AUGUST VENTURES PVT LTD

CHECKLIST FOR ELECTRICAL POWER MANAGEMENT

PROJECT : Doc NO : AV.02.08.04


CLIENT : Date :
LOCATION ; Ref :
Acceptance criteria as per tender.
Sl No DESCRIPTION YES NO REMARKS
1 Is Maintenance schedule prepared for Power management

2 Use low voltage as far as possible

3 Do not lay electric cables on floor or ground

4 Keep away all solvents / liquids / water

5 Check electric installation periodically

6 Providing appropriate earthing to all electric installations

and equipment.

7 Check the insulation resistance periodically to all

installations (insulation test)

8 Check the earth resistance periodically (megger test)

9 Check thoroughly following tools and tackles before

starting work.

a) Lifting tools and tackles

b) Ropes

c) Shackles

d) U-clamps

e) Chain pulley blocks

f) Hooks

Inspected By (Name & Designation) Signature Date

Contractor

Client