Professional Documents
Culture Documents
1. “As an engineering contractor, I want to build an on-campus house for incoming international students so that they can have a
place to stay when arriving in the country.”
2. “As a project team member, I want to know all my assignments and tasks in advance so that I can prepare and prepare my time
properly”
3. “As a team member, I want to be able to know my colleagues' progress, so I can better report our achievements and failures.”
4. “As an HR manager I need to view workers' status so that I can handle and oversee their application process during the hiring
stages.
5. “As a facilities manager , I will Report the project ’s financial condition, operations, contingencies, and opportunities
accurately and completely, So I can help my company and the school to get the details of the project's progress.
6. As a Business Analyst, I will be responsible for identifying and solving problems affecting the project solution, so I can
make recommendations for improvement.
7. As a Site Supervision Team, I will oversee the construction activities that occur on the worksite, so I can Maintain
healthy and safe work environment by enforcing procedures and standards and complying with legal regulations
8. As a Finance Manager, I will Report the project ’s financial condition, operations, contingencies, and opportunities
accurately and completely, So I can help my company and the school to get the details of the project's progress.
Please see below a sample of other students then you will get idea what is acceptance criteria
Acceptance Criteria
1. Have materials, expertise and support available that can allow the building of the on-campus house.
2. Have a centralized calendar that tracks, deadlines and submissions.
3. Have a centralized system through which access to the colleagues’ progress is viewable and communication with them is possible.
4. Have an HR or people management software present that can allow applications to be processed smoothly.
5. Access to proper reporting software is allowed so reporting can be done.
6. Be provided the ability to observe and examine business processes to identify inefficiencies.
7. Hard hats, vests and other equipment is made mandatory on the site.
8. Create and share financial statements and reports that will help people understand the financial health of the company.
9. Have a software or physical, board or book to document and plan out all my work.
10. Have a systems of regular meetings and constant feedback.
Sample of other project (You will just write last column for above role, action, and benefit
2 be able to sit down while watching I can remain comfortable during the entire
spectator Seating is installed at the field.
8 the game. game.
I can keep track of which team is winning or A scoreboard is installed on the field
2 be able to see game statistics
spectator losing the game, the number of outs a team so that it is visible to everyone at the
9 while watching the game.
has, and the number of innings played. game.
3 I have a place to park my vehicle when The existing parking lot and side
spectator be able to park my vehicle on site.
0 coming to the field to watch a game. street parking is in a useable state.
3 have a safe game watching I am protected from being hit by a stray Fencing, which meets specifications,
spectator
1 experience. baseball. is installed along the playing field.
3 I can enjoy refreshments while watching the A concessions stand/booth is
spectator be able to buy food and drink.
2 game. installed at the field.
3 be able to hear announcements I can say informed and have a pleasant Audio equipment is installed at the
spectator
3 and music during the game. experience while watching the game. field.
3 be able to see messages and I can say informed and have a pleasant Video monitors are installed at the
spectator
4 instant relays during the game. experience while watching the game. field or on the scoreboard.
3 have a way to purchase team A merchandise booth is installed at
spectator I can show support for the team.
5 merchandise. the field.
3 have a way to purchase game A ticket booth is installed at the
spectator I can purchase tickets before the game.
6 tickets. field.
I can view players' actions and resolve
3 have a way to view instant replays An automated camera/video
umpire conflicting or controversial judgments with
7 during the game recording system is installed.
coaches.
3 have the ability to park my vehicle I have a place to park my vehicle when The existing parking lot and side
umpire
8 on site. coming to the field to watch a game. street parking is in a useable state.