5.1.

7 Cable Tray Load Calculation:


Cable Tray Width used 600 x 100
No of cable trays 6
Weight of each tray 80 kg/m

Distance of
Column Span Effectrive Load on Moment on STAAD Load From
Span Left Elevation Eccentricity
Mark Right Span Column Column Beam Beam Start
Node
m m m kN m kNm
GY GX
A1 5 11 10.5 (+)6.805 50.4 1.15 57.96 254 0.805
A2 11 10.5 10.75 (+)6.805 51.6 1.15 59.34 134 0.805
A3 10.5 8 9.25 (+)6.805 44.4 1.15 51.06 135 0.805
A4 8 2.15 6.15 (+)6.805 29.52 1.15 33.948 267 2.105
5.1.8 Miscellaneous Loads

5.1.8.1 Fan Load Calculation:

Weigth of each fan with motor 3 kN

No of Fans
Col Staad
(Effectively Distance FY Eccentricity MZ
Mark Member
transferring load)

A1 0.5 93 1 1.5 1.405 2.1075


B1 1.5 101 1 4.5 1.405 6.3225
C1 2 99 1 6 1.405 8.43
D1 2 97 1 6 1.405 8.43
E1 1.5 95 1 4.5 1.405 6.3225
F1 0.5 91 1 1.5 1.405 2.1075
A4 0.5 94 1 1.5 1.405 -2.1075
B4 1.5 102 1 4.5 1.405 -6.3225
C4 2 100 1 6 1.405 -8.43
D4 2 98 1 6 1.405 -8.43
E4 1.5 96 1 4.5 1.405 -6.3225
F4 0.5 92 1 1.5 1.405 -2.1075

5.1.8.2 CCW Tank Load (Applied under Dead Load)


Operating load 50 kN

For 0.7 / 0.3 loads being transferred to each column A4 and B4 respectively
Eccentricity 2.52 m
Vertical Load 35 kN 15 kN
Moment 88.2 kN-m 37.8 kN-m
Dead Laod
Vertical Load 10 kN 10 kN
Moment 25.2 kN-m 25.2 kN-m
Live Load
Eccentricity 1.9 m
Vertical Load 90.25 kN 90.25 kN
Moment 171.475 kN-m 171.475 kN-m

5.1.8.3 IPBD Support Loads(Applied under Dead Load)


Weight of three phase IPBD 420 kg/m
Tributary span of IPBD 5.5 m
Load on Beam 9.24 kN
Hence 10kN force has been applied on the IPBD support locations conservatively.
5.1.8.4 Moment Transferred on columns due to eccentricity of the Roof Leg Columns
(Applied in Dead Load, Live Load Roof and Live Load Floor Cases)

Force-Y STAAD Additional STAAD


Node L/C kN Node L/C Ecc. Moment, MZ Application
192 1 (Dead Load) 410.598 192 1 0.25 102.65 192 MZ 102.65
2 (Live Load Floor) 52.013 192 2 0.25 13.01 192 MZ 13.01
3 (Live Load Roof) 189.378 192 3 0.25 47.35 192 MZ 47.35
193 1 (Dead Load) 409.988 193 1 0.25 102.50 193 MZ 102.5
2 (Live Load Floor) 68.632 193 2 0.25 17.16 193 MZ 17.16
3 (Live Load Roof) 189.389 193 3 0.25 47.35 193 MZ 47.35
194 1 (Dead Load) 399.222 194 1 0.25 99.81 194 MZ 99.81
2 (Live Load Floor) 56.373 194 2 0.25 14.10 194 MZ 14.1
3 (Live Load Roof) 187.144 194 3 0.25 46.79 194 MZ 46.79
195 1 (Dead Load) 263.345 195 1 0.25 65.84 195 MZ 65.84
2 (Live Load Floor) 28.622 195 2 0.25 7.16 195 MZ 7.16
3 (Live Load Roof) 52.566 195 3 0.25 13.15 195 MZ 13.15
196 1 (Dead Load) 402.287 196 1 0.25 100.58 196 MZ 100.58
2 (Live Load Floor) 56.859 196 2 0.25 14.22 196 MZ 14.22
3 (Live Load Roof) 179.994 196 3 0.25 45.00 196 MZ 45
197 1 (Dead Load) 392.016 197 1 0.25 98.01 197 MZ 98.01
2 (Live Load Floor) 70.272 197 2 0.25 17.57 197 MZ 17.57
3 (Live Load Roof) 179.991 197 3 0.25 45.00 197 MZ 45
198 1 (Dead Load) 288.763 198 1 0.25 72.20 198 MZ 72.2
2 (Live Load Floor) 25.739 198 2 0.25 6.44 198 MZ 6.44
3 (Live Load Roof) 52.556 198 3 0.25 13.14 198 MZ 13.14
199 1 (Dead Load) 381.142 199 1 0.25 95.29 199 MZ 95.29
2 (Live Load Floor) 57.356 199 2 0.25 14.34 199 MZ 14.34
3 (Live Load Roof) 177.461 199 3 0.25 44.37 199 MZ 44.37
200 1 (Dead Load) 246.243 200 1 0.25 61.57 200 MZ 61.57
2 (Live Load Floor) 117.822 200 2 0.25 29.46 200 MZ 29.46
3 (Live Load Roof) 44.657 200 3 0.25 11.17 200 MZ 11.17
201 1 (Dead Load) 236.964 201 1 0.25 59.25 201 MZ 59.25
2 (Live Load Floor) 28.565 201 2 0.25 7.15 201 MZ 7.15
3 (Live Load Roof) 44.66 201 3 0.25 11.17 201 MZ 11.17
202 1 (Dead Load) 401.988 202 1 0.25 100.50 202 MZ 100.5
2 (Live Load Floor) 53.761 202 2 0.25 13.45 202 MZ 13.45
3 (Live Load Roof) 187.124 202 3 0.25 46.79 202 MZ 46.79
203 1 (Dead Load) 393.988 203 1 0.25 98.50 203 MZ 98.5
2 (Live Load Floor) 144.46 203 2 0.25 36.12 203 MZ 36.12
3 (Live Load Roof) 177.466 203 3 0.25 44.37 203 MZ 44.37