottom 581.638 646.819 NG

Footing Name : F19 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 18

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

604 top 2.03 - D19 @ 150 1.300 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


604 top 18.756 0.131 0.0003
S1
104 bottom 124.640 1.088 0.0027

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

604 top 216.157 69.009 91.990 721.873 638.849 3972.453


S1
104 bottom 216.157 524.526 699.193 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
604 top 581.638 216.157 OK
S1
104 bottom 581.638 646.819 NG

Footing Name : F20 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 19

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 56.164 0.490 0.0012

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 232.708 310.200 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 310.200 OK

Footing Name : F21 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 29.554 0.258 0.0006

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 121.739 162.277 646.819 572.427 3559.431

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 20

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 216.157 OK

Footing Name : F22 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

603 top 2.03 - D19 @ 150 0.700 0.305 721.350 581.638


S1
314 botom 2.03 - D19 @ 150 0.700 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


603 top 9.585 0.067 0.0002
S1
314 bottom 60.686 0.530 0.0013

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

603 top 216.157 35.210 46.935 721.873 638.849 3972.453


S1
314 bottom 216.157 251.697 335.512 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
603 top 581.638 216.157 OK
S1
314 bottom 581.638 335.512 OK

Footing Name : F23 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 21

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

604 top 2.03 - D19 @ 150 1.300 0.305 721.350 581.638


S1
313 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


604 top 13.372 0.094 0.0002
S1
313 bottom 55.242 0.482 0.0012

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

604 top 216.157 49.154 65.522 721.873 638.849 3972.453


S1
313 bottom 216.157 228.841 305.045 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
604 top 581.638 216.157 OK
S1
313 bottom 581.638 305.045 OK

Footing Name : F24 GroupType : Isolated


- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 0.500 0.305 740.450 581.638


S1
708 botom 2.03 - D19 @ 150 0.500 0.305 665.450 581.638

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
708 bottom - - -

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 740.987 655.764 4077.637


S1
708 bottom 216.157 - - 665.932 589.342 3664.614

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
708 bottom 581.638 216.157 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

708 top 2.03 - D19 @ 150 1.000 0.305 721.350 581.638


S1
104 botom 2.03 - D19 @ 150 1.300 0.305 646.350 581.638

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 22

Sec.Nam L.Comb. Mu (kN-m) Rn r.Req


708 top - - -
S1
104 bottom 18.958 0.165 0.0004

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
As3(mm )
2 2
As4(mm ) As5(mm )
2
Asmax(mm )
2

708 top 216.157 - - 721.873 638.849 3972.453


S1
104 bottom 216.157 77.912 103.857 646.819 572.427 3559.431

Sec.Nam L.Comb. Using As(mm )


2
Select As(mm )
2
Result
708 top 581.638 216.157 OK
S1
104 bottom 581.638 216.157 OK

3.2 ONE WAY SHEAR FORCE


3.2.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.85 2 fck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!

3.2.2 Check of One-Way Shear


Group 1 - F1

Footing Name : F5 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 23

Footing Name : F6 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Footing Name : F7 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 24

Footing Name : F8 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Footing Name : F9 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 25

Footing Name : F10 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Footing Name : F11 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 26

Footing Name : F12 GroupType : Isolated PileType : True

Unit : mm
1000
1000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 667 304.8 140.601 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 651.1 304.8 137.249 0 OK

Group 2 - F2

Footing Name : F13 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 27

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 700 646.4 304.8 136.238 44.027 OK

Footing Name : F14 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 238 700 646.4 304.8 136.238 80.503 OK

Footing Name : F15 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 28

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 237 1400 646.4 304.8 136.238 86.766 OK

Footing Name : F16 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 1400 646.4 304.8 136.238 47.103 OK

Footing Name : F17 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 29

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 700 646.4 304.8 136.238 52.583 OK

Footing Name : F18 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 700 646.4 304.8 136.238 121.01 OK

Footing Name : F19 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 30

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 1400 646.4 304.8 136.238 126.634 OK

Footing Name : F20 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 1400 646.4 304.8 136.238 57.062 OK

Footing Name : F21 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 31

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 700 646.4 304.8 136.238 30.027 OK

Footing Name : F22 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 314 700 646.4 304.8 136.238 61.657 OK

Footing Name : F23 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 32

- Y direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 313 1400 646.4 304.8 136.238 56.126 OK

Footing Name : F24 GroupType : Isolated PileType : True

Unit : mm
1000
2000

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 101 0 665.5 304.8 140.263 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 103 1400 646.4 304.8 136.238 19.261 OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 33

3.3 TWO WAY SHEAR FORCE


3.3.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/b c) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

3.3.2 Check of Two-WayShear

2
Ft.Name F5 Punching Area 935185.600 mm

1000 Pr.Name 5 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


5
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

2
Ft.Name F6 Punching Area 935185.600 mm

1000 Pr.Name 6 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


6
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 34

2
Ft.Name F7 Punching Area 935185.600 mm

1000 Pr.Name 7 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


7
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

2
Ft.Name F8 Punching Area 935185.600 mm

1000 Pr.Name 8 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


8
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

2
Ft.Name F9 Punching Area 935185.600 mm

1000 Pr.Name 9 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


9
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

2
Ft.Name F10 Punching Area 935185.600 mm

1000 Pr.Name 10 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


10
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 35

2
Ft.Name F11 Punching Area 935185.600 mm

1000 Pr.Name 11 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


11
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

2
Ft.Name F12 Punching Area 935185.600 mm

1000 Pr.Name 12 Pile effect 0/1

Shape Rectangle f Vc1 5353.066 kN

L.Comb. 708 f Vc2 7938.402 kN


1000

Pl 300 mm f Vc3 3568.711 kN


12
Pw 300 mm f Vc 3568.711 kN

bo / d 3868.2 / 667.05 mm Vu 0.000 kN

b c / as 1 / 40 Result OK

1.265 106 mm
2
Ft.Name F13 Punching Area

1000 Pr.Name 13 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


13
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 113.585 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F14 Punching Area

1000 Pr.Name 14 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 238 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


14
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 143.236 kN

b c / as 1 / 20 Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 36

1.265 106 mm
2
Ft.Name F15 Punching Area

1000 Pr.Name 15 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 237 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


15
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 148.009 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F16 Punching Area

1000 Pr.Name 16 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


16
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 121.513 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F17 Punching Area

1000 Pr.Name 17 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


17
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 135.645 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F18 Punching Area

1000 Pr.Name 18 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


18
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 258.787 kN

b c / as 1 / 20 Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 37

1.265 106 mm
2
Ft.Name F19 Punching Area

1000 Pr.Name 19 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


19
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 278.482 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F20 Punching Area

1000 Pr.Name 20 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


20
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 147.254 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F21 Punching Area

1000 Pr.Name 21 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


21
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 77.476 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F22 Punching Area

1000 Pr.Name 22 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


22
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 124.548 kN

b c / as 1 / 20 Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 38

1.265 106 mm
2
Ft.Name F23 Punching Area

1000 Pr.Name 23 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


23
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 107.526 kN

b c / as 1 / 20 Result OK

1.265 106 mm
2
Ft.Name F24 Punching Area

1000 Pr.Name 24 Pile effect 0.787 / 2

Shape Rectangle f Vc1 2761.091 kN

L.Comb. 104 f Vc2 3982.644 kN


2000

Pl 600 mm f Vc3 1840.728 kN


24
Pw 600 mm f Vc 1840.728 kN

bo / d 2000 / 665.45 mm Vu 49.690 kN

b c / as 1 / 20 Result OK

3.4 PILE PUNCHING SHEAR FORCE


3.4.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.85 2 (1 + 2/bc) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.85 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.85 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 39

3.4.2 Check of Pile Punching Shear


2
Ft.Name F5 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 123.782 kN

d 667.05mm Result OK

2
Ft.Name F6 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 139.237 kN

d 667.05mm Result OK

2
Ft.Name F7 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 103 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 139.329 kN

d 667.05mm Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 40

2
Ft.Name F8 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 123.624 kN

d 667.05mm Result OK

2
Ft.Name F9 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 214.400 kN

d 667.05mm Result OK

2
Ft.Name F10 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 232.414 kN

d 667.05mm Result OK

2
Ft.Name F11 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 243.801 kN

d 667.05mm Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 41

2
Ft.Name F12 Punching Area 857726.100 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2586.089 kN

L.Comb. 105 f Vc2 3939.053 kN


1000

BH.B-03_ Dia 400


PileName f Vc3 1724.059 kN
Spun pile
1
Diameter 400mm f Vc 1724.059 kN

bo 1868.74mm Vu 217.341 kN

d 667.05mm Result OK

2
Ft.Name F13 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 179.419 kN

d 665.45mm Result OK

2
Ft.Name F14 Punching Area 808374.000 mm

1000 Pile No. 2 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 238 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 299.185 kN

d 665.45mm Result OK

2
Ft.Name F15 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 237 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 319.734 kN

d 665.45mm Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 42

2
Ft.Name F16 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 189.606 kN

d 665.45mm Result OK

2
Ft.Name F17 Punching Area 808374.000 mm

1000 Pile No. 2 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 207.587 kN

d 665.45mm Result OK

2
Ft.Name F18 Punching Area 808374.000 mm

1000 Pile No. 2 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 432.084 kN

d 665.45mm Result OK

2
Ft.Name F19 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 450.535 kN

d 665.45mm Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 43

2
Ft.Name F20 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 222.281 kN

d 665.45mm Result OK

2
Ft.Name F21 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 133.540 kN

d 665.45mm Result OK

2
Ft.Name F22 Punching Area 808374.000 mm

1000 Pile No. 2 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 314 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 239.724 kN

d 665.45mm Result OK

2
Ft.Name F23 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 313 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 221.575 kN

d 665.45mm Result OK

Copyright (c) GS E&C. All Rights Reserved


6/1/2021

Project Na. : 1.000.000 TPA


(EXPANDAB.. Calculation Sheet
of Project No. : 719006_2T04_RED MUD P..

Foundation Client : PT. BORNEO A... Page 44

2
Ft.Name F24 Punching Area 808373.800 mm

1000 Pile No. 1 b c / as 1 / 20

Shape Circle f Vc1 2557.099 kN

1 L.Comb. 103 f Vc2 3914.647 kN


2000

BH.B-03_ Dia 400


PileName f Vc3 1704.733 kN
Spun pile depth 8
Diameter 400mm f Vc 1704.733 kN
2
bo 1852.24mm Vu 98.262 kN

d 665.45mm Result OK

Copyright (c) GS E&C. All Rights Reserved