You are on page 1of 38

Agenda

 Who We Are
 Standards and Regulations comparison
o HTM 02-01 versus NFPA
 Medical Gas Pipeline Systems
 Penlon Products
o Source Equipment
o Pipeline Equipment
o Architectural Systems
o Suction and Oxygen Therapy
 Our Services and Country visits
PMGS M&A history

30,000 employees in 150 Countries


Mining, air compressors, pneumatic tools
8 Billion Euro turnover in 2012

Medical Business Platform

150 employees in the UK 108 employees in the UK 350 employees in USA


British Standards British Standards American Standards
PMGS M&A history

MGI (Medical Gas Installations) 1975

Medical Products Limited

East Healthcare Ltd


1997
Drager MPL

Penlon Ltd
2001
Penlon Medical Gas Solutions

Atlas Copco (PMGS Division) 2011


Penlon Medical Gas Solutions

Our Core divisions:

18,000 ft3 factory, manufacturing


all of our UK product portfolio
Meet the Team

 Penlon Medical Gas Solutions employ 108 staff


 Revenue 2012 – 15 million GBP

General Manager

Technical UK Installations Service and Business


Operations Sales
Maintenance Controller

Quality and 2 Contract 20 National Finance


Manufacturing International
Regulatory Managers Engineers Administration

2 International
Product Design Procurement UK 24 Engineers
Engineers

Quality Control Sales


System Design
and Test Administration
Medical Gases
Introduction
 Penlon Medical Gas Solutions Core Competencies:

 Products
• Medical Gas Products (source equipment, pipeline equipment)
• Suction and Oxygen Therapy (flow meters, suction regulators,
medical rail)
• Architectural Products (pendants, bedhead / trunking units,
headwalls)Services
 Services
• Medical Gas Pipeline System Design
• Medical Gas Pipeline Installations
• Medical Gas Equipment Service
• Medical Gas Pipeline System Training
• Medical Gas QC Pharmacy Testing Services
• Medical Gas System Testing and Commissioning

…and a management team with over 100 years combined experience with
medical gas systems
Medical Gases
Introduction

 What is a gas system ?


“An MGPS is designed to provide a safe and effective method of delivering the
required medical gas from the source of supply through a pipeline system to the
patient via a terminal unit” - Extract from HTM022-01
 Our Primary Objective:
To provide medical gas systems of unparalleled reliability; securing patient
safety whilst maximising efficiency in operation and use.
 The four critical elements of Medical Gas System Safety as described in HTM
(Hospital Technical Memorandum)

Continuity – the gas supply must always be available at all times


Adequacy – the correct flow and pressure must always be delivered
Identity – only the correct gas must be administered
Quality – gases must meet defined purity specifications
Medical Gases
Quality Management
 Quality Management and Certification

o ISO 13485:2003 and ISO 9001:2008 Registered


o Required by manufacturers of Medical Devices in
the European Community (EC)
o Full quality assurance to ISO 13485:2003 enables
CE marking of equipment to the Medical Devices
Directive 93/42/EEC
 Exclusive Distribution

• Eire
• Bangladesh
• Jordan
• Syria
• Saudi Arabia
• Kuwait
• Tanzania
• India
• Pakistan
• Malaysia
• Vietnam
• United Arab Emirates
• Turkey
• Bahrain
• Portugal
• Malta
• Libya
• Lebanon
• Oman
• Libya
• Sri Lanka
• Iraq
• Yemen 90 hospitals in the last three years across
• Philippines the GCC countries
• Singapore
• Hong Kong
When medical gas supply integrity is critical...

…will they have confidence in your solution ???


Source Equipment
Product Line Overview

Product Line
Medical Air Systems
Medical Vacuum Systems
Anaesthetic Gas Scavenging Systems
Automatic Changeover Manifolds
Emergency Reserve Manifolds
LOX Tanks and Vaporisers
Liquid Oxygen Control Panel
Oxygen Generators
Design / technical department

 Full design of your medical gas system to suit your hospital layout
Source Equipment
Medical Air Plant

Production Storage Purification Control


Source Equipment
Noise Considerations

 Sound Pressure Levels


o Each increase of 10 dB doubles the apparent
loudness
o Oil-free rotary vane and claw are 60% louder than oil
lubricated rotary vane vacuum pumps
 Adding Sound Pressure Levels
o What is the worst case condition?
• You must add the total of all the duty pumps operating at
the same time
• Do not include the standby pumps
Pipeline Equipment
Product Line Overview

Product Line

Terminal Units - East SP and Zeus SP

Medical Gas Hose Assemblies

Line Ball Valves

Area Valve Service Units (AVSU) - East and Zeus

Area Valve Service Unit Modules - East and Zeus

Medical Gas Area Alarms – PA6, PAX-6

Medical Gas Central Alarms – PDX-15

Medical Gas Line Pressure Regulators

Degreased Medical Copper Tube and Fittings


Pipeline Equipment
Typical Zeus AVSU Module Installation
Architectural Systems
Product Line Overview

Product Line

Rigid and Retractable Pendants

Multi-Movement Pendants

Flexible Pendants

Articulated Medical Pendants

Overhead Medical Beam

Bedhead Medical Trunking


Architectural Systems
Ceiling Pendant Systems
Architectural Systems
Ceiling Pendant Systems
Extension Arm Service Arm
Lengths (mm) Lengths (mm)
No Extension 750
600 1000
800
1000
Suction & Oxygen Therapy
Product Line Overview

Product Lines

Flowmeters

Suction Regulators

Medical Rail

Cylinder Regulators

Bubble Humidifiers

Suction Jars

Electric Suction
Factory Controlled Conditions
Degreased Medical Gas Copper Pipes
Seamless Copper Tube
Classification BS EN 13348:2008

IDENTIFICATION:
All tube stamped with:
• Tube Size
Classification
• Kite marked
• EN1254
• Temper •BS 684
• Manufacturer •ASTM B280

• Date Code •HTM02-01


•C11
•EN 737-3

All bundles sealed with medical gas •BS 6834


tape, and marked ‘MEDICAL QUALITY’
Degreased Medical Gas Copper Pipes
Mansfield PFI - UK

On site we have installed 30Km of


copper tube installed on site.
Medical Gas Pipeline Systems
Copper Pipe Jointing

 Oxygen-free nitrogen purge must be A dirty joint indicates an


insufficient nitrogen purge
used to ensure no oxidation of the
internal pipe bore
 Copper to copper joints are silver
soldered (5% silver)
 Capillary action draws molten solder
into the joint
 Some joints are cut out after installation A clean joint showing no
oxidation of the inside of the
and cut open for inspection pipe

o Solder should penetrate 3 x wall thickness


or 3mm whichever is greater
o This is checked on 1 in 200 fittings
Medical Gas Pipeline Systems
Pipe and Fittings

 Medical gas copper tubes to BS EN 13348:2008


o Material Composition:
• Cu + Ag 99,90 %
• 0,015 P 0,040 %
 Pipes degreased to ensure hydrocarbons on surface <20 mg/m2
 Fittings degreased to ensure hydrocarbons on surface <100 mg/m2
 Solder - maximum cadmium content 0.025% by weight
 Copper tube is not to be cleaned on site, it arrives capped and
bagged prior to delivery.
 Testing kits ensure quality control throughout the project
History of HTM

Third source of supply and


flow changes eg CPAP HTM02-01 (2006)

Liquid storage and flow


changes HTM2022 (1997)

Manufactured product C11 Model Engineering


guidance Specification (1998)

First introduction of the HTM22 (1972)


standards

All documents whilst revised are improvements on trusted engineered


solutions which continue to function/operate no matter which is selected.
Your experienced Partner

Medical Gases HTM 02-01 training

In the classroom – BTEC approved

International training courses –


in your offices or hospital
.....or on site for
“hands-on” experience
Your experienced Partner

Medical Gases HTM 02-01 training

In the classroom – BTEC approved

International training courses –


in your offices or hospital
.....or on site for
“hands-on” experience
Global Trained workforce – AP & CP
HTM02-01
Requirements

QC – Quality
Controller

Authorised Person –
Specialist UK training
course (PMGS)

Competent Persons – On
site training

Installation
Room Design
Guidance

On site welding
training

On site service
training

Technical training

System Acceptance
The Penlon Medical Gas Proposition

Products and
Training

Distributor

Installation and Design


Service
 HTM Training in Libya
 AP guidance
 CP guidance
 QC guidance
We are the Heart of the Hospital

We begin in the basement and finish at the roof


Thank you

You might also like