The Gullfaks field
600
500
400
300
200
100
0
Aug-96 Jan-98 May-99 Oct-00 Feb-02 Jun-03 Nov-04 Mar-06 Aug-07 Dec-08 May-10 Sep-11 Jan-13
• Desander
• Choke manifold
− manually operated
• Control cabin
• 3 x sand skips
• Emergency shutdown valve (ESD)
Desander functionality
• More efficient separation required
Need of two desanders
Option to flow through
desanders in either series or
parallel
• Constant flow without interruption
Emptying of desander without
shutting down flow
Possibility to bypass
desander
X-Flow Manifold
• Foot print
− (LxWxH: 2.0 x 2.0 x 1.2m)
• Controls the flow direction
• Enables reversible flow path
• Integrated remote choke
• Integrated flowmeter
LP test manifold
Tie-in points HP test manifolds
on test manifold south shaft
HP test manifold
LP test manifold
Tie-in points on test manifolds north shaft
600
500
400
300
200
100
0
Aug-96 Jan-98 May-99 Oct-00 Feb-02 Jun-03 Nov-04 Mar-06 Aug-07 Dec-08 May-10 Sep-11 Jan-13
Result: Optimized well performance