Professional Documents
Culture Documents
Plumbing Bid Set
Plumbing Bid Set
GW GREASE WASTE 10. NO DEMOLITION SHALL OCCUR WHICH LEAVES THE BUILDING INTERIOR
WITHOUT WEATHER PROTECTION. ALL DEMOLITION OF EXTERIOR OF I. INSULATION AND VAPOR BARRIER SHALL BE PROVIDED ON ALL PIPING
HW HOT WATER THERMOMETER EXTERIOR SURFACES SHALL BE FOLLOWED IMMEDIATELY BY PROTECTIVE AND/OR EQUIPMENT SUBJECT TO HEAT LOSS, CONDENSATION, OR
CONSTRUCTION. CONTRACTORS SHALL PROVIDE AND INSTALL CONSTITUTING A POTENTIAL BURN HAZARD.
P TEMPORARY PROTECTION IN ALL OPENINGS WHERE WINDOWS AND
HWC HOT WATER RECIRC. PRESSURE SWITCH EXTERIOR DOORS HAVE BEEN REMOVED.
J. INSULATION SHALL NOT BE CRUSHED OR COMPRESSED THROUGH
IG INTERRUPTABLE GAS F INTERFERENCE WITH SYSTEMS INSTALLED BY OTHER TRADES OR BUILDING
FLOW SWITCH 11. THE INTENT OF THE DEMOLITION ON THIS PROJECT IS THE COMPLETE CONSTRUCTION.
IW INDIRECT WASTE REMOVAL OF ALL INTERIOR AND EXTERIOR PLUMBING SYSTEMS, EXCEPT
WHERE NOTED. AFTER THE DEMOLITION OF AN AREA, THE ONLY EXISTING K. INSTALL PLUMBING AND PIPING HIGH POINTS AS TIGHT AS POSSIBLE TO THE
ITEM THAT SHOULD REMAIN IS PIPING IN (E) MASONRY WALLS AND BELOW BUILDING STRUCTURE TO ALLOW PROPER PITCH AND MAXIMIZE CEILING
LAV LAVATORY PRESSURE GAUGE W/ GAUGE COCK
(E) FLOOR SLABS. REMAINING PIPING IN THESE LOCATIONS SHALL BE HEIGHT.
PATCHED OVER AND NOT VISIBLE NOR REUSABLE. NO PIPING SHALL
LWT LEAVING WATER TEMPERATURE EXPANSION JOINT REMAIN IN CEILING SPACES. L. PROVIDE AIR VENTS AT PIPING HIGH POINTS AND DRAINS AT LOW POINTS IN
MC MECHANICAL CONTRACTOR MAINS.
FLEXIBLE PIPE CONNECTION 12. THE PLUMBING CONTRACTOR SHALL REFER TO ALL SECTIONS AND
(N) NEW DRAWINGS OF THE CONTRACT DOCUMENTS FOR DEMOLITION OF PLUMBING M. ALL PIPING SHALL BE INSTALLED IN SUCH A MANNER AS TO AVOID
PIPING RISER SYSTEM COMPONENTS INCLUDED IN THE PLUMBING CONTRACT. NOTIFY THE FREEZING. ALL WATER PIPING SHALL BE INSTALLED BELOW ATTIC
ARCHITECT OF ALL DISCREPANCIES OR QUESTIONS PERTAINING TO EXTENT INSULATION AND NO PIPING SHALL BE INSTALLED WITHIN EXTERIOR WALLS.
NIC NOT IN CONTRACT
PIPE DROP OF WORK PRIOR TO BIDDING. THE INSTALLATION OF PLUMBING SYSTEMS SHALL IN NO WAY CRUSH OR
COMPROMISE BUILDING INSULATION AND ALL BELOWGRADE WATER PIPING
NTS NOT TO SCALE PIPE ANCHOR SHALL BE INSTALLED NO LESS THAN 6" BELOW FROST DEPTH.
13. PLUMBING CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR
N.O. NORMALLY OPEN DISTRIBUTION OF RESPONSIBILITY AMONGST CONTRACTORS FOR
PIPE GUIDE SPECIFIC PORTIONS OF CUTTING AND PATCHING WORK. PLUMBING
CONTRACTOR SHALL COORDINATE ALL CUTTING AND PATCHING WORK N. AT THE COMPLETION OF THE WORK AND PRIOR TO THE FINAL
N.C. NORMALLY CLOSED
PIPE SLEEVE WITH ALL OTHER CONTRACTORS INVOLVED AS DEFINED IN THE ACCEPTANCE, ALL PARTS OF THE WORK SHALL BE THOROUGHLY CLEANED.
SPECIFICATIONS.
PC PLUMBING CONTRACTOR
UNION
PRV PRESSURE REDUCING VALVE O. ALL PIPING SHALL BE CONCEALED IN WALLS AND BEHIND FIXED
FURNISHINGS UNLESS OTHERWISE INDICATED. EXPOSED PIPING IN FINISHED
PIPE CAP AREAS SHALL BE CHROME PLATED WITH A CHROME PLATED ESCUTCHEON
RD ROOF DRAIN
AT EACH FINISHED ENTRY/EXIT.
DIRECTION OF FLOW
RPBFP REDUCED PRESSURE BACKFLOW PREVENTER
P. ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND BE
SLOPE PIPE DOWN IN DIRECTION OF ARROW SUPPORTED AND ANCHORED AS REQUIRED TO FACILITATE EXPANSION AND
RWC RAIN WATER CONDUCTOR
CONTRACTION. ALL PIPING SHALL BE CONCEALED EXCEPT IN UNFINISHED
CONCRETE THRUST BLOCK SPACES. INSTALL AS REQUIRED TO MEET ALL CONSTRUCTION CONDITIONS
SOG SAND/OIL/GAS WASTE AND TO ALLOW FOR INSTALLATION OF OTHER WORK INCLUDING DUCTS
SIGHT GLASS AND ELECTRICAL CONDUIT. ALL PIPING EXPOSED TO VIEW SHALL BE
SS SERVICE SINK ROUTED AS HIGH AS POSSIBLE AND TO THE UNDERSIDE OF STRUCTURE.
CONCENTRIC REDUCER
ST STORM SEWER
ECCENTRIC REDUCER Q. ELEVATIONS LISTED FOR ALL PLUMBING SYSTEM PIPING IN THE CONTRACT
TW TEMPERED WATER (TEPID WATER)
DOCUMENTS ARE TO BE VERIFIED PRIOR TO CONSTRUCTION AGAINST
CHECK VALVE W/ BALL DRIP EXISTING CONDITIONS, UTILITIES AND NEW CONSTRUCTION. ALL SLOPED
TYP. TYPICAL PLUMBING SYSTEMS SHALL HAVE RIGHT OF WAY OVER ALL OTHER
DOWNSPOUT NOZZLE
? REVISION DESIGNATION
IM BUILDING ADDITION AND RENOVATION
?? KEY NOTE DESIGNATION PHASE I
University Park, Pennsylvania 16802
?
ENLARGED PLAN DESIGNATION for
???
THE PENNSYLVANIA
C:\Users\bgoss\Documents\2010159_MEP_bgoss.rvt
STATE UNIVERSITY
NORTH ARROW
PSU# 09 12181.00 PSU Building # 0804 000
?
WATER RISER DIAGRAM REFERENCE
??? 300 Spruce Street Phone: (614) 461 4664
Suite 300 Fax: (614) 280 8881
PRINT DATE: 11/8/2012 4:41:19 PM
Notes
95% Construction Documents 11/9/2012
KEY NOTES
1 SEE 1/P111 FOR PLUMBING WORK IN THIS AREA.
Keyplan
1 1
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
1 OVERALL BASEMENT LEVEL PLUMBING PLAN DRAWN BY: CHECKED BY: APPROVED BY:
P110 SCALE: 1/16" = 1' 0" FINISHED FLOOR = 1163.0' N.J.B. B.C.S. B.C.S. 11279.00
Plumbing Plan
95% Construction Documents 11/9/2012
KEY NOTES
1 6" ST UP TO LEVEL ABOVE.
2 (N) 2" W DOWN IN (E) CHASE TO BFF. SAWCUT (E) FLOOR AND PATCH TO
MATCH EXISTING TO ACCOMMODATE NEW WASTE ROUTING.
7 CONNECT (N) 4" W TO (E) 6" W BFF AND (N) 3" CW TO (E) 3" CW CAPPED
ABOVE CEILING. CAP (E) 3" NP FOR FUTURE USE.
8 CONNECT (N) 3/4" HWC TO (E) 3/4" HWC ABOVE CEILING. REDUCE NEW
3/4" HWC PIPING TO 1/2" AND PROVIDE (N) BALANCING VALVE IN
DEDUCT ALTERNATE #6. SET TO 1 GPM.
22 CONNECT (N) 1" CW AND (N) 3/4" HW TO (E) CW AND (E) HW CAPPED
ABOVE CEILING. CONNECT (N) 2" V TO (E) 3" V ABOVE CEILING. EXTEND
(N) 1/2" CW AND (N) 1/2" HW FROM NEW TAPS DOWN IN WALL TO (E)
SHOWER VALVE.
23 2" W FROM LEVEL ABOVE. COMBINE WITH 4" W IN WALL AND OFFSET TO
BFF. CONNECT TO (E) WASTE MAIN BFF. SAWCUT (E) FLOOR AND PATCH
TO MATCH EXISTING AS NECESSARY.
22
2" SH 1
1" 1/2"
WC 1
21
L 1 3/4"
1/2" 7 20 19
17
Keyplan
2"
2"
1 1/2" 5 2
5
16
Storage 2"
1/2"
4" 5 18
NP
002 3"
3" (E) BASEMENT
2"
Lower Level Hall
Lower Level Hall 3/4" East
Storage West
F002
3 003 F001 2 BASEMENT
1
ST 1 1/4" ST ST ST
3/4"
8"
Lower Level Hall 10"
6" South
8"
ST
EWC 2 Q002 2"
NP
4
APArchitects, LLC Reese Engineering
3
Associate Architect MEP Engineer
P501 Elevator The EDGE Group CD+M Lighting Design Group
Telecom Equipment 10 Landscape Architect Lighting Designer
ST
ST
University Park, Pennsylvania 16802
for
3/4"
THE PENNSYLVANIA
C:\Users\bgoss\Documents\2010159_MEP_bgoss.rvt
4"
2" Mechanical 3/4"
4" 4" STATE UNIVERSITY
M004 PSU# 09 12181.00 PSU Building # 0804 000
4
2"
14
P111
FILE INFO:
22 (N) 2" W AND (N) 1/2" CW UP FROM LEVEL BELOW TO WATER COOLER.
EXTEND (N) 2" V UP IN CHASE TO LEVEL ABOVE.
23 (N) 2" W AND (N) 1/2" CW UP IN CHASE FROM LEVEL BELO TO LEVEL
ABOVE.
A B
Stair 3
Z107 Equipment
Checkout
121
21 EWC 1
Stair 8
3/4" 5 15 Daylockers
Z109 Men's Restroom
203G
R128 8 EWC 2 EWC 2
SC&1 7
3/4" 3/4"
4" Storage Janitor
6 Elevator
125A J127
2" Electric V101 Keyplan
16 16 14
Storage 16 Storage 1/2" Vending
P102
124A 4" 123 Women's 2
102
4"
Storage Restroom Office
10
17 126 R127 101A
Workroom
17
101M Conference Room
Office
101L A
11 101B
4" 2
Offices
P501
101
RD
Multipurpose Multipurpose
Room Room
RD
124 125
4" 4"
20 IB 1 S 1 Director # Date Change Description
RD
3/4" 1/2" Office 101K
4 4
Office 101J
4 Office 19 Office
Break Room 101H
Office 101F 101G RD
9 101C 19 Office
101E 4"
101D RD
STATE UNIVERSITY
PSU# 09#12181.00 PSU Building # 0804#000
1 MAIN LEVEL PLUMBING PLAN AREA A DRAWN BY: CHECKED BY: APPROVED BY:
P121 SCALE: 1/8" = 1'&0" N.J.B. B.C.S. B.C.S. 11279.00
Area A
95% Construction Documents 11/9/2012
GENERAL NOTES (THIS SHEET ONLY)
KEY NOTES
1 6" ST DOWN IN CHASE FROM LEVEL ABOVE TO BFF.
5 (N) 2" W AND (N) 1/2" CW FROM BELOW AND UP IN CHASE TO LEVEL
ABOVE.
A B
Stair 1
Z103
Stair 2
Z104
Lounge
106
EWC 1 6
Daylockers
203F
5
1
Main Level Hall
Q101
Stair 4 Stair 5
Keyplan
9 4 DSN&1
PD 1 Z101 3/4" Z102
2"
OD
3 SC&1
2 SC&1 3/4" A/V/ Storage
8"
PD 1
Fitness Office 103B
103A
B
EWC 1 EWC 2
Vestibule
Fitness 7 Corridor
Lobby F101
103 Q105
F102
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
1 MAIN LEVEL PLUMBING PLAN AREA B DRAWN BY: CHECKED BY: APPROVED BY:
P122 SCALE: 1/8" = 1'&0" N.J.B. B.C.S. B.C.S. 11279.00
Area B
95% Construction Documents 11/9/2012
KEY NOTES
1 4" RD UP TO ROOF DRAIN ABOVE.
A B
Stair 3
Z207
Stair 7
Z208
10
Mezzanine Hall
Landing West Stair EWC 2
C203
3" VTR 9
8" 6"
RD RD RD RD
7
1 4 1 1 4 3 HB(2 4" 1 6" 1 1 4" 4" 1 1"
1"
Mezzanine Hall
Landing Elevator
OD
201
8"
4" FD 2
(E) 2"
12 12
3" VTR
13 3" VTR
11
Workroom
A
203A Fitness
11
203
5 3" VTR
RD 1 RD 1 RD 1
TD 1 TD 1
TD 1
Landscape
OD 2
43
APArchitects, LLC Reese Engineering
Associate Architect MEP Engineer
The EDGE Group CD+M Lighting Design Group
Landscape Architect Lighting Designer
Sweetland Engineering Code Consultants, Inc
A B Civil Engineer Code Consultant
KORDA Engineering Rider Levett Bucknall
Structural Engineer Cost Estimator
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
1 MEZZANINE LEVEL PLUMBING PLAN AREA A DRAWN BY: CHECKED BY: APPROVED BY:
P131 SCALE: 1/8" = 1'(0" N.J.B. B.C.S. B.C.S. 11279.00
Plan Area A
95% Construction Documents 11/9/2012
GENERAL NOTES
A. REFER TO COLD WATER ISOMETRIC DIAGRAM 5/P601 FOR FITNESS (203)
WATER COOLER PIPING.
B. REFER TO WASTE AND VENT ISOMETRIC DIAGRAM 6/P601 FOR FITNESS (203)
WATER COOLER PIPING.
KEY NOTES
1 4" RD UP TO ROOF DRAIN ABOVE.
3 6" ST, 3/4" CW AND 2" V TO LEVEL BELOW. EXTEND 2" V UP TO 3"
VENT THROUGH ROOF.
A B
Mezzanine Hall
Landing East Stair
201
5 EWC 2
1"
RD RD RD RD
8"
1 1" 1 6" 1 6" 1" 1 1 6" 1
6 2
OD
4
Stair 5
3" VTR
EWC 1 Z202
Keyplan
3
Telecom
203B
Fitness
203 Fitness
203
# Date Change Description
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
1 MEZZANINE LEVEL PLUMBING PLAN AREA B DRAWN BY: CHECKED BY: APPROVED BY:
P132 SCALE: 1/8" = 1' 0" N.J.B. B.C.S. B.C.S. 11279.00
Plan Area B
95% Construction Documents 11/9/2012
KEY NOTES
1 (E) 3" FLOOR DRAIN TO REMAIN.
2 CONNECT (N) 3" W TO (E) 3" W BELOW PENTHOUSE SLAB ABOVE CEILING
BELOW.
3"FD 2
3"FD 2
1
(E) 3"
3" CO
3"FD 2
CO
3" (E) 3"
3" 3"
2 1 2 Keyplan
3"FD 2
3"FD 2
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
1 MECHANICAL PENTHOUSE LEVEL PLUMBING PLAN DRAWN BY: CHECKED BY: APPROVED BY:
P140 SCALE: 1/16" = 1'$0" N.J.B. B.C.S. B.C.S. 11279.00
Plumbing Plan
95% Construction Documents 11/9/2012
GENERAL NOTES (THIS SHEET ONLY)
A. ALL ROOF DRAINS AND VENTS THROUGH ROOF SHOWN WITHOUT LABELS ARE EXISTING TO REMAIN.
Keyplan
OD 1 8" 4" RD 1 4" RD 1 4" RD 1 RD 1 4" 4" RD 1 4" RD 1 4" RD 1 4" RD 1 4" RD 1 4" RD 1 4" RD 1 4" RD 1 RD 1 4" 8" OD 1
3" VTR
APArchitects, LLC Reese Engineering
Associate Architect MEP Engineer
3" VTR The EDGE Group CD+M Lighting Design Group
3" VTR
Landscape Architect Lighting Designer
Sweetland Engineering Code Consultants, Inc
Civil Engineer Code Consultant
KORDA Engineering Rider Levett Bucknall
3" VTR Structural Engineer Cost Estimator
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
P150
FILE INFO:
3 1" CW, 1" HW AND 4" W UP FROM LEVEL BELOW AND OFFSET IN CHASE.
EXTEND 1" CW AND 3/4" HW UP IN CHASE TO ABOVE CEILING.
5 2" V AND 3" V COMBINED INTO SINGLE 3" V IN CHASE AND EXTENDED
UP TO LEVEL ABOVE.
1 7 4" W UP TO LEVEL
3"
8 2" V UP IN CHASE TO ABOVE CEILING.
2"
3" 9 4" W TO BFF.
L 1 2" 1" 10 4" REUSE WATER EXTENDED INTO BUILDING, CAPPED AND VALVED FOR
FUTURE USE. SLEEVE THROUGH FOUNDATION WALL. REFER TO CIVIL
1"
HB 1 2
Women's DOCUMENTS FOR CONTINUATION.
Restroom
NP
11 2" W UP TO LEVEL ABOVE.
L 1 R006
12 1 1/4" CW, 1" HW AND 4" W UP TO LEVEL ABOVE.
6
13 2 1/2" NP UP TO LEVEL ABOVE.
2" 3" 2"
4
14 6" COMBINATION DOMESTIC WATER/FIRE SERVICE EXTENDED TO 5' 0"
FROM BUILDING EXCAVATION LINE. SLEEVE THROUGH FOUNDATION
ST WALL PER STRUCTURAL ENGINEER'S REQUIREMENTS. CONNECT TO SITE
WC 1 WATER SERVICE EXTENDED UP TO BUILDING IN SITE UTILITIES PORTION
8" OF WORK.
3" FD 1
NP
15 4" FIRE SERVICE DOUBLE CHECK BACKFLOW PREVENTER MOUNTED AT
24" AFF.
4" 2" WC 1
CO 16 2" HW(140), 2" CW AND 3/4" HWC DOWN TO WATER HEATERS. REFER
11 19 HB 2 TO DETAIL 1/P801. DELETE IN DEDUCT ALTERNATE #6 AND ALL
ASSOCIATED PIPING BACK TO MAINS. RE: DETAIL 1/P801.
1/2" 4" 3"
17 2" HW(140), 2" CW AND 3/4" HWC DOWN TO MIXING VALVES PIPED IN
WC 1
PARALLEL. DELETE IN DEDUCT ALTERNATE #6 AND ALL ASSOCIATED
2" 3/4" 3/4"
PIPING BACK TO MAINS.
1"
NP
1 1/4" 1 1/4" 3" FD 1
4" 1 1/4" 18 3/4" HWC TO AND FROM CIRC PUMPS PIPED IN PARALLEL. DELETE IN
DEDUCT ALTERNATE #6 AND ALL ASSOCIATED PIPING BACK TO MAINS.
WC 1 RE: DETAIL 2/P801.
2"
DHWP 1
18
DHWP 2 19 3/4" CW DOWN TO HOSE BIBB MOUNTED AT 36" AFF.
NP
2" 1"
3"
3" 20 (2) 4" DOUBLE CHECK BACKFLOW PREVENTERS (BFP DC 1&2;
4" FD 2 WC 1 CONBRACO 45 600 SERIES) PIPED SYMETRICALLY IN PARALLEL WITH
4" UPPER BACKFLOW PREVENTER AT 60" AFF. MAX. RE: DETAIL 4/P801.
CO 12 2"
4" 21 WATER SERVICE METER PROVIDED BY OWNER MOUNTED AT 24" AFF.
17 MV 1 WC 1 PROVIDE WITH METER STRAINER, ISOLATION VALVES AND BYPASS. RE:
4" FD 2 DETAIL 4/P801.
3/4"
140
22 1" CW DOWN ON WALL TO MAKE UP WATER ASSEMBLY (BFP RP 1;
4"
3" 2" CONBRACO 40 200). RE: DETAIL 3/P801.
2" 3" FD 1
25 4" 23 2" FORCED DISCHARGE AND 2" V UP ON WALL FROM BFF.
3"
1" 3/4" 24 SUMP PIT FOR CONNECTION TO UNDERSLAB GROUNDWATER DRAINAGE.
COORDINATE CONNECTION(S) IN THE FIELD WITH G.C.
WC 1 RE: DETAIL 6/P801.
4" FD 2 4" FD 2 2"
WCO
13 25 DOMESTIC HOT WATER SYSTEM EXPANSION TANK. RE: DETAIL 1/P801.
DELETE IN ALTERNATE #6.
4" SA
3"
26 CAPPED 3" NP FOR FUTURE CONNECTION TO CAMPUS RE USE LINE.
4"
27 2" V UP ON WALL FROM BFF.
16 DWH 1&2
NOTE: REFER TO DOMESTIC WATER ISOMETRIC DIAGRAM 1/P601 AND WASTE AND VENT
4" FD 2 ISOMETRIC DIAGRAM 2/P601.
4" FD 2 4" FD 2
4" 26
4" 2"
1"
2" 4"
HB 2 19
2" 2"
20 SP 2&3 24
4" FD 2
4" FD 2 22
4"
Women's
4" Mechanical
4" FD 2 4" 4" FD 2 Restroom Keyplan
M004 Janitor Men's Restroom
2" R127
R128
J127 3/4"
3
21 2" 4"
4"
7
4" FD 2 9 L 1
4" L 1
4" 1/2"
2" 2"
4" FD 2 HB 1 2 2 HB 1
4" SS 1
10 F
2"
2" L 1
4" L 1
SA 4
15 WC 1
2" L 1
2" 8 U 1
4 NP
2" 3" FD 1
2"
WC 1
14 27 WC 1
2" 3"
6" 2" U 1
NP
4"
3" FD 1 3" FD 1
2" # Date Change Description
4" WC 1 WC 1 2"
U 1
3"
NP
4" WC 1
WC 1
WC 1
3"
NP
4"
WC 1
3 ENLARGED BASEMENT LEVEL MECHANICAL ROOM PLUMBING PLAN 2"
3" FD 1
1/2" 1"
2" 3" FD 1
APArchitects, LLC Reese Engineering
P501 SCALE: 1/4" = 1' 0" WC 1 2" Associate Architect MEP Engineer
The EDGE Group CD+M Lighting Design Group
5 Landscape Architect Lighting Designer
3" FD 1 Sweetland Engineering Code Consultants, Inc
WC 1 WC 1
2" Civil Engineer Code Consultant
SA
3" 1" KORDA Engineering Rider Levett Bucknall
1" Structural Engineer Cost Estimator
WC 1 WCO
4"
WC 1 2" 4" IM BUILDING ADDITION AND RENOVATION
WCO
SA PHASE I
University Park, Pennsylvania 16802
for
THE PENNSYLVANIA
C:\Users\bgoss\Documents\2010159_MEP_bgoss.rvt
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
NOTE: REFER TO DOMESTIC WATER ISOMETRIC DIAGRAM 3/P601 AND WASTE AND VENT
ISOMETRIC DIAGRAM 4/P601.
2 ENLARGED MAIN LEVEL BATHROOM GROUP PLAN 300 Spruce Street Phone: (614) 461 4664
P501 SCALE: 1/4" = 1' 0"
Suite 300 Fax: (614) 280 8881
PRINT DATE: 11/8/2012 5:04:15 PM
P501
FILE INFO:
1/2"
1" SA 1"
IB 1
2"
2"
S 1 WC 1
2" 1/2"
WC 1
1"
SA 3/4"
2"
1"
1/2" WC 1
SA WC 1
1" SA
1"
WC 1 3/4" 1" SS 1
WC 1 2"
2" WC 1
2" 1/2"
WC 1 1"
WC 1 3/4" WC 1
NP
3/4" 3/4"
U 1 WC 1 L 1 WC 1
EWC 1 3/4" 2" NP
WC 1
U 1 WC 1
2" 3/4" WC 1
1/2"
3/4"
WC 1
L 1
L 1
HB 1
HB 1
3/4" L 1
1 1/4"
EWC 2 1"
EWC 1
3" VTR
2"
4" 2"
2" WCO
WC 1 2"
S 1
2" WC 1
3" FD 1 2" 4"
3" 2"
2"
EWC 1 3" FD 1 WC 1
WC 1
2" 3" 3" 3" FD 1 2"
3" 4"
3" 3"
WC 1 3" SS 1
2"
2" 3" 2"
2"
4"
WCO
2" WC 1 4" 4"
3" FD 1 WCO 2"
4" 3" WC 1
2" 4" 3"
L 1 3"
WC 1 2" WC 1
WC 1 3" FD 1 WC 1 2"
U 1 2"
WC 1
3" FD 1 L 1 2"
WC 1
EWC 2
4"
3" FD 1 WC 1
Keyplan
EWC 1 4" WC 1
3" FD 1
2" 4"
3" FD 1 U 1
3"
L 1 L 1 2"
4"
2"
3"
3"
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
P601
FILE INFO:
SINK SCHEDULE
ADA
PLAN CODE FIXTURE MANUFACTURER MODEL COMPLIANT CONSTRUCTION GAUGE HOLE DRILLINGS SIZE FAUCET DRAIN NOTES
S 1 SINK ELKAY LRAD 2222 Yes 302 ST/ST 18 3 @ 4" CENTERS 25" x 22" x 6 1/2" KOHLER K 15172 LK 35 1
SS 1 MOP SINK FIAT TSB 3010 No TERRAZZO 24" x 24" x 12" FIAT 830 AA 1453 BB 2, 3
1. PROVIDE 1/2" x 3/8" WHEEL HANDLE ANGLE VALVE VALVES WITH 20" RISERS, 1 1/2" CHROME BRASS TRAPS AND ONE PIECE CHROME ESCUTCHEONS.
2. PROVIDE WITH CHECK VALVES ON BOTH SUPPLIES. PROVIDE WITH 832 AA HOSE AND BRACKET AND 889 CC MOP HANGER.
3. PROVIDE AND INSTALL CHICAGO 952 HOSE BIBB ADJACENT TO FAUCET FOR CONNECTION TO SOAP DISPENSER.
1. REFER TO ARCHITECTURAL DRAWINGS FOR ADA COMPLIANT LOCATIONS AND MOUNTING HEIGHTS.
LAVATORY SCHEDULE
ADA
PLAN CODE FIXTURE MANUFACTURER MODEL COMPLIANT COLOR HOLE DRILLINGS SIZE FAUCET NOTES
L 1 UNDERMOUNT ELKAY ELU1511 Yes STAINLESS STEEL CENTERSET 17" x 13" SLOAN EAF 275 1, 2, 3, 4
1. PROVIDE 1/2" x 3/8" WHEEL HANDLE ANGLE VALVE VALVES WITH 12" RISERS, 1 1/4" CHROME BRASS TRAPS; ONE PIECE CHROME ESCUTCHEONS AND 0.5 GPM
AERATOR.
2. PROVIDE WITH TRUEBRO LAV SHIELD.
3. PROVIDE ELKAY LK 174 GRID STRAINER WITH OFFSET TAIILPIECE.
4. PROVIDE WITH SLOAN #MIX 135 A MIXING VALVE PROVIDED WITH LAVATORY AND LOCATED BEHIND SHIELD.
URINAL SCHEDULE
ADA FLOOR TO RIM
PLAN CODE FIXTURE MANUFACTURER MODEL COMPLIANT COLOR HEIGHT CARRIER NOTES
U 1 FLUSH VALVE KOHLER K 4904 ET Yes WHITE 1' 5" JOSAM 17560 UR 10 1
SHOWER SCHEDULE
ADA SHOWER HEAD
PLAN CODE FIXTURE MANUFACTURER MODEL COMPLIANT COLOR SIZE AND VALVE NOTES
DRAIN
4" FLOOR 4" 2" STATE UNIVERSITY
SINK
ELECTRIC 1/2" 2" 2" PSU# 09 12181.00 PSU Building # 0804 000
WATER
COOLER
F.V. WATER 1" 4" 2"
CLOSET
ICE MAKER 1/2"
BOX
300 Spruce Street Phone: (614) 461 4664
LAVATORY 1/2" 1/2"
Suite 300 Fax: (614) 280 8881
PRINT DATE: 11/8/2012 5:08:02 PM
P701
FILE INFO:
Plumbing Schedules
95% Construction Documents 11/9/2012
3/4"
120°C
140°
2" 2"
2"
EQ EQ
3/4"
THERMOMETER (TYP.)
EQ EQ
WATER HEATER
UNION
D
D D
EXTEND TO ADJACENT
FLOOR DRAIN
UNION (TYP.)
Keyplan
ALARM
SYSTEM
G.F.C.I. TO GRAVITY
DRAIN SYSTEM
SUMP
PUMP
STATE UNIVERSITY
PSU# 09 12181.00 PSU Building # 0804 000
24"
24"
3 MAKE UP WATER DETAIL DRAWN BY:
N.J.B.
CHECKED BY:
B.C.S.
APPROVED BY:
B.C.S. 11279.00
P801 SCALE: NONE