Professional Documents
Culture Documents
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
A. SCOPE OR REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Others
Repaired Repainted Replaced
(Brief Description)
1.Roofs In good Condition
2.Ceilings In good Condition
3.Wall In good Condition
4.Windows and Doors In Good Condition
5.Chairs/Desks, Tables and Blackboards In Good Condition
6.Comfort Rooms Ongoing Repair
7.Leaking Pipes Ongoing Reapir
8.School Grounds/Landscaping -Did Weeding of School
Grounds, Gardening and
Making of Canals
9.School signs -Posting of Covid 19
Awareness and Health
Protocol Posters
-Painting of floor markings
for physical distancing and
routing traffic
10. Alternative gates/ backdoor gates -Posting of Traffic Flow
Signages separating
Entrance from Exit
11.Electric fans
12.Lightings
13. Triage Area Setting-Up of Triage Area
at the School Entrance
14. Hand Wash Facility Area Construction of
Handwashing Facilty at the
School Entrance
15. Ensuring Availability of Learning Resources Developed Self-Learning
Modules
16. Ensuring Availability of Covid 19 PPE’s Initiated Networking with
Stakeholders in the
provision of PPE’s
BE Form 7
TOTAL 27,000.00
BE Form 7
C. VOLUNTEERS SERVICE
Number of Volunteers
Name of individuals/
Type of Volunteer
organization
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 TOTAL
Labor Parents 15 30 30 19 30 30 154
Labor BLGU 0 2 5 5 0 0 12
Labor Alumni 5 0 3 0 0 0 8
Labor NGO 0 0 0 10 0 0 10
Advocacy Senior Citizens/IP Elders 10 0 0 0 0 0 10
Governance MES Teachers Association 8 8 8 8 8 8 48
TOTAL 38 40 46 42 38 38 242
BE Form 7
BE Form 7
Networking with partners by the PTA Partners (Community, NGO, Alumni) -Provision of PPE (Facemasks,
through the “Negay Ko, Iyapon Ko June 6 – December 1, 2020 faceshields, gloves, hand sanitizers,
Contest” to ensure availability of liquid soap, alcohol, thermal scanner)
supplies in preventing the spread of
Coronovirus disease.
BE Form 7
F. LESSONS LEARNED
- Without the collaboration of School Stakeholders, the DepEd Learning Continuity Plan cannot be realized. The “Bayanihan System” in the school otherwise known as
the Brigada Eskwela gave hope to every mind that Education must go on even in this time of crisis.
- Maintain and strengthen the good collaboration of stakeholders to address issues and concerns during the school year.
Pictorials
NAME OF BEFORE DURING AFTER
ACTIVITY/
PROJECT
Physical
Cleaning
Construction
of Hand
Washing
Facility
Installation
of Triage
Advocacy &
Campaign
Networking