You are on page 1of 6

Henry Ronald Tiyow, ST

Biring Ere, January, 12th 1981


BTP, Jl. Kebahagiaan Utara VIII
Blok A -548, Makassar, SUL – SEL
+62 852 444 21188
henryronaldtiyow@yahoo.com

Professional Profile
Strong leadership, technical analytical thinking, pro-active, conceptual thinking, good inter personal skill,
negotiation skill, adaptable in multi national environment, fast-learner, willing job in underpressure,
achievement result oriented.

Skills
 Planning, Budgeting and Asset coordination
 SISNet (Service Information System CATERPILLAR) ET and VIMS
 VHMS & LinkOne (Komatsu Product)
 AutoCAD 2000 advanced (2 dimensi – dimensi)
 Application SAP Modul
 Windows, MS office (Word, Excel, Power Point, Outlook, Visio, Project)

Summary of Qualification
10 years experience in mining, especially for Maintenance-repair & Inspection heavy equipment:
 Over 1.5 Years in Junior Mechanic Of Maintenance-repair PT Prima Karya Manunggal
(Fabrication Plateand Construction) in PT. Semen Tonasa, Pangkep Sulawesi Selatan
 Over 2.5 Years in Junior Supervisor & Quantity Surveyors PT. CIPTA BETON SINAR PERKASA
(BP Tangguh LNG PAPUA BARAT) in Project Location JGC Corporation at Tangguh LNG Project,
Papua Barat
 Over 2.5 Years in Mechanical Engineer PT. Herbindo Life Sanobar (General Technician) in
Location Sulawesi Selatan
 Over 1 Years in Jr. Planner Maintenance PT. Yudha Wahana Agung in Location Site Busang,
Kalimantan Timur
 Over 2 Year in Jr. Planner Maintenance PT Bukit Makmur Mandiri Utama (Coal Mining
Contractor) in Project Location PT Perkasa Inakakerta site Bengalon, Kalimantan Timur
 Over 2 Year in Jr. Planner Maintenance PT Bukit Makmur Mandiri Utama (Coal Mining
Contractor) in Project Location PT Kaltim Prima Coal – Dharma Henwa site Bengalon. Easth
Kalimantan
 Over 4.5 Year in Jr. Planner Maintenance PT Bukit Makmur Mandiri Utama (Coal Mining
Contractor) in Project Location PT Sungai Danau Jaya site Tanah Bumbu. South Kalimantan
Henry Ronald Tiyow, ST – Resume

Relevant Work Experience


20 Feb 2012 – PT. Bukit Makmur Mandiri Utama (Site SDJ, KPC-DHA, PIK)
present Position : Maintenance Planner and Reliability Engineer
 Make a planning and strategic Maintenance to get a good achievement KPI
(Availabilty, MTBF/MTBS, MTTR, Schedule Maint. Ratio, oil consumption)
Plant Department
 Make a Yearly/Monthly Planning, budgeting and be a cost controller
Repair and Maintenance Cost, Tyre Cost & Workshop Overhead Cost,
Lubricating Cost, External Repair Plant Department
 Ensure weekly/daily Monthly Report Cost Result support
 Monitoring KPI achievement daily, weekly, monthly and yearly
 Analyze main cause pareto problem breakdown unit to get corrective and
preventive action maintenance
 Ensure a schedule maintenance (PM, Commisioning and PCR) Heavy
Equipment and General Facilty support Yearly, Monthly
 Ensure weekly/daily schedule maintenance (PM, Commisioning and PCR)
Heavy Equipment and Facilty support
 Ensure a good Maintenance Management practice to be applied in Plant
Department based on SOP company
 Ensure fix DMBD (Daily Monitoring Break Down) being reported to Head
Office
 Make Man power Mapping and Planning to fulfill Organization Chart
 Meet frequently with Operation Mining Department to set up equipment
plan on mine area based on availability unit
 Direct and promote safety & environment awareness to control system
group in order to ensure compliances toward company goals and
standards (SOP)
 Make Maintenance Order/ Work Order for critical finding on component
major
 Monitoring and make sure all the vendors are following up critical finding
for all major components that still under warranty
 Monitoring Vehicle Health Monitoring System ( VHMS) for all unit, Dozer,
Excavator ( small & Big Digger) And for all Dump Truck (Komatsu, cat etc)
If found Indication of abnormal, create notification and Maintenance
 Order for action taken to be done during PS/Shutdown
 Monitoring Program Pemeriksaan Mesin ( PPM ) If Found indication of
abnormal, create Maintenance Order/ Work Order for action taken to be
done during PS/Shutdown
 Ensure Health Condition Equipment (SOS, P2U, PPM, Magnetic Plug, Filter
cut)
 Make daly/Weekly, Monthly Summary Report equipment Criticall SOS
Rating “C”,” X”, For Follow Up

01 Feb 2011 – PT. Yudha Wahana Agung (Site Busang)


15 Feb 2012 Position : Jr. Maintenance Planner (Scheduler&Workshop)
 Ensure Update SMR And Population Equipment
 Analyze main cause pareto problem breakdown unit to get corrective and
preventive action maintenance
 Review Work In Progress Equipment Breakdown With FM & SPV
 Managing planning of appliance treatment short-range ( Short Term
Planning) PM Service for all heavy equipment unit
 Provided Daily Shut Down Unit for PM with PM Time Frame
 Provided Weekly Shut Down base PM Frequency
 Organized Part PM and Backlog Using Microsoft Project
 Provided Major Component Replacement Schedule Shut down
 Created Work Order
 Check , Review and Approve order Proses From Inspector
01 Oct 2008 –
25 Jan 2011 PT. Herbindo Life Sanobar
Position : Mechanical Engineer
 Manage new projects and predetermining the period of its
accomplishment.
 Responsible for the technical research on the assigned projects before
moving ahead.
 Use upgraded machines like bulldozers, cranes etc to accomplish the
project on time.
 Recruit competent man force for the job like driver, crane operator etc.
 Provide required training for the new recruitments.
 Ensure that all materials used in the project are ISO certified.
 Design the map before starting the construction work on the sites.
 Apply safety measures to prevent the structure from any natural calamity.
 Preparing initial project layouts as per the guidelines of the project lead
 Arrange and installing equipment and loading construction materials on
the site.
 Prepare DCR and update the reports to the field lead engineer
09 Jan 2006 –
26 Jul 2008 PT. CIPTA BETON SINAR PERKASA (Project LNG Tangguh Papua Barat)
Position : Supervisor & Quantity Surveyors
 Coordinate the inspection of construction projects including water mains,
sanitary and storm sewers, street paving and resurfacing programs,
subdivision development, and related public works improvements.
 Coordinate preliminary and construction staking surveys of anticipated
company projects and construction activities.
 Inspect, supervise, and train subordinate engineering personnel.
 Provide direct liaison between property owners, contractors and the
company.
 Prepare progress reports of construction performed by various
contractors and upon completion of a given project, record final amounts
of materials used in construction.
 Calculate payments of quantities for payment purposes of public works
construction projects.
 Record and maintain records and plans of completed projects.
 Work with outside agencies on cooperative projects.
 Inform affected agencies of road closures.
 Serve as Radiation Protection Officer
 Prepare legal descriptions and monitor preparation of exhibits utilized in
acquisition process
Henry Ronald Tiyow, ST – Resume

 Handle public and survey system section breakdowns


 Estimate costs of project
 Maintain project works
 Identify, analyze and develop responses to commercial risks
 Keep awareness to the different building contracts in current use

01Aug 2003 –
30 Jan 2005 PT. PRIMA KARYA MANUNGGAL (PKM), Fabrication Plate and Construction
SEMEN TONASA PANGKEP
Position : Mechanic & Operator PC 200-7, Dozer 85ss
 Know the main components of the engine cylinder head, cylinder block,
crankshaft, diesel fuel tanks and filters, feed pump, injection pump and
nozzle, pt pump, injectors, oil pan, Stainer, oil pump, oil filter, oil cooler,
radiator, water pump, after cooler, water manifold, air filter, turbocharger,
exhaust manifold, battery, starting motor
 Carry out engine maintenance by identifying the engine, checking the
measurement setup, spare parts replacement lube oil
 Doing repaired machine Off Dump Truck Hauling, Excavator PC200, PC400
& Doser 85ss including Troubleshooting, Investigating,
Replacingcomponents, Remove/Install components & Assist/Supervise
while mechanic work.
 Operates dump trucks, excavators, loaders and dozers in the work area
with due regard to Safety

Education
2000 – 2004 : UKIP Makassar, Mechanical Engineering
1997–2000 : SMUN 01 Pangkajenne
1994–1997 : SMP Swasta Semen Tonasa
1988 –1994 : SD Swasta Semen Tonasa

Training and Course


 COURSE Design Garfish by Widyaloka Makassar-Indonesia
 Practical Field Work on BTG (Boiler Turbine Generator) Biringkassi PT.Semen Tonasa
 Pneumatik on Balai Latihan Kerja Industri BLKI Makassar
 Training Preventive maintenance at PT. Semen Tonasa, in Maintenance Dept.
 Operator (Dump Truck, Excavator, Loader, Doser) by PT. Prima Karya Manunggal
 HSE Training Section KJP c/o JGC Corporation Tangguh Project Tangguh Operation Centre, Skill
Induction, Vehicle Induction, Total safety Task Induction, Total safety Task Observation, PPE & Eye
Safety, Commissioning Induction
 SAP ECC Training To Trainee PM Module by PT. Bukit Makmur Mandiri Utama
 Training VIMS Cat and ET Cat By PT. Trakindo Utama
 Training Commander System (Analysis Oil Result) by PT. Trakindo Utama
 Training Applied Failure Analysis (AFA) by PT. Trakindo Utama
 Training VHMS and KOMTRAX Komatsu by PT United Tractors Tbk
 Safety first aid and fire warden, Safety work height altitude and hot work permit & Performing SOP/JSA
Safety & Hand Tools, Green Card, OTT, IUT, IBPR, INVESTIGASI by PT. Bukit Makmur Mandiri Utama
 Training Basic Mechanic Cource (BMC) by PT. Bukit Makmur Mandiri Utama
 Training BUMMS (BUMA Maintenance Management System) by PT. Bukit Makmur Mandiri Utama
 Training Pembekalan Pra-POP (Pengawas Operational Pratama) by PT. Bukit Makmur Mandiri Utama
 Public Speaking Class – Speak for Success by PT. Narapatih Inspiratam
 Phoenix Project SAP S/4 HANA Train To Trainee Module PM by PT. BUMA – ACCENTURE
 Workshop Safety Culturing and Felt Safety Leadership by PT.Bukit Makmur Mandiri Utama
Henry Ronald Tiyow, ST – Resume

You might also like