Dengan Hormat,
Berikut kami sampaikan Cabin Work In Process
Morning Shift 28 December 2018
Terimakasih
====================================================================================
=============================
*NOTE: NOTIF D8 COMPLETE*
=============================
==================================================================================
Dengan hormat,
Berikut Highlight Cabin Maintenance 28 December 2018 :
*HANGAR:*
1. PK-GIK // A-CHECK : PK-GIK INVENTORY ALL LIFEVEST A-CHECK
2. PK-GIE // CIE031206E1-AT BD CHECK TTDL SEAT 7D NOT ILLUMINATE
3. PK-GIH // CRIMI WATER FIREXT 2 EA, HALON FIREXT 1 EA
4. PK-GMX // RST, RESTORE LIFE RAFTS PN: 64356-101:70167 SN: M8194
5. PK-GFR // CRIMI HALON FIREXT 1 EA
6. PK-GNF // A-CHECK
7. PK-GQF // A-CHECK
*APRON:*
1. PK-GPC // PK-GPC CIDS INVENTORY CHECK
2. PK-GPT // CPT151215E1-OVEN TEMPTRATURE BUTTON BROKEN (OVEN AVAIL CGK3 1000)
3. PK-GPT // CPT021254E1-ROW21 STARBOARD SIDE EXIT SIGN BROKEN
4. PK-GID // CRIMI HALON FIREXT 1 EA
5. PK-GPA // PK-GPA CIDS INVENTORY CHECK
6. PK-GNG // RST, RESTORE LIFE RAFTS PN: 64356-101:70167 SN: M8639
7. PK-GMC // CMC271264E1-OVEN AFT NO4 US
*MONTHLY:*
PK-GNF
PK-GMR
PK-GFA
*STERILIZATION*
PK-GIK
PK-GNF
PK-GQF
PK-GLO
*CARPET REPLACEMENT :*
-
*IFE MONTHLY SC :*
PK-GIJ
Terima kasih.
Terimakasih
-*PK-GHC*: A CHECK
STATUS: *PERFORMED*
JC STATUS: 100%
JC OPEN: 0
JC CLOSED: 62 + 2 MDR
JC TOTAL : 62
- *PK-GQC*: A CHECK
STATUS: *PROGRESS*
JC STATUS: 66,67%
JC OPEN: 4 + 1 MDR
JC CLOSED: 8
JC TOTAL: 12
TERIMAKASIH
PK-GQC *A-CHECK*
ETD : 07:45 / 17 Juli 2018
STATUS JC 0%
Total JC : 9
HI:
RESTORE FIRST AID KITS OPEN
MAINTENANCE EXTERIOR CLEANING (MANDATORY) OPEN
PAX SEATS STANDARD CHECK (GENERAL) OPEN
*PK-GIK* / PD CHECK
ETD 22:45
CABIN STD CHECK *PERFORMED*
*PK-GIC* / PD CHECK
ETD 23:50
CABIN STD CHECK *OPEN*
*PK-GMK* / A-CHECK
ETD: 13:30
HI: LAVATORY WASTE COMPARTMENT FLAPPER *OPEN*
STATUS JC : 0%
CABIN STD CHECK *OPEN*
*PK-GNE* / BD CHECK
ETD: 06:25
CABIN STD CHECK *OPEN*
*PK-GRR* / BD CHECK
ETD: MTC
CABIN STD CHECK *OPEN*
*Terimakasih*
Selamat Pagi
Berikut Workload Morning 12 Nov 2018
PK-GIF / A-CHECK
ETD : 23:50
Status JC : 51 %
Dear Pak
Mohon bantuan untuk pelaksanaanya
Terima kasih
Terima kasih
Dengan Hormat
Berikut workload Malam hari ini 04 DESEMBER 2018:
Highlight :
PK-GIK// PD-CHECK
HI: DVI, INSPECTION OF PORTABLE HALON FIRE EXTINGUISHERS P/N. 898052 SN: T199832
*PERFORMED*
ETD: 11:30
STATUS JC: 100%
CABIN STD CHECK: *PERFORMED*
PK-GPZ// BD-CHECK
HI: DIS,DISCARD GALLEY AIR EXTRACTION FILTER ELEMENT *PERFORMED*
ETD: 23:25
STATUS JC: 62.5%
CABIN STD CHECK: *PERFORMED*
PK-GDA// BD-CHECK
HI: B737-8 MAX AIRCRAFT EXTERIOR DRY WASHING *PERFORMED*
ETD: MTC
STATUS JC: 100%
CABIN STD CHECK: *PERFORMED*
PK-GMD// A-CHECK
HI: DVI, ATTENDANT SEAT STANDARD CHECK – FWD *PERFORMED*
ETD: MTC
STATUS JC: 100%
CABIN STD CHECK: *PERFORMED*
PK-GPL// BD-CHECK
HI: RST, CLEANING OF VACUUM WASTE LINES WITH CHEMICAL CLEANING AGENT AND CRUSHED ICE
*PERFORMED*
ETD: 10:10
STATUS JC: 100%
CABIN STD CHECK: *PERFORMED*
PK-GRO// BD-CHECK
ETD: 10:50
CABIN STD CHECK: *PERFORMED*
PK-GLV// 24HOURS-CHECK
ETD: 5:50
CABIN STD CHECK: *PERFORMED*
PK-GLS// 24HOURS-CHECK
HI: RST, STERILIZATION OF POTABLE WATER SYSTEM AND DISCARD OF WATER FILTER ELEMENTS, IF
INSTALLED *POSTPONED*
ETD: 9:55
CABIN STD CHECK: *PERFORMED*
PK-GIC// A-CHECK
HI: DVI, GALLEYS STANDARD CHECK *OPEN*
ETD: MTC
STATUS JC: 32.7%
CABIN STD CHECK: *OPEN*
Terima Kasih
Dh Mas @Nafi TNS
cc Bu @GM Etika TNP
Terimakasih
*A-CHECK PK-GPV*
TOTAL J/C : 52 EA
CLOSED : 11 EA
OPEN : 41 EA
MDR: NIL
*SALAM*
1. POS : __________________
2. POS : __________________
3. POS : __________________
4. POS : __________________
5. POS : __________________