The document is a checklist for electrical power management at a project site for August Ventures Pvt Ltd. It lists 9 acceptance criteria including developing a maintenance schedule, using low voltage, avoiding laying cables on the floor, keeping installations away from liquids, periodically checking installations, providing appropriate earthing, checking insulation resistance, checking earth resistance, and inspecting lifting tools and tackles before starting work. The checklist requires sign off from an inspector as well as the contractor and client.
The document is a checklist for electrical power management at a project site for August Ventures Pvt Ltd. It lists 9 acceptance criteria including developing a maintenance schedule, using low voltage, avoiding laying cables on the floor, keeping installations away from liquids, periodically checking installations, providing appropriate earthing, checking insulation resistance, checking earth resistance, and inspecting lifting tools and tackles before starting work. The checklist requires sign off from an inspector as well as the contractor and client.
The document is a checklist for electrical power management at a project site for August Ventures Pvt Ltd. It lists 9 acceptance criteria including developing a maintenance schedule, using low voltage, avoiding laying cables on the floor, keeping installations away from liquids, periodically checking installations, providing appropriate earthing, checking insulation resistance, checking earth resistance, and inspecting lifting tools and tackles before starting work. The checklist requires sign off from an inspector as well as the contractor and client.
CLIENT : Date : LOCATION ; Ref : Acceptance criteria as per tender. Sl No DESCRIPTION YES NO REMARKS 1 Is Maintenance schedule prepared for Power management
2 Use low voltage as far as possible
3 Do not lay electric cables on floor or ground
4 Keep away all solvents / liquids / water
5 Check electric installation periodically
6 Providing appropriate earthing to all electric installations
and equipment.
7 Check the insulation resistance periodically to all
installations (insulation test)
8 Check the earth resistance periodically (megger test)
9 Check thoroughly following tools and tackles before