CRANE STANDARDS
POWER LINES
CONSTRUCTION CRANES 
SUBDIVISION CC
POWER LINES

1926.1407 – Assembly/Disassembly – same 


requirements as 1408

1926.1408 – Equipment Operations

1926.1409 – Over 350 KV – simply start at 50 


feet instead of 20

1926.1410 – Closer than Table A Distances
Step 1 ‐ IDENTIFY WORK ZONE
STEP 2
YES Could you get within 20 feet  NO
of power line?

Option 1
Deenergize &  No further 
Ground action
Encroachment
Option #2 Preventive Measures
20‐foot (Equipment Operations)
Clearance
•Planning Meeting
Option #3 •If tag lines used – must be non‐
Ask Utility for  conductive
Voltage & Use  •Elevated Warning Lines, barricade or line 
Table A of signs
(with minimum  •PLUS (Choose One)
clearance  •Proximity Alarm, spotter, warning device, 
distance) range limiter, or insulating link
TABLE A – MINIMUM CLEARANCE DISTANCES
Voltage (nominal, kV  Minimum clearance distance
alternating current) (feet)
Up to 50 10
Over 50 to 200 15
Over 200 to 350 20
Over 350 to 500 25
Over 500 to 750 35
Over 750 to 1000 45
Over 1000 (as established by the power 
line owner/operator or 
registered professional 
engineer who is a qualified 
person with respect to 
electrical power transmission 
and distribution)
Intentionally Working Closer Than Table A  Zone

Must Show ALL of the following are required
•Staying outside zone is 
infeasible 1. Power line owner – sets minimum 
•Infeasible to deenergize  approach distance
and ground 2. Planning meeting – minimum procedures
• Dedicated spotter
• Elevated warning line or barricade
• Insulated link/device
• Nonconductive rigging
• Range limiter (if equipped)
• Nonconductive tag line (if used)
• Barricades – 10 feet from 
equipment
• Limited access to essential workers
• Prohibit non‐operator workers from 
touching above insulated link
• Properly ground crane
• Deactivate automatic re‐energizer
• Insulating line covers installed